aveva digital engineering - wonderware california · 2020. 9. 16. · 1 year 1 year understand your...
TRANSCRIPT
-
AVEVA Digital Engineering
© 2020 AVEVA Group plc and its subsidiaries. All rights reserved.
Parastoo Aber , Channel Manager – NA 9/10/20
-
AVEVA Industrial Software Leader
• Introduce Cost Estimation early in the design process and then use it to derive more accurate cost estimates + for cost control throughout the lifecycle of a project/operations
© 2018 AVEVA Group plc and its subsidiaries. All rights reserved.
Conceptual Design FEED
Detailed Design
Construction & Commissioning Operations
Process simulation
Basic engineering
Detailed design
Construction management EAM
HMISCADA
Track, analyze, & inform
Planning & scheduling
Direct & operate
CapEx phase 2 – 6 years OpEx phase up to 50 years
Asset Performance
Monitoring & Control Planning & Operations
Engineering
Class 4, 5 Estimates
Class 2, 3 Estimates
Class 1 Estimate
Cost Control Management
-
| Copyright © 2017 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
DESIGN
HANDOVER
FABRICATE
CONSTRUCT
HANDOVER
COMMISSIONOPERATION/REVAMP
HANDOVER
Industry Challenge
Document-centric world
-
The Complexity of Managing Engineering & Operational Data
Bulk Commodities
Pump PO
Const EWP/CWP Estimates
Piping Layout
Module
Structural Design
Area
Bulk Steel PO
Bulk Pipe & Fitting PO
Mechanical Datasheet
Electrical Datasheet
Electrical Loads
Control Elements/
InstrumentsProcess System
Electrical SystemControl
System
Plant
Procurement Plan
Vendor Data
Utilities
Cabling Layout
Total Installed Cost
Pipe Stress
Fabrication EWP/CWP Estimates
Work Order
Maintenance Data
Inspection Data
Process Safety Information
-
Digital Asset
Information
Physical Asset
SteelEvergreen
Mechanical Integrity Data Integrity
AVEVA Philosophy
-
THE DIGITALIZATION JOURNEY (DATA MANAGEMENT )
Concept Basic Detailed Start Operations Revamp
Data Sustainment
Improve Your Data
Document Centric
1 Ye
ar
1 Ye
ar
Understand Your Data
Data Discovery
Quality & Progress
Reporting
Project/Asset
Information Search
Engine
Tag Centric Information
Retrieval
Tag-to-DocCross Referencing
Multi-Project/
Asset access
and Visibility
Visualization
Data Enrichment
Data Optimization-Digital Twin
1st Stage
2nd Stage
3rd Stage
Manage Your Data
NumberingSystems
ChangeManageme
nt
BusinessValidation
Rules
Data RequirementsSpecification
Data Governanc
eModal
Integrated Engineering
Exploit the Digital Asset
Data centric
2-3 people 20-30 people 30-1000 ...
-
Agenda
© 2020 AVEVA Group plc and its subsidiaries. All rights reserved.
• Smart P&ID & Engineering Data
• Digital Twin or Digital Engineering
• Smart Electrical and Instrumentation
• AVEVA E3D
• Contract Risk Management
• Enterprise Resource Management : Construction Management
• Control of Work (Lockout Tagout –LOTO) • Laser Scanning
• How we can help you in your digitalization journey
Slide Number 1AVEVA Industrial Software Leader Slide Number 3The Complexity of Managing Engineering & Operational Data AVEVA Philosophy Slide Number 6Slide Number 7