b2.2 breakout-session marcum.ppt
TRANSCRIPT
![Page 1: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/1.jpg)
TRTL Design… and present open-ended issues to resolve
2016 INTEGRATED RESEARCH PROJECT ANNUAL MEETING
Wade Marcum
Oregon State UniversitySchool of Nuclear Science and Engineering
![Page 2: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/2.jpg)
Pragmatic Accomplishments
• Acknowledgements• NEUP Fellow! (Emory Brown)• Assistant Professor Senior Research Hired (Dr. Dan LaBrier)
• Staff• Dr. LaBrier (0.8 FTE)• Dr. TBD (0.1 FTE)• Mr. Weiss (0.1 FTE)
• Students• Emory Brown• Yikuan Yan
• QAP umbrella increased to encompass all TRTL activities• QLD-2 (equivalent rigor) on INL QSL
![Page 3: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/3.jpg)
Logistical Updates
• Fabrication• present
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
![Page 4: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/4.jpg)
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
• Fabrication• present
• Elect. Installation• March, 2017
![Page 5: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/5.jpg)
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
![Page 6: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/6.jpg)
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
• NRTL Installation• April, 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
NRTL
![Page 7: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/7.jpg)
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
• NRTL Installation• April, 2017
• Control Room• April, 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
NRTL
Con
trol
Roo
m
![Page 8: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/8.jpg)
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
![Page 9: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/9.jpg)
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
DP TransmittersP Transmitters
![Page 10: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/10.jpg)
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
Placed on trunnions. Removed by lift
![Page 11: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/11.jpg)
Recall
Suction sideFlexible high-pressure hose
Turbine flow meter
Band (pre-conditioning) heaters
Venturi flow meter
Inline heat exchanger
Instrument ‘neck’ & gas plenum
Heater and Instrument Pass-thru
Discharge sideParker Circulating
Pump
Test section
![Page 12: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/12.jpg)
Recall
![Page 13: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/13.jpg)
Recall
Known shakedown to include identification of appropriate spring-constant for check-valve
![Page 14: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/14.jpg)
Recall A-A
A-A
![Page 15: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/15.jpg)
P&ID
• Updates since last meeting• Thermal-Fluid on Secondary
Side• Have a dual cooling
plenum reservoir• Finalized on using SCR to
control power• Selected blow-down valve –
Swagelok SS-12UW-TW-8C
![Page 16: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/16.jpg)
Heater Design
![Page 17: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/17.jpg)
Heater Design
• Test heater-rod built and confirmed to meter out correctly.
• Cladding ID = 0.305 in• Cladding OD = 0.375 in
![Page 18: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/18.jpg)
Shop Drawings
![Page 19: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/19.jpg)
Shop Drawings
![Page 20: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/20.jpg)
Questions for discussion
• TRTL bounds (known and present) pre-conceptual capabilities of TRTL.• What transients (RIAs) does the INL believe the TREAT can run• How do these tie into the experiment• What are the most impactful power ramp-rates for us to consider?• What are the most impactful fluid temperature conditions to consider?• What are the most impactful system pressure conditions to consider?
• Heater• What timelines are associated with AREVA’s ability to provide sleeves?• What are the limitations on dimensionality?
![Page 21: B2.2 Breakout-Session Marcum.ppt](https://reader031.vdocument.in/reader031/viewer/2022012422/617702709872c536c71127cd/html5/thumbnails/21.jpg)
Thank You