Banedanmark – optimising life cycle costs By Søren Boysen, Director of Technical Operations - Banedanmark Deloitte – Managing Megaprojects, December 2015

Upload: others

Post on 02-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

Banedanmark – optimising life cycle costs

By Søren Boysen, Director of Technical Operations - Banedanmark

Deloitte – Managing Megaprojects, December 2015

Page 2: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

2

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 3: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

3

Assets within rail infrastructure

Signalling Bridges &

Buildings

Interlocking Rail Catenary &

Power

300

radio masts

200,000

network units

7,500 km

cable systems

1,200

info monitors

2,400

bridges

2,400

buildings

540

platforms

6,800

signals

980

crossings

100,000

relays

3,200 km

rail

3.800

switches

1,500 km

overhead line

535

cooling plants

2,300

control boards

Page 4: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

4

Banedanmark fundings 2013 - 2019

Page 5: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

5

Maintenance budget

Page 6: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

6

Renewal budget

Page 7: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

7

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 8: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

8

Components – track superstructure

Rails

Sleepers

Ballast

Gravel

Subsoil

Different lifetimes on the components in track structure

Page 9: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

9

Bridge components

Different lifetimes of bridge components

Page 10: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

10

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 11: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

11

Rail infrastructure Asset Management regimesHow to secure high availability and optimal LCC

AvailabilityRisk based approach

LCC-optimal

Method Results

• Following risk of failure.

• Maintenance and large renewal

in same closure

• Work in night shifts – or short

closures.

• Full renewal of all railcomponents

• Use LCC-model to predict and

plan renewal 4 years ahead.

• Ten year renewal pause

• Bundle renewal activities across

assets

• Minor disturbance of traffic.

• Less volume in projects

• High unit costs

• Full line closure.

• Life prolonging activities.

• Maintenance on end-of-life lines.

• Renewal of individual railcomponents

– sleeper, rail or ballast. Or in

combination.

Strategies

Page 12: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

12

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 13: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

13

The development of LCC-models

TAM 1.0

TAM 1.1

TAM 2

BAM 1

CAM 0.1

2014

2012

2011

2005-2006

2002-2003

Ongoing development and updating of Asset Management System

TAM: Track Analysis ModelBAM: Bridge Analysis ModelCAM: Catenary Analysis Model

2015:TAM 2BAM 1

CAM 0.1

Page 14: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

14

Model structure

• Asset data• Unit cost• Traffic hinderance cost• Model parameters

Technical engineering relationships:

• Deterioration of the assets described by Service Life relationship.• Maintenance activities described according to European models for tracks.

Financial optimization for each line section without constraints (only a 10 year renewal pause)

Financial optimization for each line section with constraints, e.g.:• Total renewal budget• Total activity budget

Unconstrained LCC-optimality

Technical optimality

Constrained LCC-optimality

Inputdata

Sub models

Page 15: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

15

The methodology

In case of postponed renewal:• Increased maintenance costs• Increased renewal costs• Risk of speed reductions (traffic hindrance costs)

In case of early renewal:• Penalty

Costs

Optimal time of

renewal

Costs

Lifetime

Optimal time of

renewal

Renewal costs

Maintenance

costs

Postponed time

of renewal

Postponed renewal

Costs

Lifetime

Time of

investment/reinvestment

Optimal time of

investment/reinvestment

The Bath Tub modelSpeed reduction

Page 16: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

16

Example - track

Consequence: Renewal each year

KM 0 1 2 3 4 5 KM 0 1 2 3 4 5

Rail 1966 1968 1966 1964 Rail 2026 2028 2026 2024

Sleeper 1987 1987 1987 Sleeper 2027 2027 2027

Ballast 1998 Ballast 2028

Installation date (inputdata) Technical optimal time to renew

Consequence: Activities are bundledNo traffic disturbance between renewal pauses

KM 0 1 2 3 4 5 KM 0 1 2 3 4 5

Rail 2026 2028 2026 2024 Rail 2027 2027 2027 2027

Sleeper 2027 2027 2027 Sleeper 2027 2027 2027

Ballast 2028 Ballast 2027

Technical optimal to renew LCC- optimality -Full renewal 2027

Rails

Sleepers

Ballast

Gravel

Subsoil

Page 17: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

17

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 18: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

18

Major track possessions2015-2018

Renewal plan

Page 19: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

19

Renewal of rail infrastructure on West Funen

West Funen

Daily train operation:

• 114 passenger trains

• 10 freight trains

Page 20: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

20

West Funen Track and ground works

Replacement of 30 switches

Establishing 2 new switches, Middelfart

Elimination of 13 switches

Track renewal of 2.4 km track including new ballast bed

Upgrading of 4 buffer stops

Establishing one crossing on Odense Station

Establishing a dirt road on Odense Station

Establishing 17.3 km new ballast bed

Establishing new ballast bed under all replaced switches

Ballast sanitation of 53.4 km track

Drainage tasks

10.5 km drainage

5.3 km ditch

Catenary works

Establishing “protective earthing areas” on 17

bridges

Adjustment of power line on 75.5 km track

and 30 switches

Reconstruction related to the elimination of 13

switches

Replacement of “protective earthing” related

to track works

Replacement of protective covers related to

track works

Neighbouring projects

New walking tunnel in Middelfart

New insulation of two bridges

Platform works on Ejby, Tommerup, Gelsted

Signalling Programme (new cables)

Tasks related to interlocking systems and switch heaters

New platform, Langeskov Station

Page 21: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

21

Billede indsættes.

Page 22: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

22

Billede indsættes.

Page 23: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

23

Billede indsættes.

Page 24: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

24

Agenda

• Introduction to rail assets and Banedanmark investment profile

• The anatomy of rail superstructure and bridges

• Asset Management regimes

• The LCC-approach

• Renewal plan + case West Funen

• Benefits and challenges

Page 25: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

25

Benefits

Benefits and challenges

Challenges

• Cost savings

• Potential for bundling of projects

• Fewer passenger disturbances/fewer

announcements

• Operator: Possibility for major rolling stock

repair during the possession

• Entrepreneur: Effective use of resources

(men/machinery)

• Entrepreneur: Flexibility within work site area

• Neighbours: Only one long disturbance rather

than many nights/weekends

• Constraints on passenger and freight traffic

• High demand for coordination between asset

groups

• Operator: Some passengers are lost to the

alternative transportation form (car)

• Entrepreneur: Risk of resource

overload/capacity constraints

Page 26: Banedanmark optimising life cycle costs - Deloitte · • The anatomy of rail superstructure and bridges ... • 10 freight trains . 20 West Funen Track and ground works Replacement

26

Langeskov Station

Questions?