BalloonWinds Cracks Under Pressure. Jim Ryan University of New Hampshire. BalloonWinds Instrument Overview. Size : 8 8 12’ Gondola Mass : 5500 lbs Power Requirements : 1300 W Power System : 26 Lithium-Ion Batteries Thermal Management : Ice and Electric Heaters - PowerPoint PPT PresentationTRANSCRIPT
Proprietary
BalloonWinds Cracks Under Pressure
Jim Ryan
University of New Hampshire
Proprietary
BalloonWindsInstrument Overview
Size: 8 8 12’
Gondola Mass: 5500 lbs
Power Requirements: 1300 W
Power System:
26 Lithium-Ion Batteries
Thermal Management:
Ice and Electric Heaters
Optical Systems:
Diode-Pumped Nd:YAG
½-meter Telescope
Direct-Detection Receivers (2)
Proprietary
BalloonWindsIntegrated Instrument
Proprietary
Flight Timeline
0
10
20
30
40
0 2 4 6 8 10 12 14
Time (Hr)
Altitude(km)
Flight Timeline
1. Liftoff - System Startup2. Emit Laser and Signal Fiber Alignment3. Flight Altitude Checkout4. Eight-Hour Data Collection5. Extended Data Collection (resources/weather)6. Descent
1. Liftoff - System Startup2. Emit Laser and Signal Fiber Alignment3. Flight Altitude Checkout4. Eight-Hour Data Collection5. Extended Data Collection (resources/weather)6. Descent
1 2 3 6
4 5
Proprietary
Mission Objectives
1. Measure wind velocity profiles with accuracy limited by photometric return and instrument technology.
2. Confirm instrument/atmosphere model for a space-like instrument.
3. Assess subsystem scalability for space.
4. Adapt model to a space-borne instrument and compare to data requirements.
Proprietary
Previous BalloonWinds Schedule
Activity Date
Crane Test 04 Jan 07
Pre-Env. Functional Test 30 Mar 07
Thermal-Vacuum Test 02 Apr 07
First Launch 14 May 07
Second Launch 04 Jun 07
Return to UNH 15 Jun 07
Proprietary
Thermal-Vacuum Test
• 5 April 2007 at Kirtland AFB Phillips Lab
• Catastrophic failure occurred during initial backfill
• Damage assessment, failure analysis, redesign, and chamber reviews initiated
Proprietary
External Pressure
•Vacuum at 3:30
•Target P at 3:51
•Backfill at 3:55
Internal Pressure
•Pressurized at 2:05
•Failure at 3:50
•Tracks External P
Proprietary
External Pressure
•Linear decrease from pumping
•Pressure wave from explosion measured at 3:50:22
Internal Pressure
•1.21 bar initial
•Rupture at 3:50:20
•0.13 bar final
•1.07 bar differential
Proprietary
Laser ChamberPre-Failure
Cross-supports
29 47 ½-inch lid(0.35-inch eff.
thickness)
Proprietary
Laser ChamberPost-Failure I
Cross-supports
Lid bottom
Secondary fractures from gondola impact
Thermal insulation(yellow)
Proprietary
Laser ChamberPost-Failure II
Cross-support
Lid bottom
Secondary fracturesfrom pipe interference
Fibertek Laser
Proprietary
Laser ChamberPost-Failure III
Reverse angleshowing the disorder
Proprietary
Laser ChamberPost-Failure IV
Fragments at thebottom of the
thermal-vacuum chamber
Proprietary
Damage Assessment
• Laser chamber: Lid and walls
• GPS, attitude sensors and heaters mounted on lid were damaged
• External cooling lines were stressed
• Internal damage was minimal
• FiberTek laser and other key elements passed diagnostic testing 11 July 2007
Proprietary
Failure Analysis Lid Support Structures
• Lid required additional supports to counter pressure load (19,000 lbs)
• Each cross-support was fastened to lid using 7 bolts
• Middle beam took 20-39% of total load, depending on load/lid deformation
Proprietary
Failure Analysis Lid Deformation & Reaction
• Support beams much stiffer than lid
• Lid pushed against middle beam in range of 3800-7400 lbs (calc.)
• Only the two end bolts were under tension countering this load: 1800-3700 lbs each.
Lid displacement contouracting against support beams
Proprietary
Change of Lid Bolts
• Small gauge bolt with insert to thread into Al.
• New through-bolt fixation.
Proprietary
Failure AnalysisPull-Out Strengths
• Pull-out force for ¼-28 bolt in MIC-6 calculated to be 2100 lbs
• Measurements on two samples reported 2100 & 2700 lbs
• These values are at the lower-end of the expected 1800-3700 lbs load range
Pull-Out Strength Measurements
Proprietary
Pull Test Samples
• Threads did not hold.• Too short• Too small diameter.
Proprietary
Failure AnalysisFailure Sequence I
• Pull-out occurred at an end of the middle support beam
• Same-side bolts on neighboring beams let go
• Unsupported lid then fractured
• 4 end-bolts recovered with evidence of pull-out
• 5th end bolt was released by a crack
Proprietary
Failure AnalysisReconstructed Lid Fragments
Pull-out locations
Primary fracture line
Secondary fractures
GPS & Attitude plate(damaged)
Proprietary
Failure AnalysisConclusions
• Material selection (cast aluminum) was the primary cause of the failure– Poor strength required additional support– 3% elongation caused brittle fractures
• Inaccuracies in the stress analysis– Failed to predict inadequate lid strength, which
lead to the addition of cross-supports– Failed to predict pull-out of the cross-support
bolts
Proprietary
Laser Chamber RedesignThinking outside the box…
Rectangular Cylindrical Feasible Feasible
Aluminum Steel Lighter Stronger
Reuse mounting scheme Gondola interference
Simpler implementation Easier access
Engineering costs Schedule
Proprietary
Laser Chamber RedesignDesign Comparison I
Proprietary
Laser Chamber RedesignDesign Comparison II
Material: Cast Aluminum MIC6 Wrought Aluminum 6061-T6Ultimate Strength: 166 MPa 310 MPaYield Strength: 105 MPa 275 MPaElongation at Break: 3% 12%Lid thickness (M/R) 0.5 (0.065) 2.25 (0.25)Lid/base attachment Inserted threads Through boltsWeight ~200 lbs ~400 lbs
Proprietary
Chamber ReviewsCoolant Tank
Material 304L Stainless SteelVolume (empty) 18 cubic feetDesign Pressure 18.75 psigTest Pressure (Hydrostatic) 28 psigAssembly Test Pressure (Pneumatic) 22.5 psig (1.5 MEOP)
Electronics ChamberMaterial 304L Stainless SteelVolume (empty) 30 cubic feetDesign Pressure 18.75 psigTest Pressure (Hydrostatic) 28 psigAssembly Test Pressure (Pneumatic) 22.5 psig (1.5 MEOP)
Interferometer ChamberMaterial 304L Stainless SteelVolume 14 cubic feetDesign Pressure 16.5 psigAssembly Test Pressure (Pneumatic) 22.5 psig (1.5 MEOP)
Proprietary
Revised BalloonWinds Schedule
Activity Start Date
Laser Chamber CDR 01 Aug 07
Re-Integration 29 Oct 07
Leave UNH 17 Mar 08
Thermal-Vacuum Test 27 Mar 08
First Launch 05 May 08
Second Launch 27 May 08
Return to UNH 09 Jun 08
Proprietary
Thermal ChamberDesignASME Pressure Vessel Code usedDesign validated using COMPress SoftwareMaterial 304L Stainless Steel24” Diameter 10 GA shell (.1345”)ASME Flanged and Dished headsVolume (empty) 18 cubic feetDesign Pressure 18.75 psigMaximum Expected Operating Pressure (MEOP)
~15psig
FabricationWelded cylinder, Flanges and HeadsFestival City Fabricators, Stratford ONT, CA
Code approved pressure vessel manufacturer
Proprietary
Thermal Chamber
TestingProof/Leak Test (Hydrostatic) 28 psig
Functional/Leak testing UNH (Pneumatic) 16.5 psig (1.1 MEOP)
3 Complete pressure cycles to date.
Proprietary
Electronics ChamberDesignASME Pressure Vessel Code usedDesign validated using COMPress SoftwareMaterial 304L Stainless Steel
36 Diameter 10 GA shell (.1345”)ASME Flanged and Dished headsVolume (empty) 30 cubic feetDesign Pressure 18.75 psigMaximum Expected Operating Pressure (MEOP)
~15psig
FabricationWelded cylinder, Flanges and HeadsFestival City Fabricators, Stratford ONT, CA
Code approved pressure vessel manufacturer
Proprietary
Electronics Chamber
TestingProof/Leak Test (Hydrostatic) 28
psig
Functional/Leak testing UNH (Pneumatic) 16.50 psig (1.1 MEOP)
3 Complete pressure cycles to date.
Proprietary
Interferometer ChamberDesignMaterial 304L Stainless Steel20 Diameter 12 GA shell (.105”)Flat Heads with weight relief .625 thickVolume (empty) 18 cubic feetDesign Pressure 16.5 psig **Maximum Expected Operating Pressure (MEOP) ~15psig
FabricationWelded cylinder and flanges Shell made by Hollis Line Machining Hollis NH
Code approved pressure vessel manufacturerHeads made by Advance Group Ann Arbor MI
TestingLeak Test (Helium and Nitrogen) 16.3 psigFunctional/Leak testing UNH (Pneumatic) 16.5 psig (1.1
MEOP)
**Verified by mathematical analysis and OptiVessel Code
Proprietary
• Anyone want to golf on Thursday?
• See this space for details.
Proprietary
Laser ChamberDesignMaterial MIC 6 Aluminum (Cast)
Beams (added after initial lid deformation) 6061T6
Rectangular 29 x 45 x 13Volume (empty) 9.5 cubic feet
Design Pressure ?
Maximum Expected Operating Pressure (MEOP) ~15psig
FabricationWelded side walls and O-ring seal top and bottom
Advance Group Ann Arbor MI
TestingLeak Test (Helium and Nitrogen) 16.32 psig
Functional/Leak testing UNH (Pneumatic) 16.2 psig
FailureLid failed in TVAC at a differential pressure of 16.5 psig
Proprietary
Laser ChamberFailure Analysis