Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 1
6th Sept, 2011
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 2
Team:
• Manoj Kelkar – Sr. Mgr. (Press & Fab 3Wh)
• Nitin Patil – Manager (Press Shop 3Wh)
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 3
Bajaj Group:
Among top 10 business houses in India
34 companies having presence in
diverse sectors
Automotive
Finance
Insurance
Home Appliances
Steel
International Trading
Power
Infrastructure
Bajaj Auto Ltd. flagship company of
Bajaj Group
Current World Market Standing
Ranked as the World’s 4th largest
Two & Three Wheeler manufacturer
Bajaj Group
FY 10-11
• Turnover – Rs. 1,69,315 million
• Net Profit – Rs. 33,397 million
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 4
BAL
Akurdi(Pune)
Head Qtr.
Engg.
R&D
Finance,
Mktg
HRD
Waluj(Aurangabad
All 3 WhDiscover
Platina
XCD
CT 100
Boxer
Proposed 4 Wheelers
Chakan
Discover
Pulsar
Avenger
Ninja
KTM
Pantanagar
Discover
Platina
Indonesia
CKD + SKD
Motorcycles
3 Wheelers
BAL : HQ & Plants
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 5
Started manufacturing at Akurdi, Pune
in 1961
In Waluj,Aurangabad From 1987
Total 3Whs on Road across the globe 4.84 million
50 Years .. Commutation to Logistics
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 6
World leader Fuel efficient Eco friendlyOptional Variants - CNG, LPG and diesel.
RE CDI RE CNG – 4 S RE – 4 S RE LPG – 4 S GC 1000
Product Portfolio 3-Wheeler
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 7
3Wh Products
At Present Manufacturing
22 Models
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 8
Our customers
No. of dealers – 196
No. of models – 22
Domestics Exports
Spread over more than 27 countries
Total no. of models – 4
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 9
0.100.12
0.160.18 0.18
0.21 0.210.01
0.01
0.07
0.140.17
0.23
0.32
0.110.13
0.23
0.32
0.35
0.44
0.53
0
0.11
0.22
0.33
0.44
0.55
97-98 00-01 03-04 06-07 09-10 10-11 11-12…
Million Nos.
Domestic Export Total
3Wh Production Growth
29%
26%
20%
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 10
2009-10 2010-11
9751116
0 141
30 K
37 K
Target v/s Manpower
Manpower Shortfall
Required Manpower
Monthly Target
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 11
Background
Guideline
( Objective - continuous improvements )
• No fresh recruitment of Permanent Labour
• No addition in Contract Labour
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 12
Kaizen Theme
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 13
Use of New Technology / Process
High investment
cost
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 14
Load - 1 man
Unload - 1 man
Load - 2 men
Unload - 1 man
Load - 1 man
Unload - 1 man
Press Line
Total 9
operators / shift
Windshield press part line
Load - 1 man
Unload - 1 man
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 15
Auto loading
by LCA
Auto
unloading
by LCA
Auto oil
application
Auto scrap
disposal
Oil application
Blank loading
Part unloading 1
Part loading
Scrap unloading at front side
Part unloading
Central scrap unloading
End scrap unloading
Part loading 1
Part unloading
Scrap unloading
Part loading 1
Part unloading 1
9 4 4 1 4
Final
Total
Stage wise Kaizen idea matrix
2
1
1
2
1
4
1st trim
3 2nd trim
1 Draw
KaizenSr.
No.Stage Activity
No. of
Operators
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 16
Challenges
Scrap Handling
Consistency of Part locations
Approach in die
Access for die Set up
Impact on Press cycle time
Interface between LCA & Press Auto cycle
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 17
1st trim end scrap removal & collecting in scrap trolley
Before After
Horizontal deployment on 1st trim loading side.
Challenges ► Scrap Handling
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 18
1st trim central scrap removal & collecting in trolley
Horizontal deployment on 2nd trim unloading side.
Challenges ► Scrap Handling
Before After
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 19
Challenges ► Consistency of part location
1st trim – pneumatic end
stopper for prefect location.
1st trim – Guide rods provided
with pnue. cylinder.
Proximity sensor provided in
die for full proof location &
interlocked with press cycle.
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 20
Challenges ► Approach in die
1st Trim - Die bottom casting relieve for
easy part loading
2nd trim - Die bottom punch relieve
for gripper fingers
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 21
Challenges ► Die setup
Draw - Movable loader with lead
screw arrangement for die set up
2nd trim – loader mounted on moving
bolster for die set up
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 22
Challenges ► Interface between LCA & Press auto cycle
Ready in
once
Slide at
top
Cam
Switch
Loader
at Home
Unloader
at home
In die for
job location
Part
locator
down
Part on
gripper
In die for
part
present
Part at
unloading
stage
Press cycle starts ON ON ON ON ON ON ON OFF
Loader starts ON ON ON OFF ON OFF
Unloader starts ON ON ON ON ON ON ON ON
Scrap Ejector
startsON
Safety Quality Safety Safety QualitySafety
INPUT
OUTPUT
Interlock for →
Interlock Matrix
From Press Read switch Proximity Sensor Photo Sensor
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 23
Challenges
Scrap Handling
Consistency of Part locations
Approach in die
Access for die Set up
Impact on Press cycle time
Interface between LCA & Press Auto cycle
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 24
Actual
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 25
Kaizen Sustenance
Sr. No. Part / Component Activity JH PM TBM
Air pressure Daily
Oil level in lubricator Daily
Filter cleaning Monthly
Quality PokaYoke Audit Daily
Safety PokaYoke Audit Weekly
3 Vacuum Developer Cleaning Fortnightly
4 Vacuum Cups Replacement 6 months
Sustenance points
FRL unit1
Sensors2
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 26
Result
30 operators transferred to Vehicle Assembly
Horizontal deployment on Shield press line
BeforeAfter
9
0
Wind Shield lineManpower / Shift
BeforeAfter
30
0
Press ShopManpower
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 27
Plant
Press Shop
Benefit - Productivity
10.5 times
17 %
5 %
171
200
140
160
180
200
220
Before After
Nos. Production / Hour
152
1600
0
400
800
1200
1600
2000
Before After
Nos. Production / Man
28
30
32
Before After
X 1000 nos.
Production / Month
30 K
31.5 K
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 28
PlantPress Shop
Benefit – Cost
90 %
88 %8.2
0.8
0
2
4
6
8
10
Before After
Nos. Labour Cost / Veh
80
10
0
20
40
60
80
100
Automation LCA
Rs. In Lacs Project Cost
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 29
12
00
4
8
12
16
Before After
Nos. Unsafe Conditions
9
00
2
4
6
8
10
Before After
Nos. Unhealthy Conditions
740
00
200
400
600
800
Before After
PPM Rejection(due to wrong location)
Benefits – Press Shop Quality
100 %
100 %
100 %
Safety
100 %
11670
00
4000
8000
12000
16000
Before After
PPM Rework
Bajaj Auto Ltd. – 3Wh Div. Aurangabad
TPM – The Prime Mover towards Excellence Slide No. : 30