aviation information systems
DESCRIPTION
Aviation Information Systems. 24 September 2002. ISD’s Core Products. ALMIS AMMIS (Aviation Maintenance Management Information System) ACMS (Aircraft Computerized Management System) EAL (Electronic Aircraft Logbook) Decision Support System (DSS) - PowerPoint PPT PresentationTRANSCRIPT
ISDwe make IT happen
Aviation Information Systems
24 September 2002
ISDwe make IT happen
ISD’s Core Products
ALMIS– AMMIS (Aviation Maintenance Management
Information System)– ACMS (Aircraft Computerized Management System)– EAL (Electronic Aircraft Logbook)– Decision Support System (DSS)
ATIMS (Aviation Technical Information Management System)
ARSC Website General Information Technology Support
ISDwe make IT happen
ALMIS AC&I Project
Four ALMIS Project goals– Provide source data entry– Integrate legacy systems– Improve decision support– Improve external system integration
ISDwe make IT happen
ALMIS AC&I Project – EAL
Phase 1 – Flight Schedule, Event Status, Aircraft Status
Phase 2 – Blue Sheet Phase 3 – Yellow and Pink Sheet Phase 4 – MPC / Supply integration Phase 5 –MPC signoff online Phase 6 – ACMS interface replacement
ISDwe make IT happen
ALMIS AC&I Project – DSS
Phase 1 – Aviation Inventory Control Point Phase 2 – Reliability Centered Maintenance Phase 3 – Flight Operations Phase 4 – Finance and Procurement Phase 5 – Unit Maintenance Phase 6 – Depot Supply Phase 7 – Depot Maintenance
ISDwe make IT happen
ALMIS Status
ALMISDatabase
ACMS Application
WSIIIprinters
EALApplication
Limitedprinters
ACMS GUIApplication
AMMIS Application
DSSApplication
Non-Std WS
ALMIS PortalWSIII WSIII
ISDwe make IT happen
EAL Beta Sites
Electronic Aircraft Logbook • Flight Schedule, Event & Aircraft Status• Blue Sheet Implemented Jan 2002• Yellow/Pink Sheet Implemented by Jan 2003
ISDwe make IT happen
ALMIS Evolution
ALMISDatabase
WSIIIprinters
EALBusiness Logic
DSSApplication
Non-Std WS
ALMIS Presentation Logic WSIII
ACMS GUIBusiness Logic
AMMISBusiness Logic
ACMS Business Logic
WSIIIprinters
ISDwe make IT happen
ALMIS Portal
ISDwe make IT happen
EAL
ISDwe make IT happen
DSS
ISDwe make IT happen
ALLDATA
ISDwe make IT happen
ATIMS
Definitive-Synchronized
Delivery Mechanism
Centralized Content
Management
Decentralized Content Creation
Data Repository
Oracle
Arbortext
ProEngineer
ME10
Tech Illustrator
Corel Draw
Interleaf
Arbortextwith Extensions
CDROM
Web
ISDwe make IT happen
ARSC Website
Manage ARSC administrative information Educate personnel on aviation program /
processes Host ATTC training materials Manage static legacy information
ISDwe make IT happen
Information Technology Focus
Complete security certifications Upgrade information technology hardware Complete deployment of Electronic Aircraft
Logbook Complete Decision Support System Complete MPC content management upgrade Implement systems into processes and
pipelines
ISDwe make IT happen
How can you help?
Recognize that these are your information systems
Make sure someone in Engineering becomes local expert
Learn how system can help you serve your people better
Give us your feedback / suggestions for improvement
Consider ROI for recommended changes Smart folks like you will make a difference
PVCS Tracker
HEAT Status Sequence
(1) Open (4) Reopened(2) WIP(3) Closed
HEAT Status Sequence
(1) Open (4) Reopened(2) WIP(3) Closed
PVCS Status Sequence
(1) Unassigned
(2) Analysis(3) CCB (10) On-Hold(4) Assigned(5) WIP (11) Return(6) Review (7) In QA (8) In Stage (9) Closed
Checklists
(a) Requirement(b) Development Worksheet(c) Peer Review (d) Functional Test(e) Integration Test(f) Staging
PVCS Status Sequence
(1) Unassigned
(2) Analysis(3) CCB (10) On-Hold(4) Assigned(5) WIP (11) Return(6) Review (7) In QA (8) In Stage (9) Closed
Checklists
(a) Requirement(b) Development Worksheet(c) Peer Review (d) Functional Test(e) Integration Test(f) Staging
A (3)
A
User Requirement
Support
Initial Entry (1) (a)
Initial Analysis
(2)CCB Action
(3) (10)
Work Plan Assignment
(4)
Development (5) (b) (11)
Peer Review (6) (c)
CMCheck-In
(c)
Build VDD
Functional Test
(7) (d)
Integration Test(e)
Production Ready
Acceptance Test(8) (f)
Close Out(9) (f)Production
Initial Entry (1) (4)
Analysis(2)
Support Process
Work Execution(2)
Close Out(3)
Development
QA
Staging
Production
Yes
Figure 1
Key Business Processes Service and Support
HEAT
Service
ISDwe make IT happen
Demonstration?
Questions?