BABAR. IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING. DETECTOR LAYOUT EXPLODED. DETECTOR LAYOUT ASSEMBLED. IAROCCI TUBE. TUBE MATERIAL : NORYL OR PVC THE TUBE IS NOT SELF SUPPORTING. RIB. RIB MATERIAL : STEEL - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

1

BABAR

IFR UPGRADE

DETECTOR ASSEMBLINGAND

MOUNTING

Page 2: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

2

DETECTOR LAYOUTEXPLODED

Page 3: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

3

DETECTOR LAYOUTASSEMBLED

Page 4: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

4

IAROCCI TUBETUBE MATERIAL : NORYL OR PVCTHE TUBE IS NOT SELF SUPPORTING

Page 5: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

5

RIB• RIB MATERIAL : STEEL• NUMBER OF RIBS : TO BE OPTIMIZED DEPENDING ON DETECTOR’S EFFICIENCY AND

STIFFNESS REQUIRED• ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE TOTAL LENGTH NEEDED IS

ABOUT 8000 m; THE CORRESPONDING WEIGHT IS 1260 Kg AND THE COST = 3.6*1260 = 4536 € (20% VAT INCLUDED)

Page 6: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

6

DETECTOR’S STIFFNESSTHE HELP OF THE RIBS

Page 7: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

7

GLUEING – PHASE 1

THE RIB IS GLUED ON THE TUBE’S SIDE

Page 8: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

8

GLUEING – PHASE 2

• THE DETECTOR’S MODULE IS ASSEMBLED

Page 9: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

9

GLUEING – PHASE 3

• STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE ASSEMBLED• THE TOTAL THICKNESS IS ABOUT 1 MM

Page 10: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

10

GLUEING – PHASE 4

• STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS ARE GLUED ON THE TUBES

Page 11: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

11

DETECTOR’S VERTICAL STIFFNESS

Page 12: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

12

MOUNTING AND DISMOUNTING THE DETECTOR

THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13); A PROPER TOOLING KEEPS IT IN SHAPE AND PLACE

THE MODULES OF THE DETECTOR ARE INSERTED ONE BY ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING ON THE PREVIOUS ONE (SLIDES 14, 15)

EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH ALLOWS THE LIFTING AND THE ADJUSTMENT.

WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER PIECES REMOVAL (SLIDE 16); THE PROCEDURE IS THE FOLLOWING: 1) LIFTING THE UPPER MODULES 2) EXTRACT THE CENTRAL MODULES 3) IN THE MIDDLE OF THE GAP THERE’S THE SPACE TO LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM.

THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A TOOLING, HOLDING AND HANDLING THE MODULES OF THE DETECTOR.

Page 13: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

13

INSERTING THE STRIP FOIL• THE STRIP FOIL SLIDES INTO THE GAP• A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED

Page 14: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

14

INSERTING THE DETECTOR - 1

Page 15: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

15

INSERTING THE DETECTOR - 2

Page 16: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

16

EXTRACTING THE DETECTOR

Page 17: BABAR

V. Carassiti - Princeton (USA) 9-13/01/2003

17

THE LAYER IN PLACE