Austin County

Road and Bridge Report

Precinct 3

Annual Road Report

July 1, 201\ fc> (\ .

Thru

May 31, 2017

Randy Reichardt

Page 2: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

County of Austin

Precinct No. 3

ANNUAL ROAD REPORT

1. Condition of each road, culvert, and bridge in the precinct:

See attached reports

2. Amount of money necessary for maintenance of the precinct roads during the next fiscal year:

See attached reports

3. Number of traffic control devices in the precinct defaced or torn down:

See attached

4. Any new road that should be opened in the precinct:

See attached

5. Any bridges, culverts, or other improvements necessary to place the precinct roads in good

condition, and the probable cost of the improvements:

See attached

6. Any road work contracts for the past year:

See attached

Submitted by the undersigned on this "1$. day of Xu 2017.

Commissioner, Precinct 3

Sworn to and subscribed before me, the undersigned authority,

'2017 .

SHANNON HANATH Notary Publ!c. Stale 01 Texas

My Commission Expires August 11, 20 \ 8

Notary Public

My commission expires \ \ � 0\ 'O

Page 3: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

AUSTIN COUNTY

ROAD & BRIDGE REPORT

PRECINCT 3

All county roads in this precinct are subject to normal wear and tear. Additional road damage occurs

due to overweight vehicles: gravel trucks, oil and gas truck traffic, garbage trucks, school buses and

other motor vehicles that deteriorate "fair to good" condition roads to "fair to poor" condition since this

report was filed on May 2017 and prior reports filed every July; per Transportation Code 251.005.

Page 4: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#1. Condition of each road, culvert, and bridge in the precinct.

See attached

Page 5: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Sens #5115

Paved miles 2.084 miles Condition: OK

Reclaimed & 2 course seal coat 7 /13

Total Length 2.084 miles

Culverts

Size GPS Coordinates Type Length Condition

N x W

2-24" 29*48'51 N 96*10'03 w Plastic 30' OK

15" 29*49'11 N 96*10'40 w Concrete 24' OK

18" 29*49'30 N 96*11'03 w Concrete 24' OK

24" 29*49'37 N 96*11'12 w Plastic Liner 31' OK

Page 6: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5290

Paved miles 1.169 miles Condition: OK

Total Length 1.169 miles

Culverts

Size GPS Coordinates Type Length Condition

15" 29*47'25 N 96*08'08 w Concrete 35' OK

3-18" 29*47'26 N 96*07'46 w Concrete 25' OK

3011 29*47'33 N 96*07'20 w Tin Horn 24' OK

Page 7: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Andreas #6551

Gravel miles .1 mile

Total Length .1 mile

Culverts

Size

18"

15"

GPS Coordinates

N x W

29*50'22 N 96*19'21 W

29*50'26 N 96*19'18 W

Condition: OK

Type Length

Concrete 24'

Steel Pipe 24'

Condition

OK "TXDOT"

OK

Page 8: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Ashorr1 #5575

Gravel miles .373 mile

Total Length .373 mile

Culverts

Size

24"

GPS Coordinates

N x W

29*47'40 N 96*16'20 W

Condition: Needs 100 yds

gravel

Type Length Condition

Plastic 20' OK

Page 9: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Barremore #5088

Gravel miles 1.061 miles

Total Length 1.061 miles

Culverts

Size

1511

GPS Coordinates

N x W

29*50'28 N 96*17'30 W

Type

Condition: Needs 400 yds

gravel

Length Condition

Concrete 29' OK

Page 10: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Bat la

Dirt miles .2 mile Condition: OK

Total Length .2 mile

Page 11: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .2 mile

Total Length .2 mile

Culverts

Size GPS Coordinates

N x W

Beckendorff #5025

Condition: OK

Type Length

18" 29*45'20 N 96*16'22 W Concrete 30'

Condition

OK

Page 12: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Bernard #5327

Paved miles .281 mile Condition: OK

Total Length .281 mile

Page 13: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5317

Paved miles .79 mile

Total Length .79 mile

Culverts

Size

18"

GPS Coordinates

N x W

96*47'08 N 96*11'17 W

Condition: 2" asphalt overlay 6/11/13

Type Length Condition

Concrete 29' OK

Page 14: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Brockstein #5330

Gravel miles

Paved miles

Total Length

Culverts

.217 mile

.541 mile

.758 mile

Size GPS Coordinates

N x W

12" 29*47'38 N 96*14'02 W

Condition: OK

Condition: 211 asphalt overlay 7 /11

Type Length Condition

Plastic 30' OK 7/11

Page 15: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Carlos Drive #6549

Paved miles .15 mile

Total Length .15 mile

Culverts

Size

24"

GPS Coordinates

N x W

29*46'14 N 96*12'42 W

Condition: OK

Type Length

Plastic 54'

Condition

OK

Page 16: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .176 mile

Total Length .176 mile

Culverts

Size GPS Coordinates

N x W

Lane #5334

Condition: OK

Type Length

15" 96*47'23 N 96*14'12 W Concrete 40'

Condition

OK

Page 17: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Gravel miles .3 mile

Total Length .3 mile

Culverts

Size GPS Coordinates

N x W

Dee's Circle #6546

Condition: OK

Type Length

24" 29*46'51 N 96*12'54 W Plastic 40'

Condition

OK

Page 18: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Esar Road #5291

Gravel miles .6mile

Total Length .6 mile

Culverts

Size GPS Coordinates

N x W

From Kurtz

22 x30 29*48'00 N 96*07'25 w

24" 29*48'07 N 96*07'18 w

1511 29*48'13 N 96*07'14 w

Condition: Needs 120 yds

gravel

Type Length Condition

Steel 30' OK

Concrete 28" OK

Concrete 32' OK

Page 19: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Frantz #5206

Paved miles

Gravel miles

Total Length

1.2 miles

2.1 miles

3.3 miles

Condition: Need to reclaim & re-pave

Replace culverts

Condition: Needs 500 yds gravel

State Number & Name GPS Coordinates Type Length & Condition

N x W Width

Schweiner Creek 29*50'24 N 96*21'02 w Steel & Concrete 40' x 30' OK

Yellow Creek (AA52-06-002) 29*50'05 N 96*21'48 w Steel & Concrete 32' x 16' OK

San Bernard (AA52-06-001) 29*49'2S N 96*22'43 W Steel & Concrete 45' x 16' OK

Culverts

Size GPS Coordinates Type Length Condition

N x W

18'' 29*51'02 N 96*20'23 w Concrete 62' OK

2611 x 34" 29*50'57 N 96*20'28 w Tin Horn 36'

2411 29*50'46 N 96*20'40 w Concrete 26' OK

2-24" 29*50'30 N 96*20'56 w Concrete 31' OK

18" 29*50'20 N 96*21'11 w Plastic 24' OK

15" 29*50'22 N 96*21'31 w Concrete 24' OK

42" 29*50'00 N 96*21'54 w Tin Horn 40' OK

12" 29*49'47 N 96*20'04 w Concrete 20' OK

12" 29*49'41 N 96*22'10 w Concrete 24' OK

18" 29*49'35 N 96*22'20 w Concrete 28' OK

1511 29*49'34 N 96*22'29 w Concrete 33' OK

2411 29*49'33 N 96*22'30 w Concrete 31' OK

Page 20: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Frazer #5095

Paved miles 1.346 miles Condition: OK

Gravel miles 1.995 miles Condition: Needs 450 yds.

gravel

Total Length 3.341 miles

State Number & Name GPS Coordinates Type Length & Condition

N x W Width

Palm 29*48'17 N 96*11'42 w Steel & Concrete 9' x30' OK built 5-14

Grass Farm 29*48'57 N 96*12'04 w Steel & Concrete 24' x28' OK built 5-14

Culverts

Size GPS Coordinates Type Length Condition

18'' 29*50'25 N 96*10'29 w Tin Horn 30' OK

1511 29*49'52 N 96*11'05 w Concrete 28' OK

15" 29*49'44 N 96*11'13 w Concrete 25' OK

12" 29*48'44 N 96*12'19 w Concrete 24' OK

Page 21: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Clark #5577

Paved miles

Paved miles

.073 mile

.073 mile

Total Length .146 mile

Culverts

Size GPS Coordinates

N x W

12" 29*50'38 N 96*19'28 w

12" 29*50'38 N 96*19'24 w

1511 29*50'36 N 96*19'24 w

1511 29*50'35 N 96*19'20 w

Condition: OK

Condition: 2" asphalt overlay 6/12

Type Length Condition

Concrete 42' OK

Concrete 28' OK

Plastic 40' OK

Plastic 40' OK

Page 22: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Grace Lane #6538

Paved miles .37 mile Condition: 2" asphalt overlay 5/10

Total Length .37 mile

Culverts

Size GPS Coordinates Type Length Condition

N x W

2-15" 29*47'49 N 96*13'51 w Tin Horn 40' OK

24" 29*47'47 N 96*13'40 w Plastic 42' OK

2 24" 29*47'39 N 96*13'40 w Plastic 40' OK

Page 23: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .18 mile

Total Length .18 mile

Culverts

Size GPS Coordinates

N x W

#5069

Condition: OK

Type Length

18" 29*46'55 N 96*15'26 W Concrete 30'

Condition

OK

Page 24: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Hahn #5284

Gravel miles 2.371 miles

Paved miles 1.2 miles

Total Length 3.571 miles

Culverts

Size GPS Coordinates

N x W

3611 29*48'49 N 96*17'54 w

2-24" 29*48'22 N 96*18'23 w

30" 29*48'02 N 96*18'45 w

15" 29*47'56 N 96*18'51 w

18" 29*47'43 N 96*19'05 w

48" 29*47'30 N 96*18'48 w

30" 29*47'16 N 96*18'35 w

15" 29*47'05 N 96*18'24 w

15" 29*46'55 N 96*18'09 w

Condition: Needs 1000

yds. gravel

Condition: OK

Type Length Condition

Concrete 34' OK

Concrete 29' Ok

Steel 30' OK

Concrete 24' OK

Concrete 25' OK

Tin Horn 36' OK

Tin Horn 30' OK

Tin Horn 30' OK

Concrete 25' OK

Page 25: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Hillboldt #5078

Paved miles 4.272 miles

Total Length 4.272 miles

Culverts

Size GPS Coordinates

18" 29*47'34 N 96*14'17 w

24" 29*47'36 N 96*14'42 w

18" 29*47'50 N 96*14'S8 w

18" 29*47'59 N 96*15'09 w

48" 29*48'09 N 96*15'21 w

18" 29*48'23 N 96*15'33 w

15" 29*48'44 N 96*15'56 w

30" 29*49'60 N 96*16'19 w

Condition: needs seal coat

1.1 mile seal coat 7/10 from

Jalowy

Type Length Condition

Concrete 29' OK

Concrete 30' OK

Concrete 26' OK

Concrete 30' OK

Plastic 40' OK

Concrete 26' OK

Concrete 28' OK

Plastic 37' OK

Page 26: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Hintz #5063

Gravel miles

Paved miles

.45 mile

.8 mile

Total Length 1.25 miles

Culverts

Size GPS Coordinates

N x W

18" 29*49'47 N 96*13'35 w

18" 29*46'11 N 96*13'09 w

1511 29*46'11 N 96*13'08 w

18" 29*46'17 N 96*13'01 w

Condition: Needs 200 yds. gravel

Condition: 2" asphalt overlay 4/09

Type Length Condition

Plastic 40' OK Concrete 28' OK Co�cret.e 2�· QK. Concrete 38' OK

Page 27: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Houston #5281

Gravel miles

Paved miles

.10 mile

.24 mile

Total Length .34 miles

Culverts

Size GPS Coordinates

15" 29*50'28 N 96*19'24 w

1511 29*50'28 N 96*19'24 w

12" 29*50'33 N 96*19'35 w

Condition: OK

Condition: OK

Type

Concrete

Concrete

Concrete

Length Condition

23' OK

26' OK

31' OK

Page 28: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Jackrabbit #5315

Paved miles .663 mile Condition: OK

Total Length .663 miles

Culverts

Size GPS Coordinates Type Length Condition

18" 29*46'08 N 96*11'02 w Concrete 36' OK

15" 29*46'24 N 96*11'22 w Concrete 28' OK

Page 29: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Jackson #5254

Paved miles

Paved miles

.07 mile

.20 mile

Total Length .27 miles

Culverts

Size

18"

GPS Coordinates

N x W

29*50'38 N 96*19'18 W

Condition: OK

Condition: 2" asphalt overlay 6/12

Type Length Condition

Plastic 40' OK

Page 30: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5070

Paved miles

Gravel miles

1.025 miles

2.23 miles

Condition: OK

Condition: Needs 1600 yds.

gravel

Total Length 3.255 miles

State Number & Name

Hobson

Culverts

GPS Coordinates Type Length & Condition

N 1t W Width

29*48'62 N 96*16'53 W Steel & Concrete 24' x 28' OK Built 7/14

Size GPS Coordinates Type Length Condition

N x W

20" 29*49'00 N 96*16'16 w Steel 22' OK

15" 29*48'46 N 96*16'31 w Steel 22' need to replace

72" 29*48'26 N 96*16'53 w Steel 26' OK

30" 29*48'03 N 96*17'18 w Plastic 40' OK

15" 29*47'44 N 96*17'39 w Concrete 28' OK

Page 31: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Jefferson #5276

Paved miles .294 mile Condition: OK

Total Length .294 mile

Culverts

Size GPS Coordinates Type Length Condition

N x W

1511 29*50'30 N 96*19'33 w Concrete 22' OK

18" 29*50'28 N 96*19'34 w Concrete 31' OK "TXDOT"

Page 32: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Jurica #5100

Paved miles 1.833 miles Condition: OK

Total Length 1.833 miles

State Number & Name GPS Coordinates

N x W

Type

Bollinger Creek

Culverts

Size

24"

29*48'51 N 96*09'23 W Steel & Concrete

GPS Coordinates

N x W

29*49'40 N 96*08'28 W

Type

Concrete

Length & Condition

Width

24' x 30' OK

Length Condition

50' OK

Page 33: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5333

Dirt miles .128 mile Condition: OK

Total Length .128 mile

Page 34: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Kloss #5080

Paved miles

Gravel miles

Total Length

.901 miles

1.533 miles

2.434 miles

Condition: OK

Reclaimed & 2 course seal coat 7 /13

Condition: Needs 1100 yds. gravel

State Number & Name GPS Coordinates Type Length & Condition

N.x W Width

Little Bernard Creek 29*49'21 N 96*15'04 w Steel & Concrete 40' x 30' OK 4/11

Culverts

Size GPS Coordinates Type Length Condition

N x W

1811 29*50'00 N 96*14'48 w Plastic 35' OK 7/13

1811 29*49'51 N 96*14'52 w Plastic 35' OK 7/13

1811 29*49'44 N 96*14'55 w Plastic 35' OK 7/13

18" 29*49'40 N 96*14'56 w Plastic 35' OK 7/13

24" 29*49'15 N 96*14'58 w Concrete 21' OK

12" 29*49'05 N 96*14'48 w Concrete 24' OK

4011 29*49'01 N 96*14'52 w Tin Horn 40' OK railroad

18" 29*48'47 N 96*15'08 w Concrete 29' OK

1511 29*48'25 N 96*15'32 w Concrete 29' OK

Page 35: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Kulow #5068

Paved miles

Total Length

4.199 miles

4.199 miles

Condition: 2" asphalt overlay 5/10

State Number & Name GPS Coordinates Type Length & Condition

N x W Width

AA-01-52-001 29*46'52 N 96*16'03 W Concrete 4-10' w x 9' deep box OK

(44' x 24' x 9')

29*46'57 N 96*17'07 W Concrete 2-9' w x 6' deep box OK

(19' x 24' x 6')

San Bernard 29*46'47 N 96*18'54 W Concrete 13' wide - low water OK

Culverts

Size GPS Coordinates Type Length Condition

N x W

30" 29*46'53 N 96*15'45 w Concrete 40' OK

12/J 29*46'52 N 96*16'01 w Concrete 30' OK

18" 29*46'59 N 96*16'49 w Concrete 25' OK

18" 29*46'58 N 96*16'59 w Tin Horn 30' OK

18" 29*46'37 N 96*17'29 w Concrete 27' needs replacing

18'' 29*46'29 N 96*17'38 w Concrete 30' OK

24" 29*46'47 N 96*18'07 w Concrete 22' OK

2411 29*46'47 N 96*18'15 w Concrete 22' OK

2-30" 29*46'47 N 96*18'25 w Concrete 22' OK

Page 36: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Kurtz #5367

Paved miles 1.9 miles Condition: OK

Total Length 1.9 miles

Culverts

Size GPS Coordinates Type Length Condition

18" 29*47'44 N 96*07'07 w Concrete 40' OK

1811 29*47'49 N 96*07'26 w Concrete 31' OK

1211 29*47'47 N 96*08'08 w Concrete 28' OK

24" 29*47'48 N 96*08'34 w Tin Horn 40' OK

4211 29*47'44 N 96*08'43 w Concrete 42' OK

Page 37: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles

Gravel miles

Total Length

.15 mile

.15 mile

.3 mile

Mace #5318

Condition: OK

Condition: OK

Page 38: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .278 miles

Total Length .278 miles

Culverts

Size GPS Coordinates

N x W

Madison #5277

Condition: OK

Type Length

12n 29*50'43 N 96*19'30 W Concrete 24'

Condition

OK

Page 39: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Maler #5101

Paved miles

Gravel miles

Total Length

.916 mile

1.955 miles

2.871 miles

Condition: OK

Condition: Needs 200 yds. gravel

State Number & Name GPS Coordinates Type Length & Condition

N Widl

Bullinger 29*47'57 N 96*09'01 w Concrete 100' x 24' OK Bullinger 29*48'48 N 96*08'41 w Steel & Concrete 24' x 24' OK3/07

Culverts

Size GPS Coordinates Type Length Condition

N x W

12" 29*47'44 N 96*09'15 w Concrete 24' OK

1211 29*48'09 N 96*09'06 w Concrete 24' OK

2-24" 29*49'21 N 96*08'04 w Con�ri:-t<:> 28' OK

Page 40: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Meier Rd. #5067

Gravel miles 1.775 miles

Total Length 1.775 miles

Culverts

Size GPS Coordinates

N x W

18" 29*46'48 N 96*17'16 w

2-24" 29*46'32 N 96*16'57 w

2-15" 29*46'04 N 96*16'24 w

12" 29*45'53 N 96*16'11 w

18" 29*45'44 N 96*16'01 w

Condition: Needs 400 yds. gravel

Type Length Condition

Concrete 32' OK

Concrete 29' OK

Concrete 28' OK

Concrete 28' OK

Concrete 32' OK

Page 41: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Monroe #5275

Paved miles .212 miles Condition: OK

Total Length .212 miles

Culverts

Size GPS Coordinates Type Length Condition

12" 29*50'30 N 96*19'28 w Concrete 44' OK

1811 29*50'39 N 96*19'22 w Concrete 54' OK

Page 42: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .296 mile

Total Length .296 mile

#5332

Condition: 2" asphalt overlay 7 /11

Page 43: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles

Gravel miles

Total Length

Culverts

.lmile

.1 miles

.2 miles

Size GPS Coordinates

N x W

N. Front St. #5279

Condition: OK

Condition: OK

Type Length

15" 29*50'50 N 96*19'40 W Tin Horn 22'

Condition

replace

Page 44: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5282

Paved miles 1.439 miles Condition: OK

Total Length 1.439 miles

State Number & Name

AA-01-63-003

Culverts

GPS Coordinates Type

N x W

29*51'02 N 96*20'23 W Concrete

Size GPS Coordinates Type

N x W

12" 29*50'45 N 96*19'35 w Concrete

12" 29*50'46 N 96*19'35 w Concrete

12" 29*50'46 N 96*19'36 w Concrete

18'' 29*50'48 N. 96*19'40 w Concrete

15" 29*50'52 N 96*19'51 w Concrete

36" 29*50'59 N 96*19'56 w Concrete

Length & Condition

Width

32' x 24' OK

(3'8" w x 10' tall box)

Length Condition

38' OK

42' OK

38' OK

27' OK

26' OK

50' OK

Page 45: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Odom #6539

Paved miles .395 mile

Total Length .395 mile

Culverts

Size GPS Coordinates

2-15" 29*47'36 N 96*14'20 w

15" 29*47'40 N 96*14'24 w

Condition: 2" asphalt overlay 5/10

Type Length Condition

Tin Horn 40' OK

Tin Horn 40' OK

Page 46: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Old Columbus Rd. N. #5066

Paved miles 3.366 miles Condition: 1.85 needs seal coat &

spot overlay

Total Length 3.366 miles

State Number & Name

AAOl-48-001

Culverts

GPS Coordinates Type

N x W

29*46'09 N 96*15'33 W Concrete

Size GPS Coordinates Type

3611 29*45'05 N 96*17'00 w Concrete

1811 29*45'21 N 96*16'43 w Concrete

2 24" 29*45'22 N 96*16'25 w Concrete

241} 29*45'49 N 96*15'54 w Concrete

1811 29*46'08 N 96*15'43 w Concrete/Tin Horn

2-24" 29*46'15 N 96*15'28 w Tin Horn

4-48" 29*46'47 N 96*14'53 w Tin Horn

42" 29*46'47 N 96*14'52 w Tin Horn

Length & Condition

Width

72' x 30' OK 12/09

Length Condition

27' OK

32' OK

27' OK

30' OK

24' OK

30' OK

30' OK ends rust

30' OK ends rust

Page 47: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Peschel #5314

Paved miles 1.501 miles

Total Length 1.501 miles

Culverts

Size GPS Coordinates

15" 29*46'03 N 96*11'07 w

1511 29*46'14 N 96*10'55 w

18" 29*46'22 N 96*10'46 w

18" 29*46'22 N 96*10'46 w

18" 29*46'27 N 96*10'40 w

18" 29*46'28 N 96*10'40 w

15" 29*46'38 N 96*10'28 w

18" 29*46'46 N 96*10'21 w

Condition: OK 2" asphalt overlay

6/11

Type Length Condition

Plastic liner 45' OK

Plastic 30' OK 6/11 Concrete 33' OK Concrete 30' OK

Concrete 29' OK Concrete 29' OK

Steel 29' OK

Concrete 33' OK

Page 48: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Peters San #6550

Condition: OK Paved miles

Gravel miles

.4 mile

.6mile Condition: Needs 500 yds. gravel

Total Length 1.0 mile

Culverts

Size GPS Coordinates Type Length Condition

2 18"" 29*49'38 N 96*08'25 w Concrete 45' OK 11Acme11

60" 29*49'05 N 96*07'44 w Steel 34' needs easement

To ditch

Page 49: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Pless #5274

Paved miles 1.086 mile Condition: OK

.5 mile 2" asphalt overlay 8/09 from 949

Total Length 1.086 mile

Culverts

Size GPS Coordinates Type Length Condition

N x W

151111 29*50'40 N 96*18'55 w Concrete 25' OK

20 x 30" 29*50'29 N 96*18'54 w Concrete 27' OK railroad

Page 50: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Plum Creek #5079

Paved miles

Total Length

1.612 miles

1.612 miles

Condition: Needs 2" overlay from

1094 to the bridge

State Number & Name GPS Coordinates Type Length & Condition

N x W Width

AAOl-63 001 29*49'39 N 96*16'14 w Concrete 4-8 x 10 box OK

(44' x 24' x 8')

Culverts

Size GPS Coordinates Type Length Condition

N x W

15" 29*50'25 N 96*15'42 w Concrete 24' OK

15" 26*50'14 N 96*15'47 w Concrete 24' OK

18" 26*49'53 N 96*15'59 w Steel 26' OK

2411 26*49'40 N 96*16'13 w Tin Horn 30' OK

18" 29*49'38 N 96*16'16 w Plastic 40' OK 7/10 18" 29*59'36 N 96*16'18 w Plastic 35' OK 7/10 24" 29*49'32 N 96*16'22 w Tin Horn 20' OK Railroad

30" 29*49'31 N 96*16'23 w Tin Horn 24' OK Railroad

15" 29*49'21 N 96*16'34 w Plastic 30' OK 7/10 15" 29*49'20 N 96*16'35 w Concrete 54' OK

Page 51: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5055

Paved miles 2.288 miles

Total Length 2.288 miles

Culverts

Size GPS Coordinates

2411 29*46'49 N 96*14'51 w

2411 29*46'32 N 96*14'30 w

2411 29*46'08 N 96*14'16 w

2-24" 29*46'08 N 96*14'16 w

2411 29*46'03 N 96*14'10 w

24" 29*46'47 N 96*13'36 w

Condition: Needs spot patch

& overlay

Type Length Condition

Concrete 30' OK

Concrete 24' OK

Tin Horn 30' OK

Concrete 30' OK

Concrete 21' OK

Plastic 40' OK

Page 52: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Circle #5576

Paved miles .646 mile

Total Length .646 mile

Culverts

Size GPS Coordinates

N x W

29*47'34 N 96*11'51 W

Condition: OK

Type Length

Concrete 36'

Condition

OK

Page 53: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Red Bud #6536

Dirt miles .179 mile Condition: OK

Total Length .179 mile

Page 54: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Remmert #5102

Condition: OK Paved miles

Gravel miles

1.307 miles

.916 mile Condition: Needs 250 yds. gravel

Total Length 2.223 miles

State Number & Name

Remmert

Culverts

GPS Coordinates Type

�xw

29*48'29 N 96*08'11 W Concrete

Size GPS Coordinates Type

2-36" 29*49'05 N 96*07'44 w Concrete

1811 29*48'08 N 96*08'11 w Concrete

16" 29*47'48 N 96*08'09 w Tin Horn

12" 29*47'25 N 96*08'08 w Concrete

Length & Condition

Width

40' x 21' OK

Length Condition

30' OK

24' OK

48' OK

26' OK

Page 55: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Ross #5280

Paved miles .195 mile Condition: OK

Total Length .195 mile

Culverts

Size GPS Coordinates Type Length Condition

N x W

12" 29*50'37 N 96*19'36 w Concrete 26' OK

18" 29*50'38 N 96*19'37 w Concrete 40' OK "TX DOT"

1811 29*50'39 N 96*19'38 w Concrete 40' OK 11TXDOT11

Page 56: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Schmoeller Sens Rd. #5285

Gravel miles 1.17 miles

Total Length 1.17 miles

Culverts

Size GPS Coordinates

N x W

12" 29*47'48 N 96*19'10 w

6011 29*47'52 N 96*19'15 w

2 12" 29*48'08 N 96*19'33 w

2-15" 29*48'14 N 96*19'33 w

Condition: Needs 100 yds.

gravel

Type Length Condition

Concrete 30' OK

Tin Horn 36' OK

Plastic 40' OK

Plastic 30' OK

Page 57: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Schultz #5286

Gravel miles 2.455 miles

Total Length 2.455 miles

State Number & Name GPS Coordinates

N x W

Terrazas 29*45'17 N 96*18'13 W

Culverts

Size GPS Coordinates

N x W

1811 29*45'01 N 96*17'48 w

3611 29*45'08 N 96*17'55 w

3011 29*45'33 N 96*18'22 w

24" 29*45'54 N 96*18'22 w

1511 29*46'23 N 96*18'16 w

15" 29*46'39 N 96*18'07 w

18" 29*46'47 N 96*18'05 w

Cattle Guards

Size GPS Coordinates

N x W

29*45'21 N 96*18'08 w

29*45'32 N 96*18'12 w

29*45'58 N 96*18'22 w

29*46'18 N 96*18'22 w

29*46'47 N 96*18'05 w

Condition: Needs 1100

yds. gravel

Type

Steel & Concrete

Type

Concrete

Tin Horn

Steel

Concrete

Concrete

Concrete

Concrete

Type

Pipe

Pipe

Pipe

Pipe

Pipe

Length & Condition

Width

24' x 28' OK built 7 /14

Length Condition

21' OK

30' OK

20' OK

25' OK

25' OK

20' OK

27' OK

Length Condition

8' x 13' wide OK cattle guard

8' x 13' wide OK cattle guard

8' x 15' wide OK cattle guard

O' x 14' wide OK cattle guard

7' x 13' wide OK cattle guard

Page 58: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Settlers Court Drive #6548

Paved miles .6 mile

Total Length .6 mile

Culverts

Size

32-24"

GPS Coordinates

N x W

29*46'17 N 96*13'01 W

Condition: OK

Type Length

Concrete 54'

Condition

OK

Page 59: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Settlers Drive #5378

Paved miles 1.3 miles Condition: OK

Total Length 1.3 miles

Culverts

Size GPS Coordinates Type Length Condition

N x W

2 48" 29*46'55 N 96*12'51 w Plastic 40' OK

24" 29*46'42 N 96*13'03 w Plastic 40' OK

2-30" 29*46'26 N 96*12'47 w Plastic 40' OK

48" 29*46'22 N 96*12'51 w Plastic 40' OK

Page 60: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .161 mile

Total Length .161 mile

Culverts

Size GPS Coordinates

N x W

Sundown #5328

Condition: OK

Type Length

2411 29*47'11 N 96*12'2 W Concrete 41'

Condition

OK

Page 61: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Track Rd. E #5104

Paved miles

Total Length

3.365 miles

3.365 miles

Condition: .5 mile 2 course seal coat

.34 mile 1 course seal coat

From Plum Creek Rd. to bridge

All completed 7 /13

State Number & Name GPS Coordinates Type Length & Condition

N x W Width

AAOl-63-002 29*49'44 N 96*17'10W Steel & Concrete 3-8' x 10' box OK

30' z 24' 8'

Culverts

Size GPS Coordinates Type Length Condition

1811 29*50'41 N 96*19'26 w Concrete 37' OK

4211 29*50'37 N 96*19'14 w Tin Horn 38' replace

2 7' 29*50'33 N 96*19'07 w Steel 38' OK

1511 29*50'32 N 96*19'05 w Steel 33' OK

6' 29*50'30 N 96*19'00 w Tin Horn 40' 8/15

1511 29*50'28 N 96*18'53 w Concrete 24' OK

1511 29*50'27 N 96*18'36 w Concrete 22' OK

6' 29*50'26 N 96*18'07 w Tin Horn 40' 8/15

6' 29*50'21 N 96*17'56 w Tin Horn 40' 8/15

18" 29*50'12 N 96*17'46 w Concrete 24' OK

24" 29*50'08 N 96*17'41 w Concrete 25' OK

3011 29*50'01 N 96*17'32 w Tin Horn 30' OK

21" 29*49'48 N 96*17'15 w Steel 24' OK

3611 29*49'41 N 96*17'06 w Tin Horn 30' replace

8' 29*49'34 N 96*16'59 w Tin Horn 40' 6/16

2-15" 29*49'20 N 96*16'42 w Concrete 24' OK

15" 29*49'17 N 96*16'38 w Steel 38' OK

Page 62: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Willow #5292

Paved miles .204 mile Condition: OK

Total Length .204 mile

Culverts

Size GPS Coordinates Type Length Condition

N x W

15" 29*46'41 N 96*07'46 w Tin Horn 30' both ends crush

City of Sealy

2-24" 29*46'47 N 96*07'49 w Plastic 20' OK

Page 63: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Wildflower #5335

Paved miles .531 mile Condition: OK

Total Length .531 mile

Culverts

Size GPS Coordinates Type Length Condition

24" 29*47'10 N 96*14'02 w Concrete 40' OK

24" 29*47'13 N 96*13'58 w Plastic 40' OK 6/11

Page 64: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5331

Paved miles .185 mile

Total Length .185 mile

Culverts

Size GPS Coordinates

18" 29*47'36 N 96*14'03 w

18" 29*47'34 N 96*14'00 w

Condition: 2" asphalt overlay 7 /11

Type Length Condition

Concrete 40' OK

Concrete 32' OK

Page 65: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5316

Paved miles .992 mile

Total Length .992 mile

Culverts

Size GPS Coordinates

N x W

15" 29*46'57 N 96*11'29 w

15" 29*46'52 N 96*11'23 w

24" 29*46'40 N 96*11'08 w

24" 29*46'22 N 96*10'46 w

Condition: 2" asphalt overlay 6/11

Type Length Condition

Concrete 27' lower joint separated

Concrete 24' OK

Plastic 30' OK 6/11

Concrete 42' OK

Page 66: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Paved miles .4 mile

Total Length .4 mile

Culverts

Size GPS Coordinates

N x W

Zubicek #5278

Condition: OK

Type

15" 29*50'46 N 96*19'37 W Concrete

Length Condition

33' OK

Page 67: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#2. Amount of money necessary for maintenance of the precinct roads during

the next fiscal year.

See attached

Page 68: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Precinct 3

Line Item &

Salaries (4)

Overtime

Longevity

F.l.C.A.

Retirement

Hard surface road material

Engineering services

Repairs & Replacements

TOTAL

Road & Bridge Fund

Requested

amount

$ 153,020

$ 2,500

$ 4,500

$ 12,000

$ 13,000

$ 10,000

$ 3,000

$ 223,020

Page 69: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Precinct 3

Line Item &

Gas/oil/grease

Sand & gravel

Hard surface road material

Lumber & Hardware

Tires & Tubes

Concrete pipe/culverts

Cell phones (2)

Equipment hire

Miscellaneous

Capitalize lease purchase

TOTAL

F/M & Lateral

Requested

amount

$ 38,700

$ 64,000

$ 80,000

$ 3,000

$ 10,000

$ 6,000

$ 2,500

$ 10,000

$ 10,000

$

$ 241,492

Page 70: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

County & Lateral Road Fund

$ 6,500

Page 71: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#3. Number of traffic control devices in the precinct defaced or torn down:

none

Page 72: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#4. Any new road that should be opened in the precinct:

None

Page 73: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#5. Any bridges, culverts, or other improvements necessary to place the

precinct roads in good condition, and the probable cost of the improvements.

Total cost $ 1,352,7 40

Page 74: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

Road Improvements

Road Needed maintenance Estimated Cost

Ashorn 100 yds. gravel $ 1,200

Barremore 400 yds. gravel $ 4,800

Esar 120 yds. gravel $ 1,440

Frantz reclaim & 2 course 1.2 miles $150,000

replace 2 culverts $ 3,000

500 yds. gravel $ 6,000

Frazer 450 yds. gravel $ 5,400

Hahn 1000 yds. gravel $ 12,000

Hillboldt 2 course 4.2 miles $250,000

replace culvert $ 1,500

Hintz 200 yds. gravel $ 2,000

Jalowy 1600 yds. gravel $ 19,200

Kloss 1100 yds. gravel $ 13,200

Maler 200 yds. gravel $ 2,400

Meier 400 yds. gravel $ 4,800

reclaim $ 25,000

2 course 1.8 miles $100,000

N. Front. replace culvert $ 1,000

Peters San Felipe 500 yds. gravel $ 6,000

Plum Creek 2" asphalt overlay 1.2 miles $120,000

Pyka fix shoulders to widen road $100,000

2" asphalt overlay 2.3 miles $250,000

Remmert 250 yds. gravel $ 3,000

Schmoeller Sens 100 yds. gravel $ 1,200

Schultz 1100 yds. gravel $ 13,200

Track E. spot patch $100,000

2 course 2.6 miles $150,000

replace 2 culverts

$ 1,352,740

Page 75: Austin County€¦ · Road and Bridge Report Precinct 3 Annual Road Report July 1, 201\ fc> (\ . Thru May 31, 2017 Randy Reichardt . County of Austin Precinct No. 3 ANNUAL ROAD REPORT

#6. Road work contracts for the past year:

-0-