attach file bbs bbs 4 10 evaluation questionnaire
TRANSCRIPT
-
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
1/6
QUESTIONNAIRE
FOR
EDCF PROJECT
DATE : / /
Name of Project :
Name of Executing Agency :
-
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
2/6
This questionnaire is designed to evaluate the EDCF
project which was completed by mutual cooperationbetween Korea and your country. Your views and
suggestions will be carefully considered to improve not
only ongoing projects but also similar future ones.
Please answer or check(V) the following questions
concerning the completed EDCF project.
1. How would you rate the overall sufficiency of information on the background
of the project including loan and supplier(s)?
--------------- --------------- --------------- ---------------
Poor Average Excellent
If you check poor, please describe what information was lacking.
---------------------------------------------------------------------------------------
2. Did you have any problems or difficulties with EDCF in proceeding with this
project during the implementation period?
--------------- --------------- --------------- ---------------
None Some Many
If you check some or many, what areas should be improved?
mailto:[email protected]:[email protected]:[email protected]://www.koreaexim.go.kr/ -
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
3/6
---------------------------------------------------------------------------------------
3. How would you evaluate the overall result of this project supported byEDCF?
--------------- --------------- --------------- ---------------
Poor Average Excellent
If your answer is poor, what aspects do you think should be improved?
---------------------------------------------------------------------------------------
4. How would you evaluate the quality of products supplied by the Korean compan(ies)?
--------------- --------------- --------------- ---------------
Poor Average Excellent
If your answer is poor, what products need to be improved?
---------------------------------------------------------------------------------------
5. How would you evaluate the quality of cooperation with the Korean
compan(ies), during the implementation, including communication and
advices?
--------------- --------------- --------------- ---------------
Poor Average Excellent
If your answer is poor, what aspects need to be improved?
-
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
4/6
---------------------------------------------------------------------------------------
6. What is your opinion on contribution of EDCF to enhance quality of life and
progress of economy in your country through this project?
--------------- --------------- --------------- ---------------
Poor Average Excellent
If your answer is poor, what needs to be corrected?
---------------------------------------------------------------------------------------
7. Do you think EDCF supported this project on schedule?
--------------- --------------- --------------- ---------------
Late Average Timely
If your answer is late, what do you suggest needs to be done?
---------------------------------------------------------------------------------------
8. Do you think Korean compan(ies) offered enough information and training
for operation and management? (when applicable)
--------------- --------------- --------------- ---------------
Poor Average Excellent
If your answer is poor, what specific area are you referring to?
-
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
5/6
---------------------------------------------------------------------------------------
9. Do you think that the price of products/services supplied by Koreancompan(ies) was reasonable?
--------------- --------------- --------------- ---------------
Too High Fair Very reasonable
If your answer is high or too high, which product(s) do you mean?
---------------------------------------------------------------------------------------
10. How would you evaluate the degree of accomplishment of this project
compared with initial project objectives?
--------------- --------------- --------------- ---------------
0% 50% 100%
11. If you have any suggestions for improvement, please feel free to write, as
your ideas and suggestions will be highly welcomed and deeply
appreciated for future projects.
---------------------------------------------------------------------------------------
-
7/29/2019 Attach File Bbs BBS 4 10 Evaluation Questionnaire
6/6
Thank you very much for your kind cooperation.