bab ii lines plan ej rummyeprints.undip.ac.id/26665/4/lines_plan.pdf · 2013. 3. 17. · tugas...

27
LINES PLAN TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 1 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051 BAB II PERHITUNGAN RENCANA GARIS (LINES PLAN) A. PERHITUNGAN DASAR A.1. Panjang Garis Air Muat (Lwl) Lwl = Lpp + 2 % x Lpp Lwl = 116,1 + 2 % x 116,1 Lwl = 118,42 m A.2. Panjang Displacement (L.Displ) L Displ = 0,5 x (Lwl + Lpp) L Displ = 0,5 x (118,42 + 116,1) L Displ = 117,26 m A.3. Coefisien Midship (Cm) Formula Arkent Bont Shocker Cm = 0,90 + 0,10 x Cb Cm = 0,90 + 0,10 x 69 , 0 Cm = 0,98 Memenuhi Syarat kapal barang sedang (Cm = 0,95 ~ 0,99) A.4. Coefisien Prismatik (Cp) Formula Troast Cp = Cm Cb Cp = 98 , 0 69 , 0 Cp = 0,704 Memenuhi Syarat kapal barang sedang (Cp = 0,68 ~ 0,82) A.5. Coefisien Garis Air (Cw) Formula Troast Cw = 025 , 0 Cb

Upload: others

Post on 27-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 1 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    BAB II

    PERHITUNGAN RENCANA GARIS

    (LINES PLAN)

    A. PERHITUNGAN DASAR

    A.1. Panjang Garis Air Muat (Lwl)

    Lwl = Lpp + 2 % x Lpp

    Lwl = 116,1 + 2 % x 116,1

    Lwl = 118,42 m

    A.2. Panjang Displacement (L.Displ)

    L Displ = 0,5 x (Lwl + Lpp)

    L Displ = 0,5 x (118,42 + 116,1)

    L Displ = 117,26 m

    A.3. Coefisien Midship (Cm) Formula Arkent Bont Shocker

    Cm = 0,90 + 0,10 x Cb

    Cm = 0,90 + 0,10 x 69,0

    Cm = 0,98 Memenuhi Syarat kapal barang sedang

    (Cm = 0,95 ~ 0,99)

    A.4. Coefisien Prismatik (Cp) Formula Troast

    Cp = CmCb

    Cp = 98,069,0

    Cp = 0,704 Memenuhi Syarat kapal barang sedang

    (Cp = 0,68 ~ 0,82)

    A.5. Coefisien Garis Air (Cw) Formula Troast

    Cw = 025,0Cb

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 2 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    Cw = 025,069,0

    Cw = 0,805 Memenuhi Syarat kapal barang sedang

    (Cw = 0,80 ~ 0,87)

    A.6. Luas Garis Air (Awl)

    Awl = Lwl x B x Cw (m 2 )

    Awl = 118,42 x 19,00 x 0,805

    Awl = 1811,23 m 2

    A.7. Luas Midship (Am)

    Am = B x T x Cm (m 2 )

    Am = 19,00 x 7,8 x 0,98

    Am = 145,230 m 2

    A.8. Volume Displacement (C Displ)

    V Displ = Lpp x B x T x Cb (m 3 )

    V Displ = 116,1 x 19,00 x 7,80 x 0,69

    V Displ = 11872,15 m 2

    A.9. Coefisien Prismatik Displacement (Cp Displ)

    Cp Displ = (DisplLLpp.

    ) x Cp

    Cp Displ = )26,1171,116( x 0,704

    Cp Displ = 0,69

    A.10.Displacement (D)

    D = Vol Displ x x m (Ton) Dimana :

    = 1,025 Berat jenis air laut m = 1,004 Berat jenis air laut

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 3 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    Maka :

    D = 11872,15 x 1,025 x 1,004

    D = 12217,62 Ton

    B. MENENTUKAN LETAK LCB

    B.1. Dengan menggunakan Cp Displacement pada grafik NSP pada Cp

    Displacement = 0,685 didapat letak titik LCB (Longitudinal Centre

    Bouyancy) = 0,52 % x L Displ. Dimana L Displ = 113,12 m.

    Cp Displ = (DisplLLpp.

    ) x Cp

    Cp Displ = (9,1091,116 ) x 0,704

    Cp Displ = 0,69

    a. Letak LCB Displ menurut grafik NSP

    LCB Displ = 1,5 % x L Displ

    LCB Displ = 1,5 % x 116,10

    LCB Displ = 1,758 m (Di depan midship Lpp)

    b. Jarak midship () L Displ ke FP

    Displ = 0,5 x L Displ

    Displ = 0,5 x 117,26

    Displ = 58,63 m

    c. Jarak midship () Lpp ke FP

    Lpp = 0,5 x Lpp

    Lpp = 0,5 x 116,10

    Lpp = 58,05 m

    d. Jarak antara midship () L Displ dengan midship () Lpp

    = Displ - Lpp

    = 58,63 – 58,05

    = 0,58 m (di depan Lpp)

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 4 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    e. Jarak antara LCB terhadap midship () Lpp

    = 1,758 - 0,58

    = 1,178 m (Di depan Lpp)

    B.2. Menurut Diagram NSP Dengan Luas Tiap Station (Am) = 145,23 m 2

    ordinat % % thd AM FS Hasil FM HASIL

    AP 0 0 1 0 -10 0 1 0.12 17.4276 4 69.7104 -9 -627.394 2 0.251 36.45273 2 72.90546 -8 -583.244 3 0.421 61.14183 4 244.5673 -7 -1711.97 4 0.701 101.8062 2 203.6125 -6 -1221.67 5 0.85 123.4455 4 493.782 -5 -2468.91 6 0.914 132.7402 2 265.4804 -4 -1061.92 7 0.95 137.9685 4 551.874 -3 -1655.62 8 0.978 142.0349 2 284.0699 -2 -568.14 9 1 145.23 4 580.92 -1 -580.92

    10 1 145.23 2 290.46 0 0 2 = -10479.8

    11 1 145.23 4 580.92 1 580.92 12 1 145.23 2 290.46 2 580.92 13 0.988 143.4872 4 573.949 3 1721.847 14 0.943 136.9519 2 273.9038 4 1095.615 15 0.842 122.2837 4 489.1346 5 2445.673 16 0.747 108.4868 2 216.9736 6 1301.842 17 0.546 79.29558 4 317.1823 7 2220.276 18 0.345 50.10435 2 100.2087 8 801.6696 19 0.131 19.02513 4 76.10052 9 684.9047 FP 0 0 1 0 10 0

    1 = 5976.215 3 = 11433.67

    a. h = 20

    .DisplL

    h = 20

    26,117

    h = 5,863 m

    b. Volume Displacement

    V Displ = 31 x h x 1

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 5 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    V Displ = 31 x 5,863 x 5976,215

    V Displ = 11667,83 m3

    c. Letak LCB NSP

    LCB NSP = 1

    32

    x h

    LCB NSP = 215,597611433,67 8,10479 x 5,863

    LCB NSP = 0,159 x 5,863

    LCB NSP = 0,932 m ( di depan L Displ )

    d. Koreksi prosentase penyimpangan LCB

    = Displ L

    NSP LCB - Displ LCB x 100 %

    = 117,26

    0,932 -1,758 x 100 %

    = 0.00075 x 100 %

    = 0,075 % < 0,1 % ( Memenuhi)

    e. Koreksi prosentase penyimpangan untuk volume Displ

    = Awal Displ Vol

    NSP Displ Vol - Awal Displ Vol x 100 %

    = 11872,15

    11667,83 -11872,15 x 100 %

    = 0,0021 x 100 %

    = 0,21 % < 0,5 % (Memenuhi)

    B.3. Perhitungan prismatik depan (Qf) dan koefisien prismatik belakang

    (Qa) berdasarkan label “Van Lamerent”.

    Dimana :

    Qf = Koefisien prismatik bagian depan midship Lpp

    Qa = Koefisien prismatik bagian belakang midship Lpp

    e = Perbandingan jarak LCB terhadap Lpp

    = (Lpp

    LCBLpp ) x 100 %

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 6 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    = (1,116

    178,1 ) x 100 %

    = 1,014 %

    Dengan rumus tersebut diatas dapat dihitung harga Qa dan Qf dengan

    rumus berikut :

    Qa = Qf = Cp (1,4 + Cp) x e

    Dimana :

    Qf = Cp + (1,40 + Cp) x e

    = 0,704 + (1,40 + 0,704) x 0,001014

    = 0,725

    Qa = Cp - (1,40 + Cp) x e

    = 0,704 - (1,40 + 0,704) x 0,001014

    = 0,682

    Tabel CSA lama menurut Van Lamerent (Lama) Am = 145,253 m2

    No. Ord % Luas Station % Luas station thd Am

    AP 0 0

    0,25 0,088 12,780

    0,5 0,187 17,158

    0,75 0,291 42,261

    1 0,395 57,365

    1,5 0,595 86,411

    2 0,758 110,084

    2,5 0,879 127,657

    3 0,953 138,404

    4 0,999 145,084

    5 1 145,23

    6 0,991 145,021

    7 0,906 131,578

    7,5 0,808 117,345

    8 0,672 97,594

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 7 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    8,5 0,504 73,195

    9 0,324 47,054

    9,25 0,234 33,983

    9,5 0,148 21,494

    9,75 0,069 10,020

    FP 0 0

    ∑ = 1335,607

    Tabel luas tiap section terhadap Am menurut Van Lamerent ( Baru )

    Am = 145,23 m2

    ordinat % % thd AM FS Hasil FM HASIL AP 0.009 1.30707 0.25 0.326768 -5 -1.63384 0.25 0.089 12.92547 1 12.92547 -4.75 -61.396 0.5 0.125 18.15375 0.5 9.076875 -4.5 -40.8459

    0.75 0.296 42.98808 1 42.98808 -4.25 -182.699 1 0.4 58.092 0.75 43.569 -4 -174.276

    1.5 0.579 84.08817 2 168.1763 -3.5 -588.617 2 0.695 100.9349 1 100.9349 -3 -302.805

    2.5 0.817 118.6529 2 237.3058 -2.5 -593.265 3 0.936 135.9353 1.5 203.9029 -2 -407.806 4 0.998 144.9395 4 579.7582 -1 -579.758 5 1 145.23 2 290.46 0 0 2 = -2933.1 6 0.998 144.9395 4 579.7582 1 579.7582 7 0.942 136.8067 1.5 205.21 2 410.42

    7.5 0.865 125.624 2 251.2479 2.5 628.1198 8 0.679 98.61117 1 98.61117 3 295.8335

    8.5 0.547 79.44081 2 158.8816 3.5 556.0857 9 0.391 56.78493 0.75 42.5887 4 170.3548

    9.25 0.272 39.50256 1 39.50256 4.25 167.8859 9.5 0.261 37.90503 0.5 18.95252 4.5 85.28632

    9.75 0.072 10.45656 1 10.45656 4.75 49.66866 FP 0 0 0.25 0 5 0

    1 = 3094.307 3 = 2943.413

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 8 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    a. h = 10Lpp

    = 10

    1,116

    = 11,61 m

    b. Volume Displacement pada Main Part

    V Displ = 31 x

    10Lpp x 1

    = 31 x

    101,116 x 3094.307

    = 11875,15 m 3

    c. Letak LCB pada Main Part

    = 1

    32

    x h

    = 3094.307

    2943.4132933.1- x 11,61

    = 1,037 m

    d. Perhitungan pada Cant Part

    No Ord Luas Station FS Hasil FM Hasil

    X

    Y

    A

    11,658

    5,829

    0

    1

    4

    1

    11,658

    23,216

    0

    0

    1

    2

    0

    23,216

    0

    1 = 34,974 2 = 23,316

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 9 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    e = 2

    Lpp - Lwl

    = 2

    1,11642,118

    = 1,16 m

    e. Volume Cant Part

    = 31

    x e x 1

    = 31

    x 1,16 x 34,974

    = 13,509 m 3

    A Y = 0.5AP X = AP

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 10 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    LCB Cant Part terhadap () AP

    = 1

    2

    x e

    = 34,97423,316 x 1,16

    = 0,773 m

    g. Jarak LCB Cant Part terhadap () Lpp

    = 21

    x Lpp + LCB Cant Part

    = 21

    x 116,1 + 0,773

    = 58,82 m ( di depan )

    h. Volume Displacement total

    V Displ Total = V Displ Main Part + V Displ Cant Part

    = 11875,15 + 13,509

    = 11888,66 m 3

    i. LCB total terhadap () Lpp

    = AwalntDisplecemaVol

    CPVolCPxLCBMPMPxVolLCB..

    )...()..(

    = 15,11875

    )509,1382,58()15,11875037,1( xx

    = 1,103 m

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 11 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    B.4. Koreksi Hasil Perhitungan

    a. Koreksi untuk Volume Displacement

    = AwalntDisplacemeVolumeAwalntDisplacemeVolumeTotalVolume

    .......

    x 100 %

    = 66,11888

    15,1187266,11888 x 100 %

    = 0,13 % < 0,5 % (Memenuhi)

    b. Koreksi untuk prosentase penyimpangan LCB

    = LppdshipLppTerhadapMiTotalLCBAwalLCB ...

    x 100 %

    = 1,116103,1178,1 x 100 %

    = 0,00645 % < 0,1 % (Memenuhi)

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 12 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    C. RENCANA BENTUK GARIS AIR C.1. Perhitungan Besarnya Sudut Masuk (α )

    Untuk menghitung besarnya sudut masuk garis air berdasarkan Coefisien

    Prismatik Depan ( Qf ).

    Dimana :

    Pada perhitungan penentuan letak LCB, Qf = 0,725

    Dari grafik Latsiun sudut masuk = 12˚

    Penyimpangan = ±3˚ dipakai + 3˚

    Maka besarnya sudut masuk yang diperoleh = 12˚ + 3˚ = 15˚

    C.2. Perhitungan Luas Bidang Garis Air

    ord y=1/2 B fs hasil AP 3.2 0.25 0.8 0.25 3.9 1 3.9 0.5 4.8 0.5 2.4

    0.75 5.3 1 5.3 1 5.5 0.75 4.125

    1.5 5.7 2 11.4 2 6.1 1 6.1

    2.5 7 2 14 3 8.1 1.5 12.15 4 9.5 4 38 5 9.5 2 19 6 9.5 4 38 7 8.5 1.5 12.75

    7.5 7.9 2 15.8 8 6.1 1 6.1

    8.5 5.2 2 10.4 9 4.6 0.75 3.45

    9.25 3.8 1 3.8 9.5 2.7 0.5 1.35

    9.75 1.4 1 1.4 FP 0 0.25 0

    Σ 1 232,952

    a. Luas garis air pada Main Part

    AWL MP = 2 x 31

    x ( 10Lpp

    ) x ∑1

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 13 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    = 2 x 31

    x (10

    1,116 ) x 232,952

    = 1801,25 m²

    b. Rencana bentuk garis air pada Cant Part

    No Ord 0,5 B FS Hasil

    AP

    ½ AP

    0

    3,2

    1,6

    0

    1

    4

    1

    3,2

    6,4

    0

    1 = 9,6

    c. e = 2Lpp - Lwl

    = 2

    1,11642,118

    = 1,16 m

    d. Luas garis air pada Cant Part (Awl Cp)

    Awl Cp = 2 x e x 1

    = 2 x 1,16 x 9,6

    = 7,416 m²

    e. Luas total garis air (Awl Total)

    Awl Total = Luas Main Part + Luas Cant Part

    = 1801,25 + 7,416

    = 1808,66 m²

    f. Koreksi luas garis air

    = AwalLuas

    AwalLuasTotalLuas.

    .... x 100 %

    = 23,1811

    66,180823,1811 x 100 %

    = 0,14 % < 0,5 % (Memenuhi Syarat)

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 14 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    D. PERHITUNGAN RADIUS BILGA Dimana : B = 19,00 m

    H = 10,80 m

    T = 7,80 m

    A = Rise Of Floor

    = 0,01 x B

    = 0,01 x 19,00

    = 0,19 m

    R = Jari – jari Bilga

    M = Titik pusat kelelngkungan bilga

    D.1. Dalam Segitiga ABC

    Tg α2 = BCAB =

    181,0050,9

    α2 = 88,854º

    α1 = 0,5 x (180 – a2)

    = 0,5 x (180 – 88,854)

    = 0,5 x 91,146

    = 45,575º

    D.2. Perhitungan

    a. Luas Trapesium ACED

    = ½ B x 0,5 {T + (T - a )}

    = 0,5 x 19,00 x 0,5 {7,80 + (7,80 - 0,181)}

    = 73,197 m²

    b. Luas AFHEDA

    = ½ Luas Midship

    = ½ x B x T x Cm

    = ½ x 19,00 x 7,80 x 0,98

    = 72,618 m²

    c. Luas FGHCF

    = Luas trapesium ACED - Luas AFHEDA

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 15 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    = 73,197 – 72,618

    = 0,579 m²

    d. Luas FCG

    = ½ x Luas FGHCF

    = ½ x 0,579

    = 0,289 m²

    e. Luas MFC

    = ½ x MF x FC

    = ½ x R x R Tg α1

    Luas juring MFG = α1/360 x лR2

    = Luas MFC - Luas juring MFG

    = (0,5 R2 Tgα1) – (α1/360 x лR2)

    Jadi Luas ACED - Luas AFHEDA = Luas MFC - Luas juring MFG

    73,197 – 72,618 = (0,5 R2 Tg α1) – (α1/360 x лR2)

    0,579 = (0,5 R2 Tg 44,425) – (44,425/360x

    3,14R2)

    0,579 = 0,377 R2

    R2 = 5,174

    R = 2,273 m

    E. MERENCANAKAN BENTUK BODY PLAN

    a. Merencanakan bentuk body plan adalah

    Merencanakan atau membuat bentuk garis air lengkung padapotongan

    ordinat.

    b. Langkah – langkah

    1) Membuat empat persegi panjang dengan sisi ½ B dan T

    2) Pada garis air T diukurkan garis b yang besarnya = ½ luas station

    dibagi T.

    3) Dibuat persegi panjang ABCD

    4) Diukurkan pada garis air T garis air Y = ½ lebar garis air pada station

    yang bersangkutan.

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 16 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    5) Dari titik E kita merencanakan bentuk station sedemikian sehingga

    luas ODE = luas OAB letak titik O dari station – station harus

    merupakan garis lengkung yang stream line.

    6) Setelah bentuk station selesai dibuat, dilakukan pengecekan volume

    displacement dari bentuk-bentuk station.

    7) Kebenaran dari lengkung – lengkung dapat dicek dengan menggunakan

    Planimeter.

    E.1. Rencana Bentuk Body Plan

    T = 7,80m

    2 T = 15,6 m

    ord L station Y=1/2 B B = L sta/2T AP 3.5 2 0.224 0.25 11.548 3.9 0.740 0.5 26.527 4.8 1.700 0.75 32.421 5.3 2.078

    1 50.041 5.5 3.208 1.5 74.112 5.7 4.751 2 97.845 6.1 6.272

    2.5 114.961 7 7.369 3 136.746 8.1 8.766 4 143.25 9.5 9.183 5 145.23 9.5 9.310 6 145.23 9.5 9.310 7 134.056 8.5 8.593

    7.5 119.255 7.9 7.645 8 102.412 6.1 6.565

    C

    ED

    BA

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 17 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    8.5 89.256 5.2 5.722 9 67.45 4.6 4.324

    9.25 45.219 3.8 2.899 9.5 27.032 2.7 1.733 9.75 19.749 1.4 1.266 FP 0 0 0.000

    E.2. Perhitungan Koreksi Volume Displacement Rencana Body Plan

    Pada Main Part

    no.ord L station Fs Hasil AP 3.5 0.25 0.875 0.25 11.548 1 11.548 0.5 26.527 0.5 13.2635

    0.75 32.421 1 32.421 1 50.041 0.75 37.53075

    1.5 74.112 2 148.224 2 97.845 1 97.845

    2.5 114.961 2 229.922 3 136.746 1.5 205.119 4 143.25 4 573 5 145.23 2 290.46 6 145.23 4 580.92 7 134.056 1.5 201.084

    7.5 119.255 2 238.51 8 102.412 1 102.412

    8.5 89.256 2 178.512 9 67.45 0.75 50.5875

    9.25 45.219 1 45.219 9.5 27.032 0.5 13.516

    9.75 19.749 1 19.749 FP 0 0.25 0

    Σ 1 3070.718 a. Displasment perhitungan

    = Lpp x B x T x Cb

    = 116,1 x 19,00 x 7,80 x 0,69

    = 11872,15 m 3

    b. Volume displasment main part

    = 1/3 x Lpp/10 x

    = 1/3 x 116,1/10 x 3070.718

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 18 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    = 0,333 x 11,6 x 3070.718

    = 11871,794 m 3

    c. Perhitungan Koreksi Volume Displacement Rencana Body Plan Pada

    Cant Part

    No Ord Luas Station FS Hasil FM Hasil

    X 3,5 1 3,5 0 0

    Y 1,75 4 7 1 7

    A 0 1 0 2 0

    1 = 10,5 2 = 7

    d. e = 2

    LPPLWL

    = 2

    1,11642,118

    = 1,16 m

    e. Volume Cant Part

    = 1/3 x e x 1

    = 1/3 x 1,16 x 10,5

    = 4,055 m 3

    f. Volume Displacement perencanaan Total

    = Vol Displ MP + Vol Displ CP

    = 11871,794 + 4,055

    = 11875,849 m 3

    g. Koreksi penyimpangan volume displacement body plan

    = %100..

    .... xAwalDisplVol

    awalDisplVontotalPerencanaaDisplVol

    = 11872,15

    11872,15 11875,849 x 100 %

    = 0,00185 x 100%

    = 0,185 % < 0,5 % (Memenuhi Syarat)

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 19 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    F. PERHITUNGAN CHAMBER, SHEER DAN BANGUNAN ATAS

    F.1. Perhitungan Chamber

    Chamber = 1/50 x B

    = 1/50 x 19,00

    = 0,38 m

    F.2. Perhitungan Sheer Standart

    a. Bagian Buritan (Belakang)

    1) AP = 25 (Lpp/3 + 10)

    = 25 (116,1/3 + 10)

    = 1217,5 mm

    2) 1/6 Lpp dari AP = 11,1 (Lpp/3 + 10)

    = 11,1(116,1/3 + 10)

    = 540,57 mm

    3) 1/3 Lpp dari AP = 2,8 (Lpp/3 + 10)

    = 2,8 (116,1/3 + 10)

    = 136,36 mm

    b. Bagian Midship (Tengan) = 0 m

    c. Bagian Haluan (Depan)

    1) FP = 50 (Lpp/3 + 10)

    = 50 (116,1/3 + 10)

    = 2435 mm

    2) 1/6 Lpp dari FP = 22,2 (Lpp/3+10)

    = 22,2 (116,1/3 + 10)

    = 10081,14 mm

    3) 1/3 Lpp dari FP = 5,6 (Lpp/3 + 10)

    = 5,6 (116,1/3 + 10)

    = 272,72 mm

    F.3. Rencana Bangunan Atas (Menurut methode Varian)

    a. Perhitungan Jumlah Gading

    Jarak gading (a)

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 20 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    a = 500Lpp + 0,48

    = 500

    1,116 + 0,48

    = 0,704 m

    Jarak gading besar

    = 4 x Jarak gading

    = 4 x 0,6

    = 2,4 m

    Jarak Gading Besar = 4 x 0,6 = 2,4 M

    Jarak Gading Mayor = 187 x 0,6 = 112,2 M

    Jarak gading Minor = 3 x 0.5 = 1,5 M +

    Jumlah = 116,10 M

    Jarak gading :

    AP – frame 191 = 0,6 x 191 = 114,6 m

    frame 191 – frame FP = 0,5 x 3 = 1,5 m +

    Lpp = 116,1 m

    Jumlah jarak gading keseluruhan = 194 gading

    b. Poop Deck (Geladak Kimbul)

    Panjang Poop Deck (20 % - 30 %) Lpp dari AP

    Panjang = 20 % x Lpp

    = 0,20 x 116,1

    = 23,22 m, direncanakan 23,4 m dari AP

    Rencana letak gading

    39 jarak gading x 0,6 = 23,4 m

    39 jarak gading dari AP = 23,4 m

    Tinggi poop deck 2,0 s/d 2,4 m, direncanakan 2,2 m dari main deck

    bentuk disesuaikan dengan bentuk buttock line.

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 21 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    c. Fore Castle Deck (Deck Akil)

    Panjang fore castle deck (10% - 15 %) Lpp dari FP

    Panjang = 10 % x Lpp

    = 10 % x 116

    = 11,6 m, direncanakan 11,7 m dari FP

    Rencana letak gading

    17 jarak gading x 0,6 = 10,2 m

    3 jarak gading x 0,5 = 1,5 m +

    19 jarak gading dari FP = 11,7 m dari FP

    Tinggi deck akil 2,0 s/d 2,4 m diambil 2,2 m dari main deck.

    G. PERHITUNGAN UKURAN DAUN KEMUDI

    Perhitungan ukuran daun kemudi

    Perhitungan kemudi menurut BKI 2006 Vol II (hal 14 Sec.14-1. A.3)

    A = C1 x C 2 x C 3 x C 4 x 100T x L x 1,75

    (m2)

    Dimana :

    A = Luas daun kemudi dalam m2

    L = Panjang kapal = 116,10 m

    T = Sarat kapal = 7,80 m

    C 1 = Faktor untuk type kapal = 1

    C 2 = Faktor untuk type kemudi = 0.7

    C 3 = Faktor untuk profil kemudi = 0,8

    C 4 = Faktor untuk rancangan type kemudi = 1,5 untuk kemudi dengan jet

    propeller.

    Jadi :

    A = 1,0 x 0,7 x 0,8 x 1,5 x 100

    80,710,11675,1 xx (m2)

    = 13,3 m2

    Koreksi luas daun kemudi (Buku Perlengkapan kapal ITS hal 51) :

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 22 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    = 3 6,2 -

    B x CbLpp0,023 <

    T x LppA <

    3 7,2 - B x Cb

    Lpp0,03

    = 2,6

    00,1969,010,116023,0

    x

    < 80,710,116

    974,13x

    < 2,7

    00,1969,010,11603,0

    x

    = 426,1023,0 <

    56,798974,13 <

    238,103,0

    = 0,016 < 0,017 < 0,024 (Memenuhi)

    G.1. Ukuran Daun Kemudi

    A = h x b

    Dimana : h = Tinggi daun kemudi

    b = Lebar daun kemudi

    Menurut ketentuan perlengkapan kapal ITS halaman 53 harga

    perbandingan h/b = 1,5 – 2,0

    Diambil 1,8 sehingga 1,8= h/b h = 1,8 x b

    A = h x b

    A = 1,8 x b xb

    13,974 = 1,8 x b 2

    b = 8,1/3,13

    = 2,68 m diambil 2,7 m

    h = A/b Maka b = 2,7 m

    = 13,5/2,7 h = 4,8 m

    = 4,8 m diambil 5 m

    Luas bagian yang dibalansir dianjurkan < 23 %, diambil 20 % dari

    Seluruh luas kemudi (buku perlengkapan kapal hal 52)

    A’ = 20 % x A

    = 20 % x 13,5

    =3,9 m 2

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 23 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    Lebar bagian yang dibalansir pada potongan sembarang horizontal < 35

    % dari lebar sayap kemudi (buku perlengkapan kapal hal 52). Di ambil

    35 %

    b’ = 30 % x b

    = 30 % x 2,7

    = 0,8 m

    Dari ukuran diatas dapat diambil ukuran daun kemudi :

    Luas daun kemudi (A) = 13 m2

    Luas bagian balansir (A’) = 3,9 m2

    Tinggi daun kemudi (h’) = 5 m

    Lebar daun kemudi (b’) = 2,7 m

    Lebar bagian balansir = 0,8 m

    G.2. Perhitungan Gaya Kemudi

    Menurut BKI 2006 Vol II (hal 14-3 Sec B.1.1) tentang gaya kemudi

    adalah :

    Cr = 132 x A x V2 x k1 x k2 x k3 x kt (N)

    Dimana :

    A = Luas daun kemudi = 13 m²

    V = Kecepatan dinas kapal = 15,4 Knots

    k1 = Koefisien yang bergantung pada aspek ratio (Δ)

    Δ = h²/A

    = (5)²/13

    = 1,88

    k1 = 3

    2

    = 3

    288,1 , dimana besarnya Δ tidak boleh lebih dari 2

    = 1,29

    k2 = Koefisien yang tergantung dari type kemudi =1,4

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 24 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    k3 = 1,15 untuk kemudi dibelakang propeller

    kt = 1,0 (normal)

    Jadi :

    Cr = 132 x 13 x (15,4) 2 x 1,9 x 1,4 x 1,15 x 1,0

    = 867305,467 N

    H. PERHITUNGAN SEPATU KEMUDI

    H.1. Modulus Penampang Sepatu Kemudi

    Modulus penampang dari sepatu kemudi terhadap sumbu Z, menurut BKI

    2006 Vol II hal 13-3

    Dimana :

    Bl = Gaya kemudi dalam resultan

    B1 = Cr /2

    Cr = Gaya Kemudi

    Cr = 867305,467 N

    B1 = 2

    867305,467

    = 433652,73 N

    X = Jarak masing-masing irisan penampang yang bersangkutan terhadap

    sumbu kemudi

    X = 0,5 x L 50 (X minimum)

    L 50 = L (X maximum)

    Dimana :

    L 50 = 310Pr x Cr

    Dimana Pr = 310 10 x L

    Cr

    L 10 = Tinggi daun kemudi h = 5 m

    Pr = 3 x105 867305,467

    = 177,214 N/m

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 25 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    L 50 = 310Pr x Cr

    L 50 = 3 x10177,214 867305,467

    = 4,89 m, di ambil 2,7 m

    X min = 0,5 x L50

    = 0,5 x 2,7

    = 1,35 m

    k = Faktor bahan = 1,0

    Wz = 80

    k x X x B1

    = 80

    0,135,1433652,73 xx

    = 7317,88 cm 3

    Wy = 1/3 x Wz

    = 1/3 x 7317,88

    = 1607,452 cm 3

    H.2. Perencanaan profil sepatu kemudi dengan plat dengan ukuran sebagai

    berikut :

    Tinggi (h) = 30 cm = 300 mm

    Tebal (s) = 2 x 3 = 6 cm = 60 mm

    Lebar (b) = 300 mm

    No b h f = b x h a F x a² Iz = 1/12 x b x h³

    I 30 6 180 0 0 540

    II 6 26 156 12 22464 8788

    III 6 26 156 0 0 8788

    IV 6 26 156 12 22464 8788

    V 30 6 180 0 0 540

    Σ 1= 44928 Σ 2 = 27444

    IZ = 1 + 2

    = 44928 + 27444

    = 72372 cm 4

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 26 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    Harga Wz yang akan direncanakan

    WZ’ = IZ/Amax, dimana Amax = 15 cm

    = 72372/15

    = 4824,8 cm 3

    Wy’ = WZ’/3

    = 4824,8/3

    = 1608,267 cm 3

    Koreksi perhitungan Wz

    = %100.

    .... xnPerhitungaWz

    nPerhitungaWznPerencanaaWz

    = %100356,4822

    356,48228,4824 x

    = 0,0005 x 100%

    = 0,05 % < 0,5 % (Memenuhi Syarat)

    I. STERN CLEARANCE

    Ukuran diameter propeller ideal adalah (0,6 – 0,7) T

    Dimana T = Sarat kapal

    Diambil 0,6 x T

    D Propeller Ideal adalah

    = 0,6 x T

    = 0,6 x 7,8

    = 4,68 m

    R (Jari – jari Propeller)

    = 0,5 x D Propeller

    = 0,5 x 4,08

    = 2,34 m

    Diameter Boss Propeller

    = 1/6 x D

    = 1/6 x 4,68

    = 0,78 m

  • LINES PLAN

    TUGAS AKHIR MV “EL-JALLUDDIN RUMMY” GC 3250 BRT

    PROGRAM STUDI DIPLOMA III TEKNIK PERKAPALAN II - 27 UNIVERSITAS DIPONEGORO SEMARANG ROCHMAN HARDI PRASETIO L0G 006 051

    Menurut konstruksi lambung BKI, untuk kapal baling - baling tunggal jarak

    minimal antara baling – baling dengan linggi buritan menurut aturan

    konstruksi BKI 2006 Vol II Sec 13 – 1 adalah sebagai berikut :

    a. 0,1 x D = 0,1 x 4,68

    = 0,468 m

    b. 0,09 x D = 0,09 x 4,68

    = 0,4212 m

    c. 0,17 x D = 0,17 x 4,68

    = 0,7956 m

    d. 0,15 x D = 0,15 x 4,68

    = 0,702 m

    e. 0,18 x D = 0,18 x 4,68

    = 0,8424 m

    f. 0,04 x D = 0,04 x 4,68

    = 0,187 m

    g. 2” – 3” Diambil 2,5” = 2,5 x 25,4

    = 63,5 mm

    Jarak poros propeller dengan Base Line adalah :

    = R Propeller + f + Tinggi sepatu kemudi

    = 3,9 + 0,1872 + 0,29

    = 3,040 m