ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR
1 Maintenance & Repair of Black Start & Starting Units SEC SOA 2017/2023
2 GRLA - SEC WOA SEC WOA 2017/2020
3 Supply & Installation of New Hypo Chlorinators MARAFIQ YANBU 2019/2021
4 AOS & Primary Cooling Water Basins SASREF 2019/2021
5 Transformers Maintenance - Multiple Locations SEC WOA 2019/2022
6 Relocation of Bus Duct from JPP3 to Makkah PP SEC WOA 2020
1HP Air Compressor supply Sharoura PP SEC SOA
2019/2020
2Transformers maintenance - multiple locations SEC WOA
2016/2019
3SARAH COMPOUND FCI
2018/2019
4Travelling screens - MARAFIQ MARAFIQ YANBU
2015/2019
STATUS
ATTS – On-Going ProjectsONGOING
ONGOING
ONGOING
ONGOING
COMPLETED
ONGOING
ONGOING
ATTS – Completed ProjectsCOMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 1 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
5FRP Pipe Line - RPP SEC WOA
2018/2019
6SASREF - NDT ANABEEB
2018/2019
7HAWAMAT VILLA PRIVATE (Osama Alsayed)
2018/2019
8UPS Jazan PP
SEC SOA 2016/2019
9STP Bioshaft - Upgrade & Replacement of STP - Al Salam Palace
SETE SAUDIA2018
10Gas Dampers - RPP - PHASE-II SEC WOA
2015/2018
11Vital AC - Rabigh PP SEC WOA
2016/2018
12De-watering of Canal # 01 MASA JUBAIL
2018
13STP Bioshaft - KAIA Plant KP-01 ALMABANI
2017/2018
14Gas Dampers - RPP - PHASE-I SEC WOA
2015/2017
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 2 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
15Maintenance of Generators at COA SEC COA
2016/2017
16TIMS - 8 Locations SEC WOA
2014/2017
17Installation of H25 Detectors at MASA - Jubail MASA JUBAIL
2017
18Replacement of High Bay Lighting in HAIL- 2 PP
SEC-COA 2017
19Motor Fans - Makkah PP
SEC-WOA 2014/2016
20Transformers - Multiple Locations
SEC-WOA 2013/2016
21Droplet Catchers - PP3 Jeddah
SEC-WOA 2015/2016
22Diagnostics of Generator Rotor
SEC-WOA 2013/2016
23Install & Commission 1.5MVA Transformer Makkah PP
SEC-WOA 2016
24Coaelescing filters - Duba & Al Wadjh
SEC-WOA 2014/2016
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 3 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
25NWPS - MASA MASA JUBAIL
2015/2016
26BSDG - Madinah PP2 SEC WOA
2014/2015
27Battery Bank Project - RPP SEC WOA
2014/2015
28 Construction of Lube oil tank - Sharourah SEC SOA 2014/2015
29LP CO2 at Tihama PP
SEC SOA 2014/2015
30Rehabilitation of evaporator TP9 - MASA MASA JUBAIL
2013/2014
31Chlorination - Rabigh PP SEC WOA
2013/2014
32Aircraft lighting - Rabigh PP SEC WOA
2013/2014
33Alarm & Trip for transformers at PP3 jeddah
SEC-WOA 2013/2014
34CO2 - Makkah PP
SEC-WOA 2013/2014
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 4 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
35CO2 - Jeddah PP3
SEC-WOA 2013/2014
36 NDT INSPECTION SERVICES FOR GAS TURBINE UNITS AT SEC-WEST POWER PLANTS
SEC-WOA 2012/2013
37 WATER AND FOAM PIPELINES REPLACEMENT FOR 12 NOS STORAGE TANKS, PP7, RIYADH
SEC-COA 2012
38 GTG CONDITION ASSESSMENT ANALYSIS AND REMAINING LIFE ASSESSMENT FOR HITACHI FRAME 7001E
MARAFIQ 2012
39DISMANTLING, PRESERVATION AND TRANSPORT OF ELECTROMECHANICAL EQUIPMENT AT ANPP,7G, AL
JABRIAH AND YPR SUBSTATIONS-YANBU MARAFIQ 2012
40 REMAINING LIFE ASSESSMENT OF GENERATOR OF ABB & GE UNITS AT ALL WESTERN REGION PP's, SEC
SEC-WOA 2012
41 GENERATOR REMAINING LIFE ASSESSMENT FOR HITACHI GTG 1-8, YANBU, MARAFIQ
MARAFIQ 2012
42 ELECTRICAL TESTS FOR UNIT #12 AT SWCC JEDDAH PP3 SWCC 2012
43 GENERATOR LEAP TESTING AT MAKKAH PP SEC-WOA 2012
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 5 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
44 SERVICING OF POWER TRANSFORMER 2 AT SUB STATION 3C YANBU
MARAFIQ 2011/2012
45 NDT INSPECTION OF RETAINING RINGS AND COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2011/2012
46 NDT INSPECTION OF RETAINING RINGS AND COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2011/2012
47 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF STEAM CONVERTER FEED WATER TANK, STAGE 1
RABIGH PP/SEC-WOA 2011/2012
48 SUPPLY AND INSTALLATION OF AC/DC LIGHTING SYSTEM AT TIHAMA AND ABHA
TIHAMA PP/SEC-WOA ABHA PP/SEC-WOA
2011/2012
49REPLACEMENT OF CABLES OASSING UNDER EXHAUST AND TURBINE COMPARTMENTS IN GE GAS TURBINE UNITS NO
04, 05 & 06MAKKAH PP/SEC-WOA 2011/2012
50 GENERATOR LIFE ASSESSMENT OF GENERATOR GT#14, 20 & 24 TYPE ABB 11D5
JEDDAH PP3/SEC-WOA 2011/2012
51ELECTRICAL TEST FOR GENERATOR STATOR OF GT#1
(TANDELTA TEST, PARTIAL DISCHARGE AND COUPLING RESISTANCE)
LAILA PP/SEC-COA 2011
52 ENDOSCOPIC INSPECTION OF STATOR AND ROTOR OF ABB 11D5 STG# 06 GENERATOR
SHOAIBA PP/SWCC-WOA 2011
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 6 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
53 EXTENSION OF WATER SUPPLY PIPE LINE FROM SWCC TO PP9
RIYADH PP9/SEC-COA 2011
54 GENERATOR LIFE ASSESSMENT G.T # 01 TAIF PP/SEC-WOA 2011
55 GENERATOR LIFE ASSESSMENT G.T # 01 DUBA PP/SEC-WOA 2011
56 GENERATOR LIFE ASSESSMENT G.T # 06 MADINAH PP/SEC-WOA 2010
57 ANNUAL INSPECTION OF MHI STEAM UNIT # 4 RABIGH PP/SEC-WOA 2010/2011
58 ANNUAL INSPECTION OF MHI STEAM UNIT # 5 RABIGH PP/SEC-WOA 2010/2011
59 NDT INSPECTION OF GT # 06COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2010/2011
60 NDT INSPECTION OF GT # 04COMPRESSOR BLADES
TAIF PP/SEC-WOA 2010/2011
61 NDT INSPECTION OF GT # 04COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010/2011
62 NDT INSPECTION OF GT # 19COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 7 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
63 NDT INSPECTION OF GT # 03COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2010/2011
64 NDT INSPECTION OF GT # 11COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010/2011
65 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2010/2011
66 NDT INSPECTION OF GT # 21COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
67 NDT INSPECTION OF GT # 29COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
68 NDT INSPECTION OF GT # 13COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
69 NDT INSPECTION OF GT # 01COMPRESSOR BLADES
DUBA PP/SEC-WOA 2010/2011
70 NDT INSPECTION OF GT # 04COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2010/2011
71 NDT INSPECTION OF GT # 01COMPRESSOR BLADES
TAIF PP/SEC-WOA 2010/2011
72 NDT INSPECTION OF GT # 16COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 8 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
73 NDT INSPECTION OF GT # 22COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
74 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2010/2011
75 NDT INSPECTION OF GT # 01COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2010/2011
76 NDT INSPECTION OF GT # 08COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010/2011
77 NDT INSPECTION OF GT # 07COMPRESSOR BLADES
RABIGH PP3/SEC-WOA 2010/2011
78 NDT INSPECTION OF GT # 35COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010/2011
79 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
RABIGH PP3/SEC-WOA 2010/2011
80 NDT INSPECTION OF GT # 06RETAINING RING + WEDGES
MADINAH PP/SEC-WOA 2010/2011
81 NDT INSPECTION OF GT # 19RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
82 NDT INSPECTION OF GT # 29RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 9 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
83 NDT INSPECTION OF GT # 13RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
84 NDT INSPECTION OF GT # 21RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
85 NDT INSPECTION OF GT # 17RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010/2011
86 NDT INSPECTION OF GT # 16RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
87 NDT INSPECTION OF GT # 10RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
88 NDT INSPECTION OF GT # 01RETAINING RING + WEDGES
TAIF PP/SEC-WOA 2010/2011
89 NDT INSPECTION OF GT # 33RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
90 NDT INSPECTION OF GT # 34RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
91 NDT INSPECTION OF GT # 35RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010/2011
92 NDT INSPECTION OF GT # 15RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010/2011
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 10 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
93 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010/2011
94 NDT INSPECTION OF GT # 24RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010/2011
95 NDT INSPECTION OF GT # 30RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010/2011
96 SUPPLY OF GT FUEL ADDITIVES JEDDAH PP3/SEC-WOA 2010/2011
97 INSPECTION & REPAIR OF EXCITOR ROTOR ABB GT # 34 RIYADH PP5/SEC-COA 2010
98 REPAIR OF EXCITOR STATOR & ROTOR ABB GT # 27 RIYADH PP5/SEC-COA 2010
99 REPAIR OF EXCITOR STATOR ABB GT#34 RIYADH PP5/SEC-COA 2010
100 ABB EXCITER ROTOR OVERHAULING OF GT#35 RIYADH PP5/SEC-COA 2009
101 INSPECTION & REPAIR OF EXCITER ROTOR ABB GT # 26 RIYADH PP5/SEC-COA 2010
102 INSPECTION & REPAIR OF EXCITOR STATOR AND ROTOR
ABB GT # 33RIYADH PP5/SEC-COA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 11 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
103 REPAIR OF COMPLETE ABB 11D5 EXCITER RIYADH PP8/SEC-COA 2010
104 MINOR REPAIR OF EXCITER ROTOR RIYADH PP8/SEC-COA 2010
105 ELECTRICAL TESTING OF ALTERNATOR YANBU PP/SWCC-WOA 2010
106REWINDING OF BLOW DOWN MOTOR 11KW &
BALANCING ROTOR OF MAKE UP WATER PUMP MOTOR SHOAIBA PP/SWCC-WOA 2010
107OVERHAULING OF VIBRATOR MOTOR 0.22KW,REPAIR
FREQUENCY CONVERTER MOTOR & REWINDING BREAK SHOAIBA PP/SWCC-WOA 2010
108 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2010
109 NDT INSPECTION OF GT # 06COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2010
110 NDT INSPECTION OF GT # 03COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010
111 NDT INSPECTION OF GT # 16COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010
112 NDT INSPECTION OF GT # 11RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 12 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
113 NDT INSPECTION OF GT # 11COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2010
114 NDT INSPECTION OF GT # 05RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2010
115 NDT INSPECTION OF GT # 18COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2009
116 NDT INSPECTION OF GT # 18RETAINING RING + WEDGES
MAKKAH PP/SEC-WOA 2009
117 INSPECTION OF MHI BOILER CHIMNEY OF STAGE # 1 and G.T & HRSG CHIMNEYS OF STAGE # 2
RABIGH PP/SEC-WOA 2010
118 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NEW 32 NO. FUEL ADDITIVE DOSING PUMPS
JEDDAH PP3/SEC-WOA 2010
119POWER RENTAL AND OPERATION & MAINTANENCE OF
POWER PLANT FOR GENERATION OF ELECTRICAL POWER FOR THE ISOLATED DISTRIBUTION NETWORK
AL-ULAH/SEC-WOA 2010
120 ONLINE LEAK SEALING SERVICES FOR ALL MAJOR POWER PLANTS OF SEC
MAJOR PPS/SEC-WOA 2010
121 ABB EXCITOR ROTOR OVERHAULING (REWINDING) GT #34 RIYADH PP5/SEC-COA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 13 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
122 REPAIR OF ABB EXCITOR STATOR (REWINDING) GT# 34 RIYADH PP5/SEC-COA 2010
123 INSPECTION AND REPAIR FOR EXCITOR ROTOR (REWINDING) GT# 34
RIYADH PP5/SEC-COA 2010
124 INSPECTION AND REPAIR OF EXCITOR STATOR AND ROTOR (REWINDING) GT # 27
RIYADH PP5/SEC-COA 2010
125 REPAIR AND REWINDING OF GENERATOR EXCITOR TYPE WBF6-4G FOR ABB 9D1N GT#6
TAIF PP/SEC-WOA 2010
126 GENERATOR LIFE ASSESSMENT G.T # 10 JEDDAH PP3/SEC-WOA 2010
127 GENERATOR LIFE ASSESSMENT G.T # 04 MAKKAH PP/SEC-WOA 2010
128 GENERATOR LIFE ASSESSMENT G.T # 15 MAKKAH PP/SEC-WOA 2010
129 GENERATOR LIFE ASSESSMENT G.T # 17 MAKKAH PP/SEC-WOA 2010
130 SUPPLY OF GT FUEL ADDITIVES RABIGH PP/SEC-WOA 2010
131 GENERATOR LIFE ASSESSMENT G.T # 08 JEDDAH PP2/SEC-WOA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ON GOING
ON GOING
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 14 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
132 GENERATOR LIFE ASSESSMENT G.T # 019 JEDDAH PP3/SEC-WOA 2010
133 GENERATOR LIFE ASSESSMENT G.T # 21 JEDDAH PP3/SEC-WOA 2010
134 GENERATOR LIFE ASSESSMENT G.T # 13 JEDDAH PP3/SEC-WOA 2010
135 GENERATOR LIFE ASSESSMENT G.T # 16 JEDDAH PP3/SEC-WOA 2010
136 GENERATOR LIFE ASSESSMENT G.T # 20 JEDDAH PP3/SEC-WOA 2010
137 GENERATOR LIFE ASSESSMENT G.T # 24 JEDDAH PP3/SEC-WOA 2010
138 GENERATOR LIFE ASSESSMENT G.T # 01 MAKKAH PP/SEC-WOA 2010
139 ANNUAL INSPECTION OF STEAM UNIT # 4 AT SHOAIBA PP SHOAIBA PP/SEC-WOA 2009/2010
140 ANNUAL INSPECTION OF MHI STEAM UNIT # 6 at RPP RABIGH PP/SEC-WOA 2009/2010
141 ANNUAL INSPECTION OF MHI STEAM UNIT # 4 at RPP RABIGH PP/SEC-WOA 2009/2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 15 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
142 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 28 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010
143 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 32 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010
144 MAJOR OVERHAUL of ABB GAS TURBINE UNIT # 26 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010
145 MAJOR OVERHAUL of ABB GAS TURBINE UNIT # 27 at JPP3 JEDDAH PP3/SEC-WOA 2009/2010
146GENERATOR MAJOR OVERHAUL for ABB9D1N OF GT UNIT
#05TAIF PP/SEC-WOA 2009/2010
147 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 17 JEDDAH PP3/SEC-WOA 2010
148 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 18 JEDDAH PP3/SEC-WOA 2010
149 SUPPLY OF BOILER FUEL ADDITIVES RABIGH PP/SEC-WOA 2010
150INSPECTION &REPAIR AND REWINDING OF EXCITOR
ROTOR GT# 11 QASSIM PP/SEC-COA 2009/2010
151REPAIR AND INSPECTION OF EXCITOR STATOR AND ROTOR
ABB GT # 27RIYADH PP5/SEC-COA 2009/2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 16 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
152UPGRADING OF EXISTING CONTROL SYSTEM OF ABB
TURBINES UNIT # 08 MAKKAH PP/SEC-WOA 2009/2010
153UPGRADING OF EXISTING CONTROL SYSTEM OF ABB
TURBINES UNIT # 09 MAKKAH PP/SEC-WOA 2009/2010
154UPGRADING OF EXISTING CONTROL SYSTEM OF ABB
TURBINES UNIT # 12 MAKKAH PP/SEC-WOA 2009/2010
155 REWINDING OF GENERATOR STATOR OF G.T UNIT # 1 JEDDAH PP3/SEC-WOA 2009/2010
156 REWINDING OF GENERATOR STATOR OF G.T UNIT # 9 JEDDAH PP3/SEC-WOA 2009/2010
157 REWINDING OF GENERATOR STATOR OF G.T UNIT # 12 RABIGH PP/SEC-WOA 2009/2010
158 GENERATOR LIFE ASSESSMENT G.T # 17 JEDDAH PP3/SEC-WOA 2010
159 GENERATOR LIFE ASSESSMENT G.T # 18 JEDDAH PP3/SEC-WOA 2010
160 GENERATOR LIFE ASSESSMENT G.T # 27 JEDDAH PP3/SEC-WOA 2010
161 GENERATOR LIFE ASSESSMENT G.T # 03 MAKKAH PP/SEC-WOA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 17 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
162 NDT INSPECTION OF GT # 018COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
163 NDT INSPECTION OF GT # 015COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
164 NDT INSPECTION OF GT # 017COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
165 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
166 NDT INSPECTION OF GT # 023COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
167 NDT INSPECTION OF GT # 028RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010
168 NDT INSPECTION OF GT # 18RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010
169 NDT INSPECTION OF GT # 15RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010
170 NDT INSPECTION OF GT # 17RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2010
171 NDT INSPECTION OF GT # 27ROTOR WEDGES
JEDDAH PP3/SEC-WOA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 18 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
172 NDT INSPECTION OF GT # 032COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
173 NDT INSPECTION OF GT # 027COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
174 NDT INSPECTION OF GT # 07COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2010
175 NDT INSPECTION OF GT # 03COMPRESSOR BLADES
DUBA PP/SEC-WOA 2010
176 NDT INSPECTION OF GT # 03RETAINING RING + WEDGES
DUBA PP/SEC-WOA 2010
177 NDT INSPECTION OF GT # 03COMPRESSOR BLADES
TABUK PP/SEC-WOA 2010
178 GENERATOR LIFE ASSESSMENT G.T # 03 DUBA PP/SEC-WOA 2010
179 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2010
180 NDT INSPECTION OF GT # 010COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2010
181 SUPPLY OF GT FUEL ADDITIVES RABIGH PP/SEC-WOA 2010
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 19 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
182REPLACEMENT OF WATER, FOAM AND COOLING WATER
PIPELINE OF FIREFIGHTING SYSTEMTABOUK PP1/SEC-WOA 2008/2009/2010
183 SUPPLY OF GT FUEL ADDITIVES JEDDAH PP3/SEC-WOA 2007/2008/2009/2010
184 NDT INSPECTION OF GT # 05COMPRESSOR BLADES
TAIF PP/SEC-WOA 2009
185 NDT INSPECTION OF GT # 06COMPRESSOR BLADES
TAIF PP/SEC-WOA 2009
186 NDT INSPECTION OF GT # 05RETAINING RING + WEDGES
TAIF PP/SEC-WOA 2009
187 NDT INSPECTION OF GT # 06RETAINING RING + WEDGES
TAIF PP/SEC-WOA 2009
188 NDT INSPECTION OF GT # 01COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2009
189 NDT INSPECTION OF GT # 02COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2009
190 NDT INSPECTION OF GT # 23RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
191 NDT INSPECTION OF GT # 28COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2009
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 20 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
192 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
193 NDT INSPECTION OF GT # 12RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
194 NDT INSPECTION OF GT # 11RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
195 NDT INSPECTION OF GT # 25RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
196 NDT INSPECTION OF GT # 08RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
197 NDT INSPECTION OF GT # 12RETAINING RING + WEDGES
JEDDAH PP3/SEC-WOA 2009
198 NDT INSPECTION OF GT # 025COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2009
199 NDT INSPECTION OF GT # 014COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2009
200 NDT INSPECTION OF GT # 012COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2009
201 GENERATOR LIFE ASSESSMENT G.T # 05 MAKKAH PP/SEC-WOA 2009
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 21 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
202 GENERATOR LIFE ASSESSMENT G.T # 11 MAKKAH PP/SEC-WOA 2009
203 GENERATOR LIFE ASSESSMENT G.T # 18 MAKKAH PP/SEC-WOA 2009
204 GENERATOR LIFE ASSESSMENT G.T # 02 MADINAH/SEC-WOA 2009
205 GENERATOR LIFE ASSESSMENT G.T # 05 TAIF PP/SEC-WOA 2009
206 GENERATOR LIFE ASSESSMENT G.T # 08 JEDDAH PP3/SEC-WOA 2009
207 GENERATOR LIFE ASSESSMENT G.T # 11 JEDDAH PP3/SEC-WOA 2009
208 GENERATOR LIFE ASSESSMENT G.T # 15 JEDDAH PP3/SEC-WOA 2009
209REPLACEMENT OF WATER,FOAM & COOLING WATER
LINESTABOUK PP/SEC-WOA 2009
210REPLACEMENT OF CABLES RUNNING UNDER EXHAUST OF
G.T UNIT # 7MAKKAH PP/SEC-WOA 2009
211 GENERATOR LIFE ASSESSMENT G.T # 25 JEDDAH PP3/SEC-WOA 2009
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 22 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
212 GENERATOR LIFE ASSESSMENT G.T # 26 JEDDAH PP3/SEC-WOA 2009
213 NDT INSPECTION OF GT # 02COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2009
214 NDT INSPECTION OF GT # 02RETAINING RING + WEDGES
MADINAH PP/SEC-WOA 2009
215COMPLETE REWINDING OF ABB EXCITOR TYPE WBF6-4K
OF ABB 11D5 GT UNITJEDDAH PP3/SEC-WOA 2008/2009
216 ANNUAL INSPECTION OF ALSTOM STEAM UNIT # 11 SHOAIBA PP/SEC-WOA 2008/2009
217 ANNUAL INSPECTION OF MHI STEAM UNIT # 2 RABIGH PP/SEC-WOA 2008/2009
218 ANNUAL INSPECTION OF MHI STEAM UNIT # 5 RABIGH PP/SEC-WOA 2008/2009
219 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 6 JEDDAH PP3/SEC-WOA 2008
220 MAJOR OVERHAUL of GE GAS TURBINE UNIT # 7 JEDDAH PP3/SEC-WOA 2008
221 GENERATOR LIFE ASSESSMENT G.T # 07 RABIGH PP/SEC-WOA 2008
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 23 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
222 GENERATOR LIFE ASSESSMENT G.T # 02 RABIGH PP/SEC-WOA 2008
223 GENERATOR LIFE ASSESSMENT G.T # 01 RABIGH PP/SEC-WOA 2008
224 GENERATOR LIFE ASSESSMENT G.T # 05 RABIGH PP/SEC-WOA 2008
225 GENERATOR LIFE ASSESSMENT G.T # 10 MAKKAH PP/SEC-WOA 2008
226 GENERATOR LIFE ASSESSMENT G.T # 09 MAKKAH PP/SEC-WOA 2008
227 GENERATOR LIFE ASSESSMENT G.T # 12 MAKKAH PP/SEC-WOA 2008
228 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2008
229 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 09 MAKKAH PP/SEC-WOA 2008
230 GENERATOR ROTOR WEDGE REPLACEMENT UNIT # 10 MAKKAH PP/SEC-WOA 2008
231 GENERATOR LIFE ASSESSMENT G.T # 06 JEDDAH PP3/SEC-WOA 2008
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 24 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
232 GENERATOR LIFE ASSESSMENT G.T # 07 JEDDAH PP3/SEC-WOA 2008
233 GENERATOR LIFE ASSESSMENT G.T # 07 MAKKAH PP/SEC-WOA 2008
234 GENERATOR LIFE ASSESSMENT G.T # 01 JEDDAH PP3/SEC-WOA 2008
235 GENERATOR LIFE ASSESSMENT G.T # 03 JEDDAH PP3/SEC-WOA 2008
236 GENERATOR LIFE ASSESSMENT G.T # 09 JEDDAH PP3/SEC-WOA 2008
237 GENERATOR LIFE ASSESSMENT G.T # 13 MAKKAH PP/SEC-WOA 2008
238 GENERATOR LIFE ASSESSMENT G.T # 06 MAKKAH PP/SEC-WOA 2008
239REPLACEMENT OF MAKEUP AND DRINKING WATER
PIPELINERIYADH PP8/SEC-COA 2008
240UPGRADING OF EXISTING CONTROL SYSTEM OF ABB
TURBINES UNIT # 11 MAKKAH PP/SEC-WOA 2008
241REPLACEMENT OF ROTOR RETAINING RINGS OF GE GAS
TURBINE GENERATOR TABOUK PP/SEC-WOA 2008
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 25 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
242 REPLACEMENT OF RETAINING RINGS OF GT#1 ROTOR & INSTALLING ROTOR IN GT#5 STATOR
NAJRAN PP/ SEC - SOA 2008
243 SUPPLY OF COMPRESSOR CLEANER RABIGH PP/SEC-WOA 2007/2008
244 SUPPLY OF COMPRESSOR CLEANER JEDDAH PP3/SEC-WOA 2007/2008
245 SUPPLY OF WATER TREATMENT CHEMICAL RABIGH PP/SEC-WOA 2007/2008
246 SUPPLY OF WATER TREATMENT CHEMICAL JEDDAH PP3/SEC-WOA 2007/2008
247 SUPPLY OF FUEL INJECTION SYSTEM RABIGH PP/SEC-WOA 2007/2008
248 SUPPLY OF BOILER FUEL ADDITIVES RABIGH PP/SEC-WOA 2006/2007/2008
249 SUPPLY OF BOILER FUEL ADDITIVES SHOAIBA PP/SEC-WOA 2006/2007/2008
250 GENERATOR LIFE ASSESSMENT G.T # 04 MAKKAH PP/SEC-WOA 2007
251 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 26 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
252 GENERATOR LIFE ASSESSMENT G.T # 09 MAKKAH PP/SEC-WOA 2007
253 GENERATOR LIFE ASSESSMENT G.T # 17 MAKKAH PP/SEC-WOA 2007
254 GENERATOR LIFE ASSESSMENT G.T # 18 MAKKAH PP/SEC-WOA 2007
255 GENERATOR LIFE ASSESSMENT G.T # 01 JEDDAH PP3/SEC-WOA 2007
256 GENERATOR LIFE ASSESSMENT G.T # 04 JEDDAH PP3/SEC-WOA 2007
257 GENERATOR LIFE ASSESSMENT G.T # 13 JEDDAH PP3/SEC-WOA 2007
258 GENERATOR LIFE ASSESSMENT G.T # 19 JEDDAH PP3/SEC-WOA 2007
259 GENERATOR LIFE ASSESSMENT G.T # 21 JEDDAH PP3/SEC-WOA 2007
260 GENERATOR LIFE ASSESSMENT G.T # 27 JEDDAH PP3/SEC-WOA 2007
261 GENERATOR LIFE ASSESSMENT G.T # 01 MADINAH PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 27 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
262 GENERATOR LIFE ASSESSMENT G.T # 03 MADINAH PP/SEC-WOA 2007
263 GENERATOR LIFE ASSESSMENT G.T # 05 MADINAH PP/SEC-WOA 2007
264 GENERATOR LIFE ASSESSMENT G.T # 07 MADINAH PP/SEC-WOA 2007
265 GENERATOR LIFE ASSESSMENT G.T # 03 RABIGH PP/SEC-WOA 2007
266 GENERATOR LIFE ASSESSMENT G.T # 04 RABIGH PP/SEC-WOA 2007
267 GENERATOR LIFE ASSESSMENT G.T # 08 RABIGH PP/SEC-WOA 2007
268 GENERATOR LIFE ASSESSMENT G.T # 01 YANBU PP/SEC-WOA 2007
269 GENERATOR LIFE ASSESSMENT G.T # 02 YANBU PP/SEC-WOA 2007
270 REMOVAL OF ROTOR RETAINING RING OF GAS TURBINE UNIT # 01
YANBU PP/SEC-WOA 2007
271 GENERATOR LIFE ASSESSMENT G.T # 03 TABOUK PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 28 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
272 GENERATOR LIFE ASSESSMENT G.T # 04 TABOUK PP/SEC-WOA 2007
273 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O2
RABIGH PP/SEC-WOA 2007
274 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O4
RABIGH PP/SEC-WOA 2007
275 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O5
RABIGH PP/SEC-WOA 2007
276 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O6
RABIGH PP/SEC-WOA 2007
277 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O7
RABIGH PP/SEC-WOA 2007
278 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O8
RABIGH PP/SEC-WOA 2007
279 NDT INSPECTION OF GT # 08 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
280 NDT INSPECTION OF GT # 14 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
281 NDT INSPECTION OF GT # 19 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 29 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
282 NDT INSPECTION OF GT # 22 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
283 NDT INSPECTION OF GT # 11 COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2007
284 NDT INSPECTION OF GT # 12 COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2007
285 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES
TAIF PP/SEC-WOA 2007
286 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES
TAIF PP/SEC-WOA 2007
287 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
288 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
289 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
290 NDT INSPECTION OF GT # 03 COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2007
291 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES
YANBU PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 30 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
292 NDT INSPECTION OF GT # 04 COMPRESSOR BLADES
TABOUK PP/SEC-WOA 2007
293 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES
QUARAYAH PP/SEC-EOA 2007
294 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 10
JEDDAH PP3/SEC-WOA 2007
295 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 16
JEDDAH PP3/SEC-WOA 2007
296 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 20
JEDDAH PP3/SEC-WOA 2007
297 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 04
RABIGH PP/SEC-WOA 2007
298 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 06
RABIGH PP/SEC-WOA 2007
299 NDT INSPECTION OF GENERATOR RETAINING RING G.T # 08
RABIGH PP/SEC-WOA 2007
300 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01
YANBU PP/SEC-WOA 2007
301 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02
YANBU PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 31 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
302 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 03
MADINAH PP/SEC-WOA 2007
303 REPLACEMENT OF WATER WASH DRAIN PIPES OF GE UNITS
QASSIM PP/SEC-COA 2008
304 GENERATOR LIFE ASSESSMENT G.T # 08 MAKKAH PP/SEC-WOA 2007
305 GENERATOR LIFE ASSESSMENT G.T # 14 MAKKAH PP/SEC-WOA 2007
306 GENERATOR LIFE ASSESSMENT G.T # 16 MAKKAH PP/SEC-WOA 2007
307 GENERATOR LIFE ASSESSMENT G.T # 02 JEDDAH PP3/SEC-WOA 2007
308 GENERATOR LIFE ASSESSMENT G.T # 05 JEDDAH PP3/SEC-WOA 2007
309 GENERATOR LIFE ASSESSMENT G.T # 07 JEDDAH PP3/SEC-WOA 2007
310 GENERATOR LIFE ASSESSMENT G.T # 12 JEDDAH PP3/SEC-WOA 2007
311 GENERATOR LIFE ASSESSMENT G.T # 02 TABOUK PP2/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 32 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
312 GENERATOR LIFE ASSESSMENT G.T # 01 TABOUK PP2/SEC-WOA 2007
313 GENERATOR LIFE ASSESSMENT G.T # 01 TABOUK PP1/SEC-WOA 2007
314 SUB CONTRACTOR FOR YBA KANOO FOR POWER RENTAL TO SEC ISOLATED POWER PLANT (TOTAL = 35 MW)
VARIOUS LOCATIONS IN SAUDI ARABIA
2007
315 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02
JEDDAH PP3/SEC-WOA 2007
316 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 05
JEDDAH PP3/SEC-WOA 2007
317 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 07
JEDDAH PP3/SEC-WOA 2007
318 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 12
JEDDAH PP3/SEC-WOA 2007
319 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 14
MAKKAH PP/SEC-WOA 2007
320 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 16
MAKKAH PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 33 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
321 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01
RABIGH PP/SEC-WOA 2007
322 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02
RABIGH PP/SEC-WOA 2007
323 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 05
RABIGH PP/SEC-WOA 2007
324 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 07
RABIGH PP/SEC-WOA 2007
325 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 01
TABOUK PP/SEC-WOA 2007
326 NDT INSPECTION OF GENERATOR RETAINING RING OF G.T # 02
TABOUK PP/SEC-WOA 2007
327 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
328 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
329 NDT INSPECTION OF GT # 11 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
330 NDT INSPECTION OF GT # 12 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 34 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
331 NDT INSPECTION OF GT # 15 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
332 NDT INSPECTION OF GT # 16 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
333 NDT INSPECTION OF GT # 17 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
334 NDT INSPECTION OF GT # 18 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
335 NDT INSPECTION OF GT # 23 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
336 NDT INSPECTION OF GT # 24 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
337 NDT INSPECTION OF GT # 25 COMPRESSOR BLADES
JEDDAH PP3/SEC-WOA 2007
338 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES
TAIF PP/SEC-WOA 2007
339 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES
TAIF PP/SEC-WOA 2007
340 NDT INSPECTION OF GT # 09 COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2007
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 35 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
341 NDT INSPECTION OF GT # 15 COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2007
342 NDT INSPECTION OF GT # 17 COMPRESSOR BLADES
MAKKAH PP/SEC-WOA 2007
343 NDT INSPECTION OF GT # 01 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
344 NDT INSPECTION OF GT # 02 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
345 NDT INSPECTION OF GT # 05 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
346 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES
RABIGH PP/SEC-WOA 2007
347 NDT INSPECTION OF GT # 06 COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2007
348 NDT INSPECTION OF GT # 07 COMPRESSOR BLADES
MADINAH PP/SEC-WOA 2007
349 REPLACEMENT OF SILENCER VENT LINE & DRAIN HEADER OF BLOWDOWN TANK OF HRSG ABB STAGE-II UNIT # O3
RABIGH PP/SEC-WOA 2006
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
ATTS - Projects Reference List (Various) ATTS Quality Manual Rev02 6/10/2020 36 of 37
ADVANCED TRIAD TURBINE SERVICES LTD.
MAJOR PROJECTS BY ATTS
Sr No JOB DESCRIPTION CUSTOMER MONTH/YEAR STATUS
350 REWINDING OF GENERATOR STATOR BAHA PP/SEC-SOA 2006
351MAJOR OVERHAUL OF WESTINGHOUSE (WH251B2) GAS
TURBINEJEDDAH PP2/SEC-WOA 2005
352 CABLING OF GAS TURBINE CONTROL SYSTEM MAKKAH PP/SEC-WOA 2005
353 GENERATOR LIFE ASSESSMENT JEDDAH PP3/SEC-WOA 2004
354 MAJOR OVERHAUL OF ROLLS ROYCE AVON GAS TURBINE TABARJAL PP/SEC - EOA 2003
355DIESEL GENERATOR SETS FOR POWER GENERATION ON
POWER RENTAL BASISRANIYAH PP/SEC-SOA 2003
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED
COMPLETED