EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS with EDAW + VIKA CAPITOL The George Washington University | Mount Vernon Campus Plan August 13 th 2009 Community Meeting #5

Upload: others

Post on 16-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

EHRENKRANTZ ECKSTUT & KUHN ARCHITECTSwith EDAW + VIKA CAPITOL

The George Washington University | Mount Vernon Campus Plan

August 13th 2009 Community Meeting #5

Page 2: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Mount Vernon Community Meeting 5 – Agenda

• Introduction (2 min.)

• Recap of Previous Community Meeting (10 min.)

• Ames Hall Concept Designs (5 min.)

• Landscape, Storm Water Management, and Sustainability Discussion (40 min.)

• Upcoming Community Meetings & Discussion Topics (3 min.)

P.1

Page 3: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Recap ofRecap ofPrevious Community MeetingPrevious Community Meeting

P.2

Page 4: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

1. Noise: Ongoing investigations on noise mitigation;

2. Lighting: Soccer field, tennis court and building mounted lighting;

3. Locations for future development.

P.3

Recap of Previous Community Meeting

Page 5: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Additional A2 LayoutsAdditional A2 Layouts

P.4

Page 6: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

A2: Previously Proposed Layout

P.5

New 25New 25’’--wide Emergency Vehiclewide Emergency Vehicle& Pedestrian Access Only& Pedestrian Access Only

W St. Parking LotW St. Parking Lotto be Removedto be Removed

Current Approved SetbackCurrent Approved Setback

ClarkClark

MerriweatherMerriweatherHandHandChapelChapel

Potential ParkingPotential Parking

Existing CulvertExisting CulvertR1R1

A2A2

Academic BldgAcademic Bldg

Existing EntranceExisting Entrance

Page 7: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.6

W St. Parking LotW St. Parking Lotto be Removedto be Removed

Current Approved SetbackCurrent Approved Setback

ClarkClark

HandHandChapelChapel

Existing CulvertExisting Culvert

A2: Layout Option 2

ExistingExistingEntranceEntrance

A2A2

MerriweatherMerriweather

R1R1

New 25New 25’’--wide Emergency Vehiclewide Emergency Vehicle& Pedestrian Access Only& Pedestrian Access Only

Academic BldgAcademic Bldg

Potential ParkingPotential Parking

Page 8: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.7

New 25New 25’’--wide Emergency Vehiclewide Emergency Vehicle& Pedestrian Access Only& Pedestrian Access Only

ClarkClark

HandHandChapelChapel

A2: Layout Option 3

ExistingExistingEntranceEntrance

A2A2

MerriweatherMerriweather

R1R1Academic BldgAcademic Bldg

Potential ParkingPotential ParkingCurrent Approved SetbackCurrent Approved Setback

W St. Parking LotW St. Parking Lotto be Removedto be Removed

Existing CulvertExisting Culvert

New Proposed Bldg SetbackNew Proposed Bldg Setback(moved 25(moved 25’’ further west)further west)

Page 9: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.8

New 25New 25’’--wide Emergency Vehiclewide Emergency Vehicle& Pedestrian Access Only& Pedestrian Access Only

ClarkClark

HandHandChapelChapel

Existing CulvertExisting Culvert

A2: Layout Option 4

ExistingExistingEntranceEntrance

A2A2MerriweatherMerriweather

R1R1Academic BldgAcademic Bldg

New Proposed Bldg SetbackNew Proposed Bldg Setback(moved 25(moved 25’’ further west)further west)

Current Approved SetbackCurrent Approved Setback

W St. Parking LotW St. Parking Lotto be Removedto be Removed

Potential ParkingPotential Parking

Page 10: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Ames Hall Concept DesignsAmes Hall Concept Designs

P.9

Page 11: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Ames Hall: Concept Sketch A

P.10

Page 12: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Ames Hall: Concept Sketch B

P.11

Page 13: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Ames Hall: Concept Sketch B

P.12

Page 14: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Ames Hall: Concept Sketch C

P.13

Page 15: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Landscape & Sustainability ConceptsLandscape & Sustainability Concepts

P.14

Page 16: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Existing Topography

P.15

Page 17: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Existing Pedestrian Circulation

P.16

Page 18: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Existing Fencing

P.17

Page 19: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Existing Canopy and Groundplane

P.18

Page 20: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Existing Conditions - Tree Assessment

P.19

Page 21: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Proposed Pedestrian Circulation

P.20

Page 22: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Proposed Perimeter Fencing

P.21

Page 23: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Proposed Canopy and Groundplane

P.22

Page 24: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Foxhall Road Edge Condition - Plan View

P.23

• Potential Foxhall pedestrian entrance with enhanced streetscape;

• New fencing offset in landscape;

• Additional plantings with flowering trees and shrubs;

• Potential to introduce groundcover at perimeter;

• Screened utility equipment.

Page 25: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Foxhall Road Edge Condition – Sections

P.24

Page 26: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Whitehaven Street Edge Condition – Plan View

P.25

• Further articulate Whitehaven Street entrance as the primary campus entrance;• New plaza with campus identification; • New buffer planting along street and softball field;• New universally accessible pedestrian entrance to campus and pool;• New sidewalk, curb, gutter, and street trees.

Page 27: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

W Street Edge Condition – Plan View

P.26

• Removal of parking lot, paved driveway and gatehouse;• Pedestrian access at W Street to remain;• Emergency access maintained via a “GrassPave” fire lane;• New buffer planting north of proposed academic building A2;• New street trees added at campus entrance road;• Storm water management facilities added;• Parking lot is reforested:

Increase tree canopy cover on campus;Reduce air and water pollution;Reduce volume of on-site storm water runoff;Replace non-native invasive species with native plants.

A2A2

A1A1

R1R1

Page 28: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

W Street Pedestrian Entrance/Emergency Egress

P.27

Gate open for emergency access

Gate in fully closed position

Typical gate configuration

Page 29: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.28

Germany Embassy, Foxhall Road

GrassPave2 pedestrian and fire lane access

W Street Pedestrian Entrance/Emergency Egress

Page 30: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Storm Water Management ConceptsStorm Water Management Concepts

P.29

Page 31: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Overall Campus Drainage Area Plan

P.30

Page 32: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Proposed Storm Water Management Plan

P.31

Page 33: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Potential Storm Water Management Opportunities

P.32

Potential Potential StormwaterStormwater Management Technologies:Management Technologies:• GrassPave2• Raintank/Infiltration • Green Roofs• Rain Gardens, Bioswales, Bioretention Areas• Bioretention Box• Pervious Paving• Sandfilters/Stormfilters• Retention Facilities• Cisterns/Rain barrels

*Site-specific conditions may restrict which technologies can be used in which locations

Page 34: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Atlantis Rain Tank

P.33

Potential Storm Water Management Opportunities

Page 35: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Green Roofs

P.34

Potential Storm Water Management Opportunities

Page 36: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Rain Gardens, Bioswales, Bioretention Areas

P.35

Potential Storm Water Management Opportunities

Page 37: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Bioretention Box

P.36

Potential Storm Water Management Opportunities

Page 38: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.37

Pervious Paving

Potential Storm Water Management Opportunities

Page 39: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

P.38

Storm/Sand Filter

Potential Storm Water Management Opportunities

Page 40: August 13 2009 - George Washington University 13...• Ames Hall Concept Designs (5 min.) • Landscape, Storm Water Management, and Sustainability Discussion (40 min.) ... • June

Schedule of Discussion Topics

•• May 7May 7thth Community Feedback and Site Analysis Community Feedback and Site Analysis SummarySummary

•• June 11June 11thth Design principles for campus plan, initial Design principles for campus plan, initial discussion of locations for future discussion of locations for future developmentdevelopment

•• July 9th July 9th Noise, lightingNoise, lighting

•• Aug. 13th Aug. 13th Landscape, storm water management, sustainabilityLandscape, storm water management, sustainability

•• Sept. 10th Sept. 10th Traffic, population counts and draft campus planTraffic, population counts and draft campus plan

P.39