  • 8/4/2019 Bab 1(Site Investigation 1)

    1/17

    C 2001

    ENGINEERINGMATERIALS AND

    CONSTRUCTION 2

    LECTURER BY :

    MISS NORIZAN ZAKARIA

  • 8/4/2019 Bab 1(Site Investigation 1)

    2/17

    DURATION : 15 WEEK ( 1 SEMESTER )

    THEORY : 30 HOURS

    TUTORIAL : 0 HOURS

    SYNOPSIS:

    EQUIPS STUDENTS WITH KNOWLEDGE ON INITIAL PROCESS OFCONSTRUCTION AT SITES

    THE COURSE EMPHASIZES ON SITE INVESTIGATION, IDENTIFYING

    CONSTRUCTION SITES AND THE DETERMINATION OFCONSTRUCTION PLANNING.

    IT ALSO PROVIDES KNOWLEDGE ON CONSTRUCTION AT SITES

  • 8/4/2019 Bab 1(Site Investigation 1)

    3/17

    OBJECTIVES:

    AT THE END OF THE COURSE, STUDENT SHOULD BE ABLE TO:

    1. Explain initial process of site preparation

    2. Explain the suitability of the construction site

    3. Explain methods of constructing temporary works forcertain construction.

    4. State types of machinery used at construction site

    5. Explain procedures of site supervision and duties ofsite technician

  • 8/4/2019 Bab 1(Site Investigation 1)

    4/17

    SILIBUS ON THIS SEMESTER FOR C 2001

    1.0 SITE INVESTIGATION AND PREPARATION

    Preliminary site survey, soil investigation , site preparation, drainage,cuttings, fillings and planning of site.

    2.0 FOUNDATION

    Definition and functions of foundation, shallow and deep foundations,

    pile foundation, types and functions of piles, friction piles, end bearingpiles, usage of piles, equipment and machinery used in driving piles.

    3.0 TEMPORARY WORK

    Planking and shoring, scaffolding, strut, support and formwork.

    4.0 MACHINERY EQUIPMENT

    Machinery and equipment used in Civil Engineering works.

    5.0 SITE SUPERVISION AND ORGANISATION

    Planning of site works and duties of technician at construction.

  • 8/4/2019 Bab 1(Site Investigation 1)

    5/17

    ASSESSMENT:

    i. Continuous Evaluation ( CE ) - 60%

    a. Quiz ------------ 20%

    b. Assignment -------- 30%

    c. Test ------------- 50%

    ii. Final Examination (FE ) -------- 50%

  • 8/4/2019 Bab 1(Site Investigation 1)

    6/17

    SITE

    INVESTIGATION& PREPARATION

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

  • 8/4/2019 Bab 1(Site Investigation 1)

    7/17

    INTRODUCTIONSite Investigation & Preparation Objectives : To determine the site condition is necessary for

    construction planned To make sure a safety and economical design is

    chosen To plan the construction technique based on the

    data taken

    To determine the materials needed in theconstruction To identify the necessary action taken facing on

    the difficulties happened To make sure the investigation can be done for

    any unexpected tragedy

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

  • 8/4/2019 Bab 1(Site Investigation 1)

    8/17

    INTRODUCTION Site Investigation a process to

    determine the condition of surfaceand subsurface of the site

    Preparation Of The Site earlierworks before the real constructionworks

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

  • 8/4/2019 Bab 1(Site Investigation 1)

    9/17

    INTRODUCTION2 Step Of Site Investigation Process : Off Side Information

    - Local Authorities- Geological Map / Topography Map- Ordinance Survey Map- Aerial Photography

    - Hydrological Map

    Preliminary Reconnaissance- Walking over the site area

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

  • 8/4/2019 Bab 1(Site Investigation 1)

    10/17

    TOPIC SITE SURVEY

    SOIL INVESTIGATION

    STEP OF SITE PREPARATION

    METHOD OF STABILIZING SOIL CUTTING SLOPEAND EMBANKMENT

    SITE PEGGING OR PICKETTING / SETTING OUT

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

  • 8/4/2019 Bab 1(Site Investigation 1)

    11/17

    SITE SURVEYWhy ?

    Location

    Scenery

    Climatic Factors

    Public Facilities

    Subsoil History

    Mining area and airports

    POLITEKNIK SULTAN HAJI AHMAD SHAH

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    CHAPTER I-I

  • 8/4/2019 Bab 1(Site Investigation 1)

    12/17

    SITE SURVEY

    1. Location : Can identify from which direction the sun rises at dawn.

    It is important to make sure that each space in the building

    gets enough sunlight.

    2. Scenery : A beautiful scenery is well lined by all and guarantees good

    market

    3. Climatic Factor : The site must be void of draught during rainy season.

    Avoid from choosing locations which are near the

    river.

    POLITEKNIK SULTAN HAJI AHMAD SHAH

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    CHAPTER I-I

    - Important task to do before construction work begin- This means, before starting these following information must be considered:

  • 8/4/2019 Bab 1(Site Investigation 1)

    13/17

    SITE SURVEY

    4. Public Facilities : Such as water, electricity and telecommunication.Besides that, transportation, education, shopping,

    medical

    care and recreational facilities are provided.

    5. Subsoil History : Make sure that the ( site base ) is from subsoil and not from

    any former paddy field or soft soil where dump is gathered.

    6. Mining area and airports : Avoid mining area and airports because the noise

    and vibration might cause disturbances.

    POLITEKNIK SULTAN HAJI AHMAD SHAH

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    CHAPTER I-I

  • 8/4/2019 Bab 1(Site Investigation 1)

    14/17

    SOIL INVESTIGATION

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    SOIL INVESTIGATION

  • 8/4/2019 Bab 1(Site Investigation 1)

    15/17

    SOIL INVESTIGATION

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    Introduction : Is a precaution step in the construction,

    without soil investigation can caused cracks at the column, slaband settlement.

    Objectives:

    1. To obtain information regarding condition of soil at any location andthe soil profile.

    2. To obtain the structure, thickness and strength of each strata of soilincluding types of soil.

    3. To obtain types and depth of benchmark and to find the location,arrangement, thickness, and hardness of benchmark of each strata.

    4. To obtain in ground water level as well as internal water pressure.

    5. To obtain characteristic of soil from testing.

    SOIL INVESTIGATION

  • 8/4/2019 Bab 1(Site Investigation 1)

    16/17

    SOIL INVESTIGATION

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    REQUIREMENT BEFORE SITE INVESTIGATION

    - Important to gather information about site investigation. The information that:

    1. geological map

    2. Mining of record

    3. Facilities

    4. Weather report

    5. ground water level

    6. Established map location

    7. Area photography

    SOIL INVESTIGATION

  • 8/4/2019 Bab 1(Site Investigation 1)

    17/17

    SOIL INVESTIGATION

    POLITEKNIK SULTAN HAJI AHMAD SHAH CHAPTER I-I

    C2001 ENGINEERING MATERIALS & CONSTRUCTION 2

    NEXT STEP TO CARRY OUT SITE INVESTIGATION

    1. To decide type soils of each layer

    2. To decide ground water level because in order that design are

    suitable for type of foundation.

    3. To execute surveying works in order to obtain detail information of ground

    profile and ground level.

    4. To communicate with the authorities and public agencies for providing

    public facilities, such as water and electric utilities. Therefore this facilities

    can be installed right after the building has been completed.