atul patankar [ asug installation member member since: 2000 linda wilson [ asug installation member...

10
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT MEMBER SINCE: 1998 [ ] DATA CENTER MIGRATION Challenges & Lessons Learned [ April 16, 2010 Debbie Van Dyke/ Suresh Rajan

Upload: edgar-davis

Post on 03-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

ATUL PATANKAR[ASUG INSTALLATION MEMBER MEMBER SINCE: 2000

LINDA WILSON[ASUG INSTALLATION MEMBER MEMBER SINCE: 1999

JUERGEN LINDNER[SAP POINT OF CONTACT MEMBER SINCE: 1998

[

] DATA CENTER MIGRATIONChallenges & Lessons

Learned

[April 16, 2010

Debbie Van Dyke/Suresh Rajan

Page 2: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

2

The Mission…

New Data Center 2

New Data Center 3

Data Center 1

Page 3: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

3

New

Database

Hardware

New

Application

Hardware

New Operating

System

Virtualization

through zones

Upgrade

Database

Implement

ASSM

Add

RAC

Change Physical

to Logical

Apply 22

Database

Patches

Switch

To NAS

Storage

Install SPS

And

Y/E HRSP

56

ENVIRONMENTS

The Challenge…

Page 4: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

New Hardware and Architecture

Database Upgrade and 22 Patches Applied

ImplementASSM

Install SPS& HRSP

RAC

Big BangBundle

Approach

ADAPTABILIT

Y

Page 5: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

5

SIMPLIFY

Page 6: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

6

LEADERSHIP

(with or without Authority)

Page 7: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

7

CREATIVITY

Page 8: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

8

COMMUNICATIO

N

Page 9: ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT

[

Real Experience. Real Advantage.

Comprehensive

Project Plan

Communication

Collaborative

Validation

Continuous

Improvement

Controlled

Execution

Celebrating

Victories

9

PLANNING