![Page 1: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/1.jpg)
Block Island Wind Farm
Avian and Bat Monitoring
![Page 2: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/2.jpg)
Project Permitting
Environmental permits received in 2014
Permitting was based, in part, on pre-construction avian and bat use surveys to inform potential risk
Post-construction monitoring plan developed during permitting and is a condition of USACE & RI CRMC Assent permit
![Page 3: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/3.jpg)
Pre-Construction Surveys
Surveys conducted 2009-2011
Evaluated potential impacts to birds and bats
Surveys included:
• Onshore Sea Watch Avian Surveys
• Onshore Raptor Migration Surveys
• Onshore Beached Bird Survey
• Bat Acoustic Monitoring
• Avian Acoustic Monitoring
• Offshore Boat-Based Avian Survey
• Offshore Aerial High Definition Videography
• Onshore Avian Radar Surveys
![Page 4: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/4.jpg)
Post-Construction Surveys
Year 1 Surveys nearing completion
Reports available spring 2018
Surveys include:
• Bat Acoustic Monitoring on Construction Vessels
• Onshore Beached Bird Survey
• Offshore Boat-Based Avian Survey
• Turbine-mounted Radar/Camera Collision Monitoring
• Turbine-mounted Bat and Avian Acoustic Monitoring
![Page 5: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/5.jpg)
Acoustic Monitoring
Bat acoustic detectors on jack up barges during 2016 installation
Bat and avian acoustic detectors on Turbines 1 and 3 in 2017
![Page 6: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/6.jpg)
Onshore Beached Bird
Monitoring of 3 beach areas on BIWF
Twice/month during years 1 and 3
![Page 7: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/7.jpg)
Offshore Boat-Based Avian
Protocol same as pre-construction
Once/month during years 1 and 3
Results to be compared to pre-construction
![Page 8: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/8.jpg)
Collision Monitoring/Avian Radar
Multi Sensor wildlife detection system (MUSE)
Next-generation of Thermal Animal Detection System (TADS) deployed at European offshore projects
Years 1-5
![Page 9: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/9.jpg)
Collision Monitoring/Avian Radar
Radar data also evaluated for general avian use
![Page 10: Avian and Bat MonitoringBlock Island Wind Farm Avian and Bat Monitoring . Project Permitting Environmental permits received in 2014 Permitting was based, in part, on pre-construction](https://reader033.vdocument.in/reader033/viewer/2022052005/60195959d473ea43f74265a4/html5/thumbnails/10.jpg)
Lessons Learned
Deployment
Weather
Platforms of opportunity
Much more to come