895 Dove Street, 3 rd Floor 193 Blue Ravine Road, #190 402 West Broadway, #400 Newport Beach, CA 92660 Folsom, CA 95630 San Diego, CA 92101 866.975.7070 www.3QCinc.com August 29, 2011 Victor Osorio Department of Industrial Relations Office of the Director 455 Golden Gate Avenue, 10 th Floor San Francisco, CA 94102 Re: 3QC 2010-11 Annual Report – LCP ID: 2003.00006 Dear Victor: Per your letter dated August 22, 2011, enclosed is our annual report covering July 1, 2010 to June 30, 2011. Should you have any questions, please don’t hesitate to contact me directly. Sincerely, Tami Dockendorf Labor Compliance Officer

Upload: hoangnhan

Post on 24-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

895 Dove Street, 3rd Floor 193 Blue Ravine Road, #190 402 West Broadway, #400 Newport Beach, CA 92660 Folsom, CA 95630 San Diego, CA 92101

866.975.7070 www.3QCinc.com

August 29, 2011 Victor Osorio Department of Industrial Relations Office of the Director 455 Golden Gate Avenue, 10th Floor San Francisco, CA 94102 Re: 3QC 2010-11 Annual Report – LCP ID: 2003.00006 Dear Victor: Per your letter dated August 22, 2011, enclosed is our annual report covering July 1, 2010 to June 30, 2011. Should you have any questions, please don’t hesitate to contact me directly. Sincerely, Tami Dockendorf Labor Compliance Officer

LCP-AR3

LABOR COMPLIANCE PROGRAM ANNUAL REPORT

Report for the reporting period 07/01/2010 to 06/30/2011 (mm/dd/yyyy) (mm/dd/yyyy)

1. Name of Labor Compliance Program (LCP) : 3QC, Inc. formerly WCS/Ca, Inc.

2. LCP I.D. Number (assigned by DIR): 2003.00006

3. Date of Initial Approval: March 7, 2003

4. Contact person (include name, title, address, telephone, fax, and e-mail, if available):

Tami Dockendorf, Labor Compliance Officer 193 Blue Ravine Road, Suite 190 Folsom, CA 95630 916-496-8400, 916-496-8401 fax [email protected]

5. List all Awarding Bodies covered by this report as well as any other Awarding Bodies with whom the LCP currently has a contract to provide compliance enforcement. If none, please proceed directly to item 7 and provide all requested information. Then complete the information below, and sign and submit this form to DIR, Office of the Director, Attn: LCP Special Assistant, 455 Golden Gate Avenue, 10th Floor, San Francisco, CA 94102.

Community College Districts Sacramento City USD Reclamation District 2025 Allan Hancock CCD San Leandro USD Reclamation District 2026 City College of San Francisco San Mateo-Foster City SD Reclamation District 2029 College of the Sequoias Santa Clara County Office of Education Reclamation District 2033 Los Rios CCD Sunnyvale Elementary SD Reclamation District 2037 Reclamation District 2038 K-12 Utilities Reclamation District 2042 Anaheim City ESD City of Hughson Reclamation District 2098 Buckeye Union SD Delta Diablo Sanitation District Reclamation District 2137 Castro Valley USD Department of Parks and Recreation Reclamation District 3 Evergreen ESD Department of Water Resources Reclamation District 341 Gilroy USD Diablo Water District Reclamation District 501 Hart-Ransom USD Eastern Municipal Water District Reclamation District 551 Hughson USD Monterey County Reclamation District 756 Mendocino USD Napa County Santa Clara Valley Water District Modesto City Schools Reclamation District 150 Solano County Water Agency Mt. Diablo USD Reclamation District 1614 Sonoma County Water Agency Rowland USD Reclamation District 17

LCP-AR3

What suggestions do you have for the Department of Industrial Relations to better assist you with your program in the coming year? (attach additional sheets if necessary):

SUBMITTED BY:

___________________________ Tami Dockendorf, Labor Compliance Officer August 15, 2011 Signature Name and Title Date

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and p'J;..,..~forms for each Awarding Body covered in this report). ~"'

Awarding Body: ~0A. List projects handled by LCP within the past 12 months.

prete separate

B. Summary of all wages and penalties assessed and/or recovered.

Description ofViolation

Contract Amount

Explanation

DYes D No

Approval of ForfeitureRequested from Labor

Commissioner?

Amount AmountAssessed Recovered

~<!~ forfeiture not requested from the Labor Commissioner, please explain below.

Bid Advertisement Date

Affected Contractor(who directly employed the

worker)

Project Name

Project Name

Project Name

Total

Total

C.

Total

..D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please~e the following:

Amount Assessed Amount Recovered ..r-....'-'Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g)LC§

LC § 1813 ~~es Total1775.~~

-.lTotal r~~

vry-- -E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation t,.. .

Current Status- ODL Case #

x.\,)~ ~

~F. Did you refer any contractor to the Labor Commissioner for debarment perL~ 7.1?

Please check one 0 Yes 0 No ~If yes, identify affected contractor(s) or subcontractor(s) and dat~eferral:

G. Did you refer any apprenticeship violation to the Division ofAP~eshiPStandards (DAS)?

Please check one Dyes D No #If yes, identify affected contractor(s) or sUbcontra, d date(s) of referral:.. "'\".',-

LCP-AR3

7. On a separate sheet, provide a certificate of compliance with conflict of interest disclosure requirements by employees and consultants who participate in making governmental decisions (as defined under 2 CCR § 18701) along with the names of LCP personnel who are filing disclosure statements and the agencies with which those statements are being filed. The Form 700’s are being filed with the following agencies:

Community College Districts Sacramento City USD Reclamation District 2025 Allan Hancock CCD San Leandro USD Reclamation District 2026 City College of San Francisco San Mateo-Foster City SD Reclamation District 2029 College of the Sequoias Santa Clara County Office of Education Reclamation District 2033 Los Rios CCD Sunnyvale Elementary SD Reclamation District 2037 Reclamation District 2038 K-12 Utilities Reclamation District 2042 Anaheim City ESD City of Hughson Reclamation District 2098 Buckeye Union SD Delta Diablo Sanitation District Reclamation District 2137 Castro Valley USD Department of Parks and Recreation Reclamation District 3 Evergreen ESD Department of Water Resources Reclamation District 341 Gilroy USD Diablo Water District Reclamation District 501 Hart-Ransom USD Eastern Municipal Water District Reclamation District 551 Hughson USD Monterey County Reclamation District 756 Mendocino USD Napa County Santa Clara Valley Water District Modesto City Schools Reclamation District 150 Solano County Water Agency Mt. Diablo USD Reclamation District 1614 Sonoma County Water Agency Rowland USD Reclamation District 17

8. Please update the following information per 8 CCR § 16426(a)(2), (3) and (5) disclosure requirement.

A. Identify the geographical areas in which the program intends to operate and the identity of any public agencies not previously identified in this report with which the program intends to contract to provide labor compliance enforcement. Northern, Central, and Southern California

LCP-AR3

B. State whether the entity shares personnel, management, ownership or other close affiliation with any of the following: (1) any contractor or subcontractor that within the preceding five years has been awarded a public works contract within the geographical area in which the program operates or intends to operate or with any public agency with which the program has contracted or intends to contract to provide labor compliance enforcement; (2) any person or entity who has been the surety on such a contract; (3) any joint labor-management committee established pursuant to the Federal Labor Management Cooperation Act of 1978 (section 175a of Title 29 of the United States Code); or (4) any person or entity who has represented workers employed in the same or similar classifications as those employed for such a contract and who has been engaged in (i) an organizational campaign under the National Labor Relations Act with contractors competing for such contracts or (ii) a jurisdictional dispute with another collective bargaining representative of workers utilized for such contracts.

For each affiliation, please provide the name, address, telephone number, and principal contact person for the person or entity; please identify shared personnel, management, and ownership; and if applicable, please provide a short description of the nature and extent of any other close affiliation: N/A

C. Identify the attorney or law firm available to provide legal support for the LCP, and whether the persons or firms providing that support also represent any contractor, subcontractor, surety, or worker representative referred to in the preceding item. Attorney/Law Firm Name (include address, contact person, and telephone number) Law Office of Matthew J. Durket, A P.C. Mr. Matthew Durket 2201 Francisco Drive, #140-450 El Dorado Hills, CA 95762 916-941-5291

CALIFORNIA FORM 700FAIR POLITICAL PRACTICES COMMISSION

A PUBLIC DOCUMENT

Please type or print in ink.

STATEMENT OF ECONOMIC INTERESTS

COVER PAGE

Date Receivedomcial Us. Only

NAME OF FILER (LAST)

Dockendorf

(FIRST)

Tami

(MIDDLE)

Darlene

1. Office, Agency, or Court

Agency Name

3QC, Inc. formerly WCS/CaDivision, Board, Department, District, if applicable

~ If filing for multiple positions, list below or on an attachment.

Agency: _

2. Jurisdiction of Office (Check at least one box)

~State

D Multi-County _

D City of _

Your Position

Labor Compliance Officer

Position: _

D Judge (Statewide Jurisdiction)

D County of _

D Other _

3. Type of Statement (Check at least one box)

D Annual: The period covered is January 1, 2010, through December 31, D2010. .or-

The period covered is~~~, through 6 / 30 / 11

D Assuming Office: Date ----1----1__

Leaving Office: Date Left -----1----1__(Check one)

o The period covered is January 1, 2010, through the date ofleaving office.

o The period covered is ----1----1__, through the dateof leaving office.

D Candidate: Election Year -----_

4. Schedule SummaryCheck applicable schedules or "None."

D Schedule A·1 • Investments - schedule attached

D Schedule A-2 - Investments - schedule attached

D Schedule B - Real Property - schedule attached

Office sought, if different than Part 1: ~

~ Total number of pages including this cover page: _

D Schedule C • Income, Loans, & Business Positions - schedule attached

D Schedule 0 • Income - Gifts - schedule attached

D Schedule E • Income - Gifts - Travel Payments - schedule attached

·or·~ None - No reportable interests on any schedule

5. VerificationMAILING ADDRESS STREET(Business or Agency Address Recommended - Public Document)

193 Blue Ravine, Suite 190DAYTIME TELEPHONE NUMBER

CITY

FolsomE-MAIL ADDRESS

STATE

CA

ZIP CODE

95630

( 916 ) 496-8400 [email protected] have used all reasonable diligence in preparing this statement. I have reviewed this statement and to the best of my knowledge the information containedherein and in any attached schedules is true and complete. I acknowledge this is a public document.

I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct

Date Signed gJJ; Signature _~~ft..~r _. ."L-,-:-Jf,~.~p~,....---;::----;;-77:"'"----(month: day. year) ( e t • original signed s

FPPC Form 700 (2010/2011)FPPC Toll-Free Helpline: 866/275·3772 www.fppc.ca.gov

CALIFORNIA FORM 700FAIR POLITICAL PRACTICES COMMISSION

A PUBLIC DOCUMENT

Please type or print in ink.

STATEMENT OF ECONOMIC INTERESTS

COVER PAGE

Date ReceivedOfficial Use Only

NAME OF FILER (LAST)

Quintero

(FIRST)

Alena

(MIDDLE)

Marie

1. Office, Agency, or CourtAgency Name

3QC, Inc. formerly WCS/CaDivision, Board, Department, District, if applicable

~ If filing for multiple positions, list below or on an attachment.

Agency: _

2. Jurisdiction of Office (Check at least one box)

[g] State

D Multi-County _

D City of _

3. Type of Statement (Check at least one box)

D Annual: The period covered is January 1, 2010, through December 31,2010. .or.

The period covered is ~_:!_L_:!.~, through 6 / 30 / 11

Your Position

Labor Compliance Officer

Position: _

D Judge (Statewide Jurisdiction)

D County of _

D Other _

D Leaving Office: Date Left --1--.--1__(Check one)

o The period covered is January 1, 2010, through the date ofleaving office.

D Assuming Office: Date --1--1__

D Candidate: Election Year -----_

4. Schedule SummaryCheck applicable schedules or "None."

D Schedule A·1 • Investments - schedule attached

D Schedule A·2 • Investments - schedule attached

D Schedule B • Real Properly - schedule attached

o The period covered is --1--1__, through the dateof leaving office.

Office sought, if different than Part 1: _

~ Total number of pages including this cover page: _

D Schedule C • Income, Loans, & Business Positions - schedule attached

D Schedule D • Income - Gifts - schedule attached

D Schedule E • Income - Gifts- Travel Payments - schedule attached

·or·[g] None· No reporlable interests on any schedule

5. VerificationMAILING ADDRESS STREET(Business or Agency Address Recommended - Public Document)

193 Blue Ravine, Suite 190DAYTIME TELEPHONE NUMBER

CITY

FolsomE·MAIL ADDRESS

STATE

CA

ZIP CODE

95630

Date Signed

( 916 ) 496-8400 [email protected] have used all reasonable diligence in preparing this statement. I have reviewed this statement and to the best of my knowledge the information containedherein and in any attached schedules is true and complete. I acknowledge this is a public document.

I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

?if; $;90atu" .I.b-"AAM=-nth, ay, year) / (Fite the originally signed statement with your filing officiat.)

FPPC Form 700 (2010/2011)FPPC Toll-Free Helpline: 866/275-3772 www.fppc.ca.gov

CALIFORNIA FORM 700FAIR POLITICAL PRACTICES COMMISSION

A PUBLIC DOCUMENT

Please type or print In ink.

STATEMENT OF ECONOMIC INTERESTS

COVER PAGE

Date ReceivedOfficial Use Only

NAME OF FILER (LAST)

Silveira

(FIRST)

Jamie

(MIDDLE)

Ann

1. Office, Agency, or CourtAgency Name

3QC, Inc. formerly WCS/CaDivision, Board, Department, District, if applicable

~ If filing for multiple positions, list below or on an attachment.

Agency: _

2. Jurisdiction of Office (Check at least one box)

[g] State

o Multi-County _

o City of _

3. Type of Statement (Check at least one box)

o Annual: The period covered is January 1, 2010, through December 31,2010. .or.

The period covered is _~_L!--.l~, through 6 I 30 I 11

Your Position

Labor Compliance Officer

Position: _

o Judge (Statewide Jurisdiction)

o County of _

o Other _

o Leaving Office: Date Left~~__(Check one)

o The period covered is January 1, 2010, through the date ofleaving office.

o Assuming Office: Date~~__

o Candidate: Election Year -- _

4. Schedule SummaryCheck applicable schedules or "None."

o Schedule A·1 • Investments - schedule attached

o Schedule A·2 • Investments - schedule attached

o Schedule B • Real Property - schedule attached

o The period covered is~~__, through the dateof leaving office.

Office sought, if different than Part 1: _

~ Total number of pages including this cover page: _

o Schedule C • Income, Loans, & Business Positions - schedule attached

o Schedule D • Income - Gifts - schedule attached

o Schedule E• Income - Gifts - Travel Payments - schedule attached

-or·[g] None· No reportable interests on any schedule

5. VerificationMAILING ADDRESS STREET(Business or Agency Address Recommended - Public Document)

193 Blue Ravine, Suite 190DAYTIME TELEPHONE NUMBER

CITY

FolsomE-MAIL ADDRESS

STATE

CA

ZIP CODE

95630

( 916 ) 496-8400 [email protected]

I have used all reasonable diligence in preparing this statement. I have reviewed this statement and to the best of my knowledge the information containedherein and in any attached schedules is true and complete. I acknowledge this is a public document.

I certify under penalty of perjury under the laws of the State of California that the • tr e and correct.

Date Signed dflJ(mln/h, ax year)

FPPC Form 700 (2010/2011)FPPC Toll-Free Helpline: 866/275·3772 www.fppc.ca.gov

CALIFORNIA FORM 700FAIR POLITICAL PRACTICES COMMISSION

A PUBLIC DOCUMENT

Please type or print in ink.

NAME OF FILER

Meredith

1. Office, Agency, or Court

Agency Name

3QC, Inc. formerly WCS/Ca

(LAST)

STATEMENT OF ECONOMIC INTERESTS

COVER PAGE

(FIRST)

Jennifer

Date ReceivedOfficial Use Only

(MIDDLE)

S

Office sought, if different than Part 1: _

Division, Board, Department, District, if applicable

~ If filing for multiple positions, list below or on an attachment.

Agency: _

2. Jurisdiction of Office (Check at least one box)

[8J State

o Multi-County _

o City of _

3. Type of Statement (Check at least one box)

o Annual: The period covered is January 1, 2010, through December 31,

2010. -or-

The period covered is~~~, through 6 / 30 / 11

o Assuming Office: Date~~__.

o Candidate: Election Year -----_

Your Position

Labor Compliance Officer

Position: _

o Judge (Statewide Jurisdiction)

o County of _

o Other _

o Leaving Office: Date Left~~__(Check one)

o The period covered is January 1, 2010, through the date ofleaving office.

o The period covered is~~__, through the dateof leaving office.

4. Schedule SummaryCheck applicable schedules or "None."

o Schedule A-1 • Investments - schedule attached

o Schedule A-2 - Investments - schedule attached

o Schedule B - Real Property - schedule attached

~ Total number of pages including this cover page: _

o Schedule C - Income, Loans, & Business Positions - schedule attached

o Schedule D • Income - Gifts - schedule attached

o Schedule E- Income - Gifts - Travel Payments - schedule attached

·or-o None - No reportable interests on any schedule

5. VerificationMAILING ADDRESS STREET(Business or Agency Address Recommended - Public Document)

193 Blue Ravine, Suite 190DAYTIME TELEPHONE NUMBER

CITY

FolsomE-MAIL ADDRESS

STATE

CA

ZIP CODE

95630

( 916 ) 496-8400 [email protected] have used all reasonable diligence in preparing this statement. I have reviewed this statement and to the best of my knowledge the information containedherein and in any attached schedules is true and complete. I acknowledge this is a public document.

I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Date Signed -------;-.>::;&~~'7.~L.I.=:L..-..;----(month, oay. year)

FPPC Form 700 (2010/2011)FPPC TolI·Free Helpline: 866/275-3772 www.fppc.ca.gov

LCP-AR3

LABOR COMPLIANCE PROGRAM ANNUAL REPORT

Report for the reporting period 07/01/2010 to 06/30/2011 (mm/dd/yyyy) (mm/dd/yyyy)

Name of Labor Compliance Program (LCP) : 3QC, Inc. formerly WCS/Ca, Inc.

LCP I.D. Number (assigned by DIR): 2003.00006

Date of Initial Approval: March 7, 2003

Community College Districts

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Allan Hancock Community College District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

One Stop Student Services Center 12/21/2009 Soltek Pacific, DBA Solpac $21,501,000.00

Total $21,501,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner?

Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________

G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: City College of San Francisco

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Chinatown/ North Beach Campus 9/9/2009 Bovis Lend Lease Turner Construction $151,382,970.00

Joint Use Facility/Balboa Reservoir 10/14/2008 Bovis Lend Lease Turner Construction $50,139,328.00

Total $201,522,298.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner?

Description of Violation

Joint Use Facility/Balboa Reservoir

Contract Décor $4,258.30 $4,258.30 Yes No LC § 1775

Joint Use Facility/Balboa Reservoir

Kone, Inc. $11,633.40 $11,633.40 Yes No LC § 1775 & 1813

Joint Use Facility/Balboa Reservoir

RT Western Maintenance $2,029.65 Still in Process Yes No LC § 1775

Joint Use Facility/Balboa Reservoir

Crystal Clean $20,591.31 Still in Process Yes No LC § 1775 & 1813

Total $38,512.66 $15,891.70

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Joint Use Facility/Balboa Reservoir – Contract Décor $4,258.30 $4,258.30 This was not a willful act of violation; and

was solved amicably. Joint Use Facility/Balboa Reservoir – RT Western Maintenance

$2,029.65 Still in Process This was not a willful act of violation; however still considering forfeiture.

Joint Use Facility/Balboa Reservoir – Crystal Clean $20,591.31 Still in Process

This was not a willful act of violation; however still considering forfeiture. Sub to

RT Western. Contractor no longer in business; RT Western to pay restitution.

Total $26,879.26 $4,258.30

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name LC

§1776(g) LC § 1775 LC § 1813 Wages Total

LC §1776(g) LC § 1775 LC § 1813 Wages Total

Joint Use Facility/Balboa Reservoir

$1,540.00 $2,950.00 $7,143.40 $11,633.40 $1,540.00 $2,950.00 $7,143.40 $11,633.40

Total $1,540.00 $2,950.00 $7,143.40 $11,633.40 $1,540.00 $2,950.00 $7,143.40 $11,633.40

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________

G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: College of the Sequoias

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

PE & Disabled Program Facilities 10/4/2008 Multiple prime contractors $12,500,000.00

Total $12,500,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner?

Description of Violation

PE & Disabled Program Facilities

Tutt Construction $518.04 $518.04 Yes No LC § 1813

PE & Disabled Program Facilities

Power Systems Testing $27.36 $27.36 Yes No LC § 1775

Total $545.40 $545.40

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

PE & Disabled Program Facilities – Tutt Construction $518.04 $518.04 This was not a willful act of violation; and

was solved amicably. PE & Disabled Program Facilities – Power Systems Testing

$27.36 $27.36 This was not a willful act of violation; and

was solved amicably.

Total $545.40 $545.40

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________

G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Los Rios CCD

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Folsom Lake College Visual and Performing Arts Project

5/14/2008 Multiple Prime Contractors $45,000,000.00

Total $45,000,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

Folsom Lake College Visual and Performing Arts Project

Lisa Gallager $59.00 $59.00 Yes No LC § 1775

Folsom Lake College Visual and Performing Arts Project

Dick Emard Electric $254,036.97 Still in

Process Yes No LC § 1775

Total $254,095.97 $59.00

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Folsom Lake College Visual and Performing Arts – Lisa Gallager

$59.00 $59.00 This was not a willful act of violation; and

was solved amicably.

Total $59.00 $59.00

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name LC

§1776(g) LC § 1775 LC § 1813 Wages Total

LC §1776(g)

LC § 1775 LC § 1813 Wages Total

Folsom Lake College Visual and Performing Arts

$91,350.00 $162,686.97 $254,036.97

Total $91,350.00 $162,686.97 $254,036.97

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________

G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

-- Pending submittal and approval --

LCP-AR3

LABOR COMPLIANCE PROGRAM ANNUAL REPORT

Report for the reporting period 07/01/2010 to 06/30/2011 (mm/dd/yyyy) (mm/dd/yyyy)

Name of Labor Compliance Program (LCP) : 3QC, Inc. formerly WCS/Ca, Inc.

LCP I.D. Number (assigned by DIR): 2003.00006

Date of Initial Approval: March 7, 2003

K-12 Districts

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Anaheim City Elementary School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Jefferson ES Modernization 10/29/2009 Erickson-Hall Construction Co $6,450,000.00

Ponderosa Elementary School 10/15/2007 Woodcliff Corporation $20,652,000.00

Barton Elementary School 2/25/2011 Erickson-Hall Construction Co $5,500,000.00

Lincoln Elementary School 2/8/2011 Erickson-Hall Construction Co $24,000,000.00

Total $56,602,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner?

Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________

G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Buckeye Union School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Valley View Elementary School 2/3/2011 Broward Builders, Inc. $15,687,000.00

Total $15,687,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Castro Valley USD

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Summer 2011 Seismic Work 3/31/2011 Sausal Corporation $1,784,000.00

Total $1,784,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Gilroy Unified School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Ascencion Solorsano M.S. Relocation 5/7/2010 RSH Construction, Inc. $289,900.00

Christopher High School – Phase II 3/12/2010 Swinerton Builders $19,840,218.00

Total $20,130,118.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

Christopher High School – Phase II

Best Contracting Services

$22,116.76 Still in Process Yes No LC § 1775

Christopher High School – Phase II

Swinerton Builders $1,368.00 $1,368.00 Yes No LC § 1775

Total $23,484.76 $1,368.00

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Christopher High School – Phase II – Swinerton Builders

$1,068.00 $1,068.00 This was not a willful act of violation; and

was solved amicably.

Total $1,068.00 $1,068.00

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name LC

§1776(g) LC § 1775 LC § 1813 Wages Total

LC § 1776(g)

LC § 1775 LC § 1813 Wages Total

Christopher High School – Phase II

$2,150.00 0.00 $19,966.76 $22,116.76

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

-- Penalties in submittal stage --

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Hart-Ransom Union School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Hart Ransom Elementary School 6/1/2010 CT Brayton and Sons $6,094,101.00

Total $6,094,101.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

Hart Ransom Elementary School

Advanced Roofing $3,879.18 $3,879.18 Yes No LC § 1775

Hart Ransom Elementary School

BH Tank $174.00 $174.00 Yes No LC § 1775

Hart Ransom Elementary School

Commercial Finishes $411.52 $411.52 Yes No LC § 1775

Total $4,464.70 $4,464.70

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Hart Ransom Elementary School – Advanced Roofing $3,879.18 $3,879.18 This was not a willful act of violation; and

was solved amicably.

Hart Ransom Elementary School – BH Tank $174.00 $174.00 This was not a willful act of violation; and

was solved amicably. Hart Ransom Elementary School – Commercial Finishes

$411.52 $411.52 This was not a willful act of violation; and

was solved amicably.

Total $4,464.70 $4,464.70

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Hughson Unified School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Hughson High School Modernization 4/5/2010 CT Brayton and Sons $2,367,980.00

Total $2,367,980.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Mendocino Unified School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Mendocino Fire Alarms 5/1/2009 Fort Bragg Electric $125,000.00

Mendocino K-8 Conversion 2/20/2008 Jeff Luchetti Construction, Inc $17,695,000.00

Mendocino HS Electrical and Data Rehab Project

5/16/2010 Fort Bragg Electric $127,000.00

Total $17,947,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

Mendocino Fire Alarms Slembrouck-Many Corp. $59.22 $59.22 Yes No LC § 1775

Mendocino Fire Alarms North Coast Signal $3.30 $3.30 Yes No LC § 1775

Mendocino Fire Alarms Blair Drywall $13.53 $13.53 Yes No LC § 1775

Total $ 76.05 $ 76.05

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Mendocino Fire Alarms - Slembrouck-Many Corp. $59.22 $59.22 This was not a willful act of violation; and

was solved amicably.

Mendocino Fire Alarms - North Coast Signal $3.30 $3.30 This was not a willful act of violation; and

was solved amicably.

Mendocino Fire Alarms - Blair Drywall $13.53 $13.53 This was not a willful act of violation; and

was solved amicably.

Total $ 76.05 $ 76.05

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Modesto City Schools

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Kitchen and Grease Trap Improvements 2/23/2010 J L Bray & Son, Inc. $235,000.00

Child Development Building Upgrades 3/24/2010 Acme Construction $740,000.00

Total $119,512,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from

Labor Commissioner?

Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Mt. Diablo USD

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

SMART Classrooms @ Concord High School and College Park High School

4/4/2010 Magnum Construction $1,654,725.00

Swimming Pool Replacements & College Park & Mt. Diablo High Schools

7/1/2010 California Commercial Pool, Inc. $1,809,000

Total $2,394,725.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from

Labor Commissioner?

Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Rowland Unified School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Elementary School Modernizations - Villacorta and Northam Elementary Schools

2/5/2010 MCEC, Inc. $3,275,000.00

Total $3,275,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from

Labor Commissioner?

Description of Violation

Elementary School Modernizations / Villacorta

C M LYNGLE & SONS INC (DBA LBI/Boyd)

$7,862.18 $7,862.18 Yes No LC § 1775

Total $7,862.18 $7,862.18

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Elementary School Modernizations / Villacorta – C M LYNGLE & SONS INC (DBA LBI/Boyd)

$7,862.18 $7,862.18 This was not a willful act of violation; and

was solved amicably.

Total $7,862.18 $7,862.18

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Sacramento City USD

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

School of Engineering & Sciences Library 2/25/08 McCarthy Building Companies $10,400,000.00

Total $10,400,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from

Labor Commissioner?

Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: San Leandro Unified School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

San Leandro HS New Arts Education Center

4/4/2009 Zolman Construction $13,200,000.00

San Leandro HS Restrooms Renovations 2/4/2010 Ralph Larsen & Son, Inc. $1,000,000.00

San Leandro HS Career Tech Renovations 2/05/2010 DL Falk Construction $5,000,000.00

San Leandro HS Business Academy 2/4/2010 DL Falk Construction $809,000.00

Wilson Elementary School Heat & Roofing 1/21/2010 West Coast Contractors, Inc. $1,982,000.00

Garfield Elementary School Restrooms 2/11/2010 A&E Emaar $295,000.00

Monroe Elementary School Restrooms 2/11/2010 A&E Emaar $295,000.00

Muir Middle School Heat & Roofing 1/30/2010 Ralph Larsen & Son, Inc. $3,015,000.00

Total $25,596,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

Muir Middle School Heat & Roofing

Aire Sheet metal $385.49 $385.49 Yes No LC § 1775

Muir Middle School Heat & Roofing

Trade Staff $136.84 $136.84 Yes No LC § 1775

Total $522.33 $522.33

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

Muir Middle School Heat & Roofing – Aire Sheet Metal $385.49 $385.49 This was not a willful act of violation; and

was solved amicably.

Muir Middle School Heat & Roofing – Trade Staff $136.84 $136.84 This was not a willful act of violation; and

was solved amicably.

Total $522.33 $522.33

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: San Mateo-Foster City School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Borel Middle School Roofing & Repair 5/20/2010 California Roofing $1,000,000.00

North Shoreview Montessori Roofing & Repair

5/20/2010 California Roofing $475,000.00

Parkside Elementary School Roofing & Repair

5/20/2010 California Roofing $525,000.00

San Mateo Park Elementary School Roofing & Repair

5/20/2010 California Roofing $415,000.00

Total $2,415,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

North Shoreview Montessori Roofing & Repair

California Roofing $1,085.12 $1,085.12 Yes No LC § 1775

Borel Middle School Roofing & Repair

California Roofing $2,516.44 $2,516.44 Yes No LC § 1775

San Mateo Park Elementary School Roofing & Repair

California Roofing $405.92 $405.92 Yes No LC § 1775

Total $4,007.48 $4,007.48

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

North Shoreview Montessori Roofing & Repair $1,085.12 $1,085.12 This was not a willful act of violation; and

was solved amicably.

Borel Middle School Roofing & Repair $2,516.44 $2,516.44 This was not a willful act of violation; and

was solved amicably.

San Mateo Park Elementary School Roofing & Repair $405.92 $405.92 This was not a willful act of violation; and

was solved amicably.

Total $4,007.48 $4,007.48

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Santa Clara County Office of Education

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Foothill High School 9/28/2009 John Plane Construction, Inc. $2,355,403.00

ASD Pathfinder Phase 2 5/4/2010 Premier Buildings, Inc. $995,405.00

Gateway Fire Reconstruction 3/10/2010 Blach Construction Company,

Robert A. Bothman & Rodan Builders, Inc.

$2,584,936.00

Headstart Classroom Remodel & Snell 8/25/2010 Pencon, Inc. $298,000.00

McCollam Elementary School – County Annex

1/18/2011 Blach Construction Company $3,646,189.00

Total $9,879,933.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

ASD Pathfinder Phase 2 Associate Plumbing $224.00 $224.00 Yes No LC § 1775

Total $224.00 $224.00

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

ASD Pathfinder Phase 2 – Associate Plumbing $224.00 $224.00 This was not a willful act of violation; and

was solved amicably.

Total $224.00 $224.00

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for

each Awarding Body covered in this report).

Awarding Body: Sunnyvale Elementary School District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Contract Amount

Columbia Neighborhood Center 6/4/2010 CLW Builders, Inc. $2,800,000.00

Total $2,800,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

LABOR COMPLIANCE PROGRAM ANNUAL REPORT

Report for the reporting period 07/01/2010 to 06/30/2011 (mm/dd/yyyy) (mm/dd/yyyy)

Name of Labor Compliance Program (LCP) : 3QC, Inc. formerly WCS/Ca, Inc.

LCP I.D. Number (assigned by DIR): 2003.00006

Date of Initial Approval: March 7, 2003

Utility/Water Districts

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: City of Hughson

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

City of Hughson Well #8 Improvements 10/20/09 GSE Construction Company, Inc. $2,200,000.00

Total $2,200,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered

Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: City of Roseville

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Well Monitoring Project for Wells # WPMW-1, WPMW-2, and WPMW-3

2/7/2011 Bradley & Sons, Inc. $125,000.00

Total $125,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Delta Diablo Sanitation District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Recycled Water Project 4/29/09 JMB Construction, Inc. $8,884,706.00

Total $8,884,706.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: Department of Parks and Recreation

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

High Sierra Crossing Museum 2/24/11 Younger General Contractors $4,704,000.00

Total $4,704,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: Department of Water Resources

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

San Joaquin River Restoration – Levee Road Repairs

5/23/11 Ford Construction Company $696,755.00

Total $696,755.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: Diablo Water District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Stone Creek –Well Pipeline - Phase 2 3/25/10 Platinum Pipeline $569,232.00

Stone Creek - Pump Station - Phase 3 4/15/10 McFadden Construction, Inc. $734,000.00

Total $1,303,232.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Eastern Municipal Water District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Moreno Valley - Spec 1104S MV-APAD 10/30/08 WM Lyles Co $29,761,402.00

Moreno Valley - Spec 1103S MV-SCATT 9/23/08 JR Filanc $28,572,233.00

San Jacinto SJVRWRF Plant 2 & Facilities & Title 22 Teritary Plant Upgrades 1047S

11/16/2009 PCL Construction $112,406,264.00

Total $170,739,899.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Monterey County Resource Management Agency Dept of Public Works

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

San Jerardo Water System 10/6/09 Don Chapin Company, Inc. $2,013,785.00

Total $2,013,785.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Napa County Department of Public Works

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Rutherford Dust Restoration – Reach 3 Project

5/13/10 Team Ghilotti (TGI) $1,097,225.00

Total $1,097,225.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 150

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Merritt Island / SunHarvest Post Audit 9/28/09 SunHarvest, Inc. $1,875.00

Total $1,875.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 1614

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Smith Tract #1614-03-02-10-01 – Discharge Pipe Replacement

3/5/10 DA Archer Excavating $18,000.00

Total $18,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 17

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Mossdale #17-11-18-09-19 Levee Seepage Element VII-F

1/1/10 Teichert Construction $884,835.80

Mossdale #17-10-16-09-18 Phase 2 Levee Seepage

8/27/09 Teichert Construction $405,615.25

Mossdale #17-10-06-09-16 – Phase II Levee Seepage

8/20/09 AM Stephans Construction Co. $1,460,514.35

Mossdale #17-06-07-10-06 – Levee Vegetation Maintenance

6/7/10 DA Archer Excavating $24,500.00

Mossdale #17-09-24-10-09 9/30/10 DA Archer Excavating $24,500.00

Total $2,799,965.40

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete

separate forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2025

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Holland Tract #2025-Vegetation Control 3/2/10 SunHarvest, Inc. $3,300.00

#2025 Sun Harvest Vegetation Control 7/6/10 SunHarvest, Inc. $24,025.00

#2025 – Alpine Helicopter Project 11/16/09 Alpine Helicopter $2,268.00

#2025 – Dominguez & Sons 5-24-10 Project

4/29/10 Dominguez & Sons Trucking, Inc. $5,744.64

Total $35,337.64

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2026

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Webb Tract – Sun Harvest Boom Mower 7/15/10 SunHarvest, Inc. $10,157.75

#2026 – Alpine Helicopter Project 11/9/09 Alpine Helicopter $3,943.80

Total $14,101.55

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2029

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Empire Tract – HMP Project 4/1/10 Teichert Construction - Stockton $628,601.00

Herbicide Application Project 3/16/10 Hamilton Services $2,252.25

Total $630,853.25

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2033

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Brack Tract - Levee Stablization Project 4/1/10 Asta Construction Company $202,313.00

Total $202,313.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2037

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Ringe Tract - HMP Roadway Improvement Project

4/1/10 AM Stephens Construction

Company, Inc. $120,800.00

Total $120,800.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2038

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Lower Jones Tract along Empire Cut #2038-12-01-09-2 – Robert Burns

11/13/2009 Robert Burns Construction, Inc. $514,564.96

Total $514,564.96

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2042

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Chem-Weed – Vegetation Control 4/1/10 Chem-Weed $4,000.00

Total $4,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2098

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Vegetation Maintenance 8/9/10 Lara Labor Contractors $5,054.24

Total $5,054.24

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 2137

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Drain/Ditch Cleaning 3/1/10 KH Enterprises $14,654.89

Total $14,654.89

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 3

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Washburn 11-19-09 Project 9/14*09 Washburn Spray Services $2,125.00

Total $2,125.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 341

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Vegetation Mowing – Hwy. 160 Project 9/24/09 SunHarvest, Inc. $12,150.00

Total $12,150.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 501

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

501-06-11-10-01 – ASTA Emergency Levee Crown

6/1/10 Asta Construction Company $180,565.50

Total $180,565.50

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 551

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

30” Pipe Abandonment Post Audit 9/9/09 Galindo Construction Company $31,818.00

Boom Mower Post Audit 8/20/09 SunHarvest, Inc. $3,962.50

Total $35,780.50

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Reclamation District 756

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Bouldin Island / Sun Harvest 7/1/10 SunHarvest, Inc. $24,525.00

Alpine Helicopter Project – Post Audit 11/4/09 Alpine Helicopter $5,481.00

Total $30,006.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Santa Clara Valley Water District

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

South Bay Advanced Recycled Water Treatment Facility

7/13/2010 JR Filanc $4,600,000.00

Total $4,600,000.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Solano County Water Agency

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

Ground Monitoring Well Project – Phase 1 1/15/2010 Nor-Cal Pump & Well Drilling Inc. $118,650.00

Ground Monitoring Well Project – Phase 2 1/15/2010 Eaton Pumps $30,783.00

Earthwork Project - Lower Putah Creek 8/1/2010 Lister Construction $28,760.00

Lower Putah Creek Earthwork Project 10/1/2010 Four M Contracting $12,000.00

Total $190,193.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

LCP-AR3

6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary, and please complete separate

forms for each Awarding Body covered in this report).

Awarding Body: Sonoma County Water Agency

A. List projects handled by LCP within the past 12 months

Project Name Bid Advertisement Date Prime Contractor Contract Amount

South Park CSD – Biwana Drive Colletion System

8/10/2010 Ghilotti Construction $2,500,000.00

Sonoma Valley Groundwater Monitoring 12/28/2010 Maggiora Brothers and Drilling $130,000.00

Russian River CS DTP Disinfection Upgrade Project

2/2/11 Syblon Reid Construction, Inc. $2,589,450.00

Sonoma Valley CSD Main Sewer Trunk Replacement

2/2/11 Pacific Boring and Sierra Mountain

Construction $2,337,197.00

Sonoma Valley Effluent Reservoir R5 2/3/11 Ford Construction Company $2,313,700.00

Total $9,870,347.00

B. Summary of all wages and penalties assessed and/or recovered.

Project Name Affected Contractor

(who directly employed the worker)

Amount Assessed

Amount Recovered

Approval of Forfeiture Requested from Labor

Commissioner? Description of Violation

N/A Yes No

Total

LCP-AR3

C. For any amount identified in item B for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount

Assessed Amount

Recovered Explanation

N/A

Total

D. For any amount identified in item B for which approval of forfeiture was requested from the Labor Commissioner, please provide the following:

Amount Assessed Amount Recovered Project Name

LC §1776(g) LC § 1775 LC § 1813 Wages Total LC § 1776(g) LC § 1775

LC § 1813 Wages Total

N/A

Total

E. Identify cases that are or were the subject of LC § 1742 proceedings.

Project Name Contractor Nature of Violation ODL Case # Current Status

N/A

F. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1? Please check one Yes No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: ______________________________ G. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)? Please check one Yes No If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: