babyhydro cascade
TRANSCRIPT
-
8/4/2019 BabyHydro Cascade
1/1
Small hydro from idea to operation
babyHydro Ltd, Gateside Farm, Kilncadzow, Carluke, ML8 4QNRegistered in Scotland no: SC350026
Discovery
Pre-Feasibility
Feasibility
Planning &Consents
Design
Construction
Commissioning
Operation
Small hydro from idea to operation
babyHydro havebeen classifiedas a TransitionInstaller under
MCS
For more information contact: [email protected]: 01786 820018www.babyhydro.co.uk
1111
5555
6666
8888
3333
4444
From idea to operation, from start to finish babyHydro supportslandowners and developers through every stage of creatingelectricity from running water.
Scheme size ranging from 10kW to 500kW
Specialising in low-impact hydro based on run-of-riverapproaches and the use of weirs rather than large storage dams
Access to unique Hydrobotsite identification software
Feeding into the Grid or for local consumption
Client participation encouraged at all stages of projects
2222
7777
DISCOVERYDISCOVERYDISCOVERYDISCOVERY
Identifying sites worthy ofinvestigation using Hydrobot
remote surveying service
FEASIBILITYFEASIBILITYFEASIBILITYFEASIBILITY
River flow assessment, cost/benefitanalysis and outline design
PLANNING &PLANNING &PLANNING &PLANNING & CONSENTSCONSENTSCONSENTSCONSENTS
Consultation and negotiation with SEPA,SNH and other stakeholders, including the
planning authority
DESIGNDESIGNDESIGNDESIGN
Civil, structural, electrical andmechanical, plus tendering
CONSTRUCTIONCONSTRUCTIONCONSTRUCTIONCONSTRUCTION
Project and Contract
Management
COMMISSIONINGCOMMISSIONINGCOMMISSIONINGCOMMISSIONING
Final testing and activation
OPERATIONOPERATIONOPERATIONOPERATION
Ongoing support,servicing andmaintenance
PREPREPREPRE ---- FEASIBILITYFEASIBILITYFEASIBILITYFEASIBILITY
Early assessment of the potentialand key feature identification