atrium details
TRANSCRIPT
Hollowcore Precast slab 150mm
Mastic sealant
cement particle board
Vapour barrier Continued Uptight to curtainwalling for achieving of thermal Continuity
Welded steel angle bracket
steel angle welded to underside of structuralbeam, carrying Hollowcore slab with a minimum bearing
2.5mm Mermolium floor finish
Structural Steel Universal I Beam
Strucutral reinforced screed
Atrium structure (RHS) to support curtain walling frame to engineersspecification
Bracket between curtain walling and RHS
Steel profile bolted to mullion profile, base plate and strucuture on shimsand isolatore
Extruded aluminium curtain walling box with flush non interputed finish externally ,joints to be weathered using a silicon sealent. Water tightnes of 600Pa (class 7)or better and wind load resistance of 2200 Pa or better than required
DPC and prefabricated powdered coated aluminium pressing with weep holessealents to manufactures specificationProfile with high densityInsulation
25mm Oak treated window frame
Soil Medium - allowng of grass andother plants
Drain cavity
Rigid PIR InsThermal Conductivity: 0.020w/M2k
Structural steel deck
Bracket between Curtain walling frame & RHS
Silicone filled flush finishcurtain walling joint
Bracket between Curtain walling frame & RHS
Atrium structure RHS to supportcurtain wall frame to engineers specifiction
25mm double glazed unit consisting of 8mmK glass internally,12mm argon filled& 6mm optiwhite glass externally with warm edge space bar. Glass held inplace using toggles which are placed into position/channels.
Extruded aluminium curtain walling box with flush non interputed finish externally ,joints to be weathered using a silicon sealent. Water tightnes of 600Pa (class 7)or better and wind load resistance of 2200 Pa or better than required
2350
2A118
Sim
3A118
Sim
3A118
Sim
5A118
Sim
www.autodesk.com/revit
Scale
LECTURER
Drawn by
Date
Project number
Institute of Technology CarlowBSc. in Architectural Technology
Year 3 2015-2016
As indicated
26/0
4/20
16 0
9:34
:51
Atrium Details
Project Number 3
Carlow Primary Health Care Centre
22/04/2016
Xhevdet Haliti
Dan O'Sullivan, Noel Dunne,Mark Duffy
A118
1 : 5Atrium Upstand1
1 : 5Atrium Low Corner2 1 : 5
Atrium Top Corner3
1 : 20Wall Section @ Atrium4
1 : 5Atrium Zinc Roof Section5
1 : 1Atrium6
1 : 5Key Plan @ Atrium7
Atrium 3DNTS8
62.95M