  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    1/44

    EPC SENATE CONFERENCE AT BANGKOK

    23 & 24 SEPT 2013

    ORGANIZED BY: TRUEVENTUS,MALAYSIA

    CASE STUDY -PRESENTED BY

    .FUTURA ELECTRONICS PRIVATE LTD

    29,GOWRI AVENUE

    ANAGAPUTHUR

    CHENNAI600070

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    2/44

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    3/44

    EPC PROJECTS

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    4/44

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    5/44

    ENHANCE

    AUGUMENT

    RENOVATEMODERNIZE

    BROWN

    FIELDPROJECTS

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    6/44

    Assess Aged EquipmentUnderstand additions

    Study technical feasibility

    Drawings / documentsUndocumented changes

    Obsolete Spare parts

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    7/44

    PCC Brown Field EPC @ Salalah-Oman

    Futura Electronics Private Limited,Chennai,600070,India

    Project Lead- S.Santhiraj

    April - 2011

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    8/44

    Brownfield

    Project Salalah

    STP

    Through Prime

    EPCI contractor-MPE-Turkey

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    9/44

    OVERALL ACTION PLAN

    Site Visit for Data Collection

    Proposal with Requirements

    Front End Engineering Design

    Detailed Design &Owners Consultant Approval

    Estimation, Negotiation & Order receipt

    Manufacture

    Factory Acceptance Testing

    Installation

    Commissioning

    Dispatch

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    10/44

    SITE VISITPanel Cross Section Dimensions

    Bus bar Size & disposition

    Foundation

    Discussion with maintenance for

    collecting undocumented wiring changes

    Drawings collectionCondition Assessment

    Spare parts inventory check

    Feed back from operation groupUnattended problems

    Additional requirements

    Photos of bus bars and PCC

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    11/44

    SITE VISIT EXISTING POWER CONTROL CENTER

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    12/44

    SITE VISIT PCC BUS BAR EXTENSION ONLY TO THE LEFT SIDE

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    13/44

    Site DataBill Of

    Quantities

    Scope

    Definition

    Risks

    QHSE

    Engineering

    Man HoursSite Work

    Estimation

    Feasi i ity

    HAZOP

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    14/44

    HAZOP -STUDYONE INCOMER AVAILABLE

    ONE MORE INCOMER

    NEEDED

    WHAT IF BOTH INCOMERS

    PRESSED INTO SERVICE?

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    15/44

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    16/44

    POKA YOKE MISTAKE PROOFING

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    17/44

    POKA YOKE -coined by

    Japanese industrial processengineer Shigeo Shingo

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    18/44

    ENABLE:ONE INCOMER FOR SERVICE

    DISABLE:

    PUTTING TWO INCOMERS INTO SERVICE BY ERROR

    NEED YOKE

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    19/44

    TWO LOCKS ONE KEY

    KEY REMAINS STAY PUT WHEN LOCK IS

    OEPRATED

    SO, OPERATOR CAN OPERATE ONLY

    ONE LOCK AT A TIME

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    20/44

    RISKSPHASE RISKS / CONSTRAINTS REMARKS

    TECHNICAL PARALLELING OF TWOSOURCES LEADING TO

    FLASHING

    2 LOCK+1 KEY INTERLOCK

    INSTALALTION CYCLE TIME DAMAGE WHILE REMOVAL BACK UP SPARES

    COMMISSIONINGTIME

    FAILURE OF COMPONENTSWHILE TESTING

    72 HOURS SHUT DOWN

    BACK UPSPARES/CONSUMABLES

    Proper Plan of scope of work

    Briefing before S/D

    Course Correction

    Crises handling

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    21/44

    QHSE COMPLIANCE

    Quality Assurance Plan

    FAT procedureMethod Statement for pre commissioning &

    commissioning

    Tool box meeting and briefing

    ns a a on epor

    Power up after installation with only controls power ONfor functional checking

    Commissioning

    Training of Owners personnel

    Training of Owners O&M contractorsSafety Plan for Installation and Commissioning

    Waste disposal plan as per prevailing norms of House

    Keeping policy of owner

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    22/44

    TECHNICAL PROPOSAL & SUBMIT TO

    CLIENT

    SITE VISIT

    OK ?

    Front End Engineering Design

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    23/44

    ESTIMATIONNEGOTIATION

    ORDER RECEIPT

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    24/44

    DETAILED DESIGN

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    25/44

    Scope of Work

    Bus Bar Extension to the left of existing PCC

    Extension Panel Size 1800(H) x 2340(H)x1800(D) Single front

    Extension panel to house1 x ACB 2000A + 1 X ACB1250A + 2X MCCB800A

    Bus bar interfacing between above panel & old panel

    Termination of cables to extra feeders

    Interlocking of Two Incomers with 2 Lock +1 Key , so that only

    any one incomer active always

    Electrical connections to be done within 72 hours of shutdown

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    26/44

    Single Line Diagram

    KWH

    METER

    Power from the existing Generator

    2000A, ACB, 3P, EDO, WITH O/L, S/C AND E/F RELEASE

    415V, 50HZ, 3Ph, 4 Wire Bus with EXTENSION COUPLING TO EXISTINGCOPPER BUS 3000A,COPPER 85KA

    800A, 3P,MCCB

    800A, 3P,MCCB

    1200A, ACB, 3P, MDO, WITH O/L AND S/CRELEASE

    MCC-B MCC-4B MCC-3C

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    27/44

    S.NO DESCRIPTION SPECS MAKE QTY REMARKS

    1 ACB, EDO 3P, 2000A ABB 1

    2 ACB, MDO 3P, 1200A ABB 1

    3 MCCB 3P, 800A ABB 2

    4 R,Y,B IND. LAMPS 230V AC TEKNIC 3

    5 VOLTMETER 500V AC NIPPEN 1

    6 AMMETER 0-3000A NIPPEN 1

    7 ENERGY METER KWH NIPPEN 1

    BILL OF MATERIALS

    8 RED CLOSE LAMP 230V AC TEKNIC 1

    9 GREEN OPEN LAMP 230V AC TEKNIC 1

    10 AMBER TRIP IND.LAMP 230V AC TEKNIC 2

    11 CTS 3000/5 NIPPEN 3

    12 VOLTMETER SS 600V AC TEKNIC 1

    13 AMMETER SS 4 POSL TEKNIC 1

    14 PANEL ENCLOSURE 1

    15 CONTROL FUSES-SET 6A 1

    16 NEUTRAL LINK-SET 32A TEKNIC 1

    17 NAME PLATES-SET 1

    18 SELECTOR SWITCH 4

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    28/44

    Incomer Control Circuit Scheme with 2 Lock + 1

    Key Interlock

    PTB-2

    E,

    50HZSUPPLYBYUSER

    -MCB1

    E-110VAC

    ED

    37ST81

    STB-1

    R-BUS

    -MCB2

    ECOIL

    D1U1 37

    110V ACP 110V ACP1 230V R230V R1

    2000 A

    PTB-1

    110VAC,

    SINGLEP

    HA

    DP-6

    SPRINGCH

    AR

    SPRINGCH

    AR

    38ST

    82

    STB-2

    N-BUS

    DP-6

    UNDERVOL

    TAG

    YU

    D2U2 38

    110V ACN 110V ACN1 230V N 230V N1

    ACB

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    29/44

    Front Elevation of the additionalPCC section

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    30/44

    Bus Bar Matching for Extension using

    Fish Plates 940 860

    Suggested cut outs in existing panel

    for connection size: 200[H]*100[W]

    R-Phase copper bus 90*6 sq.mm.

    - *

    170

    225

    . .

    B-Phase copper bus 90*6 sq.mm.

    N-Phase copper bus 90*6 sq.mm.

    170

    275

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    31/44

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    32/44

    MANUFACTURE

    PREPARE QUALITY ASSURANCE PLAN & GET IT APPROVED

    PREPARE DETAILED DESIGN DRAWINGS & GET THEM APPROVED

    PREPARE FAT PROCEDURE & GET IT APPROVED

    PROCURE COMPONENTS WITH TEST CERTIFICATES

    PERFORM INCOMING CHECKS FOR QUALITY & LOG

    MANUFACTURE PANEL WITH STAGE INSPECTION & LOG

    MOUNT COMPONENTS AS PER APPROVED DRAWINGS

    BUS BAR BENDING,MOUNTING & FIXING

    CABLING WITH FERRULES

    IN HOUSE ASSEMBLY TEST

    HV TEST

    MEGGER

    POWER UP

    FUNCTIONAL TEST

    FAT BY CLIENT

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    33/44

    INSTALLATION

    Civil work for cable trench as per

    foundation planLaying of cables for extra feeders with

    enough loop lengths for termination

    connectionPositioning additional panel to location

    Cut out in existing panel for bus bar

    access

    Identifying circuit points for controlcircuit supply of 110VAC new panel,

    from the old panel

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    34/44

    EXISTING PCC FRONT ELEVATION

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    35/44

    Existing PCC switch board

    Left side wall of the existing

    PCC removed

    Bus bar extension coupled

    using fish plates for theadditional panel

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    36/44

    New PCC Extension Panel Front View

    Bus Bar Extension

    ABB make ACBs &

    Cable Entry

    MCCBs

    2000A-ACB-Incomerwith EDO,O/L,S/C,E/F &

    U/V protection

    1200A-ACB-Outgoing

    Feeder with MDO,O/L &

    S/C release

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    37/44

    New PCC Extension Panel Bus Bars View at back side

    us ar atc ng n

    Elevation & Depthfor proper fish plate

    seating

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    38/44

    EXTENDED BUS BAR

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    39/44

    OLD PCC PANELEXTENSION PANEL

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    40/44

    COMMISSIONING PROBLEMDG feeder(IC2) could

    not be put into service,

    when the other

    incomer(IC1) was put

    out of service

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    41/44

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    42/44

    SURPRISES COMMISSIONING PHASE

    Tapping for Control Voltage DG

    incomer-2000A, changed to new

    panels incomer bus bar , this is toensure power availability before

    switching on the DG Incomer.When DG

    is OFF, DG incomer cannot be put onservice, as there is no control voltage

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    43/44

    The Team

  • 7/29/2019 AUGUMENTATION OF ELECTRICAL FEEDERS FOR POWER CONTROL CENTER OF SEWAGE TREATMENT PLANT- BROWN FIELD PROJECT

    44/44

    For Flawless Planning & Execution of

    Brownfield Projects in E&I

    Contact:

    S.SANTHIRAJ, +91 98400 46463

    FUTURA ELECTRONICS PRIVATE LIMITED29,Gowri Avenue

    Anagaputhur

    Chennai

    600070

    India

    [email protected]

    [email protected]