MILITARY SEALIFT COMMAND
BAHRAIN Ship Repair Industry Day
19 JULY 2019
UNCLASSIFIED - CLEARED FOR PUBLIC RELEASE
2UNCLASSIFIED
Agenda
Introduction to MSCMSC Organization
Overall OrganizationN7/N75/PM and Relationships to CTF-53 and FLCOverhaul Management Team
MSC Engineering Overview & Maintenance and RepairShip Types and Characteristics
Fleet Oiler (AO)Dry Cargo / Ammunition (AKE)Fleet Ocean Tug (ATF)Expeditionary Sea Base (ESB)Expeditionary Fast Transport (EPF)
Built and Operated to Commercial Industry StandardsClassed by ABS
3UNCLASSIFIED
MSC Program Overview - CLF
4UNCLASSIFIED
MSC Program Overview - SMS
5UNCLASSIFIED
MSC Program Overview – Service & Support
6UNCLASSIFIED
MSC Program Overview - Prepo
7UNCLASSIFIED
MSC Program Overview – Sealift
8UNCLASSIFIED
MSC Engineering (N7)
MISSION STATEMENT
To plan, develop and promulgate the Engineering policies, programs and procedures to ensure the MSC fleet operates in the most efficient, cost effective, and mission-ready posture by providing technical resources and trained personnel to support MSC ships and activities worldwide.
To be the Department of the Navy’s engineering resource of choice on all engineering issues related to the afloat capital management of the Navy’s commercially Operated fleet, including CIVMAR (civilian mariner), contract operated, and chartered ships.
9UNCLASSIFIED
MSC Engineering (N7)
Staff of approx. 330 Engineers iso more than 130 Vessels. (Gov’t Owned, Gov’t Operated & Gov’t Owned, Contract Operated)
< 3 Engineers / Ship
> 30 Ship Classes
Re-capitalization of 86% of approximately 130 MSC vessels will be started within next 5 Years and completed within the next 20!
10UNCLASSIFIED
MSC Technical Authority
COMSC Retains Technical Authority for MSC Vessels.
The MSC N7 Engineering Technical Director has delegated Technical Authority granted by COMSC.
11UNCLASSIFIED
MSC Maintenance and Repair
How We Do Business…
• Planning !• Solicitations – RFP’s issued 4-5 months prior to start date• Execution – on time availability completion!
• 000 ‘s• NSP Items, $$ Priced Items, & “Definitions”
• CSI’s and CCSI’s (Work Item Standardization) • CPI Effort. (Process Improvement)
12UNCLASSIFIED
MSC Maintenance – Solicitations
Competitive Acquisition Process
- via FLC BAHRAIN Contracting Office
Contract type will be specified within RFP • Firm Fixed Price within set Performance Period
Bid Proposal “Exceptions” will not be accepted by MSC
Vendors are encouraged to engage MSC via FLC BAHRAIN PCO and Contract Specialist in dialogue if any aspect of the solicitation may result in “not bidding”
13UNCLASSIFIED
MSC Maintenance and Repair
• Post Award Planning Conference – approx. 40 days prior to start
• Vessel’s Principle Port Engineer (PPE) will be assigned as the Contracting Officer’s technical representative (COR) and provide technical oversight.
• Vessel’s PPE leads the Overhaul Management Team (OMT) and Ship’s Management Team (SMT) during shipyard availabilities.
• Additional MSC Engineering support staff may be assigned to provide technical assistance and contract technical oversight.
14UNCLASSIFIED
MSC Maintenance and Repair
MSC Ship Repair Availability Types
Voyage Repair Availabilities (VRA)Mid-Term Availabilities (MTA)Regular Overhaul / Drydock (ROH/DD)
“All or None” Solicitations
ShipcheckBidder’s Questions
15UNCLASSIFIED
SOLICITATION PROCESS
Statement of WorkUnderstanding / Reading our Work
ItemsUse of General Technical
RequirementsUse of SWIRRs (Standard Work Items
for Repetitive Repair)- aka CSI’s & CCSI’s (Class Standard Items and Cross Class Standard Items)
References: Technical Manuals and Drawings
16UNCLASSIFIED
SOLICITATION PROCESS
Required Technical Representatives
OEM Technical RepresentativesRequired by Instruction
Responsibility for Arranging Required Technical Representatives
Specialty Work RequirementsRationale for Providing Recommended
Sources for Specialty Work Requirements
17UNCLASSIFIED
SOLICITATION PROCESS
Evaluation of ProposalsTechnical Adequacy of ProposalRealistic Production SchedulesProper Identification of Critical Path ItemsProposed Man-Hours Seem To Match
Scope of WorkNo Exceptions TakenAll Required Information is Provided
18UNCLASSIFIED
SOLICITATION PROCESS
Evaluation of ProposalsPricePrice Proposal Should Include all Costs
Contract Proposal DiscussionsClarification of Proposal Submittal ItemsEnsuring the Contractor Understands the
Statement of WorkExamples of Why Proposals are Found
Technically Unacceptable
19UNCLASSIFIED
SOLICITATION PROCESS
Award / PreparationCoordination Discussions with Contractor
and Port Engineer (Post-Award Planning Conference)
Development and Submittal of a Refined Production Schedule and MilestonesStatus Reports on CFM Orders and
DeliveriesStatus Reports on Arranged Technical
Representatives
20UNCLASSIFIED
EXECUTION PHASE
Execution of the Maintenance and Repair AvailabilitySAFETYWorking Relationship - CommunicationConstant Info Flow on Condition Found
Reports (CFRs), Request For Proposals (RFPs), Issues and Problem Areas, etc.Sourcing Adequate Skilled Labor to get
Complete All Work Requirements on Time, and to Address Emergent Requirements Found in the Execution of the Work Requirements
21UNCLASSIFIED
EXECUTION PHASE
Maintenance and Repair Availability Execution
SAFETY !
Need to Have a Strong Quality Assurance Organization to Ensure M&R is Accomplished Correctly and that Tests and Inspections are Ready as Scheduled
Importance of Properly Planning and Executing Crew Move-Aboard (as applicable), Dock Trials, and Sea Trials
22UNCLASSIFIED
SOLICITATION PROCESS
Follow-Up / Close-OutWarranty IssuesDocumentation Required to Close Out the
ContractCPARS (Contractor Performance
Assessment Reporting System)Identifies Strengths and Weaknesses of
ContractorsAllows Contractors to Respond to Ratings
and CommentsCan be Used to Evaluate Contractor
Suitability for Future Contract Awards
23UNCLASSIFIED
SOLICITATION PROCESS
Voyage Repair Availability PortsUnderstanding the Rules and Regulations
that May Affect Ability to Accomplish Work in Each of the Commercial PortsMina SalmanKBSPJebel AliPort KhalifaPort ZayedDuqmOther Ports
24UNCLASSIFIED
MSC Vessel Classes within C5F
• T-AO Class: “East Coast” US - KAISER Class Oiler, on rotation• Not Title X Exempt. • CASREP and CASREP avoidance M&R work only. • VRA’s
• T-AKE Class: “East Coast” US – Lewis and Clark Cargo Vessel, on rotation • Not Title X Exempt. • CASREP and CASREP avoidance M&R work only. • VRA’s
• T-ATF Class: USNS CATAWBA (T-ATF 168) • Title X Exempt. No limitations on M&R work.• ROHDD, MTA, VRA
• T-EPF Class: USNS CHOCTAW COUNTY (T-EPF 2) • Title X Exempt. No limitations on M&R work.• ROHDD, MTA, VRA
• T-ESB Class: USS LEWIS B. PULLER (T-ESB 3) • NOT Title X Exempt yet. Process in progress. • ROHDD, MTA, VRA
25UNCLASSIFIED
T-AO CLASS
CharacteristicsLength: 677.5 ftBeam: 97.5 ftDisplacement: 40,900-41,225 tonsSpeed: 20 knots
26UNCLASSIFIED
T-AKE CLASS
CharacteristicsLength: 689 ftBeam: 106 ftDisplacement: 41,000 tonsSpeed: 20 knots
27UNCLASSIFIED
T-ATF CLASS
CharacteristicsLength: 226 ftBeam: 42 ftDisplacement: 2,260 tonsSpeed: 14.5 knots
28UNCLASSIFIED
T-EPF CLASS
29UNCLASSIFIED
EPF – Draft, Weather, and Sea State Limitations
- EPF Class – Approach Berth and Mooring • Waterjet Under Keel Clearance (UKC) - 3 meters
30UNCLASSIFIED
T-EPF MAINTENANCE
Dry Docking – Twice in 5 Years:o Vessels are ABS Classified, and vessel delivery date establishes the annual inspection requirementso Annual surveys in years 1 through 4 allow a 3 month inspection windowo The ABS Class Renewal Survey at the completion of year 5 has a hard end date and must be
COMPLETED prior to the due date to include any work growth!
Typical Maintenance periods based on 5-year ABS cycle: o Years 1, 2, 4: 30-45 days. Annual Pier side Availability o Year 3: 60 days. Dry Docking Availabilityo Year 5: 60-90 days. Dry Docking Availabilityo NOTE: Hull Repair Requirements may require Docking in years 1, 2, or 4!
Voyage Repairs – Two x 21 days eacho Mission planners must anticipate at a minimum two VR periodso Supports Crew SAMM (Preventive Maintenance) and Industrial Support. o MSC will provide max flexibility for VR period scheduling
o Mission on / offload not scheduled during dedicated maintenance periods
o Advance planning and communications are critical!
M&R windows often include time for regulatory requirements!o SMART, AVCERT, ARQ, ISM/SMC, ISA…
31UNCLASSIFIED
ALUMINUM REPAIRS
• Determine Sensitization Levels
• Pulse GMAW must be used on repairs and install where deck plate thickness is below 6mm.
• Provide material certs, welder certs, and an ABS approved, ‘reduced heat’ weld procedure specification (WPS) to the MSC REP and ABS surveyor prior to commencing work
• All material, including prefabricated installations, shall be traceable to the material certifications and verified prior to installation.
• Ultrasonic Impact Treatment (UIT) shall be used as part of the repair process where the area is considered to be moderately sensitized.
• Plasma Arc Cutting shall NOT be used for material cutting
32UNCLASSIFIED
ALUMINUM REPAIRS
• continued…
• Shell seams shall be 300mm apart unless a request for deviation is approved by the MSC REP
• The recommended distance between field weld seams is 100mm (4in).
• Inserts shall include cut and insert plate or planking with a minimum of 75mm (3in) radius corners.
• All welds shall include non-destructive testing (NDT) upon completion and be completed to the satisfaction of the MSC REP and ABS surveyor. As a minimum, PT and UT shall be conducted on ALL shell plating welds. NDT 100% of weld seam. Structure welded to the hull perimeter shall have 20% PT testing.
–The 20% structure PT locations shall be determined based on 5X visual inspection completed in the presence of ABS and MSC REP.
33UNCLASSIFIED
T-ESB CLASS
USNS LEWIS B. PULLER (T-ESB 3)
CharacteristicsLength: 784 ftBeam: 164 ftDisplacement: 106,664 tonsSpeed: 15 knots
34UNCLASSIFIED
Adaptive Force Packages (AFP)
• MSC ships are being tasked to perform missions not envisioned when originally designed
• AFP Packages are attractive to mission sponsors for their rapid integration
• AFPs present different cargo payloads and operational requirements which may present high risks to ships and personnel
• The Oil and Gas industry Risk Assessment Methodology was chosen to address the complexities of compounding AFPs
• Signed Oct 9, 2018, there is official MSC guidance on shipboard Operational Risk Management program.
Vessel “interface” and integration work is considered to be a TRANSALT and must follow the approved T-ALT Process with ABS and technical approvals.
AFP 101
35UNCLASSIFIED
INDUSTRY FEEDBACK
What did you not hear from me that remains to be answered?
What additional efforts can MSC employ to assist industry with respect to quality and on time ship repair availabilities?
Discussion Points:
• Length of Overhauls • Material and Repair Parts • OEM Support Availability • Overhaul - Growth Work
36UNCLASSIFIED
ANY FINAL QUESTIONS OR DISCUSSION?
QUESTIONS
37UNCLASSIFIED
BACK-UP SLIDES
BACK – UP SLIDES
38UNCLASSIFIED
MSC Regulatory Requirements
39UNCLASSIFIED
COMSC Technical & Programmatic Authorities
40UNCLASSIFIED
Technical & Programmatic Authorities
41UNCLASSIFIED
Technical & Programmatic Authorities
42UNCLASSIFIED
POAM Improvement
New Milestones:• A-310 SMT Start Planning Effort. PPE conduct Planning and Scoping
Conference with PM, N10, N4, N6, Type Desk, ABS, USCG. • Goal is to discuss and establish a collaborative plan inclusive of budgetary
challenges, period of performance, regulatory and statutory requirements and ABS Survey Planning document
• A-295 PPE Arrange for Pre-Availability Assessments, (UTs, Thermographic, OEMs, etc.) with ABS Surveyor in attendance
• Goal is to improve work package specification by discovering areas of concern • A-184 Submit Initial Work Package Index for Review (N10 and N00l and N02
(DD-254)• Goal is to clarify what is actually required for this milestone
• A-167 Submit Final Work Package & Estimates (Enter in PENG) submitted to N10 as per latest checklist / instruction
• Goal is to clarify what is actually required for this milestone• A-40 PPE Conduct Post Award Planning Conference
• Goal is meet with shipyard to discuss production schedule and any work item that may cause risk to maintaining production schedule
43UNCLASSIFIED
MSC N7 Organization
44UNCLASSIFIED