7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
1/44
EPC SENATE CONFERENCE AT BANGKOK
23 & 24 SEPT 2013
ORGANIZED BY: TRUEVENTUS,MALAYSIA
CASE STUDY -PRESENTED BY
.FUTURA ELECTRONICS PRIVATE LTD
29,GOWRI AVENUE
ANAGAPUTHUR
CHENNAI600070
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
2/44
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
3/44
EPC PROJECTS
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
4/44
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
5/44
ENHANCE
AUGUMENT
RENOVATEMODERNIZE
BROWN
FIELDPROJECTS
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
6/44
Assess Aged EquipmentUnderstand additions
Study technical feasibility
Drawings / documentsUndocumented changes
Obsolete Spare parts
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
7/44
PCC Brown Field EPC @ Salalah-Oman
Futura Electronics Private Limited,Chennai,600070,India
Project Lead- S.Santhiraj
April - 2011
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
8/44
Brownfield
Project Salalah
STP
Through Prime
EPCI contractor-MPE-Turkey
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
9/44
OVERALL ACTION PLAN
Site Visit for Data Collection
Proposal with Requirements
Front End Engineering Design
Detailed Design &Owners Consultant Approval
Estimation, Negotiation & Order receipt
Manufacture
Factory Acceptance Testing
Installation
Commissioning
Dispatch
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
10/44
SITE VISITPanel Cross Section Dimensions
Bus bar Size & disposition
Foundation
Discussion with maintenance for
collecting undocumented wiring changes
Drawings collectionCondition Assessment
Spare parts inventory check
Feed back from operation groupUnattended problems
Additional requirements
Photos of bus bars and PCC
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
11/44
SITE VISIT EXISTING POWER CONTROL CENTER
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
12/44
SITE VISIT PCC BUS BAR EXTENSION ONLY TO THE LEFT SIDE
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
13/44
Site DataBill Of
Quantities
Scope
Definition
Risks
QHSE
Engineering
Man HoursSite Work
Estimation
Feasi i ity
HAZOP
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
14/44
HAZOP -STUDYONE INCOMER AVAILABLE
ONE MORE INCOMER
NEEDED
WHAT IF BOTH INCOMERS
PRESSED INTO SERVICE?
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
15/44
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
16/44
POKA YOKE MISTAKE PROOFING
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
17/44
POKA YOKE -coined by
Japanese industrial processengineer Shigeo Shingo
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
18/44
ENABLE:ONE INCOMER FOR SERVICE
DISABLE:
PUTTING TWO INCOMERS INTO SERVICE BY ERROR
NEED YOKE
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
19/44
TWO LOCKS ONE KEY
KEY REMAINS STAY PUT WHEN LOCK IS
OEPRATED
SO, OPERATOR CAN OPERATE ONLY
ONE LOCK AT A TIME
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
20/44
RISKSPHASE RISKS / CONSTRAINTS REMARKS
TECHNICAL PARALLELING OF TWOSOURCES LEADING TO
FLASHING
2 LOCK+1 KEY INTERLOCK
INSTALALTION CYCLE TIME DAMAGE WHILE REMOVAL BACK UP SPARES
COMMISSIONINGTIME
FAILURE OF COMPONENTSWHILE TESTING
72 HOURS SHUT DOWN
BACK UPSPARES/CONSUMABLES
Proper Plan of scope of work
Briefing before S/D
Course Correction
Crises handling
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
21/44
QHSE COMPLIANCE
Quality Assurance Plan
FAT procedureMethod Statement for pre commissioning &
commissioning
Tool box meeting and briefing
ns a a on epor
Power up after installation with only controls power ONfor functional checking
Commissioning
Training of Owners personnel
Training of Owners O&M contractorsSafety Plan for Installation and Commissioning
Waste disposal plan as per prevailing norms of House
Keeping policy of owner
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
22/44
TECHNICAL PROPOSAL & SUBMIT TO
CLIENT
SITE VISIT
OK ?
Front End Engineering Design
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
23/44
ESTIMATIONNEGOTIATION
ORDER RECEIPT
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
24/44
DETAILED DESIGN
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
25/44
Scope of Work
Bus Bar Extension to the left of existing PCC
Extension Panel Size 1800(H) x 2340(H)x1800(D) Single front
Extension panel to house1 x ACB 2000A + 1 X ACB1250A + 2X MCCB800A
Bus bar interfacing between above panel & old panel
Termination of cables to extra feeders
Interlocking of Two Incomers with 2 Lock +1 Key , so that only
any one incomer active always
Electrical connections to be done within 72 hours of shutdown
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
26/44
Single Line Diagram
KWH
METER
Power from the existing Generator
2000A, ACB, 3P, EDO, WITH O/L, S/C AND E/F RELEASE
415V, 50HZ, 3Ph, 4 Wire Bus with EXTENSION COUPLING TO EXISTINGCOPPER BUS 3000A,COPPER 85KA
800A, 3P,MCCB
800A, 3P,MCCB
1200A, ACB, 3P, MDO, WITH O/L AND S/CRELEASE
MCC-B MCC-4B MCC-3C
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
27/44
S.NO DESCRIPTION SPECS MAKE QTY REMARKS
1 ACB, EDO 3P, 2000A ABB 1
2 ACB, MDO 3P, 1200A ABB 1
3 MCCB 3P, 800A ABB 2
4 R,Y,B IND. LAMPS 230V AC TEKNIC 3
5 VOLTMETER 500V AC NIPPEN 1
6 AMMETER 0-3000A NIPPEN 1
7 ENERGY METER KWH NIPPEN 1
BILL OF MATERIALS
8 RED CLOSE LAMP 230V AC TEKNIC 1
9 GREEN OPEN LAMP 230V AC TEKNIC 1
10 AMBER TRIP IND.LAMP 230V AC TEKNIC 2
11 CTS 3000/5 NIPPEN 3
12 VOLTMETER SS 600V AC TEKNIC 1
13 AMMETER SS 4 POSL TEKNIC 1
14 PANEL ENCLOSURE 1
15 CONTROL FUSES-SET 6A 1
16 NEUTRAL LINK-SET 32A TEKNIC 1
17 NAME PLATES-SET 1
18 SELECTOR SWITCH 4
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
28/44
Incomer Control Circuit Scheme with 2 Lock + 1
Key Interlock
PTB-2
E,
50HZSUPPLYBYUSER
-MCB1
E-110VAC
ED
37ST81
STB-1
R-BUS
-MCB2
ECOIL
D1U1 37
110V ACP 110V ACP1 230V R230V R1
2000 A
PTB-1
110VAC,
SINGLEP
HA
DP-6
SPRINGCH
AR
SPRINGCH
AR
38ST
82
STB-2
N-BUS
DP-6
UNDERVOL
TAG
YU
D2U2 38
110V ACN 110V ACN1 230V N 230V N1
ACB
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
29/44
Front Elevation of the additionalPCC section
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
30/44
Bus Bar Matching for Extension using
Fish Plates 940 860
Suggested cut outs in existing panel
for connection size: 200[H]*100[W]
R-Phase copper bus 90*6 sq.mm.
- *
170
225
. .
B-Phase copper bus 90*6 sq.mm.
N-Phase copper bus 90*6 sq.mm.
170
275
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
31/44
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
32/44
MANUFACTURE
PREPARE QUALITY ASSURANCE PLAN & GET IT APPROVED
PREPARE DETAILED DESIGN DRAWINGS & GET THEM APPROVED
PREPARE FAT PROCEDURE & GET IT APPROVED
PROCURE COMPONENTS WITH TEST CERTIFICATES
PERFORM INCOMING CHECKS FOR QUALITY & LOG
MANUFACTURE PANEL WITH STAGE INSPECTION & LOG
MOUNT COMPONENTS AS PER APPROVED DRAWINGS
BUS BAR BENDING,MOUNTING & FIXING
CABLING WITH FERRULES
IN HOUSE ASSEMBLY TEST
HV TEST
MEGGER
POWER UP
FUNCTIONAL TEST
FAT BY CLIENT
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
33/44
INSTALLATION
Civil work for cable trench as per
foundation planLaying of cables for extra feeders with
enough loop lengths for termination
connectionPositioning additional panel to location
Cut out in existing panel for bus bar
access
Identifying circuit points for controlcircuit supply of 110VAC new panel,
from the old panel
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
34/44
EXISTING PCC FRONT ELEVATION
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
35/44
Existing PCC switch board
Left side wall of the existing
PCC removed
Bus bar extension coupled
using fish plates for theadditional panel
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
36/44
New PCC Extension Panel Front View
Bus Bar Extension
ABB make ACBs &
Cable Entry
MCCBs
2000A-ACB-Incomerwith EDO,O/L,S/C,E/F &
U/V protection
1200A-ACB-Outgoing
Feeder with MDO,O/L &
S/C release
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
37/44
New PCC Extension Panel Bus Bars View at back side
us ar atc ng n
Elevation & Depthfor proper fish plate
seating
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
38/44
EXTENDED BUS BAR
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
39/44
OLD PCC PANELEXTENSION PANEL
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
40/44
COMMISSIONING PROBLEMDG feeder(IC2) could
not be put into service,
when the other
incomer(IC1) was put
out of service
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
41/44
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
42/44
SURPRISES COMMISSIONING PHASE
Tapping for Control Voltage DG
incomer-2000A, changed to new
panels incomer bus bar , this is toensure power availability before
switching on the DG Incomer.When DG
is OFF, DG incomer cannot be put onservice, as there is no control voltage
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
43/44
The Team
-
7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT
44/44
For Flawless Planning & Execution of
Brownfield Projects in E&I
Contact:
S.SANTHIRAJ, +91 98400 46463
FUTURA ELECTRONICS PRIVATE LIMITED29,Gowri Avenue
Anagaputhur
Chennai
600070
India