Sr.No. Description Responsible Compliance Status Target Date Priority
PLL/GDF-A/2012-13/P01
Main Recommendation : To consolidate your
maintenance practices in a maintenance policy and a
maintenance strategy
Chief Mangaer
Maintenance
PLL/GDF-A/2012-13/P02
Main Recommendation : To make mock drill exercises
more realistic in order to increase the return on
experience.
PLL/GDF-A/2012-13/P03
Observation : Regularly (frequency to be determined
upon local constraints) cleaning operations of the
insulation cladding
PLL/GDF-A/2012-13/P04Observation : Verification of all equipment comply withthe Indian regulation and the Indian electrical norms to
which the regulation refers
PLL/GDF-A/2012-13/P05Observation : The hydraulic hoses on the arms could
be more guided to prevent wear and tear
PLL/GDF-A/2012-13/P06
Comment :ELENGY does not recommend painting
stainless steel pipes (including unloading arms). It is not
clear to us whether corrosion issues occurred due to the
lack of painting or due the painting itself. For instance,
cracks on the painting may retain salty water and thus
initiate corrosion. Terminals with a similar environment
(see photo of Melaka terminal) have chosen to go for
unpainted arms.
GDF SUEZ AUDIT 2012-13 ( October 9 - Otober 12)
AUDIT OBSERVATIONS LOG ACTIONS LOG
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 2/45
Sr.No.
Description Suggested Measures
Responsible
Compliance
Status
Target
Date Priority
PLL/Ener-A/2012-13/P01 Electrical System
Energy saving potential by replaces existing
fixtures by LED & installation of solar
power pack
PLL/Ener-A/2012-13/P02Air Compressor Cooling
Water Pumping System
Energy saving potential by replacement all
pump sets
PLL/Ener-A/2012-13/P03Hot Water Pumping
System at Phase - I
Energy saving potential by replacement all
pump sets
PLL/Ener-A/2012-13/P04Chilled Water Pumping
System
Energy saving potential by replacement all
pumps
PLL/Ener-A/2012-13/P05 Air Compressor System Energy saving potential by excess air
PLL/Ener-A/2012-13/P06 Blower System
Energy saving potential by clean the filter &
overhauling of pressurized air blower in
phase - I & II
ACTIONS LAUDIT OBSERVATIONS LOG
Energy Audit 2012-13 (Nov 20th to Dec 1st )
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 3/45
Remarks
G
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 4/45
Sr.No. Description
PLL/Insu-A/2012-13/P01
Thermographic survey for Process lines for
detection of corrosion under insulation incryogenic services and also the condition of
insulation in LNG systems is not done.
PLL/Insu-A/2012-13/P02Hydrocarbon analysis for Air Separation
Unit(ASU)
PLL/Insu-A/2012-13/P03In Trip Bypass procedure,there is no criteria
decided with time limit
PLL/Insu-A/2012-13/P04Vibration measurement for Intank pumps is not
available
PLL/Insu-A/2012-13/P05
In the absence of recondensor,regasification
capacity is reduced by 75% and is major
potential for business interruption
PLL/Insu-A/2012-13/P06Audit recommendations follow up and closing
are not being done effectively
PLL/Insu-A/2012-13/P07Diesel day tank is very near to the diesel pumps
and no containment is provided.
PLL/Insu-A/2012-13/P08Flexible hose connection is provided for diesel
filling in diesel storage tanks
PLL/Insu-A/2012-13/P09
Oil insulated transformers should be separated
from each other by firewalls,spatial separation
or other approved means for the purpose of
limiting the damage and potential spread of fire
from a transformer failure.
PLL/Insu-A/2012-13/P10Inspection of LNG pipeline between jetty and
terminal is not being done.
PLL/Insu-A/2012-13/P11
Flexible hose connection for Nitrogen injection
into LNG line is isolated by manual isolation
valve and incase of passing of isolation
valve,LNG can enter nitrogen header(which is of
carbon steel metallurgy) and has potential for
fire due to damaging nitrogen header.
Risk Ins
AUDIT OBSERVATIO
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 5/45
Recommendation Responsible
Compliance
Status
Target
Date Priority
Thermographic survey for process lines to bedone.
Periodic purging from liquid loop(draining of
column and reboiler).
Time limit for a trip bypass to be mentioned.
To provide vibration measurement system for
intank pumpsClosed
Installation of second recondensor.
Consolidated audit recommendation follow up
and closing system to be established.
Provide containment around diesel day tanks.
Permanent pipeline for diesel filling.
Firewall between the transformers extending
upto a height of atleast 1m above the
transformers.
Prepare a schedule for different type of
inspection like visual inspection for health of
insulation,energy loss through insulation and
corrosion under insulation.
Provide end bling at both the end of theheaders(nitrogen and LNG) and a system should
be established to ensure normalising of the
facility after any maintenance actitivites.
rance Audit 2011-12 ( Feburary 27 - 28, 2012)
ACTIONSNS LOG
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 6/45
Remarks
OEM is unable to provide
online vibration measurement
in the current set-up.
OG
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 7/45
Sr.No. Description Responsible
Compliance
Status
Target
Date Priority
PLL/NSPC-A/2012-13/P01
During the sampling audit there was an evidence to show that the
Port has not suspended the cargo operations of the vessel inspite
of wind speed exceeding 35 knots. There is evidence indicating
that the wind speed on 26th June 2012 exceeded the parameter
l imits from the period 1500 hrs to 1900 hrs while LNGC Aseem
was at berth carrying out cargo operations. Also on 19th June
2012 from 1400 hrs to 1800 hrs when LNGC SS Disha was carrying
out cargo operations wind exceeded the required parameters of
speed limit. This is a violation of the set guidelines and the
procedures as set in Terminal operation environment Guidelines.
Necessary documents of evidence attached.
PLL/NSPC-A/2012-13/P02
The Port Facility has carried out the draft survey through their
contractor (Fugro Survey India Pvt Ltd.) on Jan 2013. The earlier
survey was carried out on Oct 2011 (Fugro Survey India Pvt Ltd.)
both these survey reports need to be approved by GMB Charge
Hydrographer or NHO.
PLL/NSPC-A/2012-13/P03
Following equipment non-operational / erratic in jetty Control
Room.
a) Navtex printer non operational.
b) Radar non-operation.
c) Aneroid barometer requires calibration. Last calibration
done 22nd march 2009.
PLL/NSPC-A/2012-13/P04The staff needs training for firefighting operations and use of
extinguishers.
Complied.
AUDIT OBSERVATIONS LOG ACTIONS LO
NSPC AUDIT 2012 (Feb 19th 2013)
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 8/45
PLL/NSPC-A/2012-13/P05
During the fire fighting drill one of the fire tender could not build
pressure in the DCP fire extinguishing mode. No record of any
routine check of the fire extinguisher sighted to reflect
continuous monitoring / working of the equipments.
Complied.
PLL/NSPC-A/2012-13/P06
Port facility is constructing new jetty of LNG terminal. Port facility
to notify NHO to issue a T & P notice to that effect.
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 9/45
Remarks
Third party assessment in
progress to ascertain the
weather parameters for
ship operations.
Both survey reports have
been submitted to GMB
and NHO. Awaiting
approval.
a)Navtex sent to Elab for
repairs expected by 15th
May.
b)Radar repaired
c)Barometer sent for
repairs expected by 15th
Ma
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 10/45
Request for notification of
‘T & P notice’ for
construction of new LNG
jetty has been sent to GMB
for promulgation.
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 11/45
Sr.No. Date Description Responsible
Compliance
Status
Target
Date Priority
AUDIT OBSERVATIONS LOG ACTIONS LO
ISPS Annual Verification Audit (Feb 19th 2013)
PLL/ISPS-A/2012-13/P03 More drills to be conducted in
order to make people familiar with
Complied.
PLL/ISPS-A/2012-13/P01 Barbed wire on south side of the
jetty broken.
Complied.
PLL/ISPS-A/2012-13/P02 More training required to staff
working on Port with regard to
Complied.
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 12/45
Remarks
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 13/45
Audit Start
Date
Audit
TypeNo.
Stat
us
2012-12-28 PA4 1 O
2012-12-28 PA4 2 O
2012-12-28 PA4 3 O
2012-12-28 PA4 4 O
2012-12-28 PA4 5 O
2012-12-28 PA4 6 O
2012-12-28 PA4 7 O
2012-12-28 PA4 8 A
2012-12-28 PA4 9 A
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 14/45
2012-12-28 PA4 10 O
2012-12-28 PA4 11 O
2012-12-28 PA4 12 O
2012-12-28 PA4 13 A
2012-12-28 PA4 14 O
2012-12-28 PA4 15 O
2012-12-28 PA4 16 O
2012-12-28 PA4 17 O
2012-12-28 PA4 18 O
2012-12-28 PA4 19 O
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 15/45
Description and Consequence
Calibration:Calibration frequency of Digital Insulation Meter is not found adhered. Fluke make digital insulation meter vide sr. no.
95320032 is calibrated on 15th March'2011 & was due in 14th March'2012. However its recalibration was conducted
on 2nd July'2012. i.e.after more than 12 months. During this period this meter was used to measure IR value of one
of the LT motor on 2nd April'2012
Maintenance:
Refer LT Motor Maintenance report for 2nd April'2012. As per documented SOP (PLL/ELECT/SOP/13)Inductance
has to be measured however this is not measured since April'2012. The IR Value limit is >1.230 Mohms in motor sr.
no. 302B However reading recorded is 1.15 MOhms.
Control Conditions:
In the Field Log Book (PLL/OPR/FRM/05) Many parameters are not recorded since Aug';2012. Reasons recorded in
log book is "Busy at Jetty" & other reasons. No further actions are taken.
Enviornmental Monitoring :
Night time Noise monitoring not found evident as per the requirements
Hazard & Risk Assesment:
1. Mooring Activity has been considered as one activity in Risk Assesment in Port Operations having hazard of injury
to mooring crew.
2. Sub activites like Pilot boarding, tug fastning to Ship, bearthing , Cargo operations etc resulting in different hazards
have not been identified seperately and focused for risk assesment.
3. Injury is not defined as Cuts/Fracture/ head injury related to body part. Existing control is not focused on type of
injury and body part in SOP1 & 3 (bearthing & mooring).
4. Construction risk (task based) not found identifed in risk register for Civil.
5. Hazard identification and risk assessment (Risk Register) are not evident for office management / activities. E.g.,
Work involved in HR and Information Technology Departments.
Incident Investigation:
Incident investigations found inadequete as per below details:
1. Workers Participation is not evident in incident investigations.2. Correction, Corrective Actions, Verification of effectiveness of corrective action is not evident.
3. Reference to change in System documentation with revision no.
4. Risk register is updated for additional hazard with controls refering to SOP which has not been revised for
adequecy. Eg. Incident Report of Fracture in leg of Mr Shyam Singh during mooring operations at Port on
21.07.2011.
Canteen - Hygiene & Safety:
Safety and hygienic conditions in all canteen found inadequete :
1. Cooked & semi cooked foods are found stored without lids.
2. Evidence of regular monitoring of hygene of 30 canteen workers are not evident, nails of workman found not
acceptable.
3. Insect catching devices and wire mesh nets on windows are not evident.
4. Elctrical wires found hanging without identification at some places.
5. Canteen workers found not aware about LPG safet .Internal Audit :
Clausal references, recorded in some of the Internal Audit Nonconformity Reports and List of Findingsare not
appropriate to the nature of the findings. eg. 16th IMS IA held on 25th & 26th October 2012- POIA 16-002 and HSEIA
16-059.
HR & Training :
In a few of the Training Feedback records, effectiveness evaluation part has not been completed by the HOD /
Section Head. Numerical raring has not been indicated and/or comments column on effectiveness are left blank. The
date of effectiveness evaluation is not indicated though time frame of 3 months has been documented in Process
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 16/45
Control Conditions:
Refer Analysis report of M/s GE dated 17th Nov'2012. Which suggested to add 20 Kgs. Of BT4301 however this
addition of BT4301 was not recorded in respective dosing register.
Document Control:
1.Latest version of documents not found at point of use.SOP followed by Electrician for LT Motor Maintenance vide
document no. PLL/ELECT/SOP/13 is Rev.01 however latest version available is Rev.02.
Maintenance:
Maintenance is following Electrical Electronic Log system to monitor preventive maintenance parameters. However this doesn't cover all checkpoints as defined in data logging format FRM/11. Equipment wise checklist needs to be
prepared to effectively monitor & follow all preventive maintenance related parameters
Aspect-Impact Assesment :
Environmental aspects and associated impacts (Aspect-Impact Register) and hazard identification and risk
assessment (Risk Register) are not evident for office management / activities. E.g., Work involved in HR and
Information Technology Departments.
Legal Requirement:
PNGRP regulation for third party approval of ERP is not identified as applicable legal requirement.
Document Control:
1. Amendment Status Record for HIRA does not have provision to capture discription of existing and proposed
change.
2. Identification of change is not evident in hard copy as shading in soft copy is not visible.
Health Monitoring :
10 persons Medical check up of 10 persons are pending, form no. 33 and 32 is not addressing requirements like
name of hazardous process and employees exposed as per safety index report , Nov-12
Operation Control:
1. Refer Work Permit No. 2191 Issued at Tank No. 04. LEL is not checked on issued date i.e. 27th Dec'2012 at
Operation- Tank Storage.
2.New Civil construction found being carried out without any permit available at site (1st floor of Suryakiran). MSDS
of bituman found not available, entry in civil maintenace pending from 18/12/12, Monitoring of metal scrap generation
not found done.
Emergency Preparedness :
Mock drill not found conducted for identified potential emergency of roll over on LNG tank leading to sudeden rise in
tank pressure due to abnormal BOG generation
Enviornmental Monitoring -Horticulture :
IMP No. 86 with target date of 30/11/12 for treatment of sanitory water using bacterial culture not found monitored.Status of green belt, survival rate of trees not found monitored. Monitoring of mangroves growth to be done half
yearly is not evident.
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 17/45
Categ
ory of
Findin
g
Focu
s
Area
Proces
s/
Area/
Depart
ment
Standar
dClause
DNV-
auditor's
Initials
Analysis of Basic Cause
of Nonconformity,
Distribution of
Responsibility Within
Organization
Minor FA Electrical
Mainten
ance
ISO9001:200
8
7.6 VB
Minor FA Electric
al
Mainten
ance
ISO
9001:200
8
6.3 VB
Minor Operati
on
ISO
9001:200
8
7.5.1 VB
Minor MR -
IMS
ISO
14001:2004
4.5.2.1 HD
Minor MR IMS OHSAS
18001:20
07
4.3.1 SC
Minor MR IMS OHSAS
18001:20
07
4.5.3.1 SC
Minor Cantee
n
OHSAS
18001:20
07
4.4.6 HD
Observ
ation
MR -
IMS
ISO
9001:200
8
8.2.2
4.5.5
4.5.5
GN
Observ
ation
HR
Training
ISO
9001:200
8
6.2.2
4.4.2
4.4.2
GN
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 18/45
Observ
ation
Operati
on
(STV)
ISO
9001:200
8
7.5.1 VB
Observ
ationFA Electric
al
Mainten
ance
ISO
9001:200
8
4.2.3 VB
Observ
ation
FA Electric
alMainten
ance
ISO
9001:2008
6.3 VB
Observ
ation
MR -
IMS
ISO
14001:20
04
4.3.1
GN
Observ
ation
MR -
IMS
OHSAS
18001:20
07
4.3.2 HD
Observ
ation
Electric
al
Mainten
ance
OHSAS
18001:20
07
4.4.5 SC
Observ
ation
OHC OHSAS
18001:20
07
4.5.2.1 HD
Observ
ation
Operati
on
(Tank
Storage
)/Civil
OHSAS
18001:20
07
4.4.6 VB
Observ
ation
Operati
ons -
Port
OHSAS
18001:20
07
4.4.7 HD
Observ
ation
Horticult
ure
ISO
14001:2004
4.5.1 HD
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 19/45
Correction to Eliminate Basic
Cause of Nonconformity
Corrective Action to Eliminate Basic
Cause of Nonconformity
Deadline for
Implementation
of Corrective
Action
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 20/45
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 21/45
Verification of
Corrective Action
and Evaluation of
Effectiveness
Date CA
Accepted
DNV
Auditor
Verifying
NC
DNV-auditor's
Verification of
Corrective
Action and
Effectiveness
DNV
Auditor
Closing
NC
Date for
Closure of
Non-
conformity
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 22/45
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 23/45
Sr.No. Responsible
Compliance
Status
Targe
Date
PLL/RG-A/2012-13/P01
The ‘Terminal Information and Port Regulations Manual’ does not contain all of the
Information that is routinely provided to or required of ships calling at the terminal.
Information requirements and instructions are only provided by email message. Oneexample is the requirement for ships to report mooring line service hours and condition, this
is not mentioned in the ‘Terminal Information and Port Regulations Manual’ in effect at the
time of the review.
Complied
PLL/RG-A/2012-13/P02
a. Vessel Vetting Verification and Acceptance Policy and Procedures were observed in 3-
different documents with inconsistencies noted between them. E.g. ‘LNG Ship Approval
Procedure’ is a stand-alone Document without issue date or Revision number; it is not
identified as a Controlled document, Standard Operating Procedure, and is not consistent
with Data required per Standardized email communications or requirements noted in the
‘Terminal Information and Port Regulations Manual’
Complied
PLL/RG-A/2012-13/P03
PLL/RG-A/2012-13/P04The Sampling System does not comply to ISO 8943 Requirements due to lack of Controls in
the existing arrangement. (ISO 8943 /sections 693, 8) ------remote control facility is not
there,however data is being monitored remotely and local supervision is done.
PLL/RG-A/2012-13/P05
a. The Sampling System does not comply to ISO 8943 Requirements due to lack of Specific
Calculations for Sub-cooling degree and Vaporizer heating capacity are not provided. (ISO
8943 /section 693)
Description
Ras-Gas AUDIT 2012
AUDIT OBSERVATIONS LOG ACT
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 24/45
Sr.
No.OBSERVATION RECOMMENDATION
P3
1
It was not evident that safety committee
members are kept appraised of latest
developments in a safety, health and
environment.
Special Safety Training programmes,Talks and
Presentations may be arranged for Safety
Committee Members and record of such training
should be maintained
2Budge for Safety is not reflecting in Annual
report of the company.
May be considered in future
3
Workers are trained, however it was not evident
that they are aware of consequences in case
deviation.
Needs to address in refresher training.
4Few SOP’s found displayed in work area such as
chemical Unloading station.
SOP’s at of critical operations should be
displayed in Bold /easily readable format.
5
Company ensures that PPE’s are given by
contractor as per specifications provided,
However reluctance in use of PPE’s needs to
controlled. All tools and tackles are provided by
company.
Needs attention.
6
Contractors do not have their own safety
organization except for the project site.
It is recommended that Safety Officer of
the company should take full
responsibility for educating /training of
contractor employees and Supervisors
in Safety and ensure that only good
quality and effective PPE’s are issued
and used by Contractor employees.
7
There are hazardous operations in the plant
including, loading and unloading of highly
flammable LNG.
Existing system is good and effective
however more vigil needs to be in
place.
8
Ambulance is available all the time but it is not
trauma care ambulance van.
Needs attention to provide ambulance
van as prescribed in Gujarat factory
rules.
9Workers are aware of their mistakes which can
prejudice safety.
BBS trails should consider in near miss safety.
10Workers found admitting their mistakes System of personal counseling is recommended.
3.3 SAFETY MANUAL
NSC - Safety Audit Report 4th
- 6th
Feb 2
OCCUPATIONAL HEALTH AND SAFETY MANA3.2 OH & S ORGANIZATIONAL SET-UP
3.2.2 Safety Committee
3.2.3 Safety Budget
3.4 SAFE OPERATING PROCEDURE
3.6 CONTRACTOR’S SAFETY SYSTEM
3.7 PLANT DESIGN AND LAYOUT
3.8 MEDICAL MANAGEMENT OF ACCIDENTS
3.11 SAFETY CULTURE
3.11.2 Attitude of Workers
3.14 JOB SAFETY ANALYSIS
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 25/45
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 26/45
20
PH-1 area: EOT crane was parked in BOG
without any work. EOT lifting hook not marked
with capacity & last date of testing. (Refer site
visit observation sl. No. 64, 65).
recommended that:
a. SWL should be painted on lifting
Hook, except for the Cranes,
where capacity of Crane changes
with angle of Boom.
21
GTG Area: EOT kept in the mid of rail without
any work. (Refer site visit observation sl. No.
90). Workshop: EOT not parked in parking bay.
(Refer site visit observation Sl. No. 94).
The parking bay to be marked
(yellow /black strips) for each EOT
or HOT cranes on its main girder &
transverse girders & Lift shall be
parked accordingly, when not I
use.
22
Fire Water Pump House: EOT found mid of its
rail whereas no work was going, Also parking
area not defined. (Refer site observation Sl. No.
44). No marking for Final Isolation switch on
EOT pendent, it require in case of emergency
when pendent switch malfunctioning. (Refer site
observation Sl. No. 45). These are accident
hazards.
The Control panel to also have
proper parking place instead of
coming in the way of persons
walking.
23
T-103: The hook of EOT lifting trolley heavily
rusted. (Refer site visit observation sl. No.75).
It is recommended for regular
inspection & servicing of all lifting hoists
in field areas is suggested.
24
Testing of Hydraulic jacks and screw jacks are
not included in the list of regular testing by a
competent person.
It is recommended that the testing of
Hydraulic jacks, screw jacks & any
other similar lifting tackles to be
included in the list of regular testing by
a competent person.
25
It is observed that generally lifting tackles are
regularly examined/ tested and records are
made available. However, the specific
identification number, SWL and date of test/due
date are not written on the tackles.
It is recommended that all Slings, Dshackles,
Eye Bolts etc. to have
metallic/aluminum tags fixed with such
details, as per Rule 62 (2) (b).
26
In workshop: Chain block Sl. no 1077, 1078,
1079 were found Without safety lock/latch. It is
may cause accidental slip of sling from the hook
leading to injury. (Refer site visit observation S.
No.96).
It is recommended that lifting hooks of
all lifting tackles like pulley blocks,
EOT/HOT Cranes, to have Safety
latches, to avoid any accidental slip of
sling.
27
Workshop: One of the Hydraulic Jack
(painted yellow colour) did not have any
identification no. & last tasted date etc.(Refer site visit observation sl. No.97).
a. All lifting tackles & equipment to
have its specific identification tag
no., & its test records.b. All tools & tackles are mapped in
SAP system.
c. All testing schedules & records are
mapped in SAP for better follow up.
4.3 MANUAL AND MECHANICAL MATERIAL HANDLING
4.4 HANDLING & STORAGE OF GAS CYLINDER
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 27/45
28
Observation at site refers point sl.
No.77: Tank T-103 DCP-EX-41 tied
with aluminum wire on Tank top.
It is recommended that all cylinders be
placed with proper stand & clamping
arrangements.
Securing needs to be done & marking &
Labeling be done as per Gas Cylinder
Rules 2004 (Chapter V rule 37/42).
Marking to be done as per Rule 6 and
Labeling/colour coding of cylinders as
per Rule 9 of Gas cylinder Rules 2004.
29
Observation at site refers point sl.
No.91: GTG-C, Inside CO2 panel many
unwanted items are found lying.
It is recommended that CO2 cylinder
rack panel be kept free of any
unwanted materials. In case any spare
items need storage, a separate cabinet
be placed.
As per Rule 8 of Gas Cylinder Rules
2004 & IS 4379, the cylinders are to be
painted for its contents & colour coding.
All arrangement for storage & handling
should be done as per various
provisions of Gas Cylinder Rules 2004.
Relevant safety posters to be displayed
in the area.
30
Material Safety Data Sheets (MSDS) &
“Dos & Don'ts” are not displayed in
various Cylinder storage & Usage areas
It is suggested that MSDS/Dos & Don'ts
be displayed. Also relevant safety
posters be displayed for general
understanding of those, who handle it.
31
All machines and dangerous areas
have been guarded adequately except
for the following observations:
Adequate guarding needs to be
provided for all rotating parts of
machines.
32
For certain hazardous plant, the
process flow chart be displayed in the
field areas for better understanding of
all concerned.
Display of process flow charts at
prominent places in Hazardous plants
is suggested.
33
Pit cover plates at many places are
dislodged or not kept securely. (E.g.:
Isolation Valve Chamber of Fire ring
main VC-54 pit near T-104 south side
covers were fixed wrongly/ upside
down, as all lifting handles are
downwards. (Refer observation sl.
no.1).
A good engineering practice to be
followed & after any use, the
Chequered plates or cover plates are
properly secured after working for the
respective pits / areas below.
34
Most crossovers on storm water drain
channels, leading to fire hydrant & hose
boxes do not have railings, which may
lead to trip & fall injury. (Refer
observation sl. No. 04, 67).
Same as above. It is suggested to raise
the railings on both sides of the cross
over pathways, above the drain
channels, to avoid trip & fall injury,
especially during emergencies.
4.5 GUARDING OF MACHINES & DANGEROUS AREAS
4.6 MEANS OF ACCESS, PLATFORMS & RAILINGS
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 28/45
35
Jetty Upper deck: FRP Grating placed
near ULA found damaged. (Refer
observation sl. No. 21).
Any damaged grating be replaced immediately
lest it leads to an accident.
36
At many places Safety Chains for cat
ladders or monkey ladders are either
not provided or are not kept in latched
condition. This is a trip & fall hazard.
(Refer observation at sl. No.22, 53).
a. To identify the places where it needs
to be incorporated & incorporation of
Safety chains for Monkey ladders be
done for all such places.
b. A display Stickers be placed at all
locations for Users, to latch these
safety chains after its use.
37
Toe-guards are missing at many places
in platform railings & ladder stairs.
(Refer observation sl. No. 26, 52, and
54).
a. Identify all such locations where the
toe guards are to be placed for
platforms/ landings & stairways.
b. Incorporate these, wherever
possible with hot work as per good
engineering practice.
c. If hot work not possible, the bolted
arrangement of fixing toe guards be
considered.
38
GTG area: Near toilet, to reach to
ground level from GTG level, it is steep
down is more & may cause a trip & fall
hazard. (Refer to observation sl.
No.92).
It is recommended to provide suitable
railing & steps, to avoid trip & fall
hazard.
39Near east side of PH-1A/H: Drain pit found without
any cover.
It is recommended to place suitable cover plate /
grating.
40
PH-2 STV Area: STV drain header is found normally
used as walkway. (Refer sl. No.60).
Recommended to widen this path as
per engineering standard at places
where it is smaller, to avoid trip & fall.
41
T-103: Lift door opening orientation is
not proper & causes undue hindrance &
congestion at the landing area.
(Refer sl. No. 71).
It suggested to review, the possibility of
change of orientation for opening of the
door, in consultation with the OEM
/supplier.
42
Tank-103: At E-V1104B-092 and E-
1104A-089, floor openings without
cover plate / gratings.
Recommended to place such covers after
completion of site jobs.
43
At Jetty Operator room: The ear plug dispenser
was found to be empty.
It must be ensured that regular
replenishment of PPEs like ear plugs ismade at all locations in plant areas
especially distant areas like Jetty
Control room or Jetty Operator’s room.
4.7 VENTILATION, ILLUMINATION, NOISE
4.8 HOUSEKEEPING
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 29/45
44
Jetty Operator’s room at the top deck is
cluttered with many unwanted items
kept in room. (Refer Sl. No. 25).
All operations areas be maintained
spruced up & no unwanted items be
allowed to be placed or parked. This
room not to be used as stopgap storage
space.
45
Jetty Control Room: Many unwanted
items kept in control room, someblocking easy access to BA set.
It is suggested that a review be taken to
spruce up & decongest the room, whichin our opinion may give rise to
additional 20% floor space, by proper
stacking & mounting of essentially
required items.
46
PH-1 Air Pre-heater: Many small &
loose items found in air pre-heater area,
which may cause fall accidentally &
cause injury. (Refer sl. No. 51).
a) A regular housekeeping visit is
made, to avoid such situations.
b) Contractors be advised to use
plastic or wooden tool kits boxes to
47
Top of tank-103: Loose piece of MS
plate & small items like nut / bolts are
lying. (Refer sl. No.74 & 81).
keep all small loose items, at
respective work place.
All unwanted & left over items are removed after
work is over.
48
GTG Area; Vegetation growth in cable
tray of GTG-A observed. (Refer sl. No.
89).
Operations / Maintenance to
ensure before respective work
permit are returned.
49
Workshop Area: In front of workshop
entrance pathway, many loose
items/equipment are kept like
Motors/spring support/SS Hose etc.
without any identification tags or
marking.
a) In case items are not usable these
be moved for disposal.
b) In case items are required for reuse
later, the same shall be
preserved & identification tags be
used for each of such item.
50
The Tyco test bench is being calibrated once in a
year internally.
The test bench be calibrated & tested
through any third party agency like
Godrej.
51
It is observed that the instrument related PMs are
not loaded in SAP.
All activities are mapped in SAP. Also it
is recommended that all PMs related to
maintenance are loaded on SAP also.
52
A system is in place for instrumentation
maintenance. Regular calibration checks are done
at predetermined frequencies.
A very good practice to continue. It is
suggested that all instrument PMs are
mapped & results are loaded in SAP.
53
GTG package equipments are checked once in 4
months & other GTG instruments are as per
service of OEM.
A good practice to continue.
These activities of Package be mapped
in SAP too.
54
For Pressure & Temperature gauges
there is no fixed schedule of regular
calibration. However, it is done based
on feedback from Operations.
It is suggested to consider inclusion of
these instruments which are important
for field indications, in regular list of
calibration schedule.
4.9 PREVENTIVE MAINTENANCE SYSTEM AND RECORDS PSVs/TSVs Maintenance:
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 30/45
55
Petronet LNG has a good practice to
get all the spring supports of pipeline
checked through a third party M/s Pipe
Support India & last check was done on
22/02/2012. It is learn that 43 nos. of
defective supports were attended /
replaced. However these reports arenot available in SAP. Sample of Spring
support SS-E1002 verified & found OK.
This good practice to continue.
However, it is recommended that these
reports be made available in SAP
system for future reference & to trace
back the history.
56
Near LDB-103-B3-24, Jetty to CR
Head: Cable tray main supports are
badly corroded. (Refer sl. No. 27).
Near L-04-3005 Transformer at Jetty
CR: Main supports of cable tray are
badly corroded. (Refer sl. No. 29).
It is suggested that regular inspection
be done for other than spring hanger
supports, not only for pipelines but for
other facilities & structures, for its
proper contact, transfer of loads, decay
due to rusting, corrosion etc.
57
The work permit system has a separate
permit system for working inside the
“vessel” & same is being used for
working at “confined spaces” as well.
The conditions for working in confined
space could be different from working
inside a Vessel.
This permit to be titled as “Working in
Confined space / Inside Vessels.
The conditions for working in “confined
space” could be different from working
inside a Vessel, to be elaborated
accordingly.
58Exhaust silencers of Diesel pump at fire water
pump house are badly corroded.
To be attended immediately, lest it causes an
accident.
59
GTG Area: Ph-1 GTG SOx and NOx
analyzers out of order. Many cableswere found loose / out of tray for these
analyzers. (Refer sl. No. 85 &87).
It is recommended to ensure that all
environment related instruments/analyzers are maintained in good
working condition. The cable are
properly laid, saddled & clamped to the
respective cable trays.
60
Refer to Recycled Plastic Manufacture
& Usage Rules; Amendment 2003;
Plastic Waste (Management & handling
Rules) 2011.
It is suggested that accounting of
Hazardous wastes like e-Waste, Old
used Batteries, Oil soaked Cotton
Waste, Oily Drums & other
HDPE/Plastic containers of hazardous
chemicals is properly maintained &
disposed.
P5
4.10 WORK PERMIT SYSTEM
4.12 MONITORING OF WORK PLACE & STACK EMISSION (TREATMENT & DISPOSAL OF WASTES & EFFL
CHEMICAL & PROCESS SAFETY5.1 STORAGE & HANDLING OF HAZARDOUS CHEMICAL
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 31/45
61
17 nos. Relevant MSDS are available in
the system.
The display is done at few places field
areas as well.
However, there is need to develop
posters for “do’s & don’ts”
It is suggested to wide spread the
display of posters on “Do’s & Don’ts”
related to hazards while handling of
various chemicals. These to be
displayed at its place of storage &
usage.
62 Fire orders are available. Call response procedure may be displayed
63
Emergency Procedure is available. It is suggested that Communication
Chart may be included in ECP. Also in
absentia of Key persons may be
defined.
64
Emergency lights are available. Periodic testing, cleaning and
calibration should be done and record
should be maintained.
65
There are no fire call points; however
telephone booths/ Paging facility is
available.
Arrangement is Satisfactory, Shall need
further extension during expansion of
factory activities and Increased
inventory.
66
Distance between storage of
Flammable and Combustible material is
adequate as per layout which is well
designed.
Company may consider to purchase
Fire tender with Water Mist/Fog
generator.
67
Flame proof fittings are available as per HAC in
entire premises.
MMC Panel room on jetty (Below Jetty
C.R. should be provided with flame
proof Fitting though area is not in HACmapping to exhibit similarity.
68
Emergency procedures are displayed if form of
caution boards, Do’s and Don’ts and MSDS.
Worth appreciating efforts however few
boards found faded and needs
repainting as mentioned in enclosed list
of survey points.
69
There are no manual fire call points
however internal telephone facilities
with dedicated Tel Nos. Telephone
booths and Paging booths are
available. Two booths found O/O during
audit.
Corrective action for proper functioning
70
There are four electrical driven, two diesel driven
pump and jockey pump.
It is suggested that these pumps are
maintained in good working condition
all the time. Repair and maintenance
should be of top priority.
5.2 FIRE AND EXPLOSION HAZARDS
5.2.1 Built in safety in Civil design and Construction
5.2.2 Built in safety in Electrical Circuits and Equipment’s
5.2.4 Fire safety in handling Flammable and explosive material
5.2.5 Fire Detection and Alarm System
5.2.7 Fixed fire Extinguishing system
5.2.8 Portable Fire Extinguishers
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 32/45
71
Fire extinguishers are located at
conspicuous positions. It was observed
that foam type extinguishers were kept
in factory hospital.
Area wise extinguisher location map should be
prepared.
72
Two Fire DCP/Foam/Water fire tender is available. Consider purchase of fire tender in as
company is expanding, as proposedand discussed.
73
Firefighting equipment’s is having
proper access. However few hydrant
locations needs reorientation as storm
water drains are in proximity as listed in
site observation points.
Corrective action may be planned.
74
Fire drill is carried out by ERT during mock drill
only.
It is recommended that Fire drill and
training may be extended to employees
also to further strengthen fire fighting
capability of factory.
75
For Fire there is having dedicated internal
telephones.
There is adequate communication
facility. However instillation and use of
public address system may be
considered. This facility is of multi
utility and can also be used for
important announcements.
76
Mock drills are conducted quarterly.
No drill is conducted in night shift.
Feed back of the drill is documented.
There is Mutual Aid Scheme, andresponse of nearby industries is
satisfactory.
It is recommended that Fire mock drill
for different Scenarios of emergency
should be conducted at least once in a
quarter. Fire mock drill involving outside agencies should also be
conducted at least once in a year. One
of the mock drill should be in the Night
and/or Sunday/Holiday. Mock drill
report Should be prepared and
deficiencies should be corrected.
Mock drill report should circulate for the
understanding of outcome.
Mutual Aid Scheme is highly useful to
combat actual Emergencies. It is
suggested that Safety Officer may take
initiative in Mutual Aid Group.
P6
77
No Specific noise study has been done and
required.
It is suggested that meter should be
kept in good working condition,
Periodically calibrated and should be
use for Nose monitoring.
5.2.9 Firefighting equipment and Facilities
5.2.10 Fire Drills
INDUSTRIAL HYGIENE & OCCUPATIONAL HE6.1.3 Noise
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 33/45
78
Safety section is having Noise meter which was in
operational during the Audit.
Noise readings outside factory
boundary wall should be measured
during the Night time for the compliance
of Noise Act 2005.
79
Audiometric test is not conducted during periodic
medical checkup.
Audiometric test should be conducted
periodically for the persons who
suppose to be deployed in noisy area.
80Minimum one person at each work station is
qualified first aider.
It is suggested to display names and Tel no, of First
aider on First Aid Box.
81Trained first aiders available, however their names
are not displayed.
Names are to be displayed as near the First Aid
boxes.
82
List of required PPE for each hazardous
is available. During the audit survey
round it was observed that appropriate
PPE are available in work areas.
Helmets made available, Aprons PVC
Suits, Nitrile gloves Asbestos gloves,
and Ear muffs/Ear plugs were available.
Workers are also found wearing PPE.
Use of Safety glasses was not
observed.
Employees should be encouraged to
use Safety goggles on regular basis as
general precaution.
83Feedback from workers is not evident. It is suggested that workers may be involved in PPE
selection process.
84
PPE’s are available in Stores and issued to Plant/
Departments.
It is Suggested that safety Dept should
take a lead role to recommend and
release of PPE’s and should maintainthe record of issue.
85PPE’s purchased are of IS Standard. Always ensure procurement of good quality PPE’s
Only.
86
Site area map including layout access
roads and assembly points is not
available in Control room.
It is recommended that such map should be
displayed in Control room.
87
Hierarchy of emergency response
personnel is well identified in
Emergency Control Plan.
It is suggested that ‘Statement ‘ for
taking over charge by lower level official
in case of absentee of key personnel
should be included. There by system
will be automatically effective.
88
During the audit enquiry the siren for
declaration of emergency is not known
to all Employees especially contractor
employees
Standard practice of wailing Siren for
three minutes and Continuous siren for
one minute for Declaring emergency
and all clear should be followed and
should be communicated to employees.
6.5 PERSONAL PROTECTIVE EQUIPMENT (PPE) & EMERGENCY EQUIPMENTS
6.3 FIRST AID FACILITY AND OCCUPATIONAL HEALTH CENTRE
6.7 EMERGENCY PREPAREDNESS
6.7.1 Site Specific details
6.7.2 Duties and Responsibilities of Key personnel
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 34/45
89
Scenarios of various nature including
natural calamity such as earth quake
may be taken for mock drill and
emergency evacuation.
Different scenarios for mock exercise
should be taken. System of head count
should also be practiced.
90
Chances of off-site emergency areremote; however transport emergency
situations are not considered.
It is suggested that management mayconsider public awareness training in
future on off-site emergency plan and
transport emergency situations as well.
91
Check list for periodic inspection, such as
• Storage of Hazardous Chemicals
• Electrical hazards
• Fire safety
• Hand tools and portable tools
• Machine guarding
• Lifting equipment’s are not available
• House keeping
• Emergency equipment’s
• Gas cylinder. are in place
It is recommended that, such check list should use
for inspections.
DEPARTMENT OBSERVATIONS
ELECTRICAL 7FIRE 13
FINANCE 1
HORTICULTURE 1
HR & ADMIN 2
HSE 17
INSTRUMENT 4
MECHANICAL 19
OHC 4
OPERATION 19
PORT OPERATION 2
PROJECT 1
SECURITY 1
Total 91
Department wise Audit Findings
6.7.6 Periodic drills/exercises
6.7.7 Public awareness programme
6.8 SAFETY INSPECTIONS
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 35/45
Department Target Date Remarks
HSE
FINANCE
HSE
OPERATION
HSE
HSE
OPERATION
OHC
HSE
HSE
13
GEMENT
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 36/45
OPERATION
HSE
HSE
HR
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 37/45
MECHANICAL
MECHANICAL
OPERATION
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 38/45
FIRE
ELECTRICAL
OPERATION
MECHANICAL
OPERATION
FIRE
PROJECT
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 39/45
MECHANICAL
MECHANICAL
MECHANICAL
ELECTRICAL
OPERATION
OPERATION
ELECTRICAL
OPERATION
PORT
OPERATION
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 40/45
OPERATION
PORT
OPERATION
OPERATION
OPERATION
HORTICULTURE
MECHANICAL
MECHANICAL
INSTRUMENT
INSTRUMENT
INSTRUMENT
INSTRUMENT
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 41/45
MECHANICAL
ELECTRICAL
HSE
OPERATION
ELECTRICAL
HSE
ENTS)
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 42/45
OPERATION
FIRE
FIRE
ELECTRICAL
FIRE
FIRE
ELECTRICAL
OPERATION
FIRE
OPERATION
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 43/45
FIRE
FIRE
FIRE
FIRE
FIRE
FIRE
HSE
LTH
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 44/45
HSE
OHC
OHC
OHC
HSE
HSE
HSE
HSE
OPERATION
OPERATION
HSE
7/28/2019 Audit Compiance
http://slidepdf.com/reader/full/audit-compiance 45/45
SECURITY
HR