australia’s next uranium producer - melbourne mining club€¦ · results for the jasons deposit...
TRANSCRIPT
A U S T R A L I A ’ S N E X T U R A N I U M P R O D U C E R
ASX: BOE
1
OPTIMAL
TIMING
RISING
DEMAND BARRIERS
TO PRODUCTION
TIGHTENING
SUPPLY
URANIUM| BULL MARKET FUNDAMENTALS
2
URANIUM| OPTIMAL TIMING
$138/lb
Global Financial Crisis
SPOT PRICE
$70/lb Fukushima
Major Mine Flood (McArthur River)
McArthur River
shut down $25/lb
CONTRACT PRICE
2004
2006
2008
2010
2012
2014
2016
2018
BOSS AISC US$ 23.90/lb
US $
/lb
U308
$40
$60
$80
$100
$120
$140
$20
3
S232 PETITION RESOLVED
US$60 LB FOR MOST URANIUM MINES TO RECOVER COSTS
50
100
150
200
250 2
01
7
20
18
20
19
20
20
20
21
20
22
20
23
20
24
2025
20
26
20
27
20
28
20
29
20
30
mill
ion
poun
ds U
308
– pe
r UxC
Q3’
2017
CONTRACTED DEMAND
UNCOVERED DEMAND
URANIUM| RISING DEMAND
FASTEST NUCLEAR POWER GROWTH IN PAST 25 YEARS
4
URANIUM| BULL MARKET FUNDAMENTALS
5
50
100
150
200
250
mill
ion
po
un
ds
U308
$20
$40
$60
$80
$100
$120
$140
US $/lb U308
INVENTORIES
WORLD URANIUM PRODUCTION
COMMERCIAL REQUIREMENT
S
SPOT PRICE
SIGNIFICANT LONG-TERM GLOBAL SUPPLY SHORTAGE IS EMERGING
URANIUM| TIGHTENING SUPPLY
6
7
BOSS RESOURCES| BARRIERS TO PRODUCTION
• No new production can be built economically at current prices
• Lack of funding for new exploration
• Permitting requirements increasingly difficult
7
PREMIER JURISDICATION
RESOURCES &
EXPLORATION UPSIDE
$170M EXISTING
PLANT
BOSS RESOURCES| THE HONEYMOON PROJECT
STAKEHOLDER VALUE
8
9
SYDNEY
MELBOURNE
PERTH
ADELAIDE
BOSS RESOURCES
HONEYMOON
PROJECT
BEVERLEY OLYMPIC
DAM
BOSS RESOURCES| PREMIER JURISDICTION
• 1ST world mining
jurisdictions attract tier 1
investment and talent
• Three of Australia’s four fully
permitted uranium mines
are in South Australia
9
10
BOSS RESOURCES| RESOURCES & EXPLORATION UPSIDE
CLASSIFICATION Million Tonnes
U3O8 ppm Contained U3O8 (Mkg)
Contained U3O8 (Mlb)
Measured 3.1 1,100 3.4 7.6
Indicated 18.4 630 12.0 25.5
Inferred 30.9 570 18.0 38.5
Total 52.4 620 32.5 71.6
71.6Mlb U3O8 JORC Resource
Mining License 6109 contains 34 Mlb U3O8
Average grade 620 U3O8 ppm
Exploration target up to 190 Mlbs U3O8
Shallow mineralisation at 90-120m depth
10 targets being explored by passive seismic surveying
10
11
$170 MILLION INFRASTRUCTURE VALUE
PRODUCTION
PLANT
MODERN
CAMP
WATER
SUPPLY
AIRSTRIP &
ROADS
POWER
ACCESS
AUSTRALIA’S NEXT URANIUM PRODUCER
12
EXCELLENT
ECONOMICS
FULLY
PERMITTED
EXPERIENCED
TEAM
URANIUM| COMPELLING INVESTMENT
MAXIMISING
RETURNS
MINIMISING RISK
$
13
$0 20
40
60
80
10
0
12
0
14
0
16
0 Million lbs U308
SPOT
PRICE
OFF-TAKE
PRICE
Under Ground
Open Pit
By-Product In situ Recovery
BOSS AISC US$ 23.90/lb
PROFITABILITY | ADVANTAGEOUS PRODUCTION ECONOMICS
14
US$60 LB FOR MOST URANIUM MINES TO RECOVER COSTS
BOSS RESOURCES|PROFITABLE STAGED DEVELOPMENT
15
BOSS RESOURCES| UNIQUE VALUE PROPOSITION
EXPERIENCED TEAM
World leading uranium team
Discovered, built, produced, sold
Closed biggest M&A transaction in last bull market $2.2 Billion
FULLY PERMITTED
Uranium export permit renewed
Native Title agreements all in place
1 of 4 mines fully permitted
16
GLOBAL PEER COMPARISON | BOSS FIRST MOVER ADVANTAGE
17
Low Risk
Low CAPEX Low AISC
QUICK
START
High Risk
High CAPEX
High AISC
including exploration resource potential
18
Board of Directors Mark Hohnen * Chairman
Duncan Craib * Managing Director/ CEO
Bryn Jones ** Technical Director
Evan Cranston Non-exec Director
Peter Williams Non-exec Director
Mathew O'Hara CFO/ Co Sec
Senior Management Sashi Davies * Strategic & Marketing
Keith Bowes Project Manager
Asha Rao Geology Manager
* ex- Extract/ Kalahari ** starts 15 September 2019
Institutional Shareholders Paradice 10%
Tribeca 10%
L2 Capital
Sachem Cove
Segra Board and management 6% Top 20 shareholders 60%
Research Coverage BW Equities
Canaccord
Euroz
Larry Hill
Michael Emery
Hartleys Paul Howard
Patersons Cameron Hardie
CORPORATE INFORMATION | COMPANY PARTICULARS
18
Trading Information as at 15 July 2019
Historical Share Price
0.00
0.02
0.04
0.06
0.08
0.10
0.0
30.0
60.0
90.0
120.0
Mar-18 Jul-18 Nov-18 Mar-19
Volume - RHS BOE Shareprice - LHS
V3
Average Daily Trading Volume
3 MONTHS 3m
6 MONTHS 2.5m
Share Price 5.8 cents Market Capitalisation AUD$ 90 million Shares on Issues 1,584 million Enterprise Value AUD$ 100 million UNDILUTED Available Cash AUD$ 10.5 million
CORPORATE INFORMATION | SHARE PRICE & MARKET CAPITALISATION
19
20
BOSS Resources is ready to take advantage of the next uranium bull market …
BOSS RESOURCES| FIRST MOVER ADVANTAGE
• Signals in the uranium industry are pointing to a new Bull Market
• The Honeymoon Project – destined to be Australia’s next uranium producer
• Boss Resources – the leading low cost, low capex, market ready uranium company
20
DISCLAIMER
The information contained in this presentation or subsequently provided to any recipient of this presentation whether orally or in writing by or on behalf of Boss Resources Limited (“Boss”) or its respective
employees, agents or consultants (Information) is provided to the recipients on the terms and conditions set out in this notice. The purpose of this presentation is to provide recipients with information relating
to Boss Projects.
This presentation does not constitute investment advice and has been prepared by Boss without taking into account the recipient’s investment objectives, financial circumstances or particular needs. Each
recipient must make his/her own independent assessment and investigation of Boss and its business and assets when deciding if an investment is appropriate and should not rely on any statement or the
adequacy and accuracy of any information. This presentation is in summary form and does not purpose to be exhaustive. This presentation should be read in conjunction with Boss’ periodic and continuous
disclosure announcements lodged with the Australian Securities Exchange, which are available to download at www.asx.com.au.
Boss makes no representation or warranty (either expressed or implied) as to the accuracy, reliability or completeness of the Information. Boss and its directors, employees, agents and consultants shall have
no liability (including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or implied) arising out of, contained in or derived
from, or for any omissions from the presentation, except liability under statute that can not be excluded.
This presentation may contain forward-looking statements. Forward-looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Boss.
Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward-looking
statements.
This presentation does not constitute in any way an offer or invitation to subscribe for securities in Boss pursuant to the Corporations Act 2001 (Cth) and has not been lodged with the Australian Securities and
Investment Commission.
The information in this document relating to the Expansion Study is extracted from the announcement entitled ‘Positive Expansion Study Results Progress The Honeymoon Uranium Project To PFS’ dated 28
September 2016 and the information relating to the Pre-Feasibility Study is extracted from the announcement entitled “Honeymoon Pre-Feasibility Study Heralds Near Term Production Potential” dated 31
May 2017. The information in this document relating to the Mineral Resources is extracted from the announcements released to the ASX on 20 January 2016, 8 April 2016, 14 June 2016, 15 March 2017, 25
February 2019. The information relating to the Exploration Target is extracted from the announcement released to the ASX 8 December 2015 and 25 March 2019. The information relating to the Exploration
Results for the Jasons Deposit is extracted from the Company’s announcements dated 6 December 2016, 8 December 2016, 14 December 2016 and 3 February 2017. The information relating to the results
from the Field leach Trial (FLT) and Ion Exchange Pilot Plant have been extracted from the announcements released to the ASX on 19 June 2017, 31 July 2017, 13 September 2017, 4 & 26 October 2017, 1 & 15
November 2017. The information in these announcements has been compiled and/or reviewed by Dr Marat Abzalov, who is a Competent Person as defined in the 2012 edition of the “Australasian Code for
Reporting Mineral Resources and Ore Reserves”. Dr Abzalov has consented to the inclusion of the information in this presentation in the form in which it appears and confirmed that the form and context in
which the Competent Person’s findings are presented have not materially changed since initial release to the ASX.
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource
under the JORC Code 2012. The Exploration Target is not being reported as part of any Mineral Resource or Ore Reserve.
21
THANK YOU
@BOSS_RESOURCES
WWW.BOSSRESOURCES.COM.AU
ASX: BOE
CUTTING EDGE PRESENTATION
Melbourne Mining Club
16 July 2019
David Boyd Managing Director
16 July 2019 2
COMPLIANCE, DISCLAIMER AND CAUTIONARY STATEMENTS
These Presentation Materials include information that relates to Exploration Results prepared and first disclosed under the JORC Code (2012). The information was extracted from the Company’s previous ASX Announcements as follows: • Jamieson: “New Gold Prospects Defined at Jamieson” 15 July 2019 • Paterson: “Paterson Aeromagnetic Survey Identifies New Targets” 8 July 2019 • Jamieson: “Gold Zone Extended With Latest Results From Hill 800” 27 May 2019 • Paterson: “Major Geophysical Program to Commence in Paterson” 6 May 2019 • Jamieson: “New Drill Holes Confirm High Grade at Hill 800” 3 May 2019 • Various: “Quarterly Activities Report For The Period Ended 31 March 2019” 29 April 2019 • Jamieson: “High Grade Gold-Copper Zone Extended at Hill 800” 1 April 2019 • Paterson: “Six New High Priority Prospects in the Paterson Province” 19 February 2019 • Jamieson : “New Gold Zone Discovered at Hill 800” 5 February 2019 • Jamieson : “Second Round of Diamond Drilling Underway at Hill 800” 28 November 2018 • Oakover: “Encouraging Drill Results from Western Star” 23 November 2018 • Paterson: “Major Tenement Holding Granted in Paterson Province” 14 November 2018 • Jamieson : “Strong Finish to Maiden Drilling Program at Hill 800” 20 August 2018 • Jamieson : “Latest Results Increase Strike Potential at Hill 800” 6 August 2018 • Jamieson : “Record High-Grade Gold Intersection from Hill 800” 10 July 2018 • Jamieson : “New High Grade Gold-Copper Zone at Hill 800” 25 June 2018 • Jamieson: “Exceptional First Results from Hill 800 Drilling” 7 June 2018 • Oakover: “New Cobalt Targets Identified in Eastern Pilbara” 26-Mar-18 • IPO Prospectus: “Carawine Resources Prospectus” 12-Dec-17
Copies of these are available from the ASX Announcements page of the Company’s website: www.carawine.com.au The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements. The Company confirms that the form and context in which the competent person’s findings are presented have not been materially modified from the relevant original market announcements.
This document may not be reproduced, redistributed or passed on, directly or indirectly without the consent of the Company. By receiving the Presentation Materials, you acknowledge and represent to the Company that you have read, understood and accepted the terms of this disclaimer.
The contents of the Presentation Materials reflect various technical and economic conditions at the time of writing. Given the nature of the resources industry, these conditions can change significantly over relatively short periods of time due to factors outside the control of the Company and its directors, staff and consultants. Consequently, actual performance may vary from those contained in this document.
Some statements in the Presentation Materials regarding estimates or future events are forward-looking statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward-
looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, "predict", "foresee", "proposed", "aim", "target", "opportunity", “could”, “nominal”, “conceptual” and similar
expressions. Forward-looking statements, opinions and estimates included in this report are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions. Forward-looking statements are provided as a general guide only and should not be relied on as a guarantee of future performance. Forward-looking statements may be affected by a range of variables that could cause actual results to differ from estimated results, and may cause the Company’s actual performance and financial results in future periods to materially differ from any projections of future performance or results expressed or implied by such forward-looking statements. So there can be no assurance that actual outcomes will not materially differ from these forward-looking statements.
The Presentation Materials are for information purposes only and do not constitute or form any part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities in the Company in any jurisdiction. The Presentation Materials and its contents must not be distributed, transmitted or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that or any other jurisdiction. The Presentation Materials contain summary information about the Company and its activities which is current as at the date of the Presentation Materials. The information in the Presentation Materials is of a general nature and does not purport to contain all the information which a prospective investor may require in evaluating a possible investment in the Company or that would be required in a prospectus or product disclosure statement or other offering document prepared in accordance with the requirements of Australian law or the laws of any other jurisdiction, including the United States of America. The Company does not undertake to provide any additional or updated information whether as a result of new information, future events or results or otherwise.
The Presentation Materials are not investment or financial product advice (nor tax, accounting or legal advice) and are not intended to be used for the basis of making an investment decision. Recipients should obtain their own advice before making any investment decision.
Carawine and its directors, employees and consultants make no representations or warranty as to the accuracy, reliability or completeness of the Presentation Materials, and have no liability, including liability to any person by reason of negligence of, or contained in or derived from, or for any omissions from this document, except liability under statute that cannot be excluded.
16 July 2019 3
Jamieson • Northeastern Victoria gold and base metals • VHMS camp with +1Moz potential, underexplored • Outstanding results from diamond drilling at Hill 800
92.7m @ 3.22g/t Au from 2.3m (H8DD006) 43m @ 4.24g/t Au, 0.3% Cu (H8DD002) Main zone: 170m along strike, 175m down dip, average 35m width, open
• First Mineral Resource estimate due H2 2019
Paterson • Paterson Province WA gold and base metals • Large, strategic tenement holding • Recent large gold and copper discoveries by Rio Tinto (Winu)
and Greatland Gold (Havieron) • Major geophysical program to deliver drill targets for
testing in H2 2019
Oakover • Eastern Pilbara WA manganese, iron, cobalt, copper • One of few junior-held world-class manganese provinces
in Australia • Significant low-impurity, high grade iron potential
Fraser Range • Southeast WA nickel, copper and cobalt • JV with Independence Group (ASX:IGO), IGO 51% earning to 70%
GOLD, COPPER, BASE METALS - PROJECTS
For details relating to Exploration Results refer to the most recent ASX announcements for each Project as listed under the Compliance Statement on page 2.
16 July 2019 4
EXPERIENCED AND SUCCESSFUL TEAM
Will Burbury Non-Executive Chairman
David Boyd Managing Director
Bruce McQuitty Non-Executive Director
David Archer Non-Executive Director
Michael Cawood Exploration Manager
Geologist with over 25 years experience in the mining industry. Previously Exploration Manager for Sheffield Resources and executive of Consolidated Minerals managing exploration and resource development. Senior exploration roles with major gold mining houses RGC/Goldfields, Placer Dome and Barrick, involved in a number of gold discoveries including Raleigh and Homestead underground mines in WA.
Corporate lawyer prior to entering the mining industry in 2003. Actively involved in the identification and financing of many Australian and African resources projects. Chairman of Sheffield Resources since 2010, previously Chairman of Warwick Resources and former director of Lucapa Diamond Company Ltd.
Geologist with over 30 years experience in the mining industry. Managing Director of Sheffield Resources from 2010-2015 and Warwick Resources from 2007-2009. Prior to that was exploration manager-manganese for Consolidated Minerals, and held senior positions with RGC and Gympie Gold.
Geologist with around 30 years experience in the Australian resources sector. Technical Director of Sheffield Resources since 2010. Senior positions with major Australian mining companies, including RGC and Goldfields.
Geologist with over 25 years experience in the mining industry working for a number of Australian and international resources companies, including RGC, Western Metals, Gindalbie Gold and Teck. Explored for gold, copper and base metal deposits across a variety of geological settings, successful in Teck’s Carapateena IOCG campaign, Project Generation and Evaluation throughout the Asia-Pacific.
16 July 2019 5
CORPORATE SNAPSHOT
ASX CODE ISSUED
SHARES1
SHARE
OPTIONS2
SHARE
PRICE
MARKET
CAP. CASH
(at 31/03/19)
ENTERPRISE
VALUE
TOP 20
HOLDERS
CWX 55.8M 11.3M $0.10 $5.8M $2.0M $3.8M 41%
Top 20:
Ilwella Pty Ltd
CVC Limited
Other top 20
Directors & Management
7.6% 6.5%
5.9%
21%
59%
All figures as at 11-Jul-19 unless stated otherwise. 1 includes 2.3M shares escrowed to December 2019. 2 average exercise price $0.30 – does not include 1.9M Performance Rights
6
Jamieson Project - High Grade High Value Targets VICTORIA
Historic goldfield in northeastern Victoria VHMS / epithermal mineralisation • Au-rich polymetallic deposits • Cambrian-aged volcanics analogous to Mt Read volcanics in
western Tasmania • Similarities with the Henty gold and Hellyer lead-zinc-silver-gold
deposits
Advanced targets • Hill 800 gold deposit • Rhyolite Creek prospect
16 July 2019
For details relating to Exploration Results refer to previous ASX announcements as listed under the Compliance Statement on page 2.
7
Hill 800 Gold Deposit JAMIESON PROJECT VICTORIA
16 July 2019
For details relating to Exploration Results refer ASX announcement 27 May 2019
Long section, looking west Cross section, looking north
J-J’
200m 50m
8
Hill 800 Gold Deposit JAMIESON PROJECT VICTORIA
16 July 2019
Outstanding assay results, multiple intersections > 100 gram x metres
Intense silica-sericite-pyrite alteration system, enveloping gold and copper in quartz-pyrite-chalcopyrite-stringer veins
Two Mineralised Zones • Surface “800” Zone, blankets hill, high grade:
34m @ 3.84g/t Au from 0m, incl. 23m @ 5.06g/t Au (H8DD017) • “Main” Zone, moderate dip towards the west and open
93m @ 3.22g/t Au from 2.3m, incl. 31m @ 6.64g/t Au (H8DD006) 43m @ 4.24g/t Au, 0.3% Cu from 177m, incl. 5m @ 24.1g/t Au (H8DD004)
Gold dominant VHMS / epithermal hybrid • 1.5Moz Henty Mine analogue • Similarities in age, setting, alteration and mineral system • Geochemical and spatial evidence for magmatic input / underlying intrusive source
For details relating to Exploration Results refer ASX announcement 27 May 2019
9
Rhyolite Creek Prospect JAMIESON PROJECT VICTORIA
16 July 2019
Magnetic High
TMI Magnetic image
5km south of Hill 800
Zinc-rich “classic” VMS target • 8m @ 3.7% Zn, 0.3% Pb, 0.1% Cu, 1.6g/t Au and 29g/t Ag from
220m (RCD001) incl. 1.4m @ 15.6% Zn, 7.4g/t Au, 113g/t Ag from 223m
• Above: 59m @ 0.5% Zn from 228m (RCD001)
Gold-copper porphyry / epithermal system • +0.1g/t gold in soil anomalism over 500m x 500m • 37m @ 0.44g/t Au, 0.2% Cu, 44g/t Ag from 67.5m (RCK003) • Sparse, shallow drilling to date
For details relating to Exploration Results refer ASX announcement 15 July 2019
RCD001 [email protected]% Zn, 0.5%Cu, 7.4g/t
Au, 113g/t Ag
RC045 [email protected]/t Au
RCK003 [email protected]/t Au, 0.2%
Cu, 44g/t Ag
0.1g/t Au soil anomaly over 500m x 500m
RCK002 [email protected]/t Au
16 July 2019 10
• Strong spatial correlation of regional magnetic highs and mineralisation
• Anomalies too strong to be explained by unaltered, primary host rocks
• Zoned multi-element geochemical anomalies around magnetic highs at Hill 800 and Rhyolite Creek areas
• Several additional prospects generated around each centre at Hill 800 & Rhyolite Creek
• Bigger picture targeting large scale mineralisation associated with underlying sub-volcanic intrusives
Hill 800 & Rhyolite Creek are Parts of Larger Mineral Systems JAMIESON PROJECT VICTORIA
For details relating to Exploration Results refer ASX announcement 15 July 2019
11
Paterson Project - WA’s Hottest Exploration Province Right Now WESTERN AUSTRALIA
16 July 2019
For details relating to Exploration Results refer ASX announcement 8 July 2019
Large strategic tenement holding Shallow cover • Less than 150m
Highly prospective tenements • Nifty & Telfer host rocks • Domal structures • Intrusive centres • Geophysical anomalies
High priority prospects identified Exploration underway • Major airborne and ground geophysical program in
progress • Drill target definition, drilling H2 2019
12
Recent History and Regional Exploration Successes PATERSON PROJECT WESTERN AUSTRALIA
16 July 2019
13
Baton Tenements PATERSON PROJECT WESTERN AUSTRALIA
16 July 2019
Compelling bullseye magnetic anomalies from detailed aeromagnetic survey • Gold-copper mineralisation targeted • Exploration model based other discoveries in the Region including
Winu and Havieron • Relatively shallow depths (75m to 225m) • Skarn style, intrusion-related targets • IOCG potential Gravity survey in progress, defining targets for drill testing H2 2019
For details relating to Exploration Results refer ASX announcement 8 July 2019
RTP magnetic image
14
Red Dog Tenements PATERSON PROJECT WESTERN AUSTRALIA
16 July 2019
Four prospects identified from historic work • Bullseye magnetic anomalies • Intrusion-related mineralisation • Anomalous Cu and Zn in drilling • Similar host rocks to Nifty, Telfer and Winu VTEM™ Max geophysical survey complete • High power, low-level helicopter borne electromagnetic
survey • Proven method, similar system associated with recent
Winu discovery • Data being processed, results July 2019
Earl
Duke
Bravo
Leatherneck
BMD1 (BHP) [email protected]% Cu
KH083 2m@1,750ppm Zn
377ppm Cu
KH092 10m@2,292ppm Zn
653ppm Pb
KH103 2m@542ppm Cu
375ppm Co
For details relating to Exploration Results refer ASX announcement 19 February 2019, 6 May 2019 & 15 July 2019
RTP magnetic image
16 July 2019 15
EXPLORATION TIMETABLE
Q3 2019 Paterson: Baton aeromagnetic results Paterson: Red Dog heli-EM survey results Paterson: Baton gravity survey results Paterson: Drill targets Jamieson: Hill 800 Mineral Resource
Q4 2019 Paterson: Drilling results Jamieson: Hill 800, Rhyolite Creek drilling H1 2020 Paterson: Drilling results Jamieson: Drilling results Jamieson: Large scale target evaluation
Targeted geophysics, program planning
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Hill 800 Mineral Resource
Paterson Drilling
Hill 800
Jamieson Program Results
Drilling Hill 800, Rhyolite Creek Jamieson
Paterson Program Results
Jamieson
16 July 2019 16
QUALITY ASSETS SET FOR GROWTH
Jamieson • One of few advanced gold exploration projects in the hands of a Junior
explorer • High-grade, near-surface gold deposit at Hill 800 • Continuous mineralisation, open at depth, clear target for growth • Rhyolite Creek: zinc VMS & epithermal gold and copper targets • Large scale underlying intrusive-related mineral system at play Paterson • Greenfields exploration on quality tenements in an exciting region
• Compelling prospects within easy reach of surface
• Excellent results from first programs
16 July 2019 17
THANK YOU
For further details, please contact:
David Boyd
Managing Director
Tel: +61 8 6319 0400
www.carawine.com.au
Follow us:
@CarawineASX
carawineresources
16 July 2019 18
APPENDIX
19
Oakover Project WESTERN AUSTRALIA
16 July 2019
• Large 100% owned tenement holding • One of the few remaining world-class manganese
provinces in Australia held by a junior explorer • Significant strike length of Marra Mamba iron host
formation • Surface cobalt-manganese mineralisation up to 0.4%
cobalt and 31.4% manganese • Recently granted tenements on the eastern edge of
the Paterson Province
For details refer to Carawine’s March 2019 Quarterly Activities Report dated 29 April 2019
20
Fraser Range Project WESTERN AUSTRALIA
16 July 2019
For details refer to Carawine’s March 2019 Quarterly Activities Report dated 29 April 2019. Prospect locations sourced from public reports.
• Increase in regional discoveries recently by Legend (ASX:LEG), Galileo (ASX:GAL) and Independence Group (ASX:IGO)
Fraser Range JV - Independence Group 51%, Earning to 70% with $5M Spend
• IGO searching for the next Nova
• Regional airborne EM surveys and aircore drilling have identified targets at Red Bull, Big Bullocks and Similkameen
• Carawine retains significant exposure to any discovery
Carawine 100%
• Big Bang tenement application
• South of Legend Mining’s (ASX:LEG) Area D: nickel copper sulphide in drilling at their Rockford Project and northeast along strike from Rumble Resources (ASX:RTR) and Independence’s (ASX:IGO) Thunderstorm gold discovery
21
Hill 800 Deposit – Henty Mineral System Analogue JAMIESON PROJECT VICTORIA
16 July 2019
• Extensive mineralisation • Area explored at Hill 800 to date is equivalent in
area to that of the Henty Sill Zone • Hybrid VHMS model
1
GRUYERE GOLD MELBOURNE MINING CLUB – JULY 2019
DUNCAN GIBBS
MANAGING DIRECTOR & CEO
2
Nature of this document: The purpose of this presentation is to provide general information about Gold Road Resources Limited (the ‘Company’). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates. In attending this presentation or viewing this document you agree to be bound by the following terms and conditions. This document has been prepared by the Company. Information in this document should be read in conjunction with other announcements made by the Company to the Australian Securities Exchange and available at www.goldroad.com.au or www.asx.com.
Not an offer: This presentation is for information purposes only and does not constitute or form any part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities in the Company in any jurisdiction. This presentation and its contents must not be distributed, transmitted or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that or any other jurisdiction.
Not financial product advice: This presentation does not take into account the individual investment objectives, financial situation and particular needs of each of the Company’s Shareholders. You may wish to seek independent financial and taxation advice before making any decision in respect of this presentation. Neither the Company nor any of its related bodies corporate is licensed to provide financial product advice in respect of the Company’s securities or any other financial products.
Forward-looking statements: Certain statements in the presentation are or may be “forward-looking statements” and represent the Company’s intentions, projections, expectations or beliefs concerning, among other things, future operating and exploration results or the Company’s future performance. These forward looking statements speak, and the presentation generally speaks, only at the date hereof. The projections, estimates and beliefs contained in such forward looking statements necessarily involve known and unknown risks and uncertainties, and are necessarily based on assumptions, which may cause the Company’s actual performance and results in future periods to differ materially from any express or implied estimates or projections.
Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisers and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation, or any opinions or beliefs contained in this document, and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission there from. The Company is under no obligation to update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.
Unverified information: This presentation may contain information (including information derived from publicly available sources) that has not been independently
verified by the Company.
DISCLAIMER IMPORTANT NOTICES
3
CORPORATE PROFILE
Tim Netscher Non-Executive Chairman
Duncan Gibbs Managing Director & CEO
Justin Osborne Executive Director – Exploration & Growth
Sharon Warburton Non-Executive Director
Brian Levet Non-Executive Director
Hayden Bartrop Joint Company Secretary
Carol Marinkovich Joint Company Secretary
BOARD OF DIRECTORS
CAPITAL STRUCTURE
SHAREHOLDERS
HEDGING
FINANCE FACILITIES
(UNDRAWN of $150M)
CASH &
EQUIVALENTS
MARKET CAP
PERFORMANCE
RIGHTS
ISSUED
SHARES 877M1
7.5M1
A$1,070M2 $US720M
A$49M1 US$34M
A$117M1 US$82M
130 koz @ A$1,836/oz3 US$1,285
[CELLRANGE]
[PERCENTAGE]
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
North America
Retail
Australian Instos
Corporate
UK & European Instos
Board & Management
Asian & Rest of World
BlackRock 11%
Gold Fields Ltd 10%
Sun Valley Gold 8%
1 As at 31 March 2019 2 As at 11 July 2019, based on last close price of A$1.22 per share 3 As at 11 July 2019
FX: 1AUD = USD0.70 SUBSTANTIAL
ANALYST RESEARCH
Argonaut
Bell Potter
Canaccord
Haywood
Macquarie
Numis
RBC
4
Australia’s Newest Gold Producer – Fully Funded
50:50 JV partner Gold Fields a proven global miner
Long life, low cost production at Tier 1 gold mine1
First gold produced
Successful Explorer in Underexplored Belts
Extensive (~6,000 km2) and prospective Yamarna exploration tenements (Gold Road 100%)
UNLOCKING VALUE FOR SHAREHOLDERS
1Tier 1: greater than 10 year mine life; greater than 300,000 ounces per annum; greater than 3.5 million ounce Ore Reserve and costs at the lower end of the cost curve
GRUYERE JV
5
GRUYERE
DISCOVERY
MAIDEN
RESOURCE
NATIVE
TITLE
MAIDEN
RESERVE
GRUYERE
JV
FIRST GOLD
JUNE QTR
CONSTRUCTION
COMMENCED
PFS
FS
MINING
COMMENCED
THE SHARE PRICE JOURNEY
6
GRUYERE THE STATS
150KILOMETRES
PIPING
320KILOMETRES
ELECTRICAL CABLE
22,000CUBIC METRES
CONCRETE
3,350,000MANHOURS
TO DATE
2,700TONNES
STRUCTURAL STEEL
7
Grinding Area
Leach & CIL Tanks
Crushing Area
EARLY EARTH WORKS
NOVEMBER 2017
8
Grinding Area
Tailings Storage Facility
Leach & CIL Tanks Pre-Leach Thickener
Foundation Powerhouse
1 Refer to ASX announcement dated 28 April 2018
CONSTRUCTION PROGRESS
44% COMPLETE1
NOV 2018
9
CONSTRUCTION PROGRESS
JUNE 2019
10
11
GRUYERE
GOLD June 2019
12
13
SUSTAINABILITY
BUILDING GRUYERE
SAFELY
> 3 million manhours LTI free
Total Recordable Injury Frequency Rate 3.4
SUPPORTING OUR
COMMUNITY
We have a strong relationship with the Yilka people on whose land we work
Providing employment opportunities and community support for our traditional owners
CARING FOR THE
ENVIRONMENT
Constructed in compliance with International Cyanide Management Code
Tailings Dam, low risk life of mine design
14
GRUYERE GOLD MINE
* 100% basis, refer to ASX announcement dated 6 December 2018
15
GRUYERE 2018 MINE PLAN
Lifting Gruyere production to 300,000oz pa Capital intensity per ounce unchanged
0
50
100
150
200
250
300
350
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
AIS
C (
A$
/oz)
- G
old
pri
ce (
A$
/oz)
Pro
du
ctio
n O
un
ces
(‘0
00
)
Gruyere (oz) Golden Hwy (oz) AISC (A$/oz) Gold price (A$/oz)
Refer to ASX announcement dated 6 December 2018
16
RESOURCES & RESERVES
Ore Reserve +5% to 3.92 Moz (100% basis)1
Gruyere grade increased to 1.25 g/t Au
Golden Highway Ore Reserve
Increased to 70% to 310,000oz
130,000oz addition to the 2018 Mine Plan
2019 focus for Resource growth on 100% ground
DECEMBER 2018 UPDATE
Resource & Reserve Category
(100% basis)
Tonnes
(Mt)
Grade (g/t
Au)
Moz Au
Mineral Resource (M,I,I) 155 1.32 6.61
Ore Reserve (P,P) 97 1.25 3.92
1Refer to ASX announcement dated 13 February 2019 2Refer to ASX announcement dated 7 November 2016 3Offset by Gruyere Mineral Resource decrease by 1.7% to 139.56 Mt at 1.29 g/t Au for 5.78 Moz due to changes to the geology model and estimation methodology.
17
GRUYERE RESERVE EXTENSION DRILLING
Lifting Gruyere production >300,000oz pa
Optimise plant throughput
Increase mining rate and optimise pit design
Geotechnical review for steeper pit walls
Grow Golden Highway Ore Reserves
>2 Moz Inferred
Resource available
for conversion within
A$1,850 shell
18
YAMARNA
DISCOVERY
2,840 HOLES DRILLED
2018
147,00
0 METRES DRILLED
2018
20M EXPLORATION BUDGET
2019
19
EXPLORATION 2019 PRIORITY EXPLORATION AREAS
Targeting >1 Moz discoveries on 100% ground
Over 150 targets now defined in Project Pipeline
Southern Project Area ~75% of 2019 budget
Bloodwood priority bedrock test
Hopwood priority geochemical reconnaissance
One of Australia’s largest greenfields gold exploration budgets ~$20M
Bloodwood
Gilmour-Morello
Pebble Beach
Hopwood
Brahman
Yaffler South
Gruyere
20
SOUTHERN PROJECT AREA
GILMOUR
10 km
Note: Refer to ASX announcement dated 30 January and 28 May 2019
21
High-grade shear zone at southern end of 14 km Wanderrie Supergroup Trend
Highly continuous quartz vein with abundant coarse gold
SOUTHERN PROJECT AREA
GILMOUR
Note: Refer to ASX announcement dated 30 January and 28 May 2019
22
Multiple advanced projects
Gilmour
4 m at 19.61 g/t Au
8 m at 7.11 g/t Au
5 m at 12.52 g/t Au
1.8 m at 29.68 g/t Au
0.62 m at 117.78 g/t Au
Smokebush
Yaffler South – drilling in progress
Hopwood – next to be tested
Yaffler South
SOUTHERN PROJECT
AREA
Note: Refer to ASX announcements dated 30 January 2019, 19 December 2018 and 19 November 2018
Hopwood
23
GRUYERE GOLD MELBOURNE MINING CLUB – JULY 2019
DUNCAN GIBBS
MANAGING DIRECTOR & CEO