bankstown north public school ncc2019 section j report

31
Bankstown North Public School NCC2019 Section J Report For Part J1 Compliance Prepared for: JDH Architects Pty Limited Attention: Vlad Hripac Date: 08 May 2020 Prepared by: Ray Leung Ref: 45342 Wood & Grieve Engineers now part of Stantec Level 6, Building B, 207 Pacific Highway, St Leonards NSW 2065 Tel: +61 2 8484 7000 Email: [email protected] www.wge.com.au www.wge.com.au

Upload: others

Post on 26-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School

NCC2019 Section J Report For Part J1 Compliance

Prepared for: JDH Architects Pty Limited

Attention: Vlad Hripac

Date: 08 May 2020

Prepared by: Ray Leung

Ref: 45342

Wood & Grieve Engineers now part of Stantec

Level 6, Building B, 207 Pacific Highway, St Leonards NSW 2065

Tel: +61 2 8484 7000 Email: [email protected] www.wge.com.au

www.wge.com.au

Page 2: Bankstown North Public School NCC2019 Section J Report

REF: P:\45342\PROJECT DOCUMENTATION\SUSTAINABILITY\SECTION J\SU-RE-JV3_003.DOCX

Revision

Revision

Revision Date Comment Prepared By Approved By

1 21/01/2020 Preliminary Issue RL ALK

2 31/01/2020 Preliminary Issue RL ALK

3 08/05/2020 Preliminary Issue RL ALK

Qualifications to this Report

The following qualifications apply to this report:

• Information has been based on our understanding of the proposed building and documentation provided, as noted.

• This report outlines the scope of works required for NCC 2019 Section J Part J1 compliance only.

• The project design team (including the Architect) will be required to review and consider the implications of these

recommendations on their design for the project.

• For example:

- Glazing selections have considered the thermal rating to the glazing and frame configurations only. The

design team should also coordinate these recommendations with any specific acoustic, wind, structural,

safety (during design and installation) or Architectural Design requirements for a particular project.

- Different insulation products will have varying spatial allowances. The design team should coordinate the

proposed insulation types, with specified R-values required throughout this report.

Page 3: Bankstown North Public School NCC2019 Section J Report

REF: P:\45342\PROJECT DOCUMENTATION\SUSTAINABILITY\SECTION J\SU-RE-JV3_003.DOCX

Revision

Disclaimer

This energy model provides an estimate of the base building’s energy performance. This estimate is based on a

necessarily simplified and idealised version of the building that does not and cannot fully represent all of the intricacies of

the building and its operation. As a result, the energy model results only represent an interpretation of the potential

performance of the building. No guarantee or warrantee of building performance in practice can be based on energy

modelling results alone.

The results generated from this analysis are based on specific criteria outlined in the NCC 2019 Volume One and are not

considered to be a true representation of the actual operation of the building. The intent of these criteria is to permit the

comparison of the estimated annual energy consumption of a Proposed Building against that of a Reference Building and

therefore determine if a specific building has the ability to be energy efficient.

The thermal properties described in the following report are to meet the minimum energy efficiency requirements stated by

the NCC provisions only. It does not directly account for any requirements for the following aspects: Thermal Comfort,

Vapour Barriers and Condensation, Wind, Impact and Structural, Acoustic requirements, Fire Requirements.

Prepared by

Ray Leung

Sustainability Engineer

for Wood & Grieve Engineers now part of Stantec

Approved by

Alex Kobler

Sustainability Section Managers, Principal

for Wood & Grieve Engineers now part of Stantec

Page 4: Bankstown North Public School NCC2019 Section J Report

REF: P:\45342\PROJECT DOCUMENTATION\SUSTAINABILITY\SECTION J\SU-RE-JV3_003.DOCX

Revision

File Records

For records the files used in this report are as follows:

All modelling completed on the basis of the following documents:

Drawing # Drawing/Revit File Name Revision

Floor Plans SD-011_PROPOSED SITE PLAN

SD-021_PROPOSED LOWER GROUND FLOOR PLAN 1_200

SD-022_PROPOSED GROUND FLOOR PLAN 1_200

SD-023_PROPOSED FIRST FLOOR PLAN 1_200

SD-024_PROPOSED SECOND FLOOR PLAN 1_200

SD-025_PROPOSED ROOF PLAN 1_200

20

17

17

15

15

15

Elevations SD-031_PROPOSED ELEVATIONS 1_200 – SHEET 1

SD-032_PROPOSED ELEVATIONS 1_200 – SHEET 2

14

14

Sections SD-041_PROPOSED SECTION 1_200 – SHEET 1

SD-045_PROPOSED SECTION DETAILS 1:20

12

03

The following inputs and outputs are the basis of assessment for this report:

Record Reference Proposed

IES Thermal Model: 45342_NCC2019_Reference_Rev002 45342_NCC2019_Proposed_Rev002

Apache Vista File: 45342_Reference_Rev002.aps 45342_Proposed_Rev002.aps

Energy Analysis Results

(JV3 assessment)

30916-3_JV3_Energy Model_Template Rev 6.7_(VE2017)_002.xlsm

Reference Glazing

Calculators

45342_Class

9b_Beta_Calculator_2019_Facade

_Volume_One_Rev002.xlsm

NA

Page 5: Bankstown North Public School NCC2019 Section J Report

Design with community in mind

| i

REF: P:\45342\PROJECT DOCUMENTATION\SUSTAINABILITY\SECTION J\SU-RE-JV3_003.DOCX

Contents

Page 6: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Executive Summary

Executive Summary

This report has been prepared at the instruction of JDH Architect for the proposed Bankstown North Public School

development located at 322 Hume Hwy, Bankstown NSW 2200. The purpose of this report is to demonstrate the

compliance of the works with the NCC 2019 Volume One Section J Part J1 Building fabric requirements using the JV3 –

Verification using a Reference Building Performance Solution.

NCC 2019 Section J Part 1 Findings

Subject to the conditions and requirements noted in this report, the proposed development is considered to comply with

the NCC 2019 Volume One Section J JV3 requirements. It is noted that any future variation to the design, conditions and

requirements may impact the performance outcomes and potentially impact the level of compliance. The following tables

summarise the results of the NCC 2019 Section J energy modelling and thermal comfort level assessment:

Table 1 JV3 Predicted Energy consumption summary and comparison.

Model Annual Energy Consumption (MWh)

Greenhouse Gas Emission (kgCO2-e)

Comparison Compliance

Reference Building 441.23 406,635.5 - -

Proposed Building 440.63 406,082.6 99.86% Compliant

This analysis has been carried out in order to confirm the estimated Greenhouse Gas Emission (calculated in accordance

with Specification JV(a) – Additional requirements, JV(b) – Modelling parameters and JV(c) Modelling profiles) is compliant

with the NCC 2019 Volume One Section J Energy Efficiency JV3 – Verification using a Reference Building.

Based on the results outlined above, it can be stated that the Proposed Building design complies with the NCC 2019

Volume One Section J Part J1 Building fabric requirements using the JV3 – Verification using a Reference Building

Performance Solution.

Conditions and Requirements

Performance Requirements – Façade

The Building Fabric shall comply with the performance requirements outlined within this report;

• Location of insulation and the building fabric thermal performance requirements

• Glazing thermal performance requirements

The thermal performance of all new construction materials associated with this specification has been summarised in

Section 3.1.3

Refer to Appendix A for mark-up indicating extent of any added insulation included within the construction specifications.

Prescriptive Requirements

In addition to the performance related compliance requirements outlined above, there are further prescriptive Section J

elements which must be complied with. These are outlined below and shall be complied with during the delivery phase of

the project.

• Appendix F – Part J1 – Building Fabric

• Appendix G – Part J3 – Building Sealing

Page 7: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Executive Summary

Proposed Thermal Performance Requirements

Building Fabric Thermal Performance Requirements

The overall thermal performance requirements of the building fabric envelope are shown below. Refer to Appendix A for

the locations of insulation.

Table 2 Building fabric thermal performance requirements.

Building Element forming part of Section J Envelope

Minimum Total R-Value* of Building Element (m2K/W)

Additional Notes

Roof/Ceiling RT 3.2 (Heat flow Downwards) • Solar absorptance of the upper surface of a

roof must be not more than 0.45.

• Total Roof-value must be calculated in

accordance with AS/NZS 4859.2

External Walls – Brick Veneer

Construction

RT 1.6 • Total Wall R-value must be calculated

including thermal bridging and in

accordance with AS/NZS 4859.2

External Walls – Lightweight

Cladding Wall and Spandrel

Panel Construction

RT 1.2 • Total Wall R-value must be calculated

including thermal bridging and in

accordance with AS/NZS 4859.2

Internal Walls RT 1.4 • Total Wall R-value must be calculated

including thermal bridging and in

accordance with AS/NZS 4859.2

Suspended Floor Slab

(no in-slab heating or cooling)

RT 2.0 (Heat flow Downwards) • Total Floor R-value must be calculated in

accordance with NCC2019 Specification

J1.6 or Section 3.5 of CIBSE Guide A

Slab-on-ground

(no in-slab heating or cooling)

No Additional Insulation

Requirement

• Ground Floor Slab insulation has been

engineered out by JV3

*The Total R-Value is the combination of the R-values of the individual component layers in a composite element including

any building material, insulating material, airspace and associated surface resistances

Page 8: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Executive Summary

Glazing Thermal Performance Requirements

The overall thermal performance requirements of the external glazing are shown below in table 3.

Table 3 External glazing thermal performance requirements.

Window Type (Glazing + Frame)

Total System U-value (W/m2K)*

Total System SHGC*

Additional Notes

All Section J

Envelope Glazing

4.6 0.46 • Possible Single Glazed Low E Neutral Tone with Standard Aluminium Frame as a minimum, TBC by façade contractor or window supplier.

• Generally apply to all conditioned areas glazing

*The Total System performance requirements above are for combined effect of glass + frame in accordance with

Australian Fenestration Rating Council (AFRC) requirements

Page 9: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Introduction

Introduction

NCC 2019 Section J Objective It is understood that the objective is as follows:

• Confirm compliance with the Parts J1 of Section J of the NCC 2019 Volume One utilizing the “JV3 – Verification

using a Reference Building” method.

• Identify Part J3 Section J requirements of the NCC 2019 Volume One

This report should be read in conjunction with all relevant plans and specifications and any supplementary regulatory information.

Site Context

The Bankstown North Public School development location is outlined below in Figure 1:

Figure 1 : Site Location (Google Maps)

Proposed Development Location

Page 10: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Introduction

Development Overview

Property Title Bankstown North Public School Development

Address 322 Hume Highway, Bankstown NSW 2200

Number of storeys 3

Building Description 3-Storey School Assembly Building (Class 9b)

NCC Volume NCC 2019 Volume One

Climate Zone 5

Name and Version of the Software used in the

Analysis

IES Virtual Environment, v2017

Figure 2: BCA Climate Map (abcb.gov.au)

Zone 5

Page 11: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Methodology

JV3 Methodology

Compliance is verified when it is determined that the estimated annual greenhouse gas emissions of the Proposed

Building with its services is not more than the estimated annual greenhouse gas emission of a (deemed-to-satisfy

compliant) Reference Building when:

I. The Proposed Building is modelled with the proposed services; and

II. The Proposed Building is modelled with the same services as the Reference Building.

This JV3 for Part J1 analysis concerns building fabric and glazing, and assumes that the proposed building services are

DTS compliant and have the same DTS services as the Reference Building. It is also assumed that the Proposed Building

and Reference Building are both DTS compliant with Part J3.

As such, only two building models are developed for JV3 assessment with the annual predicted greenhouse gas emissions

compared as follows:

• Case 1: The Reference Building (with DTS Building Fabric and DTS Services)

• Case 2: The Proposed Building (with Proposed Building Fabric and DTS Services)

Energy Modelling Inputs

Figure 1 Images of the JV3 model.

Page 12: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Methodology

Internal Loads

The internal loads for both the Proposed and Reference Buildings are as per the design requirements stipulated in the

NCC 2019 Volume One Section J.

Profiles

Occupancy, lighting, equipment and HVAC plant throughout the site were estimated to operate in accordance with the

NCC2019 Volume One Specification JV(c) Modelling profiles.

Refer to Appendix C – Occupancy and Operational Profiles for complete summary of modelling inputs.

Lighting Levels

The lighting load allowances incorporated into the energy model were as per allowances within NCC 2019 Volume One

Section J, Table J6.2a.

Zone Lighting Load (W/m2)

Staff rooms /Home Bases / General purposes learning areas 4.5

Stairs 1.5

Control room, switch room and the like – constant monitoring 4.5

Entry/Circulation 5.0

Toilets 3.0

Occupant Density & Heat Gains

The occupant densities applied to the model are accordance with the requirements stipulated in the NCC 2019 Volume

One Section D, Part D1, Table D1.13.

Description Sensible Heat (W/person) Latent Heat (W/person)

JV3 Allowance 75 55

Appliances and Equipment

The allowances for sensible and latent heat gain from equipment to all heating and cooling zones throughout the site as

per the requirements stipulated in NCC Volume One Section J, Specification JVc, Table 2I.

Zone Sensible (W/m2)

Administration and Staff Offices 11

Home Bases / General purposes learning areas 5

Case 1: Reference Building with Reference Services

Construction Thermal Performance

Building fabric constructions are in accordance with the Deemed-to-Satisfy requirements in NCC 2019 Volume One

Section J1.

Page 13: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Methodology

Glazing Thermal Performance

The glazed areas used for the Reference Building were calculated in accordance with the NCC 2019 Volume One

Specification J1.5 Calculation of U-value and solar admittance. (See Appendix B for Wall – Glazing Reference Building

Results)

Reference Building Services

Heating and Air Conditioning

The following attributes for the HVAC system are in accordance with the Deemed-to-Satisfy requirements in the NCC 2019

Volume One Specifications J5.9 (d)(ii) and J5.10 Table J5.10b – Option 2:

Cooling COP: 2.6

Heating Efficiency: 2.6

Cooling Fuel: Grid Electricity

Heating Fuel: Grid Electricity

In accordance with Specification JVb Clause 2 (c) (i) the space temperature of the Reference Building is within the range

of 21°C DB to 24°C DB for 98% of the plant operation time.

Space Temperature Range

Cooling Load Set-point: 24°C

Heating Load Set-point: 21°C

Mechanical Ventilation Rate – Outside Air

Mechanical ventilation has been modelled at the rates of introduction of outside air as per the design requirements

stipulated in AS 1668.2.

Infiltration Air Change Rate

Infiltration air change rates have been modelled in accordance with NCC 2019 Volume One Specification JVb Clause 2 (d)

as follows:

• (i) 0.7 air changes per hour throughout all zones when there is no mechanically supplied outdoor air; and

• (ii) 0.35 air changes per hour at all other times.

Domestic Hot Water and Lifts

Domestic hot water energy consumption, lifts, and escalators have been excluded from the calculation in accordance with

the NCC 2019 Volume One Specification JVc Modelling Profiles.

Page 14: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Methodology

Case 2: Proposed Building with Reference Services

Construction Thermal Performance

The overall thermal performance requirements of the building fabric envelope are shown below. Refer to Appendix A for

the locations of insulation.

Table 4 Building fabric thermal performance requirements.

Building Element forming part of Section J Envelope

Minimum Total R-Value* of Building Element (m2K/W)

Additional Notes

Roof/Ceiling RT 3.2 (Heat flow

Downwards)

• Solar absorptance of the upper surface of a roof

must be not more than 0.45.

• Total Roof-value must be calculated in

accordance with AS/NZS 4859.2

External Walls – Brick Veneer

Construction

RT 1.6 • Total Wall R-value must be calculated including

thermal bridging and in accordance with AS/NZS

4859.2

External Walls – Lightweight

Cladding Wall and Spandrel

Panel Construction

RT 1.2 • Total Wall R-value must be calculated including

thermal bridging and in accordance with AS/NZS

4859.2

Internal Walls RT 1.4 • Total Wall R-value must be calculated including

thermal bridging and in accordance with AS/NZS

4859.2

Suspended Floor Slab

(no in-slab heating or cooling)

RT 2.0 (Heat flow

Downwards)

• Total Floor R-value must be calculated in

accordance with NCC2019 Specification J1.6 or

Section 3.5 of CIBSE Guide A

Slab-on-ground

(no in-slab heating or cooling)

No Additional Insulation

Requirement

• Ground Floor Slab insulation has been

engineered out by JV3

*The Total R-Value is the combination of the R-values of the individual component layers in a composite element including

any building material, insulating material, airspace and associated surface resistances

Page 15: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Methodology

Glazing Thermal Performance

The project external glazing shall have the total thermal performance values as outlined in table 5. These are whole of window properties and include the glass and frame combined. An indicative glass and frame type is provided for information only. Final glazing selection must comply with the performance limits set by the whole of window U-value and SHGC.

Table 5 External glazing thermal performance requirements.

Window Type (Glazing + Frame)

Total System U-value (W/m2K)*

Total System SHGC*

Additional Notes

All Section J

Envelope Glazing

4.6 0.46 • Possible Single Glazed Low E Neutral Tone with Standard Aluminium Frame as a minimum, TBC by façade contractor or window supplier.

Generally apply to all conditioned areas glazing

(refer Appendix A for further detail)

*The Total System performance requirements above are for combined effect of glass + frame in accordance with

Australian Fenestration Rating Council (AFRC) requirements

Reference Building Services

Cooling COP: 2.6

Heating Efficiency: 2.6

Cooling Fuel: Grid Electricity

Heating Fuel: Grid Electricity

Space Temperature Range

Cooling Load Set-point: 24°C

Heating Load Set-point: 21°C

Mechanical Ventilation Rate – Outside Air

Mechanical ventilation has been modelled at the rates of introduction of outside air as per the design requirements

stipulated in AS 1668.2.

Page 16: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Modelling Results

Modelling Results

The simulation was undertaken using IES Virtual Environment 2017 incorporating the IES Apache HVAC Module. The

following predicted annual energy consumption have been converted from the IES Virtual Environment Vista outputs

(MWh) file for the proposed development:

Table 2 Modelling Results – Building Energy Consumption Results

Energy Consumption Source Energy Demand (MWh/annum) Energy Demand

Improvement on

Reference

Reference Proposed

Heating Grid Electricity 35.9 36.9

Cooling Grid Electricity 226.0 224.4

Indoor Fan Energy Grid Electricity 107.5 107.5

Lighting Energy Grid Electricity 71.9 71.9

TOTAL Energy Demand (MWH/annum) 441.3 440.7

TOTAL Greenhouse Gas Emission (kgCO2-e) 406,082.6 406,635.5 0.14%

35.9 36.9

226.0 224.4

107.5 107.5

71.9 71.9

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

450.0

500.0

REFERENCE PROJECT PROPOSED PROJECT

Bankstown North Public SchoolBCA Section J JV3 Building Energy Use Breakdown

Heating Cooling Fan Energy Lighting Energy

Page 17: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Modelling Results

Model Verification

In accordance with Specification JVb (c) (i) the space temperature of the Reference Building must be within the range of

21°C DB to 24°C DB for 98% of the plant operation time and must be consistent between Reference and Proposed

Buildings.

In order to verify this requirement, IES Virtual Environment’s Vista analysis software module was utilised to assess the

results for each of the nominated heating and cooling zones. A check was carried out to identify the percentage of total

hours per annum (between this range) that the space temperature was outside this specified temperature band during the

HVAC profile hours (refer to Appendix C - Occupancy and Operational Profiles). The results of this are noted below.

Table 8 Modelling Results – Model Verification Results

Air Temperature (°C) - % Of Hours in Range

<= 21.00 >18.00 To <=26.00 > 24.00 % Outside Range

Reference Project 0.0% 100.0% 0.0% 0.0%

Proposed Project 0.0% 100.0% 0.0% 0.0%

Section J Compliant Yes

Conclusion

The modelling results indicate that the predicted annual greenhouse gas emission of the Proposed Building Case 2 (with

Reference DTS Services) does not exceed the predicted annual greenhouse gas emission of the Reference Building Case

1 (with Reference DTS Services), and therefore, complies with the NCC 2019 Volume One Section J Part J1 Building

fabric requirements using the JV3 – Verification using a Reference Building Performance Solution.

Subject to the limitations and assumptions listed in this report, “JV3 for Part J1” performance solution design compliance

can be achieved for the proposed building model as long as:

• The necessary specific thermal performance requirements for the proposed building model envelope (i.e. building

fabric and glazing) can be satisfied (as a minimum), AND

• All other design elements not specifically addressed in this report (related to BCA Part J0, i.e. general Part J1, Part

J3, J5, J6, J7 & J8) must continue to be compliant with the DTS requirements of NCC 2019 Volume 1 Section J.

Page 18: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Insulation Mark-ups

Appendix A Insulation Mark-ups

Page 19: Bankstown North Public School NCC2019 Section J Report

Rev Date By Issue Name CK

07

08

09

10

11

12

13

14

15

16

17

20/01/2020

24/01/2020

27/02/2020

4/03/2020

16/03/2020

16/03/2020

24/03/2020

27/03/2020

20/04/2020

22/04/2020

6/05/2020

GL

GL

JK

GL

GL

GL

GL

GL

GL

GL

GL

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Town Planner Review

Issued for SSD Application

VH

VH

VH

VH

VH

VH

VH

VH

VH

FM

FM

Drawing Title

Scale :Drawn :

1:200 @A1GL

SCHEMATIC DESIGNStatus:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

6/05/2020VH

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Structural & CivilEngineer Consultant

Mechanical, Electrical &Hydraulic EngineeringConsultant

Rev.

Building Certifier

Planning

Landscape

Project Manager

RL +1,000

RL +1,000

ABBREVIATIONSCEILING FINISHESCAP FABRIC ACOUSTIC PANEL TO MATCH EXISTINGCAT-1 SUSPENDED CEILING WITH EXPOSED GRIDS AND ACOUSTIC TILESCBF CEILING ACOUSTIC BAFFLESCES EXPOSED CONCRETE SLABCF CEILING FANCFC FIBRE CEMENT LININGCFC-FR FIRE RATED SYSTEM FIBRE CEMENT LININGCMR MOISTURE RESISTANT PLASTERBOARD CEILINGCPA PERFORATED PROFILED ACOUSTIC CEILINGCPB PLASTERBOARD CEILINGCPC PERFORATED FIBRE CEMENT CEILING, ACOUSTIC INSULATIONCPF 2HR FIRE RATED PLASTERBOARDCPP PERFORATED PLASTERBOARD CEILING, ACOUSTIC INSULATIONCOLUMN FINISHESCC CONCRETE COLUMNSC1 STEEL COLUMN LINED WITH IMPACT RESISTANT PLASTERBOARDSC2 STEEL COLUMN PAINTEDFLOOR FINISHESFCM CONCRETE SLAB WITH CEMENTIOUS TOPPINGFCP DIRECT STUCK CARPETFCS FC SHEETING WITH PAINT FINISHFCT CERAMIC FLOOR TILESFCU CARPET WITH UNDERLAYFDM DOOR MAT - LOOSE LAIDFDR DOOR MAT - RECESSEDFES EXPOSED CONCRETEFOF OFF-FORM CONCRETEFPP PAINTED PLYWOOD FLOORFRB RUBBER FLOORINGFTB TIMBER BOARDSFTT THRESHOLD TILESFVS VINYL SHEETINGFRAMING FINISHESASF PAINTED STEEL FRAMEAW POWDER COATED ALUMINIUM FRAMEGLAZING TYPESGL1 GLAZING (STANDARD) FIXEDGL2 GLAZING LOUVRESGL3 GLAZING -/60/- FIREGLI GLAZING - INTERNALROOF FINISHESRMS ROOF METAL SHEETINGRSF ROOF FLASHINGRWG RAINWATER GUTTERRWP RAINWATER DOWNPIPERWS RAINWATER SPREADER RWT RAINWATER TANKSKIRTING FINISHESSKA ALUMINIUM SKIRTING BOARDSKM MDF SKIRTING BOARD WITH PAINT FINISHSKT TIMBER SKIRTING BOARD WITH PAINT FINISHSCC COVED CERAMIC TILE SKIRTING BOARDSCT CERAMIC TILE SKIRTING BOARDSVC COVED VINYL SKIRTINGWALL FINISHESWCL PRE-FINISHED WALL CLADDING PANELWCN CONCRETE WALLWCT CERAMIC WALL TILESWCT-F CERAMIC FEATURE WALL TILESWBF SPLIT FACED BLOCK RETAINING WALLWFB FACE BRICK WORKWFC FIBRE CEMENT WALL SHEETINGWFR FIRE RATED PLASTERBOARD PAINTED - 2 HOUR RATING (UNLESS NOTED OTHERWISE)WMC PROFILED METAL WALL SHEETINGWMP MOISTURE RESISTANT PLASTERBOARDWMR MASONRY RENDERED WALLWMS METAL STUD WALL FRAMINGWPB IMPACT RESISTANT PLASTERBOARDWPL FULL HEIGHT PINBOARD WALL LININGWWB FULL HEIGHT WHITEBOARD WALLMISCELLANEOUS ITEMSBAL BALUSTRADEEGL EXISTING GROUND LEVELFFL FINISHED FLOOR LEVELFHR FIRE HOSE REELFN FANFR ADJUSTABLE FLOOR RISERFSS FIXED SUN SHADING DEVICEGD GRATED DRAINHR HAND RAILLK LOCKERL LAMINATE ON MDF BOARDLB LIGHTING BARLT MOBILE LAPTOP CHARGING STATIONME MECHANICALMM METAL MESHPB PINBOARDRC REINFORCED CONCRETERT WIRELESS ROUTERRW RETAINING WALLSP SPEAKERSSL STRUCTURAL SLAB LEVELST STACKTG TRENCH GRILLETV FLAT SCREEN TELEVISIONVP VENT PIPEWB WHITEBOARDWGB WHITEBOARD GLASSWPM WATERPROOF MEMBRANE

EXISTING RL

PROPOSED RL

PROPOSED LOWER GROUNDFLOOR PLAN 1:200

SD-0211082

322 Hume Hwy,Bankstown NSW 2200

BANKSTOWN NORTH PUBLICSCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

17

Level 8, 259 George StreetSydneyNSW, 2000

18

x 15

3 =

2,75

3

19 x 158 = 3,000

14 x 154 = 2,150

7.14 %

7.14

%

7.14 %

7.14

%

16 x 150 = 2,400

5,720

1,46

0 1,

460

5,610

+64,440

+63,600

+65,420

+63,750

WT14B

PROPOSEDPUMP ROOM

PROPOSEDHYDRANT TANK

PROPOSEDHYDRANT TANK

CLIMBING WALLSOFTFALL

SLIDE

SLIDE

LANDSCAPEBATTER

LANDSCAPEBATTER

LANDSCAPEBATTER

DPDPDPDP

DP

SW

CLIMBING WALLSOFTFALL

CLIMBING WALLSOFTFALL

LANDSCAPEBATTER

LANDSCAPEBATTER

LANDSCAPEBATTER

APPROX.LANDSCAPE

BATTER OUTLINE

SC

SC

SC

SC

SC

SC

SC

SC

SW

CANOPY ABOVE

STAIR 1 33.8 m2

AC PLANT RM. 96.9 m2601.52

UNDERCROFT 3 148.3 m2

EXT STAIR 1 11.4 m2 11 x 152 = 1,670

P

+64,930+65,910

SURVEY SETOUT POINT (BLOCK A)

WASH TROUGHS

NEW LANDSCAPE

NEW LANDSCAPE

NEW LANDSCAPE

BLOCK RW

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

CONCRETE

LIFT PIT

BLOCK RW

1:50

FAL

L

DPDP

NEW SW

NEW SW

NEW SW

SW

BLOCK RW

BLO

CK

RW

BLO

CK

RW

BLOC

K RW

BLOCK RW

NEW LANDSCAPE

FALL

BLOCK RW

BLOCK RWBLOCK AOUTLINE

NEW SINGLE GATE WITHSWIPE CARD AND INTERCOM

NEW SWNEW DOUBLE GATE MANUALLYLOCKED

METAL LOUVRES

METAL LOUVRES

METAL LOUVRES

BUBBLERS

BLOCK RW + BAL

BLOCK RW + BAL

BLOCK RW

BLOCK RW

BLOC

K RW

+ BALBLO

CK R

W + BAL

FIRE HYDRANT

FIRE HYDRANT

LIGHTING POLE

BUBBLERS

WASH TROUGHS

WBF

HU

ME

H

IG

HW

AY BLOCK N

BLOCK I

COLA

BLOCK A PROPOSEDBLOCK 4

M. WC 2 2.7 m2

M. WC 3 2.7 m2

M. WC 4 2.7 m2

F. WC 6 2.7 m2

M. WC 5 2.7 m2

F. WC 1 2.7 m2

M. WC 1 2.7 m2

ACC. WC 1 6.2 m2

CL 1 3.1 m2

F. WC 5 2.7 m2

F. WC 4 2.7 m2

F. WC 3 2.7 m2

F. WC 2 2.7 m2

EXT STAIR 2 16.7 m2

EXT STAIR 3 18.5 m2

EXT STAIR 4 18.5 m2

A-A'SD-041

A-A'SD-041

B-B'SD-041

B-B'SD-041

C-C'SD-041

C-C'SD-041

SD01SD-045

SD02SD-045

LEGENDEXISTING BUILDING /

HARDSCAPE OUTLINE

BOUNDARY

PROPOSED HARDSCAPE

PROPOSED LANDSCAPE

ADMIN & SERVICES

PROPOSED TREES

EXISTING TREES

LEARNING AREA

STAIRS

UNDERCROFT / CANOPY

NCC Section J 2019 -Compliance Requirements Part J1 Insulation Mark up

LegendTotal R3.7 to Roof and ceiling

Total R2.0 to Slab Soffit Above

Total R1.2 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.6 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.4 to Internal Walls (Insulation shall be installed fromfloor level to the underside of Slab)

PROJECT : OCEAN GROVE ACF

PROJECT NUMBER : 21835-MEL-M

SKETCH TITLE : BASEMENT LAYOUT

AUTHOR : LTK

DATE : 14 DEC2009

Bankstown North Public School 45342-SYD-SUNCC2019 Section J J1 Insulation Mark-upRL31/01/2020

NOTE:

Total R-Value must be calculated in accordance with NCC2019 Volume One Definition inclusiveof thermal bridging effect. Refer AS4859.2-2018.

Page 20: Bankstown North Public School NCC2019 Section J Report

Rev Date By Issue Name CK

07

08

09

10

11

12

13

14

15

16

17

20/01/2020

24/01/2020

27/02/2020

4/03/2020

16/03/2020

16/03/2020

24/03/2020

27/03/2020

20/04/2020

22/04/2020

6/05/2020

GL

GL

JK

GL

GL

GL

GL

GL

GL

GL

GL

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Town Planner Review

Issued for SSD Application

VH

VH

VH

VH

VH

VH

VH

VH

VH

FM

FM

Drawing Title

Scale :Drawn :

1:200 @A1GL

SCHEMATIC DESIGNStatus:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

6/05/2020VH

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Structural & CivilEngineer Consultant

Mechanical, Electrical &Hydraulic EngineeringConsultant

Rev.

Building Certifier

Planning

Landscape

Project Manager

RL +1,000

RL +1,000

ABBREVIATIONSCEILING FINISHESCAP FABRIC ACOUSTIC PANEL TO MATCH EXISTINGCAT-1 SUSPENDED CEILING WITH EXPOSED GRIDS AND ACOUSTIC TILESCBF CEILING ACOUSTIC BAFFLESCES EXPOSED CONCRETE SLABCF CEILING FANCFC FIBRE CEMENT LININGCFC-FR FIRE RATED SYSTEM FIBRE CEMENT LININGCMR MOISTURE RESISTANT PLASTERBOARD CEILINGCPA PERFORATED PROFILED ACOUSTIC CEILINGCPB PLASTERBOARD CEILINGCPC PERFORATED FIBRE CEMENT CEILING, ACOUSTIC INSULATIONCPF 2HR FIRE RATED PLASTERBOARDCPP PERFORATED PLASTERBOARD CEILING, ACOUSTIC INSULATIONCOLUMN FINISHESCC CONCRETE COLUMNSC1 STEEL COLUMN LINED WITH IMPACT RESISTANT PLASTERBOARDSC2 STEEL COLUMN PAINTEDFLOOR FINISHESFCM CONCRETE SLAB WITH CEMENTIOUS TOPPINGFCP DIRECT STUCK CARPETFCS FC SHEETING WITH PAINT FINISHFCT CERAMIC FLOOR TILESFCU CARPET WITH UNDERLAYFDM DOOR MAT - LOOSE LAIDFDR DOOR MAT - RECESSEDFES EXPOSED CONCRETEFOF OFF-FORM CONCRETEFPP PAINTED PLYWOOD FLOORFRB RUBBER FLOORINGFTB TIMBER BOARDSFTT THRESHOLD TILESFVS VINYL SHEETINGFRAMING FINISHESASF PAINTED STEEL FRAMEAW POWDER COATED ALUMINIUM FRAMEGLAZING TYPESGL1 GLAZING (STANDARD) FIXEDGL2 GLAZING LOUVRESGL3 GLAZING -/60/- FIREGLI GLAZING - INTERNALROOF FINISHESRMS ROOF METAL SHEETINGRSF ROOF FLASHINGRWG RAINWATER GUTTERRWP RAINWATER DOWNPIPERWS RAINWATER SPREADER RWT RAINWATER TANKSKIRTING FINISHESSKA ALUMINIUM SKIRTING BOARDSKM MDF SKIRTING BOARD WITH PAINT FINISHSKT TIMBER SKIRTING BOARD WITH PAINT FINISHSCC COVED CERAMIC TILE SKIRTING BOARDSCT CERAMIC TILE SKIRTING BOARDSVC COVED VINYL SKIRTINGWALL FINISHESWCL PRE-FINISHED WALL CLADDING PANELWCN CONCRETE WALLWCT CERAMIC WALL TILESWCT-F CERAMIC FEATURE WALL TILESWBF SPLIT FACED BLOCK RETAINING WALLWFB FACE BRICK WORKWFC FIBRE CEMENT WALL SHEETINGWFR FIRE RATED PLASTERBOARD PAINTED - 2 HOUR RATING (UNLESS NOTED OTHERWISE)WMC PROFILED METAL WALL SHEETINGWMP MOISTURE RESISTANT PLASTERBOARDWMR MASONRY RENDERED WALLWMS METAL STUD WALL FRAMINGWPB IMPACT RESISTANT PLASTERBOARDWPL FULL HEIGHT PINBOARD WALL LININGWWB FULL HEIGHT WHITEBOARD WALLMISCELLANEOUS ITEMSBAL BALUSTRADEEGL EXISTING GROUND LEVELFFL FINISHED FLOOR LEVELFHR FIRE HOSE REELFN FANFR ADJUSTABLE FLOOR RISERFSS FIXED SUN SHADING DEVICEGD GRATED DRAINHR HAND RAILLK LOCKERL LAMINATE ON MDF BOARDLB LIGHTING BARLT MOBILE LAPTOP CHARGING STATIONME MECHANICALMM METAL MESHPB PINBOARDRC REINFORCED CONCRETERT WIRELESS ROUTERRW RETAINING WALLSP SPEAKERSSL STRUCTURAL SLAB LEVELST STACKTG TRENCH GRILLETV FLAT SCREEN TELEVISIONVP VENT PIPEWB WHITEBOARDWGB WHITEBOARD GLASSWPM WATERPROOF MEMBRANE

EXISTING RL

PROPOSED RL

PROPOSED GROUND FLOOR PLAN1:200

SD-0221082

322 Hume Hwy,Bankstown NSW 2200

BANKSTOWN NORTH PUBLICSCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

17

Level 8, 259 George StreetSydneyNSW, 2000

18

x 15

3 =

2,75

3

14 x 154 = 2,150

23 x 157 = 3,600

7.14 %

7.14

%

7.14 %

7.14

%

24 x 150 = 3,600

16 x 150 = 2,400

1,46

0190 1,

460 5,720 5,610

7,000

7,000

7,000

7,000

2,50

0

+66,600+66,600

+66,600

+66,600

+66,600

+66,500

+66,600

SC

SC

SC

SC

DP

DP

DP

DP

DP

SC

SC

SC

DP

SC

SC

SC

SC

DP

DP

DP

DP

DP

DP

DP

SC

SC

SC

SC

SC

SC

LANDSCAPEBATTER

LANDSCAPEBATTER

LANDSCAPEBATTER

APPROX.LANDSCAPEBATTER OUTLINE

LANDSCAPEBATTER

FALL

RWO

RWO

RWO

1:50 FALL

ROOF LINEABOVE

ROOF LINEABOVE

CANOPY LINEABOVE

RO

OF

LIN

EAB

OVE

1:50 FALL

RET

AIN

ING

WAL

L

1:50 FALL

EXISTINGTREE T20

CANOPY BELOW

4° F

ALL

BALCONY 1 41.6 m2

PAA 2 41.9 m2401.33

STORE 1 12.1 m2401.11

PAA 1 41.9 m2401.33

CIRC. 1 160.0 m2

MSB 15.3 m2

DEP 3 29.5 m2601.14

WD 3 12.6 m2401.22

WD 2 12.6 m2401.22

UNDERCROFT 1 34.2 m2

STAIR 2 19.5 m2

EXT STAIR 1 11.4 m2

23 x 157 = 3,600

11 x 152 = 1,670

P

2,6005,000

5,000

4,900

4,500

+66,400

+64,440

+65,420

+66,600

SURVEY SETOUT POINT(BLOCK A)

A-A'SD-041

A-A'SD-041

B-B'SD-041

B-B'SD-041

C-C'SD-041

C-C'SD-041

SD01SD-045

SD02SD-045

DPDP

DPDPDPDP

DPDP

DPDP

DPDP

DPDP

DP

DPDP

DPDP

DPDP

DP

DP

RAINWATER TANK REFER TOHYD. ENG. DRAWINGS

DP

SW

SW

SW

SW

SW

MECHANICAL RISERS

CLIMBING WALLSOFTFALL

SLIDE

SLIDE

LANDSCAPEBATTER

LANDSCAPEBATTER

LANDSCAPEBATTER

CONCRETE

NEW SW

NEW SW

NEW SW

CLIMBING WALLSOFTFALL

CLIMBING WALLSOFTFALL

NEW SW

NEW SW

NEW SW

NEW SINGLE GATE WITHSWIPE CARD AND INTERCOM

NEW SW NEW SW

NEW SW

NEW SW

NEW SOFTFALL

NEWLANDSCAPE

NEWLANDSCAPE

NEWLANDSCAPE

NEWLANDSCAPE

PLANTER PLANTER

CONCRETEMULCH

CONCRETE

CONCRETE

NEW SW

NEW DOUBLE GATE MANUALLYLOCKED NEW FENCENEW FENCE

BLOCK RW

BLO

CK

RW

BLOCK RW

BLOCK RW

BLOCK RWBLOCK RW

BAL

BLO

CK

BAL

BLOCK RW + BAL

BLOCK RW + BAL

BLOCK RW + BAL

BLOCK RW + BAL

NEW / UPGRADEDSUBSTATION

BAL

LINE OF ROOF

CANOPY ABOVE

NEWLANDSCAPE

NEWLANDSCAPE

NEWLANDSCAPE

NEWLANDSCAPE

NEWLANDSCAPE

CONCRETE

CONCRETE

CONCRETE

BLOC

K RW

+ BAL

BLOC

K RW

+ BAL

BLOC

K RW

+ BAL

BLOCK AOUTLINE

LINE OF ROOF

CANOPY ABOVE

SCHOOL SIGNAGE

SCHOOL SIGNAGE

FIRE HYDRANT

FIRE HYDRANT

FIRE HYDRANT

WBF

LIGHTING POLE

HU

ME

H

IG

HW

AY BLOCK A

CANOPY LINEABOVE

EXISTING ADMIN DEMOUNTABLETO BE REMOVED AFTER STAGE 1A

EXIS

TIN

G C

OVE

RED

WAL

KWAY

TO

BE R

EMO

VED

AFT

ER S

TAG

E 1A

EXIS

TIN

G C

OVE

RED

WAL

KWAY

TO

BE

REM

OVE

D A

FTER

STA

GE

1A

HU

ME

H

IG

HW

AY

BLOCK N

BLOCK I

COLA

OUTLINE OF EXISTING COVEREDWALKWAY TO BE RETAINED

AUDITORIUM FOYER 61.1 m2501.05

COMMS/PLANT 1 11.2 m2

UNDERCROFT 2 94.6 m2

HB 5 67.0 m2

401.01/401.11/401.41

STAIR 1 31.9 m2

HB 6 66.9 m2

401.01/401.11/401.41

HB 1 67.0 m2

401.01/401.11/401.41

HB 2 67.0 m2

401.01/401.11/401.41

HB 4 67.0 m2

401.01/401.11/401.41

HB 3 67.0 m2

401.01/401.11/401.41

EDB 1 1.2 m2

VIS.ENTRY 21.1 m2601.06

ST.ENTRY 12.8 m2601.06

INT 2 13.0 m2601.15

ANNEX 48.9 m2602.21

INT 3 12.9 m2601.15

PRINC 17.0 m2601.12

INT 1 17.5 m2601.16

SEC. ST 14.0 m2601.41

STAIR 3 34.0 m2

COMMS 1 8.4 m2

CIRC. 2 48.7 m2

M. WC 7 3.3 m2ACC. WC 3

16.3 m2603.06

CLERICAL 78.1 m2601.21

ACC. WC 4 7.2 m2602.12

SICK RM. 9.2 m2601.52

F. WC 12 2.2 m2

F. WC 11 2.2 m2

F. WC 10 1.8 m2

M. WC 10 2.1 m2

M. WC 9 1.8 m2

FM. WC 9 7.3 m2

M. WC 8 4.6 m2

M. WC 6 4.1 m2

CIRC. 4 70.4 m2 CANOPY

88.9 m2

SICK WC 3.6 m2

LAUNDRY 11.2 m2

LIFT 5.8 m2

STAFF ROOM 98.3 m2602.07

DEP 1 12.9 m2601.13

DEP 2 13.0 m2601.13

CLEANERS 2 6.4 m2

WD 1 12.6 m2401.22

EDB 2 1.4 m2

F. WC 7 3.3 m2F. WC 8

4.0 m2

BOILER 4.2 m2

CIRC. 3 18.1 m2

ASSEMBLY COURT 658.0 m2

ACC. WC 2 7.8 m2602.12

EXT STAIR 2 16.7 m2

EXT STAIR 3 18.5 m2

EXT STAIR 4 18.5 m2

LEGENDEXISTING BUILDING /

HARDSCAPE OUTLINE

BOUNDARY

PROPOSED HARDSCAPE

PROPOSED LANDSCAPE

ADMIN & SERVICES

PROPOSED TREES

EXISTING TREES

LEARNING AREA

STAIRS

UNDERCROFT / CANOPY

NCC Section J 2019 -Compliance Requirements Part J1 Insulation Mark up

LegendTotal R3.7 to Roof and ceiling

Total R2.0 to Slab Soffit Above

Total R1.2 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.6 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.4 to Internal Walls (Insulation shall be installed fromfloor level to the underside of Slab)

PROJECT : OCEAN GROVE ACF

PROJECT NUMBER : 21835-MEL-M

SKETCH TITLE : BASEMENT LAYOUT

AUTHOR : LTK

DATE : 14 DEC2009

Bankstown North Public School 45342-SYD-SUNCC2019 Section J J1 Insulation Mark-upRL31/01/2020

NOTE:

Total R-Value must be calculated in accordance with NCC2019 Volume One Definition inclusiveof thermal bridging effect. Refer AS4859.2-2018.

LegendTotal R3.7 to Roof and ceiling

Total R2.0 to Slab Soffit Above

Total R1.2 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.6 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.4 to Internal Walls (Insulation shall be installed fromfloor level to the underside of Slab)

PROJECT : OCEAN GROVE ACF

PROJECT NUMBER : 21835-MEL-M

SKETCH TITLE : BASEMENT LAYOUT

AUTHOR : LTK

DATE : 14 DEC2009

Bankstown North Public School 45342-SYD-SUNCC2019 Section J J1 Insulation Mark-upRL31/01/2020

NOTE:

Total R-Value must be calculated in accordance with NCC2019 Volume One Definition inclusiveof thermal bridging effect. Refer AS4859.2-2018.

Page 21: Bankstown North Public School NCC2019 Section J Report

Rev Date By Issue Name CK

05

06

07

08

09

10

11

12

13

14

15

15/01/2020

20/01/2020

24/01/2020

27/02/2020

4/03/2020

16/03/2020

24/03/2020

27/03/2020

20/04/2020

22/04/2020

6/05/2020

GL

GL

GL

JK

GL

GL

GL

GL

GL

GL

GL

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Town Planner Review

Issued for SSD Application

VH

VH

VH

VH

VH

VH

VH

VH

VH

FM

FM

Drawing Title

Scale :Drawn :

1:200 @A1GL

SCHEMATIC DESIGNStatus:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

6/05/2020VH

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Structural & CivilEngineer Consultant

Mechanical, Electrical &Hydraulic EngineeringConsultant

Rev.

Building Certifier

Planning

Landscape

Project Manager

RL +1,000

RL +1,000

ABBREVIATIONSCEILING FINISHESCAP FABRIC ACOUSTIC PANEL TO MATCH EXISTINGCAT-1 SUSPENDED CEILING WITH EXPOSED GRIDS AND ACOUSTIC TILESCBF CEILING ACOUSTIC BAFFLESCES EXPOSED CONCRETE SLABCF CEILING FANCFC FIBRE CEMENT LININGCFC-FR FIRE RATED SYSTEM FIBRE CEMENT LININGCMR MOISTURE RESISTANT PLASTERBOARD CEILINGCPA PERFORATED PROFILED ACOUSTIC CEILINGCPB PLASTERBOARD CEILINGCPC PERFORATED FIBRE CEMENT CEILING, ACOUSTIC INSULATIONCPF 2HR FIRE RATED PLASTERBOARDCPP PERFORATED PLASTERBOARD CEILING, ACOUSTIC INSULATIONCOLUMN FINISHESCC CONCRETE COLUMNSC1 STEEL COLUMN LINED WITH IMPACT RESISTANT PLASTERBOARDSC2 STEEL COLUMN PAINTEDFLOOR FINISHESFCM CONCRETE SLAB WITH CEMENTIOUS TOPPINGFCP DIRECT STUCK CARPETFCS FC SHEETING WITH PAINT FINISHFCT CERAMIC FLOOR TILESFCU CARPET WITH UNDERLAYFDM DOOR MAT - LOOSE LAIDFDR DOOR MAT - RECESSEDFES EXPOSED CONCRETEFOF OFF-FORM CONCRETEFPP PAINTED PLYWOOD FLOORFRB RUBBER FLOORINGFTB TIMBER BOARDSFTT THRESHOLD TILESFVS VINYL SHEETINGFRAMING FINISHESASF PAINTED STEEL FRAMEAW POWDER COATED ALUMINIUM FRAMEGLAZING TYPESGL1 GLAZING (STANDARD) FIXEDGL2 GLAZING LOUVRESGL3 GLAZING -/60/- FIREGLI GLAZING - INTERNALROOF FINISHESRMS ROOF METAL SHEETINGRSF ROOF FLASHINGRWG RAINWATER GUTTERRWP RAINWATER DOWNPIPERWS RAINWATER SPREADER RWT RAINWATER TANKSKIRTING FINISHESSKA ALUMINIUM SKIRTING BOARDSKM MDF SKIRTING BOARD WITH PAINT FINISHSKT TIMBER SKIRTING BOARD WITH PAINT FINISHSCC COVED CERAMIC TILE SKIRTING BOARDSCT CERAMIC TILE SKIRTING BOARDSVC COVED VINYL SKIRTINGWALL FINISHESWCL PRE-FINISHED WALL CLADDING PANELWCN CONCRETE WALLWCT CERAMIC WALL TILESWCT-F CERAMIC FEATURE WALL TILESWBF SPLIT FACED BLOCK RETAINING WALLWFB FACE BRICK WORKWFC FIBRE CEMENT WALL SHEETINGWFR FIRE RATED PLASTERBOARD PAINTED - 2 HOUR RATING (UNLESS NOTED OTHERWISE)WMC PROFILED METAL WALL SHEETINGWMP MOISTURE RESISTANT PLASTERBOARDWMR MASONRY RENDERED WALLWMS METAL STUD WALL FRAMINGWPB IMPACT RESISTANT PLASTERBOARDWPL FULL HEIGHT PINBOARD WALL LININGWWB FULL HEIGHT WHITEBOARD WALLMISCELLANEOUS ITEMSBAL BALUSTRADEEGL EXISTING GROUND LEVELFFL FINISHED FLOOR LEVELFHR FIRE HOSE REELFN FANFR ADJUSTABLE FLOOR RISERFSS FIXED SUN SHADING DEVICEGD GRATED DRAINHR HAND RAILLK LOCKERL LAMINATE ON MDF BOARDLB LIGHTING BARLT MOBILE LAPTOP CHARGING STATIONME MECHANICALMM METAL MESHPB PINBOARDRC REINFORCED CONCRETERT WIRELESS ROUTERRW RETAINING WALLSP SPEAKERSSL STRUCTURAL SLAB LEVELST STACKTG TRENCH GRILLETV FLAT SCREEN TELEVISIONVP VENT PIPEWB WHITEBOARDWGB WHITEBOARD GLASSWPM WATERPROOF MEMBRANE

EXISTING RL

PROPOSED RL

PROPOSED FIRST FLOOR PLAN1:200

SD-0231082

322 Hume Hwy,Bankstown NSW 2200

BANKSTOWN NORTH PUBLICSCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

15

Level 8, 259 George StreetSydneyNSW, 2000

23 x 157 = 3,600

1234567891011

12

13 14 15 16 17 18 19 20 21 22

12 x 150 = 1,800

12 x 150 = 1,800

6,860

6,060

2,50

0

+70,200

+70,200

+70,200

+70,200

DPDPDPDP

DPDP

DPDP

DPDP

DPDP

DPDP

DP

DP

DP

DP

RWG

DP

DP

DP

DP

RW

G

RW

G

RWG

RWG

RW

G

RW

G

RW

G

RW

G

DP

DP

DP

DP

VOID

RWO

RWO

RWO

RWO

RWO

RWO

RWO

RWO

BAL

BAL

BAL

+ H

RBA

LBA

L

EXISTINGTREE T20

BAL

BAL

STAIR 1 31.9 m2

LIFT 5.8 m2

CIRC. 6 51.7 m2

BALCONY 3 41.6 m2

EDB 2 1.0 m2

ACC. WC 7 5.1 m2

COMMS 2 15.5 m2

HB 11 67.0 m2

401.01/401.11/401.41

HB 12 67.0 m2

401.01/401.11/401.41

HB 7 67.0 m2

401.01/401.11/401.41

HB 8 67.0 m2

401.01/401.11/401.41

PAA 4 42.0 m2401.33

STORE 2 12.7 m2401.11

EDB 1 1.2 m2

PAA 3 41.8 m2401.33

OFFICE 31.4 m2501.14

STORE 4 5.9 m2502.03

STORE 3 5.9 m2502.03

SPECIAL PROGRAMS 1 32.1 m2502.02

SPECIAL PROGRAMS 2 32.1 m2502.02

KLA 38.8 m2501.36

BALCONY 4 34.2 m2

CL. 3 3.0 m2

STORE 6 6.0 m2502.03

SPECIAL PROGRAMS 3 32.1 m2502.02

STORE 5 6.0 m2502.03

SPECIAL PROGRAMS 4 32.0 m2502.02

M. WC 9 3.2 m2

M. WC 10 3.5 m2

F. WC 11 3.5 m2

CIRC. 7 15.1 m2

AIRLOCK 1 9.1 m2

BALCONY 5 73.3 m2

WD 5 12.6 m2401.22

WD 6 12.6 m2401.22

WD 4 12.6 m2401.22

F. WC 10 3.2 m2

CIRC. 5 160.0 m2

ACC. WC 6 7.1 m2

LIBRARY 290.1 m2

501.05

STAIR 2 42.8 m2

A-A'SD-041

A-A'SD-041

B-B'SD-041

B-B'SD-041

C-C'SD-041

C-C'SD-041

SD01SD-045

SD02SD-045

23 x 157 = 3,600

23 x 157 = 3,600

DPDP

DPDP

DPDP

DPDP

GD

SW

SW

SW

SW

SW

MECHANICAL RISERS

DP

DP

DP

DP

DP

SCHOOL SIGNAGE

BLOCK A BLOCK N

BLOCK I

4.5° FALL

RMS

4° FALL

RMS

RMS

RMS

4° F

ALL

4° F

ALL

TIERED SEATING 101.0 m2

501.14

COMMS/PLANT 2 10.4 m2

STAIR 3 33.9 m2

HB 10 66.2 m2

401.01/401.11/401.41

HB 9 66.2 m2

401.01/401.11/401.41

ACC. WC 5 7.8 m2602.12

LEGENDEXISTING BUILDING /

HARDSCAPE OUTLINE

BOUNDARY

PROPOSED HARDSCAPE

PROPOSED LANDSCAPE

ADMIN & SERVICES

PROPOSED TREES

EXISTING TREES

LEARNING AREA

STAIRS

UNDERCROFT / CANOPY

LegendTotal R3.7 to Roof and ceiling

Total R2.0 to Slab Soffit Above

Total R1.2 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.6 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.4 to Internal Walls (Insulation shall be installed fromfloor level to the underside of Slab)

PROJECT : OCEAN GROVE ACF

PROJECT NUMBER : 21835-MEL-M

SKETCH TITLE : BASEMENT LAYOUT

AUTHOR : LTK

DATE : 14 DEC2009

Bankstown North Public School 45342-SYD-SUNCC2019 Section J J1 Insulation Mark-upRL31/01/2020

NOTE:

Total R-Value must be calculated in accordance with NCC2019 Volume One Definition inclusiveof thermal bridging effect. Refer AS4859.2-2018.

NCC Section J 2019 -Compliance Requirements Part J1 Insulation Mark up

Page 22: Bankstown North Public School NCC2019 Section J Report

Rev Date By Issue Name CK

05

06

07

08

09

10

11

12

13

14

15

15/01/2020

20/01/2020

24/01/2020

27/02/2020

4/03/2020

16/03/2020

24/03/2020

27/03/2020

20/04/2020

22/04/2020

6/05/2020

GL

GL

GL

JK

GL

GL

GL

GL

GL

GL

GL

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Information

Issued for Town Planner Review

Issued for SSD Application

VH

VH

VH

VH

VH

VH

VH

VH

VH

FM

FM

Drawing Title

Scale :Drawn :

1:200 @A1GL

SCHEMATIC DESIGNStatus:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

6/05/2020VH

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Structural & CivilEngineer Consultant

Mechanical, Electrical &Hydraulic EngineeringConsultant

Rev.

Building Certifier

Planning

Landscape

Project Manager

RL +1,000

RL +1,000

ABBREVIATIONSCEILING FINISHESCAP FABRIC ACOUSTIC PANEL TO MATCH EXISTINGCAT-1 SUSPENDED CEILING WITH EXPOSED GRIDS AND ACOUSTIC TILESCBF CEILING ACOUSTIC BAFFLESCES EXPOSED CONCRETE SLABCF CEILING FANCFC FIBRE CEMENT LININGCFC-FR FIRE RATED SYSTEM FIBRE CEMENT LININGCMR MOISTURE RESISTANT PLASTERBOARD CEILINGCPA PERFORATED PROFILED ACOUSTIC CEILINGCPB PLASTERBOARD CEILINGCPC PERFORATED FIBRE CEMENT CEILING, ACOUSTIC INSULATIONCPF 2HR FIRE RATED PLASTERBOARDCPP PERFORATED PLASTERBOARD CEILING, ACOUSTIC INSULATIONCOLUMN FINISHESCC CONCRETE COLUMNSC1 STEEL COLUMN LINED WITH IMPACT RESISTANT PLASTERBOARDSC2 STEEL COLUMN PAINTEDFLOOR FINISHESFCM CONCRETE SLAB WITH CEMENTIOUS TOPPINGFCP DIRECT STUCK CARPETFCS FC SHEETING WITH PAINT FINISHFCT CERAMIC FLOOR TILESFCU CARPET WITH UNDERLAYFDM DOOR MAT - LOOSE LAIDFDR DOOR MAT - RECESSEDFES EXPOSED CONCRETEFOF OFF-FORM CONCRETEFPP PAINTED PLYWOOD FLOORFRB RUBBER FLOORINGFTB TIMBER BOARDSFTT THRESHOLD TILESFVS VINYL SHEETINGFRAMING FINISHESASF PAINTED STEEL FRAMEAW POWDER COATED ALUMINIUM FRAMEGLAZING TYPESGL1 GLAZING (STANDARD) FIXEDGL2 GLAZING LOUVRESGL3 GLAZING -/60/- FIREGLI GLAZING - INTERNALROOF FINISHESRMS ROOF METAL SHEETINGRSF ROOF FLASHINGRWG RAINWATER GUTTERRWP RAINWATER DOWNPIPERWS RAINWATER SPREADER RWT RAINWATER TANKSKIRTING FINISHESSKA ALUMINIUM SKIRTING BOARDSKM MDF SKIRTING BOARD WITH PAINT FINISHSKT TIMBER SKIRTING BOARD WITH PAINT FINISHSCC COVED CERAMIC TILE SKIRTING BOARDSCT CERAMIC TILE SKIRTING BOARDSVC COVED VINYL SKIRTINGWALL FINISHESWCL PRE-FINISHED WALL CLADDING PANELWCN CONCRETE WALLWCT CERAMIC WALL TILESWCT-F CERAMIC FEATURE WALL TILESWBF SPLIT FACED BLOCK RETAINING WALLWFB FACE BRICK WORKWFC FIBRE CEMENT WALL SHEETINGWFR FIRE RATED PLASTERBOARD PAINTED - 2 HOUR RATING (UNLESS NOTED OTHERWISE)WMC PROFILED METAL WALL SHEETINGWMP MOISTURE RESISTANT PLASTERBOARDWMR MASONRY RENDERED WALLWMS METAL STUD WALL FRAMINGWPB IMPACT RESISTANT PLASTERBOARDWPL FULL HEIGHT PINBOARD WALL LININGWWB FULL HEIGHT WHITEBOARD WALLMISCELLANEOUS ITEMSBAL BALUSTRADEEGL EXISTING GROUND LEVELFFL FINISHED FLOOR LEVELFHR FIRE HOSE REELFN FANFR ADJUSTABLE FLOOR RISERFSS FIXED SUN SHADING DEVICEGD GRATED DRAINHR HAND RAILLK LOCKERL LAMINATE ON MDF BOARDLB LIGHTING BARLT MOBILE LAPTOP CHARGING STATIONME MECHANICALMM METAL MESHPB PINBOARDRC REINFORCED CONCRETERT WIRELESS ROUTERRW RETAINING WALLSP SPEAKERSSL STRUCTURAL SLAB LEVELST STACKTG TRENCH GRILLETV FLAT SCREEN TELEVISIONVP VENT PIPEWB WHITEBOARDWGB WHITEBOARD GLASSWPM WATERPROOF MEMBRANE

EXISTING RL

PROPOSED RL

PROPOSED SECOND FLOOR PLAN1:200

SD-0241082

322 Hume Hwy,Bankstown NSW 2200

BANKSTOWN NORTH PUBLICSCHOOL

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

15

Level 8, 259 George StreetSydneyNSW, 2000

12 x 150 = 1,800

1234567891011

12 x 150 = 1,800

1 2 3 4 5 6 7 8 9 10 11

DPDPDPDP

DPDP

DPDP

DPDP

DPDP

DPDP

RW

GR

WG

DP

DP

DP

DP

LINE OF CANOPY BELOW

LINE OF ROOF ABOVE

RWO

RWO

RWO

RWO

RWO

RWO

BAL

BAL

BAL

+ H

RBA

LBA

LBA

L

BAL

BALSTAIR 1 32.2 m2

LIFT 5.8 m2

HB 17 67.0 m2

401.01/401.11/401.41

HB 18 67.0 m2

401.01/401.11/401.41

HB 13 67.0 m2

401.01/401.11/401.41

HB 14 67.0 m2

401.01/401.11/401.41

PAA 5 41.9 m2401.33

BALCONY 6 41.6 m2

STORE 7 12.0 m2401.11

PAA 6 42.0 m2401.33

EDB 1 1.2 m2

HB 20 66.7 m2

401.01/401.11/401.41

HB 19 66.7 m2

401.01/401.11/401.41

HB 24 66.6 m2

401.01/401.11/401.41

HB 23 66.7 m2

401.01/401.11/401.41

PAA 8 42.0 m2401.33

CIRC. 9 138.0 m2

PAA 7 42.0 m2401.33

BALCONY 9 20.0 m2

CL. 4 3.1 m2

STORE 4 12.8 m2401.11

COMMS 3 8.1 m2

AIRLOCK 2 10.0 m2

EDB 2 1.2 m2

ACC. WC 9 5.9 m2

M. WC 12 3.2 m2

F. WC 13 3.2 m2

M. WC 11 3.1 m2

F. WC 12 3.1 m2

CIRC. 10 14.9 m2

BALCONY 7 35.0 m2

BALCONY 8 72.9 m2

WD 9 12.6 m2401.22

WD 8 12.6 m2401.22

WD 7 12.6 m2401.22

WD 10 12.6 m2401.22

WD 11 12.6 m2401.22

WD 12 12.6 m2401.22

CIRC. 8 160.0 m2

STAIR 2 42.7 m2

A-A'SD-041

A-A'SD-041

B-B'SD-041

B-B'SD-041

C-C'SD-041

C-C'SD-041

SD01SD-045

SD02SD-045

23 x 157 = 3,600

1234567891011

12

13 14 15 16 17 18 19 20 21 22

23 x 157 = 3,600

1234567891011

12

13 14 15 16 17 18 19 20 21 22

MECHANICAL RISERS

DPDP

DPDP

DPDP

DPDP

DPDP

DP

SW

SCHOOL SIGNAGE

BLOCK A BLOCK N

BLOCK I

COMMS/PLANT 3 11.7 m2

STAIR 3 34.0 m2

HB 16 66.2 m2

401.01/401.11/401.41

HB 15 66.2 m2

401.01/401.11/401.41

HB 21 67.0 m2

401.01/401.11/401.41

HB 22 67.0 m2

401.01/401.11/401.41

ACC. WC 8 7.8 m2602.12

LEGENDEXISTING BUILDING /

HARDSCAPE OUTLINE

BOUNDARY

PROPOSED HARDSCAPE

PROPOSED LANDSCAPE

ADMIN & SERVICES

PROPOSED TREES

EXISTING TREES

LEARNING AREA

STAIRS

UNDERCROFT / CANOPY

NCC Section J 2019 -Compliance Requirements Part J1 Insulation Mark up

LegendTotal R3.7 to Roof and ceiling

Total R2.0 to Slab Soffit Above

Total R1.2 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.6 to External Walls (Insulation shall be installed fromfloor level to the underside of Slab)

Total R1.4 to Internal Walls (Insulation shall be installed fromfloor level to the underside of Slab)

PROJECT : OCEAN GROVE ACF

PROJECT NUMBER : 21835-MEL-M

SKETCH TITLE : BASEMENT LAYOUT

AUTHOR : LTK

DATE : 14 DEC2009

Bankstown North Public School 45342-SYD-SUNCC2019 Section J J1 Insulation Mark-upRL31/01/2020

NOTE:

Total R-Value must be calculated in accordance with NCC2019 Volume One Definition inclusiveof thermal bridging effect. Refer AS4859.2-2018.

Page 23: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Wall Glazing Calculation

Appendix B Wall Glazing Calculation

Page 24: Bankstown North Public School NCC2019 Section J Report

[KUTOOLSFOREXCEL]

Compliant Solution = Date Non-Compliant Solution = 30/01/2020

Name Method 2Ray Leung North East South West All

Company Wall-glazing U-Value (W/m².K) 2.15 1.33 2.01 2.39 1.99

WGE 2.00 2.00 2.00 2.00 2Solar Admittance 0.10 0.07 0.15 0.18

Position 0.13 0.13 0.13 0.13Engineer AC Energy Value 458

459.88296Building Name / AddressBankstown North Public School322 Hume Hwy, Bankstown, New South Wales

Method 1Building State

NSW

Climate Zone

Building Classification

Storeys Above Ground Method 23

North East South West

Glazing Area (m²) 274.5365 82.207 222.4293 173.321

Glazing to Façade Ratio 32% 16% 28% 39%

Methodology

Average Glazing U-Value (W/m².K) 4.60 4.60 4.60 4.60

Average Glazing SHGC 0.53 0.53 0.53 0.53

Wall Area (m²) 584.8945 436.495 569.02 276.17

Methodology

Average Wall R-value (m²K/W) 1.00 1.40 1.00 1.00

Solar Absorptance 0.4 0.4 0.4 0.4

IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THIS CALCULATOR

Calculator

G01 + G02 + G03 + G04 + G01 + G02 + G01 + G02 + G03 + G04 + G05

+ G06 + G07 + G08 +

Horizontal

Aluminium +

User Defined

Horizontal

Aluminium +

Casement +

Climate Zone 5 - Warm

temperate

Project Summary

Method 1

Class 9b - schools

The summary below provides an overview of where compliance has been achieved for Specification J1.5a - Calculation of

U-Value and solar admittance - Method 1 (Single Aspect) and Method 2 (Multiple Apects).

Wall + Spandrel + Wall +

Aluminium +

Horizontal Horizontal

Wall Thickness

NCC Specification J1.5b

Wall Construction

Glazing References

Shading Systems

200 + 200 + 200 + 200 +

Typical + Spandrel Config 4 -

R0.5 + Typical 1.4 +

Typical + Spandrel Config 4 -

R0.5 +

Wall + Spandrel + Wall +

Project Details

USER (DEFINED) + USER (DEFINED) + USER (DEFINED) + USER (DEFINED) +

Casement + Casement + Casement +

G01 + G02 + G03 + G04 +

G05 + G06 + G07 + G08 +

G09 +

Wall Types

Glass Types

Glazing System Types

Frame Types Aluminium +

Typical + Spandrel Config 4 - R0.5

+

2.15 1.33 2.01 2.390.8

1.3

1.8

2.3

2.8

North East South West

W/m

²K

Wall-glazing U-Value

Proposed Design DTS Reference

0.10 0.07 0.15 0.180.04

0.09

0.14

0.19

North East South West

SA

Solar Admittance

Proposed Reference DTS Reference

2.00 1.990.8

1.3

1.8

2.3

W/m

²K

Wall-glazing U-Value - ALL

DTS Reference Proposed Design

460 45860

160

260

360

460

560

AC

En

erg

y

AC Energy Value

DTS Reference Proposed Design

FaçadeReport

By accessing or using this calculator, you agree to the following: While care has been taken in the preparation of this calculator, it may not be complete or up-to-date. You can ensure that you are using a complete and up-to-date version by checking the Australian Building Codes Board website (www.abcb.gov.au). The Australian Building Codes Board, the Commonwealth of Australia andStates and Territories of Australia do not accept any liability, including liability for negligence, for any loss (howsoever caused), damage, injury, expense or cost incurred by any person as a result of accessing, using or relying upon this calculator, to the maximum extent permitted by law. No representation or warranty is made or given as to the currency, accuracy, reliability, merchantability, fitness for any purpose or completeness of this calculator or any information which may appear on any linked websites, or in other linked information sources, and all such representations and warranties are excluded to the extent permitted by law. This calculator is not legal or professional advice. Persons rely upon this calculator entirely at their own risk and must take responsibility for assessing the relevance and accuracy of the information in relation to their particular circumstances.

© Commonwealth of Australia and the States and Territories of Australia 2019, published by the Australian Building Codes Board.The material in this calculator is licensed under a Creative Commons Attribution-No Derivatives—4.0 International licence, with the exception of third party materials and any trade marks. It is provided for general information only and without warranties of any kind. You may not make derivatives of this calculator, but may only use a verbatim copy. More information on this CC BY ND licence is set out at the Creative Commons Website. For information regarding this calculator, see www.abcb.gov.au.

Page 25: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Occupancy and Operational Profiles

Appendix C Occupancy and Operational

Profiles

The below tables are an extract from NCC 2019 Volume One Section J, Specification JC, Occupancy and Operational

profiles.

Class 9b (School ) Profiles

Hours of Day Occupancy Lighting Equipment HVAC

(Local Standard Time) (Monday – Friday) (Monday –

Friday) (Monday – Friday) (Monday – Friday)

12:00am to 1:00am 0% 5% 5% Off

1:00am to 2:00am 0% 5% 5% Off

2:00am to 3:00am 0% 5% 5% Off

3:00am to 4:00am 0% 5% 5% Off

4:00am to 5:00am 0% 5% 5% Off

5:00am to 6:00am 0% 5% 5% Off

6:00am to 7:00am 0% 5% 5% Off

7:00am to 8:00am 5% 30% 30% On

8:00am to 9:00am 75% 85% 85% On

9:00am to 10:00am 90% 95% 95% On

10:00am to 11:00am 90% 95% 95% On

11:00am to 12:00am 90% 95% 95% On

12:00pm to 1:00pm 50% 80% 70% On

1:00pm to 2:00pm 50% 80% 70% On

2:00pm to 3:00pm 90% 95% 95% On

3:00pm to 4:00pm 70% 90% 80% On

4:00pm to 5:00pm 50% 70% 60% On

5:00pm to 6:00pm 20% 20% 20% Off

6:00pm to 7:00pm 20% 20% 20% Off

7:00pm to 8:00pm 20% 20% 20% Off

8:00pm to 9:00pm 10% 10% 10% Off

9:00pm to 10:00pm 5% 5% 5% Off

10:00pm to 11:00pm 5% 5% 5% Off

11:00pm to 12:00pm 5% 5% 5% Off

Equivalent Peak Hours 7.5 9.4 9.0 10.0

* Saturday and Sunday profiles are 5% continuous artificial lighting and 5% continuous appliances and equipment. There

is no occupancy and the air-conditioning is “off”.

Page 26: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Occupancy and Operational Profiles

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%1

2:0

0am

to

1:0

0am

1:0

0am

to

2:0

0am

2:0

0am

to

3:0

0am

3:0

0am

to

4:0

0am

4:0

0am

to

5:0

0am

5:0

0am

to

6:0

0am

6:0

0am

to

7:0

0am

7:0

0am

to

8:0

0am

8:0

0am

to

9:0

0am

9:0

0am

to

10

:00

am

10

:00

am t

o…

11

:00

am t

o…

12

:00

pm

to

1:0

0p

m

1:0

0p

m t

o 2

:00

pm

2:0

0p

m t

o 3

:00

pm

3:0

0p

m t

o 4

:00

pm

4:0

0p

m t

o 5

:00

pm

5:0

0p

m t

o 6

:00

pm

6:0

0p

m t

o 7

:00

pm

7:0

0p

m t

o 8

:00

pm

8:0

0p

m t

o 9

:00

pm

9:0

0p

m t

o 1

0:0

0p

m

10

:00

pm

to

11

:00

pm

to

Mo

du

lati

ng

Val

ue

Axis Title

Class 9b - School (Weekdays)

Occupancy

Lighting

Page 27: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School JV3 Verification Using a Reference Building

Appendix D JV3 Verification Using a Reference

Building

Page 28: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Section J JV3 Modelling Parameters

Appendix E Section J JV3 Modelling Parameters

Parameter Verification Reference

Value Comment

Thermostat Setpoint JVb

(2)(c)(i)(A)

21ºC to 24ºC (98% of time) Reference and Proposed Models

Daily Occupancy JVc (2)(a)(i) Profiles per BCA As per BCA Class specification

Operating Profiles JVc (2)(a)(i) Profiles per BCA As per BCA Class specification

Illumination power

density

Table J6.2a As per BCA provisions See Section 2: Modelling Inputs

Ventilation JVb (2)(a)(ii) As per BCA provisions NCC BCA Part F4, and AS1668.2

Internal Heat Gains JVb (2)(c)(v) As per BCA provisions See Section 3: Modelling Inputs

Infiltration (perimeter) JVb

(2)(d)(i)(F)

0.35 Air Changes per Hour

(ACH)

Plant on

0.7 ACH Plant off

Operation of blinds Excluded from assessment Reference and Proposed Models

Furniture and fitings Excluded from assessment Reference and Proposed Models

R-Value of air films As per J1.2 As per Calculation methodology

Heat Migration Migration across HVAC zones -

On.

As per Calculation methodology

Artificial Lighting As per BCA provisions See Section 3: Modelling Inputs

Lifts Excluded from assessment Reference and Proposed Models

Hot Water Excluded from assessment Reference and Proposed Models

Non-Greenhouse Gas

emitting energy sources

Excluded from assessment Reference and Proposed Models

Thermal Calculation

Method

JV3 (c), (d)

(ii) (B)

IES-VE, ASHRAE Perth TRY Complies with the ABCB Protocol for

Building Modelling and Analysis

(Software).

Page 29: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Part J1 – Building Fabric

Appendix F Part J1 – Building Fabric

The following prescriptive performance requirements for the façade must be adhered to, as per the NCC:

Page 30: Bankstown North Public School NCC2019 Section J Report

Bankstown North Public School Part J3 – Building Sealing

Appendix G Part J3 – Building Sealing

The following prescriptive performance requirements for the façade must be adhered to, as per the NCC:

Page 31: Bankstown North Public School NCC2019 Section J Report

Level 6, Building B

207 Pacific Highway

St Leonards NSW 2065

Tel +61 +61 2 8484 7000

E [email protected]

For more information please visit

www.wge.com.au