Page 1: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Baganuur coal mine expansionOpportunities for investors

Ulaanbaatar

Page 2: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Content

• Introduction• Resources and reserves• Coal production• Market outlook• Mine expansion plan• Research and development• Investment issues

Page 3: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Introduction• ESTABLISHED IN1978.

• SE 130 KM FROM ULAANBAATAR. CONNECTED TO PAVED ROAD AND RAILWAY NETWORK.

• GOVERNMENT OWNS 75%, OTHERS 25%OF SHARES RESPECTIVELY.

• EMPLOYEES 1100

• EXTRACTS 50% OF COAL CONSUMPTION FOR PRODUCING ENERGY OF MONGOLIA, 60% FOR CENTRAL REGION.

Page 4: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Coal quality standartMNS  3818‐2001

Type of coal size

Ash content /%/

<Aã

Moisture /%/<Wã

Sulfur content /%/ Sd

t

Volatile matter /%/V

Calorific value <Qã

t

Kkal/kg KJ/kg

Brown coal type -B2 17.5 37.5 0.5 45 3360 13.0

Page 5: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Main consumers

# Thermal power plants

Annual supply

/thous.tn/Shares to total consumption

1 TPP-4 1600.0 60%2 TPP-3 1100.0 100%3 TPP-2 210.0 100%4 Darkhan TPP 250.0 60%5 Erdenet TPP 120.0 50%

Page 6: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Resource and reserve

Proved in 1978 with 600.0 million tons.Updated in 1998 with 708.2 million tons as a result of detailed survey.In total, 88.4 million tons of coal has been extracted since 1978.Norvest migrated the reserve model of 1978 into Minex in 3D.

Page 7: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

2,00

2,50

3,00

3,50

4,00

4,50

5,00

-

100

200

300

400

500

600

700

800

900 0,

2

0,3

0,4

0,5

0,6

0,7

0,8

0,9 1

1,1

1,2

1,3

1,4

1,5

1,6

1,7

1,8

1,9 2

Кхх,

м3/тн

Mill

ions

Minimum thicknesses of coal seam, m

2-р давхарга

2a-р давхарга

3-р давхарга

Хязгаарласан хөрс хуулалтын итгэлцүүр, м3/тн

Resource and reserve

Reserve can be elevated up to 700 million tones depending on the availability of minable coal seam thicknesses.

Seam 2

Seam 2a

Seam 3

Limiting strip ratio m3/ton

Page 8: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Quality of survey results

Laboratory analysis:In total samples from drilled boreholes

Ash analysis 47%Caloric value analysis 24%Sulphur content analysis 47%Volatile analysis 29%Core recovery – (60-70%)

Insufficient quality of survey

to prepare a Feasilibility

study for a bank

Requires detailed survey to choose proper mine technology for the mine.Potentiality of resource increase up to 1.0 billion tones by conductingadditional geological survey in accordance with international standards.

Page 9: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

2,00  

4,00  

6,00  

8,00  

10,00  

12,00  

14,00  

16,00  

0

500

1000

1500

2000

2500

3000

3500

4000

4500

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

Нүүрс олборлолт, м.тн Кхх, м3/тнCoal production, thous.tons

COAL PRODUCTION

Increase in earth moving.

Page 10: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Current situation

Page 11: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

CHALLENGES• Overdue overburden • Water drainage issues• Higher unit production cost than selling price• Coal price set by government• Outdated equipments and facilities - 90%, requires technical

renovation.• Movement in internal stock piling• Unreachable reserves due to geological conditions• Increase in transport distance• HR risks- lower salary• Financial issues

Requires technical renovation and decrease in production cost

Page 12: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

PROJECTED COAL CONSUMPTION IN CENTRAL REGION

5,2  5,3  5,9  7,1 10,6  11,7  13,0 

15,0 6,5  6,8  7,5 

8,8 

12,5 13,7 

15,7 18,1 

‐2,0 4,0 6,0 8,0 10,0 12,0 14,0 16,0 18,0 20,0 

Million tone

s

ТЭХС‐ийн хэрэглээ  Тєвийн бүсийн нийт хэрэглээ

2012 20172016201520142013 2018 2025Central energy system’s consumption

Total consumption in central region

Coal consumption of central region projected to be 6.5 million tones in 2012 while it will reach 15.7 million tones in 2018, 18.1 million tones in 2025 respectively.

Regarding the consumption projection, Baganuur mine needs to expand the mine capacity.

Page 13: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Capacity expansion

3,30 3,57 3,52 4,30

5,51 5,51 5,51 5,64 6,05 6,00 6,13 5,2 5,3 5,9 7,1

10,6 11,7 12,2 12,5 13,0 13,5 14,0

-

2,00

4,00

6,00

8,00

10,00

12,00

14,00

16,00

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Багануурын нийлүүлэлт

ТЭХС-ийн эрэлтDemand from CES

30% of coal consumption to TPP-5 which will be built with 820 MW capacity in 2012-2016.100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the mine is 6 million tons by 2020.

Supply from Baganuur

Page 14: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Technological developments

To entry Surface mining technology for Coal production and overburden

To build conveyor systems for both coal and waste transport

To start using underground mine technologies in some coal seams.

To reduce overburden volume and optimize mine earth movements

Page 15: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

COAL PRICE AND MINEABLE RESERVEs

140  186 392 

683  717  731  749 

1,98  2,16  

2,43  

2,72   2,74   2,75   2,80  

1,00  

1,20  

1,40  

1,60  

1,80  

2,00  

2,20  

2,40  

2,60  

2,80  

3,00  

500 

1 000 

1 500 

2 000 

2 500 

3 000 

0,7 0,8 0,9 1 1,1 1,2 1,3

Millions

Хөрс, м3

Нүүрс, тн

Кхх, м3/тн

Main option‐ Coal price 20500 tugriks/ton

Technology: Surface mining + Conveyor systems

Mineable reserve can be elevated to 749 million tones if selling price increased by

30% after technological renovation.

Minimum coal thickness  seam‐

0.4 m

Waste, m3

Coal, ton

Strip ratio, m3/t

Page 16: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

74  84  123  148  150  152  152 45  65 

167 

298  310  315  325 

22 37 

102 

238 258  264  272 

100 

200 

300 

400 

500 

600 

700 

800 

0,7 0,8 0,9 1 1,1 1,2 1,3

Millions

Factor impacting selling price

2‐р давхарга

2a‐р давхарга

3‐р давхарга

Minimum thickness of coal seam‐ 0.4 m

Main option‐ Coal price 20500 tugriks/ton

COAL PRICE AND MINEABLE RESERVETechnology: Surface mining+ conveyor system

Seam 2

Seam 2a

Seam 3

Page 17: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

MINE PLAN 2012-20224,10  

3,51  3,19  

2,69  

2,05  2,34  

2,14  2,22  2,30  2,24  2,07  

0,50  

1,00  

1,50  

2,00  

2,50  

3,00  

3,50  

4,00  

4,50  

10 

15 

20 

25 2012

 он

2013

 он

2014

 он

2015

 он

2016

 он

2017

 он

2018

 он

2019

 он

2020

 он

2021

 он

2022

 он

Strip

 ratio

 m3/t

Million

Хөрс хуулалт, м3

Нийт нүүрс, тн

Хөрс хуулалтын итгэлцүүр, м3/тн

Substantial decline in the volume of vesting

waste, m3

Coal, ton

Strip ratio, m3/t

Page 18: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

PROJECTED COST AFTER TECHNOLOGICAL RENOVATION

23,121,7

20,3

17,7

14,6 15,5 15,3 15,4 15,1 14,8 13,9

4,2 5,2 5,2 5,3 5,3 5,1 5,4 5,3 5,0 5,0 5,0

0,5 

1,0 

1,5 

2,0 

2,5 

3,0 

3,5 

4,0 

4,5 

5,0 

0,0

5,0

10,0

15,0

20,0

25,0

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Strip

 ratio

, m3/t

Thou

s. tu

griks

1 тн нүүрсний бүрэн өөрийн өртөг 1 м3 Уулын цулд ноогдох зардал КххUnit cost/ton coal Unit cost/ m3 rock mass Strip ratio

Page 19: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Preparation to stock exchange (2012)

- Geophysical survey- Detailed survey drilling - Geotechnical survey- Drainage survey- Resource report in accordance with JORC- Have the resource report in accordance with Mongolian standard approved by Mineral Resource Authority. - Have the feasibility study in accordance with Mongolian standard approved by Mineral Resource Authority. - Feasibility study for a bank- Prepare documents for stock exchange

- Баяжуулах үйлдвэрийн туршилт судалгаа ТЭЗҮ боловсруулахAdditional shares to be sold at domestic stock exchange to raise the necessary fund while keeping state owned shares at 51% in 2012.

Page 20: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

Investment plan

14

71,6

1,5 4,1

11,1

3,9 2,9 9,4

2,9 1,5 7,1

1,5

(10)

-

10

20

30

40

50

60

70

80

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Хөрөнгийн биржд гарах бэлтгэл ажлын зардал

Уурхайн тоног төхөөрөмж

Preparation cost  to stock exchange

Mine equipments and facilities

(/in accordance with Feasibility study done by Glogex LLC)

Total investment of 131.4 million USD required between 2012 and 2022

Page 21: Baganuur coal mine expansion - MZV · 2012. 2. 20. · 100% of coal consumption to Baganuur power plant which will be built with 270MW in 2013-2016. projected coal production of the

ECONOMIC PARAMETERS

• Investment– Facilities

• CAPEX 2012: USD85.5 million • OPEX (2013-2015): USD16.7 million• OPEX (2016-2022): USD29.2 million• Total: USD117.5 million

– Preparation cost to stock exchange USD 13.9 million – Total USD131.4 million

• Coal price/ton: 20500 tugriks in 2012, 22500 tugriks in 2013-2022• Unit cost/ ton of coal

– in 2012: 23100 tugriks– in 2014: 20300 tugriks– in 2018: 15300 tugriks– in 2022: 13900 tugriks

• Net present value (when NPV @ 10%): 35.6 billion tugriks• Internal rate of return (IRR) - 13.4 %,• Payback period – 7.91years or in 2018.