attachment i - doe nonconforming uses

21
8/9/2019 Attachment I - DOE Nonconforming Uses http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 1/21 Nonconforming Uses and Structures Washington Dept. of Ecology Betty Renkor October 25, 2007

Upload: bsh-admin

Post on 30-May-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 1/21

Nonconforming

Uses and Structures

Washington Dept. of Ecology

Betty Renkor

October 25, 2007

Page 2: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 2/21

Nonconforming structures

Beach Drive house Beach Drive beach

Page 3: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 3/21

Nonconforming structures

North Vashon garage North Vashon beach

Page 4: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 4/21

Nonconforming structures

Page 5: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 5/21

Nonconforming and SMPs

Isn’t this in the WAC?

Yes, but… (applies only if your SMP doesn’t cover it)

Your SMP can be different than WAC

Page 6: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 6/21

Nonconforming and SMPs

Basic information

SHB and court cases

WAC 173-27-080

Permits SMP examples

Considerations

Page 7: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 7/21

Nonconforming basics

Lawfully established or built

Prior to effective date of SMA/SMP

Do not conform to current SMP Use - no longer allowed in environment

Structure –inconsistent with bulk, setback,

height, densityNot consistent w/ community vision

Page 8: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 8/21

Nonconforming basics

Can continue to exist

Long term goal: eliminate

Nonconformity cannot increase

Abandoned: NC status expires

Reality: many exist for a long time

Page 9: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 9/21

SHB and Court cases

Rhod-a-zalea v. Snohomish County

NC uses disfavored; restrict so they phase out

Jefferson Co. v. Seattle Yacht Club NC uses disfavored

SHB 95-6 If setbacks not intended to phase out residential

use, invites piecemeal granting of variances

Page 10: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 10/21

SMA & Guidelines

SMA: silent on nonconforming

Guidelines: address nonconforminguses and properties

(WAC 173-26-191(2)(a)(iii)(A)

Page 11: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 11/21

WAC 173-27-080

Conforming use, NC structures

OK to maintain & repair Can expand, but not increase extent of

nonconformity

NC uses cannot expand, except for SFR

Structure that needed variance

Legal nonconforming structure NC regulations apply

Page 12: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 12/21

WAC 173-27-080

NC development that is damaged

Up to 75%, may be rebuilt to prior configurations Apply within 6 months

Complete restoration within 2 years of permit

NC use that is discontinued NC rights expire

Subsequent use shall be conforming

Page 13: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 13/21

Recent permits

Snohomish County Proposal – add 2nd

story, unheated attic,

same footprint New house underway

Ecology denied variance

SHB Adding 16’ of height

increasesencroachment

Setback line extendsinto the air

Page 14: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 14/21

Recent permits

West Seattle Proposal – Add partial3rd story, additions

Stringline setback – nearest shoresidecorners

SMP – No expansion inany manner thatincreases extent of NC

Ecology denied variance

Page 15: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 15/21

SMP examples

Bellingham

CUP needed to expand NC structure No expansion toward shoreline

Must meet 35–ft height restriction

No increase in impervious surface

Commercial – public access, restoration may berequired

Residential - buffer enhancement may be required

Page 16: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 16/21

SMP examples

Port Townsend

NC use discontinued for 365 continuous days losesNC status

NC structure damaged more than 50% replacement

cost must conform to SMP to be restored NC residential structures destroyed may be rebuilt

Commercial, marine, etc. – interior, nonstructural

changes OK, limited to 50% replacement cost over5 years

Page 17: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 17/21

SMP examples

Whatcom County

Expansion of SFR needs CUP Can go upland & into side yards

No expansion waterward or into side yard setback

Can go higher if meet view blockage requirements

Buffer planting needed

Expanding waterward, into side yard setback orabove height standards needs variance

Page 18: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 18/21

SMP examples

Pt. Roberts salmon cannery Whatcom proposed

SMP revisions CUP to require public

access, beach planting

Hotel/restaurant -change roofline, waterviews for guests

Page 19: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 19/21

Considerations

Vashon shoreline Shoreline with lots of

NC structures Is variance needed

for new development

Consider appropriatedesignations andregulations

Page 20: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 20/21

Considerations

Address nonconforming regulations in

cumulative impact analysis Is no net loss achieved?

Time frame for abandonment

Maximum % destroyed & allowed to rebuild

What does zoning code allow?

NC structures can be rebuilt to same footprint& height prior to destruction

Page 21: Attachment I - DOE Nonconforming Uses

8/9/2019 Attachment I - DOE Nonconforming Uses

http://slidepdf.com/reader/full/attachment-i-doe-nonconforming-uses 21/21

Conclusion

Guidelines allow some flexibility

Nonconformities need to be managed Think it through; show your work

Ecology considers statewide interest,public access, habitat restoration