Page 1: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 2: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BALTIMORE CITY PUBLIC SCHOOLS

MATERIALS MANAGEMENT DEPARTMENT

Contract No. IFB-17073

INVITATION FOR BIDS

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240

6300 O’Donnell Street

Baltimore, MD 21223

PSC No. 30.222.15/17

and

Holabird Elementary/Middle School No. 229

1500 Imla Street

Baltimore, MD 21224

PSC No. 30.240.15/17

Bid Due Date:

Thursday, July 13, 2017 at 11:00 A.M. Local Time.

In order to be eligible for consideration, bids must be received at City Schools Office of Materials Management no later than 11:00 am

local time, July 13, 2017 in Room 401. Vendors mailing bids shall allow sufficient carrier delivery time to ensure timely receipt of

their bid in the Office of Materials Management (Room 401) prior to the deadline. Any bid received in the Office of Materials

Management after the submission deadline, no matter what the reason, will be returned unopened. Delivery to the City Schools’

mailroom, lobby etc shall not constitute delivery to the Office of Materials Management located in Room 401. All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works

Contractors Qualification Committee at Room #634, Charles L. Benton Building, 417 E. Fayette Street, Baltimore,

Maryland 21202. For additional information please call 410-396-6883.

Note: MBE/WBE package shall be submitted on a bid due date and time in a separate sealed envelope.

Only MBE firms certified by the Maryland Department of Transportation (MDOT) can be utilized to

meet the MBE requirements for the contract.

For additional information and assistance please contact

Mr. Brien Boone at (443) 642-4364 – M/WBE Manager

or e-mail to:

[email protected]

Page 3: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID INFORMATION SHEET

CONTRACT/SOLICITATION NUMBER: IFB-17073

I. Description of Work: Construction Services for Replacement of Graceland

Park/O’Donnell Heights Elementary/Middle School No. 240

and Holabird Elementary/Middle School No. 229

II. Locations of Work: Graceland Park/O’Donnell Heights EMS No. 240

6300 O’Donnell Street

Baltimore, MD 21223

Holabird Elementary/Middle School No. 229

1500 Imla Street

Baltimore, MD 21224

III. Documents Available At: In order to participate interested

bidders need to visit eMaryland Marketplace website at

https://emaryland.marketplace

and/or

http://www.baltimorecityschools.org/Page/25290 beginning Friday June 2, 2017

IV. Pre-Bid Conference: Mandatory walk through project construction site will be on

June 20, 2017 at 10:00 a.m. (Start at Graceland and move to Holabird)

for information contact

Project Managers Mr. Phillip Scott

Office Telephone: (410) 396-8690

Cell Telephone: (443) 677-6617

E-Mail: [email protected]

V. Bids Received/Due Date: Baltimore City Public Schools

200 East North Avenue, Room #401

Baltimore, MD 21202

Thursday, July 13, 2017

by 11:00 a.m. Local Time.

VI. Bid Opening: Baltimore City Public Schools

200 East North Avenue, Room #401

Baltimore, MD 21202

Thursday, July 13, 2017 @ 12:00 noon

VII. Contact Person: Mike Krupnik – Contract Manager

Office Telephone: (410) 396-8826

E-Mail: [email protected]

Page 4: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

NOTE TO PROSPECTIVE CONTRACTORS

An electronic or soft copy of the specifications and drawings for

Solicitation IFB-17073 is available free of charge commencing June 20, 2017 at

Baltimore City Public Schools Headquarters Building at:

Material Management Department

200 E. North Avenue

Room #401

Baltimore, MD 21202

Monday thru Friday

Between 9:30 a.m. and 3:30 p.m.

For additional information related please contact:

Ms. Patricia Graff at 410-396-8755 or

[email protected]

Solicitation IFB-17073

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240

6300 O’Donnell Street

Baltimore, MD 21223

and

Holabird Elementary/Middle School No. 229

1500 Imla Street

Baltimore, MD 21224

Page 5: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Responding Contractor(s), The forms included in contractors Response Package shall be executed by all responding contractors in sufficient details to demonstrate that the contractor possesses the required qualifications, capacity, ability and resources to accomplish the work as set in the solicitation, all to the satisfaction of the Baltimore City Public Schools (City Schools) and for the proper determination of the low, responsible and responsive bidder. All attached forms shall be returned by the vendor(s) on the Bid Due Date and Time to:

Baltimore City Public Schools Materials Management Department

200 E. North Avenue Suite 401

Baltimore, MD 21202

Page 6: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 1

BID FORM

(SUBMIT IN DUPLICATE)

BID DUE DATE: July 13, 2017 by 11:00 a.m. Local Time

CONTRACT NO: IFB-17073

PROJECT TITLE: Provide Construction Services for Replacement of Graceland

Park/O’Donnell Heights Elementary/Middle School No. 240 and Holabird Elementary/Middle

School No. 229

THIS BID SUBMITTED BY:

(company name)

(address)

Principal Name, Title, Phone, FAX & E-Mail

REGISTERED MARYLAND CONTRACTOR NO. _______________________________

SUBMITTED TO:

The Baltimore City Board of School Commissioners

Baltimore, Maryland

The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with THE

BALTIMORE CITY BOARD OF SCHOOL COMMISSIONERS, hereinafter referred to as the OWNER, in

the form included in the Contract Documents to complete all Work as specified or indicated in the Contract

Documents for the Contract Price and within the Contract Time indicated in the Bid and in accordance with

the Contract Documents.

BIDDER has examined the site and locality where the Work is to be performed, the legal requirements

(federal, state and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or

performance of the Work and has made such independent investigations, as BIDDER deems necessary.

The Owner reserves the right to select or reject any, all or none of the alternates in any order.

ADDENDA

Receipt of the following addenda to the Contract Documents is hereby acknowledged:

Addendum No. ______ Dated __________________Addendum No. _____Dated ___________

Addendum No. ______ Dated __________________Addendum No. _____Dated ___________

Addendum No. ______ Dated __________________Addendum No. _____Dated ___________

Page 7: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 2

IFB-17073

BID PROPOSAL

PROPOSAL OF

ADDRESS ZIP CODE

BIDS DUE: July 13, 2017 Contract IFB-17073

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

TO THE BOARD OF SCHOOL COMMISSIONERS OF BALTIMORE CITY

The undersigned agree to furnish all labor, materials and equipment to Provide Construction

Services for Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School

No. 240 and Holabird Elementary/Middle School No. 229 for Baltimore City Public Schools

(City Schools) in accordance with the attached Specifications, Drawings and other related

Contract Documents.

The entire work specified shall be completed for the following prices:

ITEM #1 – Base Price:

Construction Services for Replacement of Graceland Park/O’Donnell Heights

Elementary/Middle School No. 240

Dollars and Cents ($ )

SCHEDULE OF ALTERNATE BIDS - Graceland Park/O’Donnell Heights EMS #240

A. Alternate #1:

Add Item - PV on Entrance Canopy:

Base Bid:

Metal entrance canopy roof with translucent panels as shown on drawings;

Alternate #1A: Metal canopy roof with partial PV as shown in drawings on sheet A-8.1

Dollars and Cents ($ )

Alternate #1B:

Full PV canopy roof as shown in drawings on sheets A-8.1 and W-1.1A

Dollars and Cents ($ )

B. Alternate #2:

Add Item - Rainwater harvesting:

Base Bid:

Downspout to cast iron boot at grade as indicated on the drawings near Stair 3 2.

Alternate:

Page 8: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 3

Provide rainwater harvesting cistern system for schoolyard garden watering including: rain barrel

downspout escutcheon, downspout “Y”, diverter, and filter; a Bushman USA SlimLine 130 gal. rain

barrel (color: clay) on 30” Wx5’Lx12”H concrete pad, and a Rain Harvesting’s Tank Gauge/Water

Level Indicator.;

Dollars and Cents ($ )

C. Alternate #3:

Add Item - Engraved, Etched pigmented Colored site concrete paving with patterns:

Base Bid:

Provide scored concrete paving as shown at building entrance and Outdoor

Learning Areas.

Alternate:

Provide Engraved, etched colored concrete with custom scoring pattern as shown on landscape

drawings L-4.00.

Dollars and Cents ($ )

D. Alternate #4:

Add Item - Sod:

Base Bid:

Seed as per specification section 32 92 00- 2.1

Alternate:

Provide sod as per alternate specification section 32 92 00-2.2

Dollars and Cents ($ )

E. Alternate #5:

Add Item - Wall panels at community entrance at Vestibule V100:

Base Bid:

Painted CMU wall

Alternate:

Demountable Graphic wall panel system as shown on drawings

Dollars and Cents ($ )

F. Alternate #6:

Add Item - Air Facility Monitoring System Service agreement:

Base Bid:

3-year annual service agreement as per specification 23 52 00-2.9

Alternate:

Provide 5-year annual service agreement

Dollars and Cents ($ )

G. Alternate #7:

Add Item – Lobby Ceiling Fans:

Base Bid:

No fans

Alternate:

Provide ceiling fans with associated wiring as shown on drawings A-7.4, E-2.1 and M-1.1

Dollars and Cents ($ )

Page 9: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 4

H. Alternate #8:

Add Item – Gym Ceiling Fans:

Base Bid:

No fans

Alternate:

Provide ceiling fans with associated wiring as shown on drawings A-7.4, E-2.1 and M-1.1

Dollars and Cents ($ )

I. Alternate #9:

Add Item – Concrete in lieu of asphalt sidewalks:

Base Bid:

Asphalt sidewalks as shown on landscape drawings

Alternate:

Provide concrete sidewalks in lieu of asphalt sidewalks were indicated on landscape drawings.

Dollars and Cents ($ )

J. Alternate #10:

Add Item – Additional Landscape trees:

Base Bid:

Trees as shown in landscape plans

Alternate:

Additional trees where indicated in landscape plans..

Dollars and Cents ($ )

Page 10: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 5

SCHEDULE OF UNIT PRICES- Graceland Park/O’Donnell Heights EMS #240

A. Unit Price: Removal of unsatisfactory soil and replacement with engineered fill material.

Description: Removal of unsatisfactory soil excavation and disposal off site and replacement with

engineered fill from off site, as required, according to Section 31 10 00 "Earth Moving."

Unit of Measurement: Cubic yard of soil excavated, based on survey of volume removed.

Quantity to be included in Base Bid: 200 cubic yards.

Dollars and Cents ($ )

B. Unit Price: Removal of unsatisfactory soil and replacement with satisfactory soil material.

Description: Removal of unsatisfactory soil excavation and disposal off site and replacement with

borrow/satisfactory soil from off site, as required, according to Section 31 20 00 "Earth Moving."

Unit of Measurement: Cubic yard of soil excavated, based on survey of volume removed.

Quantity to be included in Base Bid: 400 cubic yards.

Dollars and Cents ($ )

C. Unit Price: Sheeting and shoring for protection of excavation.

Description: Erection and maintenance of Sheeting and shoring as specified in Section 31 50 00;

removal at completion of use.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: None.

Dollars and Cents ($ )

D. Unit Price: 6” nominal CMU wall.

Description: Erection of interior 6” CMU walls as specified in Section 04 20 00.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

E. Unit Price: 4” nominal CMU wall.

Description: Erection of interior 4” CMU walls as specified in Section 04 20 00.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

F. Unit Price: Partition type J1 metal stud gypsum wall.

Description: Erection of interior partition type J1 walls as specified in Section 09 21 16 and 9 22 16.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

G. Unit Price: 1. Description: Erection of interior partition type X1 walls as specified in Section 09 21 16 and 9 22 16.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

Page 11: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 6

ITEM #2 – Base Price:

Construction Services for Replacement of Holabird Elementary/Middle School No. 229

Dollars and Cents ($ )

SCHEDULE OF ALTERNATE BIDS - Holabird EMS #229

A. Alternate #1:

Add Item – PV on Entrance Canopy:

Base Bid:

Metal entrance canopy roof with translucent panels as shown on drawings;

Alternate #1A: Metal canopy roof with partial PV as shown in drawings on sheet A-8.1

Dollars and Cents ($ )

Alternate #1B:

Full PV canopy roof as shown in drawings on sheets A-8.1 and W-1.1A

Dollars and Cents ($ )

B. Alternate #2:

Add Item - Rainwater harvesting:

Base Bid:

Downspout to cast iron boot at grade as indicated on the drawings near Stair 3 2.

Alternate:

Provide rainwater harvesting cistern system for schoolyard garden watering including: rain barrel

downspout escutcheon, downspout “Y”, diverter, and filter; a Bushman USA SlimLine 130 gal. rain

barrel (color: clay) on 30” Wx5’Lx12”H concrete pad, and a Rain Harvesting’s Tank Gauge/Water

Level Indicator.;

Dollars and Cents ($ )

C. Alternate #3:

Add Item - Engraved, Etched pigmented Colored site concrete paving with patterns:

Base Bid:

Provide scored concrete paving as shown at building entrance and Outdoor

Learning Areas.

Alternate:

Provide Engraved, etched colored concrete with custom scoring pattern as shown on landscape

drawings L-4.00.

Dollars and Cents ($ )

D. Alternate #4:

Add Item - Sod:

Base Bid:

Seed as per specification section 32 92 00- 2.1

Alternate:

Provide sod as per alternate specification section 32 92 00-2.2

Dollars and Cents ($ )

Page 12: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 7

E. Alternate #5:

Add Item - Wall panels at community entrance at Vestibule V100:

Base Bid:

Painted CMU wall

Alternate:

Demountable Graphic wall panel system as shown on drawings

Dollars and Cents ($ )

F. Alternate #6:

Add Item - Air Facility Monitoring System Service agreement:

Base Bid:

3-year annual service agreement as per specification 23 52 00-2.9

Alternate:

Provide 5-year annual service agreement

Dollars and Cents ($ )

G. Alternate #7:

Add Item – Lobby Ceiling Fans:

Base Bid:

No fans

Alternate:

Provide ceiling fans with associated wiring as shown on drawings A-7.4, E-2.1 and M-1.1

Dollars and Cents ($ )

H. Alternate #8:

Add Item – Gym Ceiling Fans:

Base Bid:

No fans

Alternate:

Provide ceiling fans with associated wiring as shown on drawings A-7.4, E-2.1 and M-1.1

Dollars and Cents ($ )

I. Alternate #9:

Add Item – Concrete in lieu of asphalt sidewalks:

Base Bid:

Asphalt sidewalks as shown on landscape drawings

Alternate:

Provide concrete sidewalks in lieu of asphalt sidewalks were indicated on landscape drawings.

Dollars and Cents ($ )

J. Alternate #10:

Add Item – Additional Landscape trees:

Base Bid:

Trees as shown in landscape plans

Alternate:

Additional trees where indicated in landscape plans..

Dollars and Cents ($ )

Page 13: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 8

SCHEDULE OF UNIT PRICES- Holabird EMS #240

A. Unit Price: Removal of unsatisfactory soil and replacement with engineered fill material.

Description: Removal of unsatisfactory soil excavation and disposal off site and replacement with

engineered fill from off site, as required, according to Section 31 10 00 "Earth Moving."

Unit of Measurement: Cubic yard of soil excavated, based on survey of volume removed. Quantity

to be included in Base Bid: 200 cubic yards.

Dollars and Cents ($ )

B. Unit Price: Removal of unsatisfactory soil and replacement with satisfactory soil material.

Description: Removal of unsatisfactory soil excavation and disposal off site and replacement with

borrow/satisfactory soil from off site, as required, according to Section 31 20 00 "Earth Moving."

Unit of Measurement: Cubic yard of soil excavated, based on survey of volume removed.

Quantity to be included in Base Bid: 400 cubic yards.

Dollars and Cents ($ )

C. Unit Price: Sheeting and shoring for protection of excavation.

Description: Erection and maintenance of Sheeting and shoring as specified in Section 31 50 00;

removal at completion of use.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: None.

Dollars and Cents ($ )

D. Unit Price: 6” nominal CMU wall.

Description: Erection of interior 6” CMU walls as specified in Section 04 20 00.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

E. Unit Price: 4” nominal CMU wall.

Description: Erection of interior 4” CMU walls as specified in Section 04 20 00.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

F. Unit Price: Partition type J1 metal stud gypsum wall.

Description: Erection of interior partition type J1 walls as specified in Section 09 21 16 and 9 22 16.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

G. Unit Price: Description: Erection of interior partition type X1 walls as specified in Section 09 21 16 and 9 22 16.

Unit of Measurement: Square feet.

Quantity to be included in Base Bid: 200 square feet.

Dollars and Cents ($ )

Page 14: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 9

Total lump sum for base items only - Item #1 and Item #2:

Dollars and Cents ($ )

TERMS: NET 30

(Unless otherwise stated)

F.O.B.: DELIVERED

BASIS OF AWARD: This contract shall be awarded to the lowest, qualified, responsive

and responsible bidder based on per items or total lump sum cost

whatever is in the best interest of Baltimore City Public Schools.

Work for alternate bid items and unit bid items shall be awarded at

the sole discretion of City Schools

Page 15: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 10

SCHEDULE:

The undersigned agrees that if awarded a contract, they will work under the contract and expeditiously

conduct the Work in a manner consistent with the approved construction schedule so as to ensure completion

of the Work within the prescribed time limits.

REPRESENTATION:

In submitting this Bid, the undersigned Bidder represents that:

a. It has read and understands the Contract Documents, particularly the General Conditions, and his/her

bid is made in accordance therewith.

b. It has visited the site; familiarized itself with the local conditions under which the work is to be

performed; compared the site with the plans and specifications; satisfied themselves of the conditions of

delivery, handling and storage of materials, and all other matters which may be incidental to the work,

before submitting its bid.

c. Its bid is based upon the materials and equipment described within the Bidding Documents without

exception.

d. It has read the Contract and understands all of the terms and conditions and will execute it without

exception.

ATTACHMENTS

The following items shall be completed, attached to this BID FORM and shall be submitted to City Schools

herewith with Contractors Response Package on Bid Due Date and Time:

1) Bid Proposal Form

2) Non-Collusion Affidavit

3) Anti-Bribery Affidavit

4) Debarment Affidavit

5) Bid Bond

6) Copy of the current Baltimore City Contractor and Subcontractors Prequalification Certificates

7) Contractor Qualifications Verification Response.

8) Copy State of Maryland Contractors License

9) Copy State of Maryland Certificate of Good Standing or other filing verifying the bidder is

in Good Standing with the Department of Assessments and Taxation of Maryland.

10) Copies of your firm’s Lead-Based Paint Certification, Renovator Certification and worker

training records.

11) W-9 Form

12) Insurance Certificate

13) City’s YouthWork Program - Baltimore City

14) Minority Business Enterprise documentation as required, forms

Page 16: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 11

NON-COLLUSION AFFIDAVIT

_______________________________, being first duly sworn deposes and says that he is an officer in the

building construction organization known as______________________________

and the party making a certain proposal or bid dated ______________________, 20___, to the Board of School

Commissioners for Baltimore City Public Schools:

and that this bid is genuine and not collusive or sham; that said bidder has not colluded, conspired, connived or

agreed, directly or indirectly, with any bidder or person to put in a sham bid or to refrain from bidding, and has not

in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference, with any

person to fix the bid prices of the affidavit or any other bidder, or to fix any overhead, profit or cost element of

said bid price, or that of any bidder, or to secure any advantage against the Board of School Commissioners for

Baltimore City Public Schools or any other person interested in the proposed contract; and that all statements in

said proposal or bid are true.

Signature of:

x________________________________

Bidder, if the bidder is an individual

x________________________________

Partner, if the bidder is a partnership

x________________________________ Maryland Contractor No. _______________________

Officer, if the bidder is a corporation

Subscribed and sworn before me this ______ day of ___________________, 20___.

x________________________________ Notary Public

My commission expires: ___________________

Page 17: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 12

ANTI-BRIBERY AFFIDAVIT

, being first duly sworn deposes and says that he is an officer in the building

construction organization known as and the party making a certain

proposal or bid dated, _________________________20___, to the Board of School Commissioners for Baltimore

City Public Schools:

I further confirm that: Neither I, nor to the best of my knowledge, information, and belief, the above business (as

in defined in Section 16-101(b) of the State Finance and Procurement Article of the Annotated Code of

Maryland), or any of its officers, directors, partners, or any of its employees directly involved in obtaining or

performing contracts with public bodies (as is defined in Section 16-101(f) of the State Finance and Procurement

Article of the Annotated Code of Maryland), has been convicted of bribery, attempted bribery, or conspiracy to

bribe in violation of Maryland Law, or of the law of any other state or federal law, except as follows (indicate the

reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before

judgment with the date, court or administrative body, sentence or disposition, the name(s) of person(s) involved,

and their current positions and responsibilities with the business):

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

Signature of:

x________________________________

Bidder, if the bidder is an individual

x________________________________

Partner, if the bidder is a partnership

x________________________________ Maryland Contractor No. _______________________

Officer, if the bidder is a corporation

Subscribed and sworn before me this ______ day of ___________________, 20___.

x________________________________ Notary Public

My commission expires: ___________________

Page 18: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID FORM 13

DEBARMENT AFFIDAVIT

, being first duly sworn deposes and says that he is an officer in the building

construction organization known as and the party making a certain

proposal or bid dated, ___________________________20___, to the Board of School Commissioners for

Baltimore City Public Schools.

I further affirm that: Neither I, nor to the best of my knowledge, information, and belief, the above business, or any

of its officers, directors, partners, or any of its employees directly involved in obtaining or performing contracts

with public bodies, has ever been suspended or debarred (including being issued a limited denial of participation)

by any public entity, except as follows (list each debarment or suspension providing the dates of the suspension or

debarment, the name of the public entity and the status of the proceedings, the name(s) of the person(s) involved

and their current positions and responsibilities with the business, the grounds of the debarment or suspension, and

the details of each person's involvement in any activity that formed the grounds of the debarment or suspension):

____________________________________________________________

____________________________________________________________

I further affirm that:

(1) The business was not established and it does not operate in a manner designed to evade the application of or

defeat the purpose of debarment pursuant to Sections 16-101, et seq., of the State Finance and Procurement Article

of the Annotated Code of Maryland; and

(2) The business is not a successor, assignee, subsidiary, or affiliate of a suspended or debarred business, except as

follows (you must indicate the reasons why the affirmations cannot be given without qualification):

____________________________________________________________

____________________________________________________________

Signature of:

x________________________________

Bidder, if the bidder is an individual

x________________________________

Partner, if the bidder is a partnership

x________________________________ Maryland Contractor No. _______________________

Officer, if the bidder is a corporation

Subscribed and sworn before me this ______ day of ___________________, 20___.

x________________________________ Notary Public

My commission expires: ___________________

Page 19: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID BOND 00431 - 1

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned

as Principal, and

as Surety, are hereby held and

firmly bound unto the Baltimore City Board of School Commissioners and the Baltimore City Public

Schools, as Owner, Two Percent (2%) of the Total Bid submitted for the payment of which, well

and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors,

administrators, personal representatives, successors and assigns. Signed this day of

, 19 .

The condition of the above obligation is such that WHEREAS the Principal has submitted to the

Baltimore City Board of School Commissioners and the Baltimore City Public Schools a certain Bid,

attached hereto, and hereby made a part hereof to enter into a Contract, in writing, for the

NOW, THEREFORE,

(a) If said Bid shall be rejected or in the alternate.

(b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form

of Contract attached hereto (properly completed in accordance with said Bid), and shall furnish

a bond for his faithful performance of said Contract, and for the payment of all persons performing

labor or furnishing materials in connection therewith and shall in all other respects perform the

Agreement created by the acceptance of said Bid.

Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly

understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event,

exceed the penal amount of this obligation, as herein stated.

The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its

bond shall be in no way impaired or affected by an extension of the time within which the Owner may

accept such Bid; and said Surety does hereby waive notice of any such extension.

Page 20: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

BID BOND 00431 - 2

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their Hand and Seals, and such

of them as are Corporation have caused their Corporate Seals to be hereto affixed and these presents to

be signed by their proper Officers, the day and year first set forth above.

ATTEST: PRINCIPAL

(SEAL)

______________________________ ________________________

________________________

________________________

ATTEST: SURETY

(SEAL)

______________________________ ________________________

________________________

________________________

Page 21: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

1

CERTIFICATE OF INSURANCE COVERAGE

Contract: IFB-17073

Contract Title: Provide Construction Services for Replacement of Graceland Park/O’Donnell Heights

Elementary/Middle School No. 240 and Holabird Elementary/Middle School No. 229

NAME OF CONTRACTOR:

ADDRESS:

NAME OF SURETY: (TYPE OR PRINT)

NAME OF AGENT: (TYPE OR PRINT)

AGENT’S PHONE NO.:

The below signed hereby certifies that the following information is true and correct.

MINIMUM POLICY OR ACTUAL

TYPE OF REQUIRED BINDER LIMITS EXPIRATION

COVERAGE LIMITS NUMBER PROVIDED DATE____________

COMMERCIAL GENERAL LIABILITY

$1,000,000 OCC / $3,000,000 AGG.

BUSINESS AUTOMOBILE LIABILITY

$1,000,000 PER OCCURRENCE

___________________________________________________________________________

WORKMAN’S MARYLAND STATE MINIMUM

COMPENSATION STATUTORY___________________________________________________________

( ) LIMITS ON ABOVE POLICY WILL BE INCREASED ( ) ABOVE POLICY NOW IN EFFECT

( ) POLICY WILL BE OBTAINED/ISSUED___________________________________________________

The following additional clauses will be considered a part of the above policy(s), the same as if specifically written

therein, as pertains to the above stated contract.

1. The Baltimore City Public Schools and Board of Schools Commissioners are hereby named as Additional

Insured.

2. The policy(s) cannot be reduced or cancelled without at least forty-five (45) days prior written notice to the

Baltimore City Public Schools.

3. The insurance company is prohibited from pleading government function in the absence of any specific

written authority by the Baltimore City Public Schools.

4. The policy(s) will be automatically included and cover all phases of work, equipment, persons, et cetera

which are normally covered while performing work under the above contract, whether specifically written

therein or not.

The Baltimore City Public Schools is hereby granted authority to contact the agency directly to confirm

information or obtain copies of certificates of insurance. The Baltimore City Public Schools bears no responsibility

for premiums or other cost of insurance. If policy(s) is not currently in effect, it will be written immediately upon

notice of award, and a copy of binder or certificate will be sent directly to the Baltimore City Public Schools. A

properly executed copy of this document shall be legally binding as a Carrier Certificate of Insurance Form.

________________________________________________ _______________________________________

(AUTHORIZED AGENT’S SIGNATURE) (DATE)

INSURANCE:

Page 22: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Provide Construction Services for Replacement of

Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229

Baltimore City Public Schools (City Schools)

2

The successful bidder will be required to provide insurance coverage as shown in General Conditions of

Bid and Contract, prior to beginning any work. This insurance coverage must be maintained throughout

the life of the contract. PROOF THAT COVERAGE IS EITHER CURRENTLY IN PLACE OR WILL

BE PROVIDED MUST BE SUBMITTED WITH THE BID. This can be done by one of the two

following methods:

1. Complete form “CERTIFICATION OF INSURANCE COVERAGE” or

2. Submit a Certificate of Insurance on a form provided by your Insurance Agent. This form

must include the following clauses:

a. The Baltimore City Public Schools and Board of Schools Commissioners are hereby

named as Additional Insured.

b. The policy(s) cannot be reduced or canceled without at least forty-five (45) days’

prior written notice to the Baltimore City Public Schools.

c. The insurance company is prohibited from pleading government function in the

absence of any specified written authority from the Baltimore City Public Schools.

d. The policy(s) will automatically include and cover all phases of work, equipment,

persons, et cetera which are normally covered while performing work under the

above contract, whether specifically written therein or not.

Regardless of the method used, the form MUST be totally complete, MUST show that all Limits of

Insurance are or will be met, and MUST be signed by the Agent.

Failure to provide the required insurance coverage by either of the two (2) methods described above

when the bid is submitted, may result in rejection of your bid as being non-responsive.

Page 23: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Copy of the Current Baltimore City

Contractor and Subcontractors

Prequalification Certificates

Page 24: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Contractor Qualifications Verification Response

This Document shall be submitted as a part of the Contractor’s Response Package on the

Bid Due Date and Time

Company known as

party making a certain proposal or bid dated, 20___, to the Board of School

Commissioners for the Baltimore City Public Schools.

I further affirm that: The above business shall self-perform the majority (>51%) of the work, shown

on the contract drawings with their own forces; this percentage of the work may not be

subcontracted. If at any point during the project it is determined by City Schools that this percentage

will not be met, it is grounds for immediate contract termination.

I further affirm that: The information provided in the document below is complete and accurate to the

best of my knowledge and that this information will be used by Baltimore City Public Schools to

determine the responsiveness of the apparent low bidder. Incorrect or incomplete information will be

cause for Baltimore City Public Schools to deem the apparent low bidder as unresponsive, thereby

disqualifying the bidder.

Office Address:

Additional Location:

Signature of:

x

Bidder, if the bidder is an individual

x

Partner, if the bidder is a partnership

x

Officer, if the bidder is a corporation

Maryland Contractor No._

Subscribed and sworn before me this day of , 20

x

Notary Public

My commission expires

Page 25: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

A. How many years has your organization been in business?

B.

How many year has your organization been in business under its present business name?

PROJECT EXPERIENCE

, being first duly sworn deposes and says that he is an

officer in the building construction organization known as

and the party making a certain proposal or bid dated,

20 , to the Board of

School Commissioners for the Baltimore City Public Schools.

I further affirm that:

C. Under what other or former names has your organization operated?

_

_

_

I further affirm that: The above business has successfully completed, in the role of General

Contractor, a minimum of 3 projects of similar size, scope (+/- 20% of construction cost

compared to this project) and duration in a public school within the past five years. At least

one of those projects must have been as a public-private partnership project. Respondent

shall provide a resume indicating the above-required project experience and at least two

references pertaining to this experience.

Examples must be provided below.

1. Project Name

Project Address City State

Project Owner Contact Phone Number

Date of Project Completion

Size of Project Dollar Value

Page 26: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

2. Project Name

Project Address City State

Project Owner Contact Phone Number

Date of Project Completion

Size of Project Dollar Value

Page 27: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

3. Project Name

Project Address City State

Project Owner Contact Phone Number

Date of Project Completion

Size of Project Dollar Value

Warranty Term

Signature of: x

Bidder, if the bidder is an individual x

Partner, if the bidder is a partnership

x

Officer, is the bidder is a corporation

Maryland Contractor No._

Subscribed and sworn before me this day of , 20 .

x Notary Public

My commission expires:

Page 28: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

State of Maryland Contractors License

Page 29: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

State of Maryland Certificate of Good Standing or other filing verifying the bidder is in Good Standing with the Department of Assessments and Taxation of Maryland (Copy).

Page 30: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Copies of your firm’s Lead-Based Paint

Certification, Renovator Certification and worker

training records.

Page 31: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 32: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 33: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 34: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 35: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 36: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 37: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 38: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 39: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 40: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 41: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 42: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 43: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors
Page 44: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment A (page 1 of 2)

Provide Construction Services for Replacement of Graceland Park/O’Donnell Heights Elementary/Middle School No. 240 and

Holabird Elementary/Middle School No. 229 for Baltimore City Public Schools (City Schools)

CERTIFIED MINORITY BUSINESS ENTERPRISE

UTILIZATION AND FAIR SOLICITATION AFFIDAVIT

NOTE: You must include this document with your bid or offer. If you do not submit the form

with your bid or offer, the procurement officer shall deem your bid non-responsive or your

offer not reasonably susceptible of being selected for award. This MBE package shall be returned to City Schools in a separate sealed envelope.

For additional information and assistance please contact:

Mr. Boone, Brien C. Boone at (443) 642-4364 or [email protected]

* * * * * * * * * * * * * * * As per State of Maryland Procurement Regulations 21.11.03 all solicitations issued on or after June 9, 2014 MBE Prime

contractors can be counted up to (50%) towards the entire MBE Goal, and up to 100% towards any one of the MBE sub goals.

Part I.

I acknowledge the:

Overall certified MBE subcontract participation goal of 32%. and

The subgoals, if applicable, of:

7% for certified African American-owned businesses and

4% for certified Asian American-owned businesses.

I have made a good-faith effort to achieve this goal. If awarded the contract, I will continue to attempt to

increase MBE participation during the project. Only MBE firms certified by the Maryland Department of Transportation (MDOT) can be utilized to meet the MBE

requirements for the contract. Part II.

Check ONE Box

NOTE: FAILURE TO CHECK ONE OF BOXES 1, 2, or 3 BELOW WILL RENDER A BID

NON-RESPONSIVE OR AN OFFER NOT REASONABLY SUSCEPTIBLE OF BEING

SELECTED FOR AWARD

NOTE: INCONSISTENCY BETWEEN THE ASSERTIONS ON THIS FORM AND THE

INFORMATION PROVIDED ON THE MBE PARTICIPATION SCHEDULE

(ATTACHMENT B) MAY RENDER A BID NON-RESPONSIVE OR AN OFFER NOT

REASONABLY SUSCEPTIBLE OF BEING SELECTED FOR AWARD

1 I have met the overall MBE goal and MBE subgoals for this project. I submit with this Affidavit

MBE Participation Schedule [Attachment B], which details how I will reach that goal.

or

2 After having made a good-faith effort to achieve the overall MBE goal and MBE subgoals for this

project, I can achieve partial success only. I submit with this Affidavit MBE Participation Schedule

[Attachment B], which details the MBE participation I have achieved.

I request a partial waiver as follows:

Waiver of overall MBE subcontract participation goal: ____ %

Waiver of MBE subcontract participation subgoals, if applicable:

____ % for certified African American-owned businesses and

____ % for certified Asian American-owned businesses.

Within 10 days of being informed that I am the apparent low bidder, I will submit MBE Waiver

Documentation [Attachment F] (with supporting documentation).

Page 45: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment A (page 2 of 2) or

3 After having made a good faith effort to achieve the overall MBE goal and MBE subgoals for this

project, I am unable to achieve any portion of the goal or subgoals. I submit with this Affidavit

MBE Participation Schedule [Attachment B].

I request a full waiver.

Within 10 days of being informed that I am the apparent low bidder, I will submit MBE Waiver

Documentation [Attachment F] (with supporting documentation).

Part III.

I understand that if I am the apparent low bidder, I must submit within 10 working days after receiving

notice of the potential award.

Outreach Efforts Compliance Statement (Attachment C)

Subcontractor Project Participation Statement (Attachment D)

Minority Subcontractors Unavailability Certificate (Attachment E) (if applicable)

Any other documentation the Procurement Officer requires to ascertain my responsibility in

connection with the MBE participation goal and subgoals

I acknowledge that if I fail to timely return complete documents, the Procurement Officer may determine

that I am not responsible and therefore not eligible for contract award. If the contract has been awarded, the

award is voidable.

I acknowledge that the MBE subcontractors/suppliers listed in the MBE Participation Schedule and any

additional MBE subcontractor/suppliers identified in the Subcontractor Project Participation Statement will

be used to accomplish the percentage of MBE participation that I intend to achieve.

In the solicitation of subcontract quotations or offers, MBE subcontractors were provided the same

information and amount of time to respond as were non-MBE subcontractors.

The solicitation process was conducted in such a manner so as to not place MBE subcontractors at a

competitive disadvantage to non-MBE subcontractors.

In accordance with §14-303(b)(5) of the State Finance and Procurement Article ("SFP"), the Board of

Public Works promulgated regulations requiring all contracts with Minority Business Enterprise (MBE)

participation goals to include a liquidated damages provision (COMAR 21.11.03.10(E)). Code of Maryland

Regulations 21.01.03.02 provides that "Each regulation adopted under this title that is in effect on the date

of award of any procurement contract... is applicable to the contract." See also SFP § 11-206(a).

Therefore, the MBE liquidated damages requirement became effective for all contracts awarded on or

after May 13, 2013.

I solemnly affirm under the penalties of perjury that this Affidavit

is true to the best of my knowledge, information, and belief.

____________________________ ________________________________

Bidder/Offeror Name Affiant Signature

____________________________ ________________________________

Address Printed Name & Title

____________________________ ________________________________

Address (continued) Date

Page 46: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment B – Baltimore City Public Schools

MBE PARTICIPATION SCHEDULE This document must be included with the bid or offer. If the bidder or offeror fails to submit this form with the bid or

offer as required, the procurement officer shall deem the bid non-responsive or shall determine that the offer is not

reasonably susceptible of being selected for award.

1. Prime Contractor’s Name 2. Prime Contractor’s Address and Telephone Number

3. Project/School Name

Roofs Replacement Services at Polytechnic High School #403 and

Western High School #407 for Baltimore City Public Schools

4. Project/School Location

5. Solicitation #BCS-17064 6. Base Bid Amount $

Minority Firm Address

7a. Minority Firm Name

Minority Firm Telephone Number

Minority Firm Fax Number

MDOT Certification Number

MBE/WBE is in Good Standing with Maryland Department of Assessments and

Taxation: YES or NO

Minority Group Type

(African American )

(Asian )

(American Indian)

(Women )

(Hispanic)

(Disabled)

Work to be Performed and Subcontract Dollar Amount

7b. Minority Firm Name

Percent of Total Contract

Minority Firm Address

Minority Firm Telephone Number

Minority Firm Fax Number

MDOT Certification Number

MBE/WBE is in Good Standing with Maryland Department of Assessments and

Taxation: YES or NO

Minority Group Type

(African American )

(Asian)

(American Indian)

(Women )

(Hispanic)

(Disabled)

Work to be Performed and Subcontract Dollar Amount

Percent of Total Contract

7c. Minority Firm Name

Minority Firm Address

Minority Firm Telephone Number

Minority Firm Fax Number

MDOT Certification Number

MBE/WBE is in Good Standing with Maryland Department of Assessments and

Taxation: YES or NO

Minority Group Type

(African American )

(Asian)

(American Indian)

(Women )

(Hispanic)

(Disabled)

Work to be Performed and Subcontract Dollar Amount

Percent of Total Contract

8. MBE Total Dollar Amount

9. Total MBE Percent of Entire Contract

10. Form Prepared by :

Name

Title

Date

11. Reviewed and Accepted by City Schools MBE Liaison Officer

Name

Title

Date

Total MBE Participation: ________% $ ____________

Total African-American MBE Participation: ________% $ ____________

Total Asian MBE Participation: ________% $ ____________

Total Other Participation: ______ % $ ____________

Page 47: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment C – Baltimore City Public Schools

OUTREACH EFFORTS COMPLIANCE STATEMENT

In conjunction with the bid or offer submitted in response to Baltimore City Public Schools System for the

_________________ project, BCS # _______________, I state the following: (name)

1) Bidder/Offeror identified opportunities to subcontract in these specific work categories:

2) Attached to this form are copies of written solicitations (with bidding instructions) used to

solicit certified MBEs for these subcontract opportunities.

3) Bidder/Offeror made the following attempts to contact personally the solicited MBEs:

4) Bidder/Offeror assisted MBEs to fulfill or to seek waiver of bonding

Requirements (Described Efforts)

This project does not involve bonding requirements.

5) Bidder/Offeror did/did not attend the pre-bid conference

No pre-bid conference was held.

_________________________________ By: ________________________

Bidder/Offeror Name

_________________________________ _________________________

Address Name, Title

_________________________________ __________________________

Date

Page 48: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment D – Baltimore City Public Schools

MINORITY BUSINESS ENTERPRISES SUBCONTRACTOR PROJECT

PARTICIPATION STATEMENT PROJECT/ SCHOOL NAME:

PROJECT/ SCHOOL LOCATION:

LEA: BALTIMORE CITY PUBLIC SCHOOLS

NAME OF PRIME CONTRACTOR: ____________________________________________________

NAME OF MBE SUBCONTRACTOR:

MDOT Certification Number

1. Work/Services to be performed by MBE Subcontractor:

2. Subcontract Amount: $

3. Bonds - Amount and type required of Subcontractor if any:

4. MBE Anticipated or Actual Commencement Date: Completion Date:

5. This MBE subcontract represents the following percentage of the total contract cost:

6. This is an African American Firm: Yes No

7. This is an Asian American Firm: Yes No

8. This is a Women Owned, American Indian, Hispanic or Disabled Firm: Yes No

(Circle One)

***********************************************************************************************

The undersigned subcontractor and prime contractor will enter into a contract for the work/service indicated above upon the prime

contractor’s execution of a contract for the above referenced project with the Baltimore City Board of School Commissioners.

The undersigned subcontractor is a MDOT certified Minority Business Enterprise. The terms and conditions stated above are

consistent with our agreements.

Signature of Subcontractor:

Date: ________________________

The term and conditions stated above are consistent with our agreements.

Signature of Prime Contractor:

Date:

Page 49: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment E – Baltimore City Public Schools

MINORITY SUBCONTRACTOR UNAVAILABILITY CERTIFICATE

It is hereby certified that the firm of

(Name of Minority firm)

located at

(Number) (Street)

(City) (State) (Zip)

was offered an opportunity to bid on the school project with Baltimore City Board of School Commissioners by (Name of Prime Contractor’s Firm)

*************************************************************************************

2. The (Minority Firm), is either unavailable for the work/service

or unable to prepare a bid for this project for the following reason(s):

Signature of Minority Firm’s MBE Representative Title Date

MDOT Certification # Telephone #

3. To be completed by the prime contractor if Section 2 of this form is not completed by the minority firm.

To the best of my knowledge and belief, said Certified Minority Business Enterprise is either unavailable for the work/service for

this project, is unable to prepare a bid, or did not respond to a request for a price proposal and has not completed the above

portion of this submittal.

Signature of Prime Contractor Title Date

Page 50: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

Attachment F – Baltimore City Public Schools

MBE WAIVER DOCUMENTATION

Project Name: PSC No.

Base Contract Amount $

Plus Accepted Alternates

Equals Total Contract Amount $

I have previously requested that a waiver be granted to the overall MBE goal for this project of ____percent, with a

minimum of ____ percent from certified African American-owned businesses, a minimum of ____ percent from certified

Asian American-owned businesses, and the balance from all certified minority business enterprises, if applicable. This

would include the total dollar value of all materials, supplies, equipment, and services, including construction services

directly or indirectly, from Minority Business Enterprises (MBE) which are currently certified by the Maryland Department

of Transportation (MDOT).

I , hereby certify that my position is

(Name of Company Representative)

, and I am the duly authorized representative of

(Position Title)

(Company Name)

I further certify that I have submitted a Schedule for Participation of Certified Minority Business Enterprises

which reflects the percentage and dollar value of certified Minority Business Enterprise participation which my

company expects to achieve for this contract. Therefore, the request for the waiver is as follows:

Summary MBE Participation Schedule from Attachment B

Minority

Group

MBE GOAL Actual MBE

Dollar Participation

Request For Waiver

Percent of

Total

Contract

Dollar Value of

Total Contract*

Dollar Value Percent of

Total

Contract

Dollar Value Percent

of Total

Contract

a. Sub Goal

African American

____%

b. Sub Goal

Asian American

____%

c. Other * in Sub Goal group

a/b above

TOTALS

______%

with accepted/rejected alternates

F-1

Page 51: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

To support this request for a waiver, I include the following information as attachments which I certify to be

true to the best of my knowledge.

1. A detailed statement of the efforts made by the contractor to identify and select portions of the work

proposed to be performed by subcontractors in order to increase the likelihood of achieving the stated goal;

2. A detailed statement of the efforts made by the contractor prior to and up to 10 days before the bid opening

to solicit minority business enterprises through written notices that describe the categories of work for

which subcontracting is being solicited, the type of work to be performed, and specific instructions on how

to submit a bid;

3. A detailed statement of the contractor’s efforts to make personal contact with MBE firms identified for

Item 2. above;

4. A record of the name, address, telephone number, and dates contacted for each MBE identified under

items 2. and 3. above;

5. A description of the information provided to MBE’s regarding the plans, specifications and the anticipated

time schedule for portions of the work to be performed;

6. Information on activities to assist minority business enterprises to fulfill bonding requirements, or to obtain

a waiver of these requirements;

7. Information on activities to publicize contracting opportunities to minority business enterprises,

attendance at pre-bid meetings, or other meetings scheduled by the MBE Liaison or designated

representative;

8. As to each MBE that placed a subcontract quotation or offer which the apparent low bidder or successful

offeror considers not to be acceptable, a detailed statement of reasons for this conclusion; and

9. A list of minority subcontractors found to be unavailable. This shall be accompanied by a Minority

Subcontractor Unavailability Certificate signed by the minority business enterprise or from the apparent low

bidder or successful offeror indicating that the minority business did not provide the written certification.

Signature Date (Company Representative Name)

Sworn and subscribed before me this day of

in the year Notary Public

----------------------------------------------------------------------------------------------------------------------------------------------

Reviewed and accepted by the Baltimore City Public Schools MBE Liaison Officer.

Signature Date (City Schools Representative Name)

G-1

Page 52: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

IAC/PSCP Form 306.4 CERTIFIED MINORITY BUSINESS ENTERPRISE PARTICIPATION

STANDARD MONTHLY CONTRACTOR'S REQUISITION FOR PAYMENT

Revised March 2013

LEA: DATE:

FACILITY NAME:

SCOPE OF WORK:

PSC NO:

REQ NO:

Name of MBE

Sub-Contractor

MDOT

Certification

Number and

Classification

TOTAL MBE

Contract

Amount

Amount to be

Paid THIS

Requisition

TOTAL Paid

to Date

MBE has

Received

FINAL

Payment?

If amount paid is

LESS than TOTAL

MBE Contract Amount,

EXPLAIN VARIANCE

TOTAL:

$ -

$ -

$ -

MDOT Certification Number and Classification can be located at http://mbe.state.mdot.state.md.us/directory/

MBE Classification:

African American = AA

Hispanic American = H

Native American = N

Asian American = A

Women = W

African American/Women = AAW

Hispanic American/Women = HW

Native American/Women = NW

Asian American/Women = AW

I certify that the figures and information presented above represent accurate and true statements, that timely

payments have been and will be made to suppliers and subcontractors on this project as requisitioned payments

are received, and in accordance with our contracts.

Name of Contractor Firm Authorized Contractor Signature/Date

Contractor Federal Tax ID #

Name of LEA MBE Liaison

Contractor MBE Classification # (if applicable) Signature of LEA MBE Liaison/Date

Page 53: BALTIMORE CITY PUBLIC SCHOOLS - Baltimore, Maryland€¦ · All contractors bidding on this contract must first to be prequalified by Baltimore City Department of Public Works Contractors

IAC/PSCP Form 306.4 CERTIFIED MINORITY BUSINESS ENTERPRISE PARTICIPATION

STANDARD MONTHLY CONTRACTOR'S REQUISITION FOR PAYMENT

Revised March 2013

Instructions for Completion of IAC/PSCP Form 306.4

THIS FORM TO BE COMPLETED BY PRIME CONTRACTOR ONLY

1. LEA – Enter full name of LEA.

2. Facility Name – Enter full name of school/facility.

3. Scope of Work – Enter type of work being performed (i.e. New, Renovation, Roof, HVAC, ASP – Flooring, QZAB – Media

Center, etc.).

4. Date – Date of Requisition.

5. PSC NO – Enter full PSC Number as assigned by PSCP.

6. REQ NO – Enter the number of the corresponding Requisition for Payment.

7. Name of MBE Sub-Contractor – Enter full name of MBE Sub-Contractor.

8. MDOT Certification Number & Classification – Enter the 5 digit MDOT Certification number and corresponding MDOT

Classification for each MBE Sub-Contractor. MDOT Classifications and the MDOT website are listed at the bottom of

this form.

9. TOTAL MBE Contract Amount – Enter ORIGINAL Total MBE Contract Amount as stated on MBE Attachments B and D.

This amount should NOT be altered with change order amounts, changes to scope of work, etc. which may affect

contract amount.

10. Amount to be Paid This Requisition – Enter the amount to be paid to the MBE Sub-Contractor for work applicable to this

requisition.

11. TOTAL Paid to Date – Enter the TOTAL amount paid to date to the MBE Sub-Contractor – this amount should NOT

include the amount being paid on this requisition, only the total of prior payments.

12. MBE has Received FINAL Payment – Enter “YES” if the MBE Sub-Contractor has been paid in full. Enter “NO” if the

MBE Sub-Contractor has NOT been paid in full.

13. If amount paid is LESS than TOTAL MBE Contract Amount, EXPLAIN VARIANCE – Enter a brief reason for the MBE

Sub-Contractor NOT being paid equal to or greater than the ORIGINAL Total MBE Contract Amount as stated on this form

and MBE Attachments B & D. Additional documentation may be required to be submitted for variance explanations.

14. Name of Contractor Firm – Enter full name of Prime Contractor.

15. Authorized Contractor Signature/Date – The authorized individual employed by the Prime Contractor who filled this

form out should date and sign here.

16. Contractor Federal Tax ID # – Enter the Federal Tax ID Number of the Prime Contractor.

17. Contractor MBE Classification # - Enter the MDOT MBE Classification Number if the Prime Contractor is a MDOT

certified MBE Company.

18. Name of LEA MBE Liaison – PRINT the name of the LEA MBE Liaison (or other LEA authorized employee) responsible

for VERIFYING ALL INFORMATION filled out by the Prime Contractor on this form.

19. Signature of LEA MBE Liaison/Date – Signature of the person VERIFYING ALL INFORMATION filled out by the Prime

Contractor on this form (signature of person stated in Step #18.)