DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVE. SAVANNAH, GEORGIA 31401-3640 REPLY TO ATTENTION OF A UGUST o 5 2015 Regulatory Division SAS-2009-01007 JOINT PUBLIC NOTICE Savannah District/State of Georgia The Savannah District has received an application for a Department of the Army Permit, pursuant to Section 404 of the Clean Water Act (33 U.S.C. 1344), as follows: Application Number: SAS-2009-01007 Applicant: Mr. Robert Baumgardt Fort Stewart Director Public Works Department of the Army Headquarters, 3D Infantry Division 1587 Frank Cochran Drive, Suite 101 Fort Stewart, Georgia 31314-4928 Agent: Mr. Steven L. Smith, Jr. Senior Environmental Scientist Arrowood Environmental Group, Inc. Post Office Box 61237 Savannah, Georgia 31420 Location of Proposed Work: The project site is located within the existing Wright Army Airfield (WAAF)/ Mid Coast Regional Airport, Fort Stewart Army Installation, Liberty Count y, Georgia 31314 (Latitude 31.8849, Longitude -81.5757) and within USGS Hydrologic Unit Code 03060204. Description of Work Subject to the Jurisdiction of the U.S. Army Corps of Engineers: Request authorization to fill 12.31 acres of jurisdictional wetlands in order to construct the proposed runway extension project located on WAAF/MidCoast Regional Airport. The proposal is for a 1,500 linear foot runway extension to the southwest of runway 6L as well as the construction of an Instrumental Landing System (ILS) and Medium- Intensity Approach Lighting System with Runway Alignment (MALSR). The proposed facility expansion has been designed in accordance with the applicable Unified Facility Requirements regulations. The proposed improvements are located within a 126.16 acre area located to the southwest of Runway 6L. By letter dated January 19, 2012, the Corps verified 13.87 acres of wetlands, as defined by the 1987 "Corps of Engineers Wetland Delineation Manual", which may be waters of the United States. 12.31 acres of jurisdictional wetlands would be filled during the proposed construction. The wetlands

Upload: others

Post on 09-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT CORPS OF ENGINEERS

100 W OGLETHORPE AVE SAVANNAH GEORGIA 31401-3640

REPLY TO

ATTENTION OF AUGUST o5 2015

Regulatory Division SAS-2009-01007

JOINT PUBLIC NOTICE Savannah DistrictState of Georgia

The Savannah District has received an application for a Department of the Army Permit pursuant to Section 404 of the Clean Water Act (33 USC 1344) as follows

Application Number SAS-2009-01007

Applicant Mr Robert Baumgardt Fort Stewart Director Public Works Department of the Army Headquarters 3D Infantry Division 1587 Frank Cochran Drive Suite 101 Fort Stewart Georgia 31314-4928

Agent Mr Steven L Smith Jr Senior Environmental Scientist Arrowood Environmental Group Inc Post Office Box 61237 Savannah Georgia 31420

Location of Proposed Work The project site is located within the existing Wright Army Airfield (WAAF) Mid Coast Regional Airport Fort Stewart Army Installation Liberty County Georgia 31314 (Latitude 318849 Longitude -815757) and within USGS Hydrologic Unit Code 03060204

Description of Work Subject to the Jurisdiction of the US Army Corps of Engineers Request authorization to fill 1231 acres of jurisdictional wetlands in order to construct the proposed runway extension project located on WAAFMidCoast Regional Airport The proposal is for a 1500 linear foot runway extension to the southwest of runway 6L as well as the construction of an Instrumental Landing System (ILS) and MediumshyIntensity Approach Lighting System with Runway Alignment (MALSR) The proposed facility expansion has been designed in accordance with the applicable Unified Facility Requirements regulations The proposed improvements are located within a 12616 acre area located to the southwest of Runway 6L By letter dated January 19 2012 the Corps verified 1387 acres of wetlands as defined by the 1987 Corps of Engineers Wetland Delineation Manual which may be waters of the United States 1231 acres of jurisdictional wetlands would be filled during the proposed construction The wetlands

are located in the proposed location of the Runway 6L expansion taxiway construction ILS construction MALSR construction and within the Runway Protection Zone (RPZ) Wetland Impact Area A is an 1126 acre portion of an overall 7321 acre wetland located immediately to the southwest of the existing Runway 6L at the site Wetland Impact Area A would be filled from the construction of the Runway 6L extension the ILS system the taxiway construction and the guideslope construction Wetland Impact Area B is the entire 105 acre wetland identified within training area 19 located to the southwest of Fort Stewart Road 47 Wetland Impact Area B would be filled from the clearing and grading proposed to occur within the RPZ

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the Corps and the State of Georgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certification The Georgia Department of Natural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Permit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources Environmental Protection Division Water Protection Branch 2 Martin Luther King Jr Drive Suite 1456 East Tower Atlanta Georgia 30334 during regular office hours A copier machine is available for public use at a charge of 25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 15 days of the States receipt of application in writing and state the reasons or basis of objections or request for a hearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division 100 West Oglethorpe Avenue Savannah Georgia 31401-3640

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease permit or other appropriate instrument

Georgia Coastal Management Program Prior to the Savannah District Corps of Engineers making a final permit decision on this application the project must be certified by the Georgia Department of Natural Resources Coastal Resources Division to be consistent with applicable provisions of the State of Georgia Coastal Management Program (15 CFR 930) Anyone wishing to comment on Coastal Management Program certification of this project should submit comments in writing within 15 days of the date of this notice to the Federal Consistency Coordinator Ecological Services Section

2

Coastal Resources Division Georgia Department of Natural Resources One Conservation Way Brunswick Georgia 31523-8600 (Telephone 912-264-7218)

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance of a Department of the Army permit

Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior US Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area By letter dated October 28 2013 the US Fish and Wildlife Service concurred with a may affect but not likely to adversely affect determination for the red-cockaded woodpecker wood stork Eastern Indigo snake frosted flatwood salamander and smooth coneflower By letter dated September 11 2013 the US Army Installation Management Command made a no affect determination for the Atlantic and Short nose sturgeon

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The Corps is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the Corps to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties

3

water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Ms Barbara A Bass 100 West Oglethorpe Avenue Savannah Georgia 31401-3640 no later than 15 days from the date of this notice Please refer to the applicants name and the application number in your comments

4

If you have any further questions concerning this matter please contact Ms Barbara A Bass Regulatory Specialist Coastal Branch at 912-652-5690

Enclosures 1 Permit maps and drawings (10 pages)

5

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 2: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

are located in the proposed location of the Runway 6L expansion taxiway construction ILS construction MALSR construction and within the Runway Protection Zone (RPZ) Wetland Impact Area A is an 1126 acre portion of an overall 7321 acre wetland located immediately to the southwest of the existing Runway 6L at the site Wetland Impact Area A would be filled from the construction of the Runway 6L extension the ILS system the taxiway construction and the guideslope construction Wetland Impact Area B is the entire 105 acre wetland identified within training area 19 located to the southwest of Fort Stewart Road 47 Wetland Impact Area B would be filled from the clearing and grading proposed to occur within the RPZ

BACKGROUND

This Joint Public Notice announces a request for authorizations from both the Corps and the State of Georgia The applicants proposed work may also require local governmental approval

STATE OF GEORGIA

Water Quality Certification The Georgia Department of Natural Resources Environmental Protection Division intends to certify this project at the end of 30 days in accordance with the provisions of Section 401 of the Clean Water Act which is required for a Federal Permit to conduct activity in on or adjacent to the waters of the State of Georgia Copies of the application and supporting documents relative to a specific application will be available for review and copying at the office of the Georgia Department of Natural Resources Environmental Protection Division Water Protection Branch 2 Martin Luther King Jr Drive Suite 1456 East Tower Atlanta Georgia 30334 during regular office hours A copier machine is available for public use at a charge of 25 cents per page Any person who desires to comment object or request a public hearing relative to State Water Quality Certification must do so within 15 days of the States receipt of application in writing and state the reasons or basis of objections or request for a hearing The application can be reviewed in the Savannah District US Army Corps of Engineers Regulatory Division 100 West Oglethorpe Avenue Savannah Georgia 31401-3640

State-owned Property and Resources The applicant may also require assent from the State of Georgia which may be in the form of a license easement lease permit or other appropriate instrument

Georgia Coastal Management Program Prior to the Savannah District Corps of Engineers making a final permit decision on this application the project must be certified by the Georgia Department of Natural Resources Coastal Resources Division to be consistent with applicable provisions of the State of Georgia Coastal Management Program (15 CFR 930) Anyone wishing to comment on Coastal Management Program certification of this project should submit comments in writing within 15 days of the date of this notice to the Federal Consistency Coordinator Ecological Services Section

2

Coastal Resources Division Georgia Department of Natural Resources One Conservation Way Brunswick Georgia 31523-8600 (Telephone 912-264-7218)

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance of a Department of the Army permit

Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior US Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area By letter dated October 28 2013 the US Fish and Wildlife Service concurred with a may affect but not likely to adversely affect determination for the red-cockaded woodpecker wood stork Eastern Indigo snake frosted flatwood salamander and smooth coneflower By letter dated September 11 2013 the US Army Installation Management Command made a no affect determination for the Atlantic and Short nose sturgeon

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The Corps is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the Corps to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties

3

water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Ms Barbara A Bass 100 West Oglethorpe Avenue Savannah Georgia 31401-3640 no later than 15 days from the date of this notice Please refer to the applicants name and the application number in your comments

4

If you have any further questions concerning this matter please contact Ms Barbara A Bass Regulatory Specialist Coastal Branch at 912-652-5690

Enclosures 1 Permit maps and drawings (10 pages)

5

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 3: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

Coastal Resources Division Georgia Department of Natural Resources One Conservation Way Brunswick Georgia 31523-8600 (Telephone 912-264-7218)

US ARMY CORPS OF ENGINEERS

The Savannah District must consider the purpose and the impacts of the applicants proposed work prior to a decision on issuance of a Department of the Army permit

Cultural Resources Assessment Review of the latest published version of the National Register of Historic Places indicates that no registered properties or properties listed as eligible for inclusion are located at the site or in the area affected by the proposed work Presently unknown archaeological scientific prehistorical or historical data may be located at the site and could be affected by the proposed work

Endangered Species Pursuant to Section 7(c) of the Endangered Species Act of 1973 as amended (16 USC 1531 et seq) we request information from the US Department of the Interior US Fish and Wildlife Service the US Department of Commerce the National Oceanic and Atmospheric Administration and the National Marine Fisheries Service or any other interested party on whether any species listed or proposed for listing may be present in the area By letter dated October 28 2013 the US Fish and Wildlife Service concurred with a may affect but not likely to adversely affect determination for the red-cockaded woodpecker wood stork Eastern Indigo snake frosted flatwood salamander and smooth coneflower By letter dated September 11 2013 the US Army Installation Management Command made a no affect determination for the Atlantic and Short nose sturgeon

Public Interest Review The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest That decision will reflect the national concern for both protection and utilization of important resources The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments All factors which may be relevant to the proposal will be considered including the cumulative effects thereof among those are conservation economics aesthetics general environmental concerns wetlands historic properties fish and wildlife values flood hazards flood plain values land use navigation shoreline erosion and accretion recreation water supply and conservation water quality energy needs safety food and fiber production mineral needs considerations of property ownership and in general the needs and welfare of the people

Consideration of Public Comments The Corps is soliciting comments from the public federal state and local agencies and officials Native American Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity Any comments received will be considered by the Corps to determine whether to issue modify condition or deny a permit for this proposal To make this decision comments are used to assess impacts on endangered species historic properties

3

water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Ms Barbara A Bass 100 West Oglethorpe Avenue Savannah Georgia 31401-3640 no later than 15 days from the date of this notice Please refer to the applicants name and the application number in your comments

4

If you have any further questions concerning this matter please contact Ms Barbara A Bass Regulatory Specialist Coastal Branch at 912-652-5690

Enclosures 1 Permit maps and drawings (10 pages)

5

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 4: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

water quality general environmental effects and the other public interest factors listed above Comments are used in the preparation of an Environmental Assessment andor an Environmental Impact Statement pursuant to the National Environmental Policy Act Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity

Application of Section 404(b)(1) Guidelines The proposed activity involves the discharge of dredged or fill material into the waters of the United States The Savannah Districts evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator Environmental Protection Agency under the authority of Section 404(b) of the Clean Water Act

Public Hearing Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application for a Department of the Army permit Requests for public hearings shall state with particularity the reasons for requesting a public hearing The decision whether to hold a public hearing is at the discretion of the District Engineer or his designated appointee based on the need for additional substantial information necessary in evaluating the proposed project

Comment Period Anyone wishing to comment on this application for a Department of the Army Permit should submit comments in writing to the Commander US Army Corps of Engineers Savannah District Attention Ms Barbara A Bass 100 West Oglethorpe Avenue Savannah Georgia 31401-3640 no later than 15 days from the date of this notice Please refer to the applicants name and the application number in your comments

4

If you have any further questions concerning this matter please contact Ms Barbara A Bass Regulatory Specialist Coastal Branch at 912-652-5690

Enclosures 1 Permit maps and drawings (10 pages)

5

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 5: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

If you have any further questions concerning this matter please contact Ms Barbara A Bass Regulatory Specialist Coastal Branch at 912-652-5690

Enclosures 1 Permit maps and drawings (10 pages)

5

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 6: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

N

A

I ( i

~ bull11middot

STEWART -~~~~ ~ ~~ ~middot ~ bullmiddot

middot ~- ~ ~middot

bullmiddotmiddot 4shybull - bull

~~ -) ~)

Chirnt1tY ~o

STEWAR T

bull

~

0 1000 2000 4000 6000 _c=_c=----======JFeet

Figure 2 bull Site Vicinity Map bull Topographic Map View WAAFMidCoast Regional Airport Runway 6L Extension Project Fort Stewart Georgia Drawing Date April 22 2015

0

AbulltesWn Wtt Legend

toebull

bullbull

~ --- bull shy

A

D Project Area

bull 8 11 4

FORT STEWART

M I L I T A R Y R E S E R V A T tON

~

~ - ~

_1-~

~-J

Society I-cubed

ARROWCDD t i I T ~

I

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 7: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

111 lt Xshy

N OJOhllOf 11~0ClOibull

A I Iiilt 8shylfflt 8shy

lH05020fl1050207

Ill lt~shyIll( Xshy

OJO~fl014llliltmiddot xshy HIT Sshy00ltbull021lJ lit ( 8- I JIlt XshyIl lf lshyOJ071l1Ct 00(1020 ClJ01tO IOIgt 011111210 Cl070107

H l C SshyOJlllt10l IO

Hl i( 8shyCl107010

I-WC 8middot OJ0701 06

IW( ~ IUC 8shy

0307010t 0J OM204 l it( Sshy lfli( 8shy

OJH7021ll (IJll70 211

If lf( 8shylfll( lImiddot 0J070 IO(i 1-Jll( Mshy-~

Ol070 H2 OJOh004

Hl (8shy0J 0700I

Legend m middotltmiddotS-Ill CR- 010700J Project location

11110202 JffC 8- 0 8-digtt HU

0Jl IOW I

Figure 4 bull 8-Digit HUC Location Map WAAF I MidCoast Regional Airport Runway 6L Expansion Fort Stewart Georgia Drawing Date April 22 2015

ARROWOOD

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 8: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

--ctvtn_L_

lESAS200901007 lleJneatedWeUanda

Ruiiway Mid ra~iway futtMaOtt

RPZ

cJProOd

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres

Figure 5 - Extent of Project Area with Proposed Site Improvements WAAF I MldCoast ~eglonal Airport 500 1000 2000 3000 0Runway 6L Expansion Feet C5 ARROWCDD Fort Stewart Georgia t _I~bull 1Nr bull it Drawing Date April 22 2015

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 9: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

Total Project Area 12616 acres Total Upland within Project Area 11229 acres Total Wetlands within Project Area 1387 acres Impacts to Wetland A 1126 acres Impacts to Wetland B 105 acres Total Wetland Impacts 1231 acres

Figure 6 middotSummary of Impacts to Jurisdictional Wetlands WAAF I MldCoast Regional Airport Runway 6L Expansion 0 500 1000 2000 3000 ARROW([)DFort Stewart Georgia Feet ~ l ~ M - bull A Drawing Date April 22 2015

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 10: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

--- I

I l I I

I I

I )

_ I

Training Area A-19 Wetland Impact ARROWOODCross-Sections

PO Box 61237WMFMldCoast Regional Airport Savannah Georgia 31420 9129202895Runway 6L Extension and Improvements Project

wwwarrowoodenvcom

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 11: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

0

~ ~ lt(

~ ~ ~ ltgtsitgtgt ~ e~ ~ ~2~8 camp~S~

bull C N I0 111 - CV

~1m1 CIJ

-~~

i-+1-i-1--l--1--tLJII

I I I

10 20 JO 40 70 IO 160 190 170 llO 180 200 210 220 290 JOO

rJI rn=n111 li - l+~P I I 1 J_L

2 -~rnM

I I I I- bull 22

- 20

ts im e a Q

t= ~~O -cI~+ kB+=

E

m lt E

Q)80 100 11 0 120 130 140

+ c ltO ~ c (J) 0 Q Q

PROFILE B-B ~~ ~sectOgt (J) a O

c~ en fl) ltOltO shy

eo middot- +-+- -+- ~ -middot -I I

J I I

1-

--~ I middotr-middot-

I

i 1 ~I

-l I I I I i I I l _

~

-middotmiddot -~-middot-middotii middot- I I I I I

f- - -middot I -1C ~- ~-I Ii ~ - I

I I I i I I

~ t-1middot I-~~

1 I l t f -E Jsrr~ lrwl I I I _ ~H- ] 1

I I I I I- I losltNc titI IE 7

I --~I-_i I l I-I I j I

t -bRdE

L _

--

__ I I I

I j7~~ I ~ -- _J - i

1-t ~ ~ - I middot +-1t li -WI I I I

~ I ij t I bull I I ~ -11 _ -_ I bull I 1-r J

J --1 l J__-

0 cJ chT-~~~ u Q -shy- O (J middotshy

middotshy

JI i I I i I I I - middot-Lir--t

-- I I I

l+rishy

_

_ -

50

m o -c (J) shy ~s 42

lt() LL X 42

1

40 Cgtc ~~ =_J

38 middot-middot-cJI 311

J4 J4 ~ f32 J2 IshyI ampJOO 10 20 JO 40 eo IO 70 IO 80 100 110 120 llO 140 100 Ito 170 190 180 200 210 220 2l0 240 2SO 270 290 290 JOOJO

SECTION A-A Project No 2014-10 Drawn By SU Designed By PC Slmontor Surveyed By PC Slmontor

hacked By JL~

1sca1e Date

2 of 2

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 12: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

()

middotJ

middotbull middotI middotl -1

middot1 middot I ltJ-t

middotI

bull I

middotJ

-1 middotl bullI

middot I

I

I

bull

I I

1middot

f -middot middotmiddot jmiddot f 1 middotl middot-middot-~

I middotI middotI ~ 1 middotI I middotJ

middotJ gt middot1 bull)

I I

I _ middotI

bullI

middotl

middot1 middotI

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 13: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

25

55 55

-PROPOSED RUNWAY 50 50_ SURFACE

4545 ~--middot~= ~~ifl~~21poundltITl$101rJ

40 40 smiddot x5 DBL BARREL ec shySTA 133bull4269

IE 2634 middot middot 3535

30 1 STREAMBEDshy -middotmiddot --~ iJJ 30

MATERIAL

EXISTING_ GRADE

N ltO NM g ~ 8 tri N V c-J ) ~ M M M

128+00 129+00 130+00

45

40

35

30

25

20

M M M MII) NII) 00 II)ltO bull Ogt bull ltO bull

bull Ogt bull Ogt ~~ I- M lt0 M M N N

307+00 308+00 309+00

25

~ Cgt ~ _ ~ ~~ ~ ~~ N M

131+00 132+00 133+00

SECTION A- A

45 - PROPOSED TAXrtiAY SURFACE

40

356 X 5 DSL 8ARREL SC r sTA 311+1802

1euro 2595 30

25 1 STREAMBED - bull shy

MATERIAL

20

Cgt NII)16 M M

M bull Ogt bull ~ 1 tri ~ cO ~ oci ~ N N N

310+00 311+00 312+00 SECTION B - B

VpoundRT1CAI SCALE f 0 t a

__ rr=t KMItbullbull

~ 0 raquo ~

HOOIZOHTAL SCALE ICAlI tbullM

___deg

lVtHtlllllW0deg UBERlY COONTY MINESIUE GA

RUNWAY ampLn4R 1-500 EXTEMSkgtH OESGNTMth --tbull WofOtol l

lbton Nnkdellvelt APJUIXmiddotJOOOlmiddotxxocnl I tOO)tt

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015

Page 14: ATTENTION OF AUGUST 5 2015 · 05-08-2015  · Coastal Resources Division, Georgia Department of Natural Resources, One Conservation Way, Brunswick, Georgia 31523-8600 (Telephone 912-264-7218)

45

40

SURFACE ltt_RUNWAY

ltt_TAXrNAY

I 45

40

35 35

30

25

20

EXISTINGshyGRADE

I ---middot- - - - - shy -middotshy -1 STREAMBED -

MATERIAL

middot - _ _L~~ bullbull _~_ 4 middot _

_RIPAAP APRON

30

25

20

co-shyltN ()

-500

o~ ~ glM

-400

N8 Obull 00 N ()

-300

N~ co NN M

-200

N c ~~ M

-100

8~ ~~

0

lttgt co () MN M

100

NM _-t bullbull lttgt N N M

200

00 ltO N - laquo) N M

300

Clgt ~ lt deggN 400

0

laquo~ _ N N

500

lttgt8 O cD ~ N

600

Clgt ~~

bull IO 00 N N

700

SECTION C- C

11 t

VE~TICAL SCALE ICNll lbullI ~~ --- --- I ~- K111 r

ttORtZONTAL SCALE TMthSCALI lbull W llsun-kcleMr~~ --- ~-~~---------~~~

lVllbullIPMtObullfM ~IBEATV COUNTY HINESlllUE QA

RUNWAY 6U2bullR 1500 EXTENStQN OESlGN

AXgttX-anXXfXKlrbull I tOOllbull

Figure 13 - Alternative Site Locations WAAF I MidCoast Regional Airport Runway 6L Expansion 0 1000 2000 4000 ~~ [5 ARROWOOD Fort Stewart Georgia cc1111ic======~Feet 1middot~ bullbullbull Drawing Date July 7 2015