An Introduction to the Gas Sector & Production Sharing Contract Bangladesh Oil, Gas & Mineral Corporation (Petrobangla) April 30,2008

Upload: doanxuyen

Post on 28-Jan-2017

368 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

1

An Introduction to the Gas Sector &

Production Sharing Contract

Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

April 30,2008

Page 2: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

2

Emergence of Petrobangla

Bangladesh Mineral Oil & Gas Corporation (BMOGC) was created through PO #27 on March 26, 1972.

Minerals operation segregated & vested to BMEDC, through PO #120 on Sept. 27, 1972.

Reconstituted Bangladesh Oil & Gas Corporation (BOGC) was short named Petrobangla through the Ordinance #15, on August 22, 1974.

Importation, Refining & Marketing of crude & petroleum products vested with BPC through Ordinance #88, on November 13, 1976.

BOGC & BMEDC merged to form Bangladesh Oil, Gas & Mineral Corporation (BOGMC), by the Ordinance #21 of April 11, 1985.

Partial modification of the Ordinance by the Law 11 of February 1989, the corp. was short named Petrobangla & given the authority to hold the shares of the companies dealing in oil, gas & minerals exploration and development.

Page 3: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

3

Petrobangla’s Vision

To Provide Energy for the Sustainable Economic Growth and Maintain Energy Security of the Country. To Provide Energy to All Socio - Economic Groups in All the Areas of the Country.To Diversify Usage of Indigenous Energy.To Contribute Towards Protection of Environment of the Country

Page 4: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

4

Petrobangla’s MissionTo Expedite Exploration and Exploitation of Oil, Gas, Coal, and Mineral Resources

To ensure conservation of energy through judicious use

To Carry Research and Development in the Field of Exploration and Exploitation of Energy and Mineral Resources

To Promote CNG and LPG for Protection of Environment

To Encourage Foreign and Private Investment in Oil, Gas and Mineral Sector

Institutional Capacity Building for Achieving the Goals and Objectives

Page 5: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

5

Sylhet Gas Fields Ltd.

Bangladesh Petroleum Expl. &

Prod. Co. Ltd.

Bangladesh Gas Fields Co. Ltd.

Barapukuria Coal Mining Co.

Ltd.

Rupantarita Prakritic Gas

Co. Ltd.

Titas Gas T & D Co. Ltd.

Gas Trans. Co. Ltd.

Pashchimanchal Gas Co. Ltd.

Jalalabad Gas T & D System Ltd.

Bakhrabad Gas Sys. Ltd.

MaddhyaparaGranite Mining

Co. Ltd

Energy & Mineral Resources Division

PETROBANGLA

Production MiningCNG & LPGDistributionExploration &

Production Transmission

Page 6: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

6

GAS MANAGEMENTGAS MANAGEMENT

PGCL

CONSUMER

JGTDSL TGTDCL BGSL

CONSUMER CONSUMER CONSUMER

SGFL BAPEX TULLOW CAIRNCHEVRONNIKOBGFCL

GTCL

Page 7: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

7

P GCL3 %

J GTDS L4 %

BGS L18 %

TGTDCL7 5 %

Distrib

ution

Tea CNG Domestic Total1.531 35.846 154.313 1401.9

0% 3% 11% 100%

Power43%

Fertiliser16%

Captive12%

Industry14%

Domestic11%Comm

1%

TeaN egl

CNG3%

Avg. Consumption

Tullow4%

Niko0%

Cairn5%

SGFL11%

BAPEX3%

Chevron35%

BGFCL42%

Pro

du

ctio

nTGTDCL

22%

JGTDSL3%

BGSL5%

GTCL70%

Tran

smission

GasSupply Chain

Page 8: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

8

Fieldwise Production Capacity

45012Bibiyana

1838

70

5

100

230

70

17

11

18

53

97

7

0

35

246

34

405

Capacity (MMSCFD)

IOCs915 MMSCFD

Petrobangla Companies923 MMSCFD

Total

79Total:

2Bangura

3Feni

4Moulavibazar

4Jalalabad

6Sangu

1Fenchuganj

2Saldanadi

2Beanibazar

5Rashidpur

6Kailastila

2Sylhet

1Meghna

2Narsingdi

9Habiganj

4Bakhrabad

14Titas

Producing WellsGas Fields

Page 9: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

9

Gas Production and Consumption Data – April 23, 2008

1368Comp-total

TGTDCL

3535Narsingdi

69Power147230Jallabad

AmountSectorGas Mkt. Company

Available Production

Production CapacityFields

1812Total17921838Total

860Non-bulk

186Fertilizer886915S-Total (IOCs)

766Power

Overall

6970Bangura

79Comp-total55Feni

10Non-bulk528450Bibiyana

0Fertilizer76100MoulavibazarPGCL

89Comp-total6160Sangu

35Non-bulk906923S-Total (PB)

10Fertilizer1917Fenchuganj

44Power

JGTDSL

1211Salda

276Comp-total5353Rashidpur

135Non-bulk9697Kailashtilla

65FertilizerBGSL67Sylhet

77Power00Meghna

681Non-bulk245246Habiganj

111Fertilizer3334Bakhrabad

576Power397405Titas

Unit: mmscfd

Page 10: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

10

Gas Reserve Vs Production (As of December 2007)

21.265

7.6918

5.4711

7.98

7.42

15.4035

0 5 10 15 20 25

PossibleRecoverable

ProbableRecoverable

Proven Remaining

Production

Proven Recoverable

Proven

Gas in TCF

(GIIP)

Page 11: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

11

Sector wise Daily Demand Forecast(GSMP-2006 : Base case)

3818161827819212019-203509152727817042018-193240144227815192017-183030136427813882016-172853128727812882015-16 2669121527811772014-152518114427810972013-14234010762789862012-13215810082788722011-1220229322788122010-1118968442787742009-1017257642726882008-0916196892726582007-08TotalNon-BulkFertilizerPowerFY

(MMSCF)

Page 12: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

12

Company wise Daily Demand Forecast(GSMP-2006 : Base case)

303017410414962419792016-17

381825418516880224092019-20350924311015577222292018-19324017810715169821062017-18

285312911615256018952015-16 266911510818054417232014-15251813011611753816172013-14234013211511646415132012-13215812010911545113652011-1220221289710641612742010-11189680849734612892009-10172574838831211682008-0916191848829411522007-08TotalS&SWPGCLJGTDSLBGSLTGTDCLFY

(MMSCF)

Page 13: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

13

3823148837519602016-17

4567177537524172019-204303167337522552018-194045157737520932017-18

3600140337518222015-16 3435136037517002014-153224126137515882013-143021117137514752012-132847108832514342011-122620101132512842010-11237089028911912009-1020188432898862008-0919008012898102007-08

Total OthersFertilizerPower FY

(MMSCF)

Sector wise Daily Demand Forecast(By Petrobangla-2007)

Page 14: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

14

Company wise Daily Demand Forecast(By Petrobangla-2007)

456755542680827782019-20430355034478826212018-19404554531674424402017-18382354129070222902016-17360053826366021392015-16 343548023765620622014-15322442123563619322013-14302141623456318082012-13284736323349117602011-12262024923247516642010-11237021013746315602009-1020189412741313842008-0919007612236213402007-08Total PGCL+ S&SWJGTDSLBGSLTGTDCLFY

(MMSCF)

Page 15: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

15

Projected Daily Gas Production by Petrobangla(MMSCF)

179818752014198519651943188817251595142712401042991Total

1331381842052402382582702401961416249BAPEX

660660660610550530475370300300223199202SGFL

100510771170117011751175115510851055931876781740BGFCL

2019-20

2018-19

2017-18

2016-17

2015-16

2014-15

2013-14

2012-13

2011-12

2010-11

2009-10

2008-09

2007-08

COMPANY

Page 16: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

16

Projected Daily Gas Production—IOCs(MMSCF)

2019-20

2018-19

2017-18

2016-17

2015-16

2014-15

2013-14

2012-13

2011-12

2010-11

2009-10

2008-09

2007-08Company

IOC-1 (Existing Fields)

10012012012513013514014515055606570Cairn

00001515202530304566Niko

1070109011101155119512401270132013601310128010761061Sub-Total

10010010010010010010010010010010010080Tullow

IOC-2 (Expected from Contracted Blocks)

87087089093095099010101050108011251075905905Chevron

500500500500300000000Sub-Total

1970199020102055189516401670167014601310128010761061Gr. Total

IOC-3 (Expected from 3rd Round Bidding)4004004004004004004003501000000Sub-Total

IOC -1 + IOC – 2 + IOC - 3

Total EP

Cairn

Chevron

1001001001001001001005000000

10010010010010010010010000000

2002002002002002002002001000000

Page 17: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

17

Projected Demand - Supply Balance(MMSCFD)

2868296531243140316031833158304529552737252021182052Production (PB + IOC-1)

4502433042504126401837963587345831422749238322612006Demand

2019-20

2018-19

2017-18

2016-17

2015-16

2014-15

2013-14

2012-13

2011-12

2010-11

2009-10

2008-09

2007-08Events

Balance -1634-1365-1126-986-858-613-429-413-187-12137-14346

Reserve basis: P1 + P2 of Existing fields + Sundalpur + Bibiyana Expansion + Magnama.

Page 18: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

18

Current Reserve Categories –Supply Demand Balance

0

1000

2000

3000

4000

5000

6000

2005

2007

2009

2011

2013

2015

2017

2019

2021

2023

2025

Gas

mm

cfd

Proved Probable Possible Case B Demand

Shortfall would commence in 2011 against Proved ReservesShortfall would commence in 2011 against Proved Reserves

Ref: GSMP 2006

Page 19: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

19

Gas Infrastructure

Nalka

Khulna

Rajshahi

West Zone Proposed Gas

Pipeline540km

Compressor Stations

Muchai

Ashuganj(West)

Ashuganj(South)

Elenga

Existing

Total Capacity : 2,000 MMCFD

Total Length : 1,900 Kilometer

Future Expansion:

Capacity : 1,000 MMCFD

Length : 850 Kilometer

Size: 12 inch to 30 inch pipeline is planned to construct by 2011 to cover Rajshahi and Khulna regions.

In addition 4 compressor stations will be installed at Muchai, Ashuganj (south), Ashuganj (west) and Elenga by 2011 to boost up pipeline pressure.

Gas Pipeline Network

Page 20: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

20

Major Transmission Pipelines

425

200

350

250

200

270

200

500

500

350

Capacity(mmcf)

2006/200710002060Dhanua-Aminbazar

200610003037Ashuganj-Monohordi

2005

1982

1985

1999

1992

2001

2002/2004

1998

1993

CommissionedIn the year

96024175Bakhrabad-Chittagong

1000[30,20][6+54]=60

Nalka-Bogra

10002068Bakhrabad-Demra

1000[24,30,24,20][14+9+16+35]=

74Elenga-Baghabari

100024124Ashuganj-Elenga

11352018Beanibazar-Kailashtila

113530,14[75+82]=157Rashidpur-Ashuganj

10003058Ashuganj-Bakhrabad

113524175North-South

Maximum Allowable Operating Pressure

NominalDiameter(Inches)

Length(Km)Pipelines

Page 21: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

21

Transmission Projects under Implementation

30”x235kmADBDec 2011Ashuganj-BKB-CTG Trans. Pipeline(under active consideration of ADB)

30”x60kmWBJune 2010Bakhrabad – Siddirganj 24”x14kmADB/GOBJune 2010Pipeline from Titas field to A-B pipeline20”x165kmADBJune 2011Bheramara-Khulna Pipeline

SizeFunded ByCompletion TimeProjects

12”x51kmADBJune 2009Bonpara-Rajshahi Pipeline

30”x87kmADBJune 2010Hatikamrul-Ishwardi-Bheramara Pipeline10000 hpADBJune 2011Elenga Compressor

Expansion to West Zone

BB Corridor Expansion30”x51kmADBJune 2009Monohordi-JMB East Loopline

18000 hpADBDec 2011• Ashuganj Compressor Station12000 hpADBDec 2011• Muchai Compressor Station

North-South System Expansion

Page 22: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

22

130June-Dec. ‘08

BanguraTullow

115May-June ‘08

Fenchuganj #2

BAPEX

1

Dev. Well

3

2

Workover

65Total

20Oct.-Dec. ’08BKB # 2, 5BGFCL

Production (MMSCFD)

PeriodWellCompany

Production Augmentation ActivitiesProduction Augmentation Activities(2007(2007--08 to 200808 to 2008--09)09)

Page 23: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

23

110July-Sept. ‘09BKB#9BGFCL120May-Aug ‘09Shahbajpur BAPEX

130Feb.-Jun ‘11SrikailBAPEX

115Aug-Nov ‘09Meghna#1BGFCL

130Jan-June ‘10SundalpurBAPEX

120Feb.-July ‘10SemutungBAPEX130Sept.-Oct. ‘10BegumganjBAPEX

125May-Aug ‘10Titas # 18BGFCL125Jun-Oct ‘10Kaillastila # 7SGFL125Sep-Dec ‘10Habiganj # 12BGFCL

5

Dev. Well

6255Total

125Jan-Mar ‘10Titas # 17BGFCL

Production MMSCFD

Appraisal Well/Workover

PeriodWellCompany

Production Augmentation ActivitiesProduction Augmentation Activities(2009(2009--10 to 201010 to 2010--11)11)

Page 24: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

24

Cairn

Total EP & JV

Cairn-Chevron

Company

200Nov ’08 –June ‘12

Exploration in Block # 5,7,10

100Nov ’08 –June ‘12

Exploration Drilling of Magnama & Hatiya Structure

300 - 5002009-2016Bangladesh Offshore Bidding Round 2008

50 - 100Nov ’08 –June ‘12

Exploration in Block # 17 & 18 (3-D Seismic followed by exploration drilling)

Production MMSCFDPeriodPrograms

Production Augmentation Activities Production Augmentation Activities (Long term) (Long term)

Page 25: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

25

PSC ACTIVITIES-SOME DEFINITIONS

ConcessionA license, lease, or other permit for exploration and/or production in an area or block. It usually denotes a government lease.

Page 26: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

26

PSC ACTIVITIES-SOME DEFINITIONSJoint Operating Agreement(JOA)

The document governing operations in a Joint Venture of prime importance to all participants as under it they secure or may lose, rights to production etc.A typical Joint Operating Agreement will include sections to cover most or all of the following topics:

-Scope, Duration, Legal Status -Interest rights and duties of the Operator and other participants-Management Structure and voting procedure-Approval of Operating Programmes and Budgets-Cash contributions, costs and accounting-Control and custody of joint properties and equipment-Sole Risk,Default,Withdrawal,Assignment etc-Disposal of Petroleum-Confidentiality,-Force Majeure,Litigation etc.

Page 27: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

27

PSC ACTIVITIES-SOME DEFINITIONS

Joint Venture: A common form of risk-sharing in Oil and Gas operations, especially exploration and production. Although they may have many of the characteristics of partnerships and are often referred to as such, they are usually legally constituted specifically to avoid partnership implications.

Page 28: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

28

PSC ACTIVITIES-SOME DEFINITIONS

Production Sharing Contract:A contract between a host government and petroleum company for the exploration and production of petroleum resources where the company's costs are recovered from a percentage share of production and the balance is shared between the government and the company.

Page 29: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

29

On Contracts

• These slides are taken from the Training materials of IHRDC,Boston,MA,USA

Page 30: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

30

Page 31: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

31

Page 32: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

32

Page 33: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

33

Page 34: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

34

Page 35: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

35

Page 36: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

36

Page 37: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

37

Page 38: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

38

Page 39: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

39

Page 40: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

40

Page 41: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

41

Page 42: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

42

Page 43: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

43

Page 44: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

44

Page 45: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

45

Page 46: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

46

Page 47: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

47

Exploration of Hydrocarbon in Bangladesh

Bangladesh is one of the Largest Deltas.Surface Area is Mostly Covered by Alluvial and Delta Plains, but has some Hill Areas in the Northeast and Southeastern Part.Hydrocarbon Exploration Activities Started in Bangladesh Territory Since 1908.�First Discovery of Gas in Sylhet in 1955 �Enactment of Bangladesh Petroleum Act 1974 Promoted New Investment Under Production Sharing Contract�First Oil Discovery in 1986 at Sylhet-7 Well

Page 48: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

48

Exploration of Hydrocarbon in Bangladesh

• Phase-I (1910- 1933)• In the early days of exploration, drilling was

targeted near oil/gas seeps in the fold belt. In this phase six exploration wells were drilled by Exploration and Production companies without any discovery. Individual well depth varied from 763 meters to 1,047 meters. The Second World War disrupted the exploration activities until the middle of the last century.

Page 49: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

49

Exploration of Hydrocarbon in Bangladesh

• Phase-II (1951- 1971)• During the second phase, early forms of modern geophysical

methods were used in exploration. During the 50’s and 60’s the onshore area was explored by major International Oil Companies, e.g. Shell, Stanvac, Pakistan Petroleum Limited (PPL, a subsidiary of Burma Oil Company) and the national Oil & Gas Development Corporation (OGDC). Gravity and Surface Magnetic reconnaissance surveys were conducted followed by single fold seismic studies supplemented by geological information from wells and outcrops in the surrounding areas. The operators of the second phase drilled 22 exploratory wells, thereof one offshore, and discovered eight gas fields, all in onshore area

Page 50: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

50

Exploration of Hydrocarbon in Bangladesh• Phase-III (1972- 2007)• After the emergence of Bangladesh, the Bangladesh Petroleum Act. 1974

was promulgated following which Petrobangla was formed in 1974 to promote and regulate exploration, production and distribution ofpetroleum. The years 1974-78 were focused on offshore drilling by six International Oil Companies under Production Sharing Contracts (PSC).

• The 80,s exploration was targeted on liquid hydrocarbon; Bangladesh entered into the oil-era in December 1986, when oil was discovered in Sylhet -7 well. Oil was also tested at Fenchuganj-2 and Kailashtila-2. Model PSCs of 70's and 80's were based only on oil prospects.

• During the period 1972-2008, 173 wells including 26 offshore wells were drilled by the national organization Petrobangla and foreign oil companies. Petrobangla discovered 10 gas fields including oil discovery in two gas fields below the producing gas sands and the foreign companies discovered five gas fields of which two are in the offshore area.

Page 51: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

51

Production Sharing Contract Activities• During 1989 Bangladesh was

divided into 23 acreage Blocks (6 offshore + 17 onshore blocks)

• 8 PSCs active in 10 BlocksIOC Block (s) NosCairn, UK 16, 5 & 10 3Chevron, USA 12,13 & 14, 7 3Tullow, Ireland 9 1Tullow, Ireland 17 & 18 1

• BAPEX working in 2 Blocks (Blocks 8 and 11)

• 11 Blocks are open

Page 52: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

52

PSC Activities: Cairn Energy• Operation: In Block# 16, 10 & 5• Discovery: Offshore Sangu gas field • Production: 70 MMCFD from Sangu gas

field• Present partnership of Sangu Gas Field:

Santos-37.5%,Cairn-37.5%, Halliburton & Roots-25%.

• Submitted appraisal program for further activities like 3D Seismic & drilling wells at Maghnama and Hatia structures

• Development partner: Bapex (10% carried) in Block#10 & 5

• Conducted seismic surveys in Block#10 and Block#5

Page 53: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

53

PSC Activities: Chevron• Operation: In Block#12, 13, 14 and 7• Discovery: Maulavibazar gas field in Block#14 and

Bibiyana gas field in Block#12• Production: 230 MMCFD from Jalalabad gas field and

112 MMCFD from Maulavibazar gas field• Bibiyana gas field started production from March 2007 &

presently producing 450 MMCFD ,500 MMCFD by Dec 2008 .

• Block#7: Offered under 2nd Round of Bidding, partner BAPEX (10% carried), conducted seismic survey, identified leads & planning to conduct more survey to confirm the leads.

Page 54: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

54

PSC Activities: Tullow-Niko-Bapex• Contract signed : April 11, 2001 under 2nd Bidding

Round in Block# 9• Partnership : Tullow - 30%, Niko - 60%, & Bapex - 10%

(Carried)• Activity: Conducted 2D & 3D seismic surveys and

drilled 3 exploration wells• Discovery: Bangura and Lalmai gas fields• Producing 70 MMCFD from 3 wells under Long-term

Testing.• Expected to increase production upto 100MMCFD by

July 2008.

Page 55: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

55

PSC ACTIVITIES: TOTAL E & P►Operation : In Block # 17 & 18

►Discovery: Nil

►Offered under 1st Round of Bidding

►Conducted seismic survey during Initial Exploration Period and drilled 1 well (Reju # 1) during 1st extension of the InitialExploration Period

►An Amendment Agreement has been signed on March, 2007 to extend the Exploration Period upto March 2010.The exploitation program includes:1000 sq. km 3D seismic and drilling of one well.

Page 56: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

56

No. of blocks : 23

No. of onshore blocks: 17

No. of offshore blocks : 6

Average size: 11,000 sq. km

Southern boundary of blocks were upto 20 degree North Latitude

During 1st and 2nd bidding rounds total 10 PSCs were signed for 12 blocks

Currently 8 PSCs are active in 10 blocks

Due to large size of the blocks, none of these blocks were fully explored

Review of the acreage block map - 1989

Page 57: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

57

Page 58: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

58

The Acreage Block Map - 2008

Number of blocks on offer - 28 offshore blocks

The shallow water blocks situated north of 20º N latitude are categorized as Type-A

The deep water blocks situated south of 20ºN latitude are categorized as Type-B.

Type A: Average size 6,000 sq. kmNo. of blocks - 8Max. Water Depth – about 200 m

Type B : Average size 3,300 sq. kmNo. of blocks - 20Max. Water Depth – about 2000m

Page 59: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

59

Parties

The Government of the People's Republic of Bangladesh and Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

Contractor(s)

Contract Period

Exploration: 8 (4+2+2) years for Type - A Blocks

9 (5+2+2) years for Type - B Blocks

Appraisal: : Up to a maximum of three years if needed

Production: For each production area 20 years from the approval date of Development Plan for an Oil Field and 25years for a Gas Field. Provision for five years extension subject to Petrobangla’s approval.

SALIENT FEATURES OF THE MODEL PSC 2008

Page 60: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

60

25% of the contract area at the end of 4th/5th contract year; however in case of seismic only option at the end of 3rd contract year.

Additional 25% at the end of the 6th/7th contract year

All areas not declared as production areas at the end of the 8th/9th contract year

MINIMUM WORK OBLIGATION

Mandatory Work Program: During Initial Exploration Period, the Contractor shall conduct:

2D seismic survey in a given grid covering the entire Contract Area for both Type-A and Type-B blocks .

Drilling of 1 exploration well only for Type – A blocks.

RELINQUISHMENT

Page 61: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

61

Initial Exploration Period :

Geological Survey, Geophysical Survey, Other Surveys and Drilling of Exploration Wells

1st Extension to Initial Exploration Period:

Geological Survey, Geophysical Survey and Drilling of Exploration Wells.

2nd Extension to Initial Exploration Period:

Geological Survey, Geophysical Survey and Drilling of Exploration Wells.

BIDDABLE MINIMUM WORK PROGRAM

Page 62: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

62

A Joint Review Committee (JRC) shall be established by Government/Petrobangla and Contractor promptly after the Effective Date.

JRC shall consist of eight (8) members, three (3) of whom shall be designated by Petrobangla, one (1) by Government and four (4) by Contractor.

The Chairman of the JRC shall be designated by Petrobangla from among the members appointed by it.

The JRC shall review and make recommendations,opinion or decision on the proposed Work Program and Budget submitted by Contractor for each Contract Year during Exploration Period.

JOINT REVIEW COMMITTEE

Page 63: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

63

Bank guarantee against minimum biddable work program must reflect market cost.

Within thirty (30) days of the signature of the Contract, and upon each request for extension of the Exploration Period, Contractorshall provide Petrobangla an irrevocable and unconditional bank guarantee in form and substance.

If the Contractor fails to perform any of its accrued Minimum Exploration Program, then the Contractor or its guarantor shall pay Petrobangla the entire amount of such outstanding guarantee or guarantees for the work.

The companies constituting the Contractor shall procure and deliver to Petrobangla within thirty (30) days from the Effective Date of the Contract financial and performance grantee in favor of Petrobangla from a parent company acceptable to Petrobangla.

BANK GUARANTEE

Page 64: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

64

Register within one hundred and eighty (180) days of the Effective Date a subsidiary or branch or representative office in accordance with the relevant provisions of Applicable Law

Conduct all Petroleum Operations in a diligent, conscientious and workmanlike manner

Contractor shall maximize the employment of Bangladeshi nationals possessing the requisite qualifications and experience in Petroleum Operations. Contractor shall ensure that the employment of the Bangladeshi nationals be maintained in the following proportion:

Exploration Period: Initial Exploration Period not below 20%.Extended Exploration Period not below 50%

Production Period: 1st five years - not below 60%Next five years - not below 75%Period after ten years - not below 90%

CONTRACTOR'S OBLIGATIONS

Page 65: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

65

The Contractor shall obtain the following insurance coverage for Petroleum Operations :

Loss or damage to all installations, equipment and other assets

Loss of property or damage or bodily injury suffered by any third party

The cost of cleaning up pollution following an accident

The Contractor’s liability to its employees

Cost of well control and re-drilling expenses

Third party liabilities

Contractor shall furnish to Petrobangla policies / certificates evidencing that such coverage is in effect.

Such insurance policies shall include Petrobangla as additional name insured and shall waive subrogation rights against Government and Petrobangla.

Page 66: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

66

Contractor shall conduct the following environmental examinations:

Initial Environmental Examination (IEE)

Environmental Impact Assessment (EIA)

Environmental Management Plan (EMP) as per prevailing Environment Conservation Act, 1995 and Environmental Conservation Rules 1997

In case of any damage or expense caused by inefficient, careless or negligent activities of the Contractor:

Contractor will not be allowed to recover the cost for such damage under Cost Recovery

Contractor shall pay due compensation for such damage.

Page 67: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

67

Within thirty (30) days after the Date of Declaration of the first Commercial Discovery, a Joint Management Committee (JMC) shall be established by Government/Petrobangla and Contractor .

JMC shall consist of eight (8) members, three (3) of whom shall bedesignated by Petrobangla, one (1) by Government and four (4) by Contractor.

The Chairman of the JMC shall be designated by Petrobangla from among the members appointed by it.

JOINT MANAGEMENT COMMITTEE

Page 68: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

68

The JMC shall amongst other things deal with the following matters :

All Work Programs, Budgets and other reports and proposals submitted by Contractor to Petrobangla

Progress of Contractor's work

Any problem arising in Petroleum Operations

Appointment of auditors

Loan agreements for Development Plan

Annual personnel plan of the Operator

Page 69: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

69

Within sixty (60) days after Petrobangla's approval of a Development Plan, Contractor shall propose a detailed Work Program and Budget for that Production Area for the ensuing Calendar Year. The Joint Management Committee shall act on such proposals.

No Petroleum Operations shall be carried out unless and until the relevant Work Program and Budget has been approved in writing by Petrobangla.

If there is difference in opinion regarding a Budget proposed byContractor and the Parties fail to resolve it, then, notwithstanding the foregoing, the matter shall be referred to the Secretary of the Energy and Mineral Resources Division

WORK PROGRAM AND BUDGET FOR DEVELOPMENT PLAN

Page 70: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

70

COST RECOVERY

Contractor shall recover all costs and expenses in respect of Exploration, Appraisal and Development related operations

The Cost Recovery limit shall be maximum of fifty-five percent (55%) per Calendar Year of all Available Oil / Natural Gas/ Condensate/ NGL from the Contract Area.

COST RECOVERY AND PROFIT ALLOCATION

Page 71: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

71

The Profit Petroleum shall be allocated between Petrobangla and Contractor in the following proportions:

Type – A Block

Oil/Condensate/NGL: Biddable from 55% to 80% on tranches from 12,500 to 100,000 bbl/day or above

Gas: Biddable from 55% to 80% on tranches from 75 to 600 mmscf/day or above

Type – B Block

Oil/Condensate/NGL: Biddable from 50% to 75% on tranches from 12,500 to 100,000 bbl/day or above

Gas: Biddable from 50% to 75% on tranches from 75 to 600 mmscf/day or above

PROFIT SHARING

Page 72: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

72

Contractor shall have the right to produce annually a total volume of Gas up to 7.5% of the Proven Recoverable Gas reserves from onshore blocks

In case of offshore blocks a greater percentage may be agreed by Petrobangla and the Contractor

Natural Gas for Export

Contractor shall have the right to export any Marketable Natural Gas produced from the Contract Area in the form of Liquefied Natural Gas ("LNG"), subject to first right of refusal of Petrobangla

Gas Price

Onshore gas: 75% of HSFO with biddable discounts. The price will have a floor of US$70/metric ton and a ceiling of US$180/metric ton of HSFO

Offshore gas (Type – A blocks): 25% higher than the onshore gas price

Offshore gas (Type – B blocks): 100% of the HSFO

Western zone (Onshore): 25% higher than for the other onshore gas price

NATURAL GAS

Page 73: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

73

Contractor shall have the right to operate the Pipeline until cost recovery is completed. If Petrobangla so desires the Contractor shall continue to operate the Pipeline after the Cost Recovery .

Except Petrobangla, all parties who use the Pipeline downstream of Measurement Point shall pay 1% tariff against their share of Petroleum transmitted through the pipeline for transmission service. Any tariff received will be paid to the account of Petrobangla

However, the Contractor will be exempted from paying tariff during cost recovery of the said pipeline

Title to the Pipeline(s) shall be with Petrobangla

PIPELINES

Page 74: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

74

For third party sales, the value of petroleum will be realized at arms length

If there have been no sales of Crude Oil to third parties at arm's length, the Value of Oil shall be determined as follows:

on the basis of the FOB selling price per Barrel of a basket of three Crude Oils

On the basis of the spot market for the same Crude Oils

Spot price and FOB selling price will be taken from Platt's Oilgram or Asian Petroleum Price Index (APPI)

VALUATION OF PETROLEUM

Page 75: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

75

No taxes will be imposed on materials and equipment related to Petroleum Operations brought into Bangladesh by Contractor, its subcontractors or by any agent on permanent or re-exportable basis

Contractor shall be liable to pay including but not limited to the following:

Corporate income tax

Income tax of employees of Contractor

Income tax of sub-contractors

Duties and taxes on locally purchased goods and commercial services

Any levies or exaction in respect of property including leased property, capital, net worth, operations, remittances or transactions

TAXES AND DUTIES

Page 76: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

76

Duties and VAT on imported office equipment, air conditioners, refrigerators, sedan cars and station wagons, microbuses, household utensils .

Value Added Tax and Supplementary Duty (if any) for goods and services purchased to implement Petroleum Operations as per provisions of the Value Added Tax Act. 1991 and the Value Added Tax Rules, 1991 or as may be amended from time to time.

TAXES AND DUTIES

Page 77: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

77

The Contractor shall pay the following fees and bonuses:

Discovery bonus : UD$ 3,000,000

Production bonus : US$ 500,000 to US$ 4,000,000 for different production levels

Research and development fees : US cents 3 per Barrel of Contractor's Profit Oil and Profit Condensate and US cents 0.4 per MCF of their profit Natural Gas

Contract service fee : US$200,000/year for Exploration and Development PeriodUS$ 300,000/year for Production Period

FEES AND BONUSES

Page 78: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

78

Petrobangla shall become the owner of the following:

Any immovable property purchased or acquired by Contractor

Any fixed or movable asset purchased by Contractor outside Bangladesh when it is landed in Bangladesh

Any fixed or movable asset purchased in Bangladesh as soon as it is purchased

All original geological, geophysical, geochemical, drilling, engineering, well logs, production and other data obtained or compiled by Contractor as a result of Petroleum Operations

TITLE TO ASSETS AND DATA

Page 79: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

79

Contractor shall be required to provide 80% of its pro-rata share Oil, Condensate and NGL at 15% discount to meet internal demand.

Contractor shall not enter into any contract for sale of any part of Petrobangla's Oil from the Contract Area without Petrobangla's prior specific consent.

SUPPLY OF INTERNAL DEMAND AND STATE'S RIGHT OF REQUISITION

Page 80: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

80

Together with the yearly Work Program and Budget, Contractor shall submit its manpower requirements including its organization chart.

Contractor shall first obtain written approval from Petrobangla for any positions to be filled by expatriate personnel by ensuring that expatriate personnel are employed only to occupy positions for which it has not been possible to obtain Bangladesh personnel. [This clause will not be applicable for the Exploration Period of offshore blocks]

Contractor shall review its expatriate requirements with Petrobangla annually.

Contractor shall consult with Petrobangla for the purpose of employing qualified Bangladesh personnel in the conduct of Petroleum Operations.

EMPLOYMENT, TRAINING AND TECHNOLOGY TRANSFER

Page 81: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

81

During Petroleum Operations, Contractor shall have the obligation to arrange for the systematic transfer of its technology, know-how and experience to Petrobangla

Contractor shall offer a mutually agreed number of Bangladeshi nationals the opportunity for on-the-job training and practical experience in Petroleum Operations

During the Exploration and Development Period, Contractor shall make a training grant to Petrobangla of US$150,000 per Contract Year

Following the Date of Commencement of Commercial Production, Contractor shall make a training grant to Petrobangla of US$ 200,000per Contract Year

The above training grants shall not be subject to Cost Recovery.

Page 82: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

82

The Parties shall make their best efforts to settle any disputeamicably through consultation

If any dispute is not settled through consultation, the Parties may, by mutual agreement, refer the dispute for determination by a sole expert to be appointed by agreement between the Parties.

The proceedings before the sole arbitrator or the arbitration tribunal shall be governed by the Bangladesh Arbitration Act 2001.

In pursuance of section 25 of the Arbitration Act 2001, the solearbitrator or the arbitration tribunal shall conduct the arbitration in accordance with the United Nations Commission on International Trade Law Arbitration Rules (“UNCITRAL Rules”).

CONSULTATION, EXPERT DETERMINATION AND ARBITRATION

Page 83: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

83

Contractor may with prior written approval of Petrobangla assignany or all of its rights, interests and obligations to any of its Affiliates or to a non-Affiliated third Party

The proposed assignee or assignees must produce reasonable evidence of its or their financial and technical competence

In case of any change in the status of any entity comprising theContractor or its share holding resulting in a change in the control of the entity; or its relationship with the company(ies) providing the guarantee; the company shall seek the consent of the Government/Petrobangla for assigning the Participating Interest under the changed circumstances

(“control” means ownership by one company of more than fifty percent (50%) of the voting securities of the other company; or the power to direct, administer and dictate policies of the other company )

ASSIGNMENT

Page 84: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

84

The assignor shall submit a valuation and all material terms of the assignment.

Any transfer or related taxes, stamp, duty, charges or other fees from any assignment shall be borne by Contractor.

The Government/Petrobangla reserves the right to employ an independent consultant, at the cost of Contractor to be mutually agreed by government/Petrobangla and such entity, to carry out an independent valuation of the assignment transaction.

ASSIGNMENT

Page 85: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

85

Provision for Unitization between two adjacent blocks where a single geological structure spreads over both the blocks

Provision for international unitization agreement if a single geological structure spreads over international boundaries

UNITIZATION

Page 86: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

86

During the term of the Contract, Contractor shall be responsible for Abandonment of all Petroleum facilities.

Contractor shall conduct Abandonment Operations in accordance with the approved Abandonment Work Program and Budget

Contractor shall commence payment to Petrobangla into a fund called "Abandonment Fund" on the first anniversary of the FirstCommercial Production

Contractor shall not have to be liable for both payment into theAbandonment Fund and the actual cost for Abandonment of Petroleum facilities carried out by Contractor during the term of this Contract.

Abandonment Fund payments made by Contractor to Petrobangla shall be cost recoverable.

ABANDONMENT

Page 87: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

87

BID AREA

Number of blocks on offer: 28 offshore blocks

The shallow water blocks situated north of 20º N latitude are categorized as Type-A

The deep water blocks situated south of 20º N latitude are categorized as Type-B.

Size

Average size of Type-A blocks ~6,000 sq.km.

Average size of Type-B blocks ~3,300 sq.km.

Water Depth

Water depth of Type-A blocks: upto 200 meter.Water depth of Type-B blocks: above 200 meter.

Page 88: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

88

Pre-qualification CriteriaBidder, whether individual or in case of joint venture at least one member must hold an offshore acreage as operator, with an offshore daily production of at least 25,000 BOE to be considered as technically qualified for bidding.

• Evaluation Criteria

• Biddable Work Program: [30 marks]• Seismic Survey • Wells • Other Surveys (Geochemical, Seabed Sampling, Gravity, Magnetic, Sea bed mapping

etc.) • Bank Guarantee

• Fiscal Package: [70 marks]• Percentage of Profit Petroleum Allocation: Biddable from the minimum level for

each tranche as per PSC Article 14.6. The bidder offering higher profit petroleum share indicating better NPV to the government will be more favorably evaluated.

BASIS OF BID EVALUATION

Page 89: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

89

To be qualified for selection, the bidder, whether individual or in case of joint venture, at least one member must hold an offshore acreage as operator, with an offshore daily production of at least 25,000 BOE to be considered as technically qualified for bidding.

A bid not confirming commitment to the Mandatory Work Program shall be liable to be rejected.

The bidders shall be required to commit at least one exploratorywell in the Initial Exploration Period for the Type - A blocks. Otherwise, such bid shall be liable to be rejected.

A bid would be liable for rejection if it contains any conditions, assumptions and/ or deviations which are inconsistent or not complying with the contract terms.

EVALUATION OF BIDS AND REJECTION CRITERIA

Page 90: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

90

For a bid to be valid, bidding company or consortiums required to purchase the Promotional Package before the bid closing date.

Government may also take into account the past performance of bidding companies including the track record of the companies orthe consortium in respect of court cases against or any other basis and on this consideration or any other consideration, at the sole discretion of the Government, it may accept or reject any or all bids.

Government at its sole discretion reserves the right to accept or reject any or all of the bids received without assigning any reason, whatsoever.

EVALUATION OF BIDS AND REJECTION CRITERIA

Page 91: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

91

Information Package: Includes the detailed Notice Inviting Bids, a brochure providing geological and related information, details of the blocks offered, the Model Production Sharing Contract-2008, The National Energy Policy-1995, The Bangladesh Petroleum Act-1974, Promotional Package order form with content and Data Sales Package order form with content and price. The Information Package will be available at a cost of TK. 7000 or US $ 100.

Promotional Package: Includes 28 maps/sections representing geology of the country. Purchase is mandatory to qualify for bidding. Price is US$ 7,500 or BDT 525,000.

Data Packages: Contains seismic sections, gravity, magnetic, geological maps, wire line logs and geochemical data etc. to enable companies to assess the geological prospects of the blocks on offer. Several Data Sales Packages are available at different prices.

AVAILABILITY OF DATA

Page 92: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

92

Way ForwardSteps to be taken to meet future energy demand:

Exploration Efforts to be Strengthened to Discover More Gas by Petrobangla and IOC

Sole Dependency on Natural Gas has to be Reduced.

Usage of Renewable Energy to be Encouraged and Pursued.

Energy Conservation, Energy Mix Policy

New Power Plants should have Dual Fuel Provision.

Country’s Indigenous Coal Extraction to be Given Priority.

Initiative for Import of LNG or Pipe Gas should be undertaken assoon as possible

Page 93: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)

93

VALUE OF EDUCATION& HUMAN RESOURCES

VALUE OF EDUCATION"If you plan for a year, plant a seed. If for ten years, plant a tree. If for hundred years, teach the people. When you sow a seed once, you will reap a single

harvest. If you teach the people, you will reap a hundred harvests".

K'uan-tzu (591-47 BC)Value of Human Resources

"Human Resource is the means and end of all development"

Page 94: Bangladesh Oil, Gas & Mineral Corporation (Petrobangla)