awqaf presentation.pptx

Upload: shareyhou

Post on 07-Jan-2016

33 views

Category:

Documents


3 download

TRANSCRIPT

TENDER NO. T/41/2012 Site Preparation for IT Data Centre

DATA CENTRE AND NETWORK INFRASTRUCTURE UPGRADE

1C. Electrical Scope

33

1- Company Profile

3

Business RegionsMidis Group operates in THREE major regions:

Eastern EuropeMiddle EastAfrica

4

Business FieldsMidis Group covers market needs in FOUR business fields:

Software & Professional Services

Electronic Components& Peripherals

Computer Systems,Networking & Communications

Site & PowerSolutions

5

The Group Structure:35 Countries115 Companies4,000 Employees3.1 Billions $2 Countries8 Companies450 Employees300Millions $Levant GroupEurope GroupAfrica GroupEast GulfGroup(Oman & Qatar)UAE GroupSaudi GroupAsia GroupMidisGroup

6

Go To Market / By Brand

IT SupplierSoftware Solutions & Prof ServicesSystem Integration& TelecomValue AddedDistributionLocal OfficeSite & PowerRetail

7

MDS Grouth

8

MDS Oman ISO Certificates

9

Financial StabilityWell below the globally recommended threshold of 5Well ahead of similar global companiesWell below the average across the industryRev in B$Equity in B$Rev / Equity Total 500 US Corporations 12,063.10 6,131.80 1.97 Microsoft 73.766.3631.11Apple 156.5118.211.32Emerson Electric24.510.2952.38Midis Group2.2090.6223.55Dell 56.910.685.33Hewlett-Packard 120.422.4365.37Intl Business Machines 104.518.865.54Ingram Micro37.833.6110.47

10

RECENT MDS REFERENCES IN DATA CENTRE IN OMANMajlis OmanState AuditGovernment of OmanTRANawras Data Centre (4 DCs)Omantel Exchange ( 4 DCs)NRAAOman Electricity Transmission Co.Government Of Oman Haya WaterNational MuseumMinistry of Tourism12. ORPIC Sohar13. Oman Gas

14. Electricity Holding Company15. Sohar University16. Olympic Committee17. Central Bank Of Oman18. ITA19.DRC Clinic -Salalah 20. Muriya21. Salalah Methanol22. OCTAL-Salalah23. Nawras Salalah 24. OMEFCO Salalah

11

11

MDS Sample List of Prestigious Data Center Clients

12

MDS Team Qualification

S&P Products Range

Uninterrupted Power SystemUSA/Eu

Precision Cooling & Chillers USA/Eu

DC SystemUSA/Eu

GeneratorFrance

Sealed Lead Acid BatteriesUK

Leak Detection System France

Access Raised FlooringGermanyFire Prevention System UK

BMS SystemGermany

14

Why MDS15

We are specialized in Designing and Implementing turnkey solution as per Clients requirement.

We have the highest level of Partnership with Market Leading Companies.

In house technical expertise.

MDS believe in the necessity of getting Client engineers updated in all Data Center new technology and trends. Therefore, we are offering to host quarterly technical update sessions to your engineers in different selected topics.

16

16WHY MDS Oman?We have locally the right resources to implement & support.

MDS Oman have built the biggest DC references in the Country.

Empowering Omanization.

MDS proposed a local training course for IT team.

17

17

2- Design Overview

18

18

Data Center Existing LayoutBlock WallGlass Window Non fire rated existing Gypsum Partition

19

Data Center Proposed Layout

20

S&P Scope of WorkMARAData CenterElectricalCooling SystemFF SystemSecurityDBSocketsCable TrayMCBCablesUPSPower DistributionCRAC Access Raised FlooringTemp.SensorHumi. SensorEMS SystemFire Detection, and SuppressionLeak DetectionBlock with PaintingCivilFire Rated DoorsSplit Units False Ceiling

21

Proposed Civil Layout

23

Size of Doors MDS proposed to supply and install 3 Nos. single leaf 1hrs fire rated wooden doors.

Fire Rated Gypsum Partitions Supply and Install 1 hrs. Fire rated gypsum board to create NOC room and electrical room

Block Wall

We will supply & Install block wall between DC &Employees office

False Ceiling System

We will supply & Install fire rated false ceiling. It will cover the NOC room and electrical room

Civil Work

24

MERO Company started its activities in 1928 in Berlin, Germany in economic and flexible access floor systems for office buildings and computer areas. MERO products are of high quality standard which is assured by permanent internal and external quality control, which are certified according to DIN EN ISO 9001

EUROVEA, BratislavaFerrari Abu Dhabi

Al Gurg Tower in Dubai Access Raised Flooring

25

Panel :Chipboard panel high density 720 kg/m Type 5 NB 30, of 30.0 mm thick with 0.5mm Steel Sheet on bottom and 0.9mm HPL cover, Print 577, factory bonded on top.

Pedestal :Steel, type M20 D23 zinc coated and yellow chromatized, adjustable, including gasket & glue.

Stringer:Heavy Duty Steel, M type (30x30x1 mm, point load +500 N), to increase the load bearing and lateral stability.

FFH :400 mm

Access Raised Flooring

26

Cooling System

27

Close Control Unit Precision Cooling

28

Close Control Unit Precision Cooling

30

Main Features of Emerson Closed Control Unit31

EC Fan automatically adjust cooling unit capacities to match the IT server demands and improve energy savings and Power Usage Effectiveness (PUE). Icom : allows units to communicate and operate as a system to provide maximum control of temperature and humidity across a room or zone of influence while optimizing cooling efficiency. With intelligent control capabilitiesDigital compressor increases HVAC system efficiencyandprovides more energy savingsby precisely matching compressor output to cooling needsDigital scroll technology is up to 30% more efficient than traditional methods of compressor modulation

31We proposed to use 2 sets of Comfort Air Condition systems

The CAC indoor units will be 1 No. running and 1 No. Standby, they are connect together through AC control panel to work in sequence each one 12 Hrs. also to run both in case of more heat load.

Cooling Solution for Electrical room-Split A/C No.Data DescriptionHeat Output1UPS heat Load 60 KVA3,600W2Solar (20w per Sq. Meter = 20 * 14 sq. Meter )280W3Lighting (20w per Sq. Meter = 20 * 14 Sq. Mete )280W4People (100w per person = 100 * 5 people)500W5TOTAL COOLING REQUIRED4,660W6At 85% efficiency5,359W7In Ton1.5Ton

32

Our Approach

Electrical Scope-Single Line Diagram

34

Total PowerTotal IT Load (4 racks * 8KW)32.00kWOther load for security Systems (CCTV, BMS, Leak detection,..etc.)4.00kWSafety Factor 10%40.00kWTotal load Power Consumption40KWTotal KVA Required with 1 PF40KVAElectrical Scope-Uninterrupted Power Supply (UPS)Option1 :Standalone UPS :

The UPS size calculated according to the client existing requirements to have 4 racks each one 8Kw.

40KVA40KVA

35

Install 2 modular UPS each one 60 KVA. Each UPS consist of 5 modules each one 30KVA=30KW. We are going to install now 2 modules to achieve 60KVA and in future we can add more modules Option2 : APM Modular UPS (Recommended) Electrical Scope-Uninterrupted Power Supply (UPS)

36

Racks and Cable Tray Grounding

Grounding and bonding will include Supplemental bonding grid (SBG), rack bonding conductor (RBG), telecommunication grounding bus bar (TGB), and telecommunication bonding backbone as per standards TIA-942 and TIA-607 B Grounding and bonding

37

We proposed NTI Environment Monitoring System for the main Equipment Room. The system is offered with Temperature & Humidity sensors, AC voltage sensors, GSM Modem and other components as requested in the RFP BOQ.

Environment Monitoring Systems

39

Access Control SystemNo.DescriptionPictureUnitQty1SUPREMA BIO ENTRY PLUS STAND ALONE BIOMETRIC ACCESS CONTROL READER WITH BUILTIN PROXIMITY CARD READER & TCP/IP CONNECTIVITY.No.32BIOSECURITY POWER SUPPLY WITHENCLOSURE & BATTERY BACKUP.No.34BIOSECURITY EXIT BUTTON WITHMETALLIC FINISH.No.35BIOSECURITY ELECTROMAGNETIC LOCKWITH BRACKET FOR SINGLE LEAF DOOR.No3

40

Monitoring System

ItemDescriptionPictureUnitQTY1HIKVISION DS2CD2112I INDOOR VANDALPROOF 1.3 MEGAPIXEL POE ENABLED NETWORK DOME CAMERA WITH IR & 4MM FIXED LENS.No.42Rack Mounted , HIKVISION DS7608NISE/P 8 CHANNEL NVR WITH 4TB HDDbNo.1

41

1.3MP (1280 x 960) high resolution, HD 720p real-time video, Up to 30m IR visibility, True day/night IP66 rating Vandal-proof housing

41E. Fire Fighting System

42

Fire Detection SystemMDS proposed Tyco Safety products (UK) which proposing a combination of a fire alarm panel and a fire extinguishing panel. Covering all parts of the Data Centre.Room Void between Ceiling & Raised FloorBelow the Raised floor. Above the false ceiling.

MDS proposed NOVEC 1230

43

3. Warranty, Maintenance and Support Services

44

44All hardware products shall carry a warranty at site ( parts+ labor + software and firmware update) for a period of 12 months from the date of commissioning .

Warranty

45

45

Remedial Maintenance ServiceRemote Technical Support Engineer On-site Support Defective Parts /Replacement

Quarterly Preventive Maintenance

Manufacturer Trained Personnel

All our support capabilities (Personnel and Parts) are locally available in Oman through our Muscat offices

24x7 helpdesk services

The result of our excellent services: MDS is currently responsible for the support and maintenance of more than 30 data centers in Oman, and another 100+ S&P Sites.

MDS Support Services

46

464. Added Values For This Project

Added Value48

Q&A49

50