WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT Ass't District Engr.: Paul Gudelski General Contractor: American Bridge/ Kraemer & Sons,Inc PCC Resident Engineer: Srinivas Gunna Contractor Project Manager: Dan Bell Estimate Ending Date: April 25, 2004 Schedule Status Date: May 5, 2004 Base Contract Amount: 185,919,605 $ Notice to Proceed Date: 21-Feb-03 Approved Change Orders: (Total Chgs:4) (269,784) $ Original Contract Completion Date: 15-Aug-08 Additional Work Items: (Total Items:5) 82,607 $ Number of Contract Days: 2003 Overruns to Date: - $ Current Contract Amount: 185,732,427 $ Contract Days Expended: 22.0% or 440 Days Remaining Work Item Budget 9,213,374 $ Total MSHA Contract Budget 194,945,801 $ Revised Contract Completion Date: N/A Installed Work Paid to Date: (Est. #29) 29,433,281 $ Current Baseline Schedule % Complete: 16.6% Stored Material Balance: 8,818,935 $ Total Paid to Contractor 38,252,216 $ Contract Amount Remaining*: 156,299,146 $ * - Current contract amount less installed work paid to date. Percent Work Complete**: 15.8% ** - Installed work to date divided by current contract amount. Construction Activities Summary Status thru Average Daily Labor: 60 Average Daily Supervisory: 13 May 5, 2004 April 29, 2004 A. Current Progress: Field Activities - Continued construction of falsework at M1-OL. - Placed concrete at V1-OL South, Segment 6. - Continue construction of formwork and falsework for V1OL- South, Segment 7 - Continue placement of reinforcing steel for V1OL-South, Segment 7. - Placing reinforcing steel at V1OL-Center, Seg 4/Seg 6 construction joint. - Continued construction of falsework for front transverse beam at V1OL, South, Center, and North Arches. - Continued constructing formwork for stair landings, V1OL- Center and North, front and rear arches. - Completed grouting tendons T2R, V1OL-Center. - Placed concrete at M1OL-North Segment 1, Top. - Placing reinforcing steel at M1OL-North Segment 2, Top. - Placed concrete at M1OL-Center Segment 3, Bottom. - Placing reinforcing steel at M1OL-Center Segment 4, Bottom. - Placing pre-fabricated reinforcing steel at V1OL-North, Segment 6. B. Planned Activities For The Next 30 Days: - Continue construction of falsework and formwork for V1 Outer Loop Arches. - Continue placement of concrete at V1 Outer Loop Arches. - Complete formwork and falsework for V1-OL North Segment 6. - Place concrete at V1-OL North, Segment 6. - Continue construction of formwork and falsework for V1-OL South, Segment 7. - Place concrete at V1-OL South, Segment 7. - Grout tendons at V1-OL Center, T8F, T3R, T4F,T5R, T7R. - Continue construction of falsework and formwork for V1-OL tie girders. - Continue formwork and falsework erection at M1OL. - Place concrete for M1 OL Center, Segments 4, and 5, Bottom - Place concrete for M1OL North, Segments 2, 3, 4 and 5 Top. - Next Partnering Meeting scheduled for 10:30 AM, May 19, 2004 at the Eisenhower office. C. Issues /Concerns - Resumed air testing of PT ducts at M1-OL, South, Center, and North pedestals. Clean-up of previously repaired ducts at M1-IL South, Center and North pedestals will resume when barge is available for vacuum trucks. - Regrouted T5F, M1OL-Center. The current status of the PT duct grouting and air testing is a shown on the attached report. - The Contractor has submitted a claim regarding the operator house glazing D. Potential Community Impacts - None at this time E. Key Date Plan Forecast FRP V1-OL South, Segment 6 22-Jan-2004* 30-Apr-2004A * Based on 3AX7 schedule N Fender System M1 V1 IL OL Existing Bridge OL N IL

Upload: others

Post on 26-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 063

Bascule Spans (BR-3A)Project Number: PG-34555173R

MDOT Ass't District Engr.: Paul Gudelski General Contractor: American Bridge/ Kraemer & Sons,IncPCC Resident Engineer: Srinivas Gunna Contractor Project Manager: Dan Bell

Estimate Ending Date: April 25, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 185,919,605$ Notice to Proceed Date: 21-Feb-03Approved Change Orders: (Total Chgs:4) (269,784)$ Original Contract Completion Date: 15-Aug-08Additional Work Items: (Total Items:5) 82,607$ Number of Contract Days: 2003Overruns to Date: -$ Current Contract Amount: 185,732,427$ Contract Days Expended: 22.0% or 440 DaysRemaining Work Item Budget 9,213,374$ Total MSHA Contract Budget 194,945,801$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #29) 29,433,281$ Current Baseline Schedule % Complete: 16.6%Stored Material Balance: 8,818,935$ Total Paid to Contractor 38,252,216$

Contract Amount Remaining*: 156,299,146$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 15.8% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 60 Average Daily Supervisory: 13

May 5, 2004April 29, 2004

A. Current Progress:Field Activities- Continued construction of falsework at M1-OL.- Placed concrete at V1-OL South, Segment 6.- Continue construction of formwork and falsework for V1OL-South, Segment 7- Continue placement of reinforcing steel for V1OL-South, Segment 7.- Placing reinforcing steel at V1OL-Center, Seg 4/Seg 6 construction joint.- Continued construction of falsework for front transverse beam at V1OL, South, Center, and North Arches.- Continued constructing formwork for stair landings, V1OL-Center and North, front and rear arches.- Completed grouting tendons T2R, V1OL-Center.- Placed concrete at M1OL-North Segment 1, Top.- Placing reinforcing steel at M1OL-North Segment 2, Top.- Placed concrete at M1OL-Center Segment 3, Bottom.- Placing reinforcing steel at M1OL-Center Segment 4, Bottom.- Placing pre-fabricated reinforcing steel at V1OL-North, Segment 6.

B. Planned Activities For The Next 30 Days:- Continue construction of falsework and formwork for V1 Outer Loop Arches.- Continue placement of concrete at V1 Outer Loop Arches.- Complete formwork and falsework for V1-OL North Segment 6.- Place concrete at V1-OL North, Segment 6.- Continue construction of formwork and falsework for V1-OL South, Segment 7.- Place concrete at V1-OL South, Segment 7.- Grout tendons at V1-OL Center, T8F, T3R, T4F,T5R, T7R.- Continue construction of falsework and formwork for V1-OL tie girders.- Continue formwork and falsework erection at M1OL.- Place concrete for M1 OL Center, Segments 4, and 5, Bottom- Place concrete for M1OL North, Segments 2, 3, 4 and 5 Top.

- Next Partnering Meeting scheduled for 10:30 AM, May 19, 2004 at the Eisenhower office.

C. Issues /Concerns - Resumed air testing of PT ducts at M1-OL, South, Center, and North pedestals. Clean-up of previously repaired ducts at M1-IL South, Center and North pedestals will resume when barge is available for vacuum trucks.

- Regrouted T5F, M1OL-Center. The current status of the PT duct grouting and air testing is a shown on the attached report.

- The Contractor has submitted a claim regarding the operator house glazing

D. Potential Community Impacts - None at this time

E. Key Date Plan ForecastFRP V1-OL South, Segment 6 22-Jan-2004* 30-Apr-2004A* Based on 3AX7 schedule

N

Fender SystemM1V1

IL

OL

Existing Bridge

OL

N

IL

Page 2: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

BR-3A Substructure Concrete Placed

Virginia Outer Loop - Segments and Tie GirdersThrough 05-May-04

0

1

2

3

4

5

6

7

8

9

10

20-A

ug-20

03

3-Sep

-2003

17-S

ep-20

03

1-Oct-

2003

15-O

ct-20

03

29-O

ct-20

03

12-N

ov-20

03

26-N

ov-20

03

10-D

ec-20

03

24-D

ec-20

03

7-Jan

-2004

21-Ja

n-200

4

4-Feb

-2004

18-Feb

-2004

3-Mar-

2004

17-M

ar-20

04

31-M

ar-20

04

14-A

pr-20

04

28-A

pr-20

04

12-M

ay-20

04

26-M

ay-20

04

9-Jun

-2004

23-Ju

n-200

4

7-Jul-

2004

21-Ju

l-200

4

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

1

2

3

4

5

6

7

8

9

10

Thou

sand

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cum Plan Early Cumulative Actual Cum Plan Late

Actual 2,955 of 7,659 cy = 38.6 % ComplPlanned6,075 of 7,659 cy = 79.3 % Compl

Tie Girders

S/N Seg 6

S/N Seg 7C Seg 6

C Seg 7

Maryland Outer Loop - Segments and Tie GirdersThrough 05-May-04

0

1

2

3

4

5

6

7

8

9

10

28-Ja

n-200

4

11-F

eb-20

04

25-F

eb-20

04

10-M

ar-20

04

24-M

ar-20

04

7-Apr-

2004

21-A

pr-20

04

5-May

-2004

19-M

ay-20

04

2-Jun

-2004

16-Ju

n-200

4

30-Ju

n-200

4

14-Ju

l-200

4

28-Ju

l-200

4

11-A

ug-20

04

25-A

ug-20

04

8-Sep

-2004

22-S

ep-20

04

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

1

2

3

4

5

6

7

8

9

10

Thou

sand

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cum Plan Early Cumulative Actual Cum Plan Late

Actual 475 of 7,659 cy = 6.2 % ComplPlanned3,260 of 7,659 cy = 42.6 % Compl

Tie Girders

N Seg 7C Seg 6

S/N Seg 6

C Seg 7

S Seg 7

Page 3: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

Total DuctsNo Grouting

RequiredGrouting Required

* Grouting Complete

** Pressure

Test Required

Pressure Test

Complete

Virginia Outer Loop (V1 OL)South Pedestal 18 4 14 14 18 18Center Pedestal 18 12 6 6 18 18North Pedestal 18 17 1 1 18 18

Maryland Outer Loop (M1 OL)South Pedestal 18 10 8 8 18 18Center Pedestal 18 10 8 8 18 17North Pedestal 18 10 8 8 18 18

Maryland Inner Loop (M1 IL)South Pedestal 18 9 9 9 18 0Center Pedestal 18 13 5 5 18 0North Pedestal 18 4 14 14 18 0

Virginia Inner Loop (V1IL)South Pedestal 18 4 14 14 18 16Center Pedestal 18 11 7 7 18 18North Pedestal 18 8 10 10 18 18

TOTAL 216 112 104 104 216 159

Last Week's Total 216 112 104 104 216 159

** There are 76 ducts total, that have been grouted, but cannot be air tested until warmer weather.

* There are 28 ducts total, that have been grouted, but cannot be cleaned until warmer weather. These are the repaired ducts located at MIIL, SOUTH, CENTER, and NORTH pedestals.

Pier

WEEKLY STATUS REPORT 026BR-3A DUCT GROUTING

PCC Resident Engineer : Srinivas GunnaConstruction Activities Summary Status thru May 5, 2004

Page 4: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 053

VA Fixed Span Construction for the Replacement of the Woodrow Wilson Bridge on I-95/495 (Capital Beltway) over the Potomac River (BR3B)

Project Number: PG-517-5173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: Va Approach Constructors (VAC)PCC Resident Engineer: David Tackoor Contractor Project Manager: Robert McTavish

Estimate Ending Date: April 27, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 115,505,592$ Notice to Proceed Date: 22-Apr-03Approved Change Orders: (Total Chgs:1) 19,954$ Original Contract Completion Date: 15-Aug-08Additional Work Items: (Total Items:2) 171,920$ Number of Contract Days: 1943Overruns to Date: -$ Current Contract Amount: 115,697,466$ Contract Days Expended: 19.6% or 380 DaysRemaining Work Item Budget 5,603,360$ Total MSHA Contract Budget 121,300,826$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #20) 19,408,952$ Current Baseline Schedule % Complete: 21.6%Stored Material Balance: 6,653,492$ Total Paid to Contractor 26,062,444$

Contract Amount Remaining*: 96,288,514$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 16.8% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 60 Average Daily Supervisory: 14

May 5, 2004April 29, 2004

A) CURRENT PROGRESS - Continue installation of reinforcing steel for V4 OLN east arm and V6 OLS east arm AND Commence V3 OLS west arm CAST - Segment V6 OLS A5E - Segment V6 OLS A4E - Segment V6 OLS A3E - Segment V6 OLS A0E (Core) - Segment V4 OLN A5E - Segment V4 OLN A4E - Segment V4 OLN A0E (Wings) ERECTED - Segment V7 OLS A0E (Wings) - Segment V7 OLN A0E (Core + Wings) - Segment V7 OLN A0W (Core + Wings) - Segment V6 OLS A3W - Tie beams (total to date = 40) B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: PRECAST POURS - Commence V6 OLN east arm - Continue V6 OLS east arm - Complete V4 OLN east - Commence V3 OLS west arm ERECTION - Complete Knuckle/Tie beams V7 OLS - Complete Knuckle/Tie beams V7 OLN - Complete Knuckle/Tie beams V4 OLS - Complete V6 OLS west arm & Commence V6 OLS west arm - Continue V4 OLN west arm

C) ISSUES/CONCERNS: - None D) POTENTIAL COMMUNITY CONCERNS - None

E) KEY DATES Planned Forecast - Complete erection/tie beams 02/25/04 05/30/04 on V7 OLS - Complete erection/tie beams 03/31/04 05/30/04 on V7 OLN - Complete erection/tie beams 04/09/04 05/30/04 on V4 OLS

Page 5: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

BR-3B Segments CastVirginia Outer Loop

Through 05-May-04

Pier 2

Pier 5

Pier 3

Pier 6Pier 4

Pier 7

0

10

20

30

40

50

6-Oct-

03

3-Nov

-03

1-Dec

-03

29-D

ec-03

26-Ja

n-04

23-Feb

-04

22-M

ar-04

19-A

pr-04

17-M

ay-04

14-Ju

n-04

12-Ju

l-04

9-Aug

-04

6-Sep

-04

4-Oct-

04

1-Nov

-04

Wee

kly

Segm

ents

Cas

t

0

50

100

150

200

250

Cum

ulat

ive

Segm

ents

Cas

t

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 79 of 230 segments = 34.3 % ComplPlanned153 of 230 segments = 66.5 % Compl

BR-3B Segments SetVirginia Outer Loop

Through 05-May-04

Pier 7

Pier 2 & 3

Pier 4 & 5

Pier 6

0

10

20

30

40

50

12-N

ov-03

10-D

ec-03

7-Jan

-04

4-Feb

-04

3-Mar-

04

31-M

ar-04

28-A

pr-04

26-M

ay-04

23-Ju

n-04

21-Ju

l-04

18-A

ug-04

15-S

ep-04

13-O

ct-04

10-N

ov-04

Wee

kly

Segm

ents

Cas

t

0

60

120

180

240

300

Cum

ulat

ive

Segm

ents

Cas

t

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 44 of 230 segments = 19.1 % ComplPlanned 72 of 230 segments = 31.3 % Compl

Page 6: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 049

Construction of Maryland Approach Spans for the Replacement of the Woodrow Wilson Bridge on I-95/495 (Capital Beltway) over the Potomac River (BR-3C)

Project Number: PG5155173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: Potomac ConstructorsPCC Resident Engineer: Harold A. (Jay) Davidson Contractor Project Manager: Kevin Davy

Estimate Ending Date: April 26, 2004 Schedule Status Date: May 6, 2004Base Contract Amount: 191,182,746$ Notice to Proceed Date: 13-Jun-03Approved Change Orders: (Total Chgs:0) -$ Original Contract Completion Date: 1-Dec-08Additional Work Items: (Total Items:2) 3,959,201$ Number of Contract Days: 1998Overruns to Date: 600$ Current Contract Amount: 195,142,547$ Contract Days Expended: 16.5% or 329 DaysRemaining Work Item Budget 5,599,336$ Total MSHA Contract Budget 200,741,883$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #15) 33,655,094$ Current Baseline Schedule % Complete: 22.6%Stored Material Balance: 976,499$ Total Paid to Contractor 34,631,593$

Contract Amount Remaining*: 161,487,454$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 17.2% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 51 Average Daily Supervisory: 12

May 6, 2004April 29, 2004

A) CURRENT PROGRESS - M7-ILN-KE was cast on 30 Apr. - M9-ILS-4E was cast on 30 Apr. - M9-ILN-1E was cast on 4 May. - M9-ILS-5E was cast on 5 May. - M8-ILN-2E was cast on 5 May. - As built pedestal survey continues. - The bulkhead construction continues. - The cleaning of PT ducts has commenced. Pier M9 has been completed. - As of 5 May, 39 segments have been cast. B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: - Continue casting of segments. - Complete bulkhead construction. - Continue PT duct cleaning. - Start PT duct repairs.

C) ISSUES/CONCERNS: - Segment casting continues to fall behind schedule. D) POTENTIAL COMMUNITY CONCERNS - None

E) KEY DATES PLAN FORECASTStart segment erection @ M9-ILN 07-Apr-2004 5-Aug-2004

Page 7: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

ououoiu

BR-3C Segments CastMaryland Inner & Outer Loop

Through 05-May-04

0

5

10

15

20

17-D

ec-03

14-Ja

n-04

11-Feb

-04

10-M

ar-04

7-Apr-

04

5-May

-04

2-Jun

-04

30-Ju

n-04

28-Ju

l-04

25-A

ug-04

22-S

ep-04

20-O

ct-04

17-N

ov-04

15-D

ec-04

12-Ja

n-05

9-Feb

-05

9-Mar-

05

6-Apr-

05

4-May

-05

1-Jun

-05

Wee

kly

Segm

ents

Cas

t

0

200

400

600

800

Cum

ulat

ive

Segm

ents

Cas

t

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 39 of 616* segments = 6.3 % ComplPlanned141 of 616* segments = 22.9 % Compl

*excluding 144 tie girders which were shown in previous reports

BR-3C Segments SetMaryland Inner & Outer Loop

Through 05-May-04

0

5

10

15

20

7-Apr-

04

5-May

-04

2-Jun

-04

30-Ju

n-04

28-Ju

l-04

25-A

ug-04

22-S

ep-04

20-O

ct-04

17-N

ov-04

15-D

ec-04

12-Ja

n-05

9-Feb

-05

9-Mar-

05

6-Apr-

05

4-May

-05

1-Jun

-05

29-Ju

n-05

27-Ju

l-05

24-A

ug-05

Wee

kly

Segm

ents

Ere

cted

0

200

400

600

800

Cum

ulat

ive

Segm

ents

Ere

cted

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 0 of 596* segments = 0.0 % ComplPlanned26 of 596* segments = 4.2 % Compl

20 segments for Pier M10 scheduled for erection Dec 2006

*excluding 144 tie girders which were shown in previous reports

Page 8: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 124

I-295 Ramps E, E-1, F, R Contract (MA1)Project Number: PG-346-5173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: G.A. & F.C. Wagman, Inc.PCC Resident Engineer: Paul Stroessner Contractor Project Manager: Michael Navecky

Estimate Ending Date: April 13, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 42,435,333$ Notice to Proceed Date: 26-Nov-01Approved Change Orders: (Total Chgs:7) 340,056$ Original Contract Completion Date: 25-Feb-04Additional Work Items: (Total Items:16) 1,859,797$ Number of Contract Days: 931Overruns to Date: 759,219$ Current Contract Amount: 45,394,404$ Contract Days Expended: 95.8% or 892 DaysRemaining Work Item Budget (497,249)$ Total MSHA Contract Budget 44,897,155$ Revised Contract Completion Date: 14-Jun-04

Installed Work Paid to Date: (Est. #31) 40,298,594$ Current Baseline Schedule % Complete: 100.0%Stored Material Balance: 620,796$ Total Paid to Contractor 40,919,390$

Contract Amount Remaining*: 5,095,810$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 88.8% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 32 Average Daily Supervisory: 4

May 5, 2004April 29, 2004

A) CURRENT PROGRESS - ROADWAY - Excavating for full-depth pavement Ramp E sta.437+00 to 439+00 - Remove temporary Ramps CC and DD - Final grading & topsoil at Ramp E-1 - ELECTRICAL / ITS EQUIPMENT - None - EROSION AND SEDIMENT CONTROL - Maintenance of erosion & sediment control devices thru-out project - STRUCTURE WORK BRIDGE 12 WORK - Painting structural steel in Spans 8, 9 & 10 Bridge 21 Work - Set girders 1 thru 4 and install diaphragms to complete structural steel work - RED LINE REVISIONS RED LINE #8 - Slope Repair along Ramp F at Abutment A - Change issued to Contractor - Negotiations complete - Currently in submittal/review phase

RED LINE #9 - Addition of Retaining Wall #14 to Contract - Change issued to the Contractor - Negotiations in progress

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS - Ramp E - Final pavement markings from 400+00 to 407+00 - Fulldepth removal/paving Sta. 440+00 to 453+00 - Ramp E-1 - Final grading , topsoil , seed and mulch - Complete paving & pavement markings - Electrical - Signal work at Ramp E-1 and Oxon Hill Road - Signal work at Ramp E-1 and IRS entrance - Bridge 21 - Install overhangs and deck rebar - Install deck pans and shear studs for phase II construction - Foamed concrete backfill - Ramp F - Begin Stage 6 work - Final surface and pavement markings at Sta. 671+00 to 704+00 C) ISSUES/CONCERNS - None D) POTENTIAL COMMUNITY CONCERNS - None

E) KEY INTERFACE DATES Planned Forecast - Project Completion 14-Jun-04 TBD Pending Red Line Negotiations

Page 9: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 140

I-95 Northbound Soil Preconsolidation & Initial Grading Contract (MA-1A)Project Number: PG-3555173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: John Driggs Company, Inc.PCC Resident Engineer: Siva Kesavan Contractor Project Manager: Mohammed Salman

Estimate Ending Date: April 12, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 9,361,229$ Notice to Proceed Date: 15-Aug-01Approved Change Orders: (Total Chgs:2) (21,789)$ Original Contract Completion Date: 15-Feb-04Additional Work Items: (Total Items:8) 364,981$ Number of Contract Days: 915Overruns to Date: 591,600$ Current Contract Amount: 10,296,022$ Contract Days Expended: 108.7% or 995 DaysRemaining Work Item Budget (488,520)$ Total MSHA Contract Budget 9,807,502$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #33) 9,196,228$ Current Baseline Schedule % Complete: 100.0%Stored Material Balance: 29,449$ Total Paid to Contractor 9,225,677$

* - Current contract amount less installed work paid to date.Contract Amount Remaining*: 1,099,794$ ** - Installed work to date divided by current contract amount.Percent Work Complete**: 89.3%

Construction Activities Summary Status thruAverage Daily Labor: 8 Average Daily Supervisory: 1

May 5, 2004April 28, 2004

1. CURRENT PROGRESS: A. Section 1 Stage 3 (Wall G3 and Wall 4) Sta. 902 - 904

• Continue fixing the top layers of reinforcement and face panels of wall G-3.

• Continue monitoring period. B. Section 2 Stage 4 (Walls 1 and 5) Sta. 904 - 917

• Continue building wall 1 from Sta.906+00 towards east and placing soil backfill behind it.

• Fix the backfill slope to project specifications along I-95. C. Section 3 Stage 3 South Portion of Rosalie Island & Wall 10

• Continue monitoring instruments. D. General Comments

• None 2. PLANNED ACTIVITIES FOR THE NEXT 30 DAYS A. Section 1 Stage 3 (Walls G3 and Wall 4) Sta. 902 - 904

• Continue monitoring period. • Continue fixing the top lifts and face panels of wall G-3.

B. Section 2 Stage 3 (Walls 1 and 5) Sta. 904 - 917 • Continue building wall 1.

C. Section 3 Stage 3 South Portion of Rosalie Island & Wall 10 • Continue monitoring instruments.

D. General Comments • None

3. ISSUES AND CONCERNS • None

4. POTENTIAL COMMUNITY IMPACTS • None

KEY INTERFACE DATES • Section 1 – Completion Stage 4 Monitoring

o Scheduled Completion – 29-Nov-04 o MA-2/3 AR – 01-Jan-05

• Section 2 – Completion Stage 4 Monitoring o Scheduled Completion – 25-Sep-04 o MA-2/3 AR – 01-Jan-05

Page 10: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

MA-1A Retaining WallsThrough 05-May-2004

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,00024

-Oct

- 01

21-N

ov-0

119

-Dec

-01

16-J

an- 0

213

-Feb

-02

13-M

ar-0

210

-Ap r

- 02

8 -M

ay- 0

25 -

J un -

023 -

J ul- 0

231

-Ju l

-02

28-A

ug-0

225

-Sep

-02

23-O

c t- 0

220

-Nov

-02

18-D

ec-0

215

-Jan

- 03

12-F

eb-0

312

-Mar

-03

9 -A

p r-0

37 -

May

- 03

4 -J u

n -03

2 -J u

l- 03

30-J

u l-0

327

-Aug

-03

24-S

ep-0

322

-Oc t

- 03

19-N

ov-0

317

-Dec

-03

14-J

an- 0

411

-Feb

-04

10-M

ar-0

47 -

Ap r

-04

5 -M

ay- 0

42 -

J un -

0430

-Jun

- 04

Wee

kly

Are

a of

Wal

l Fac

e (S

F)

0

10

20

30

40

50

60

70

Cum

ulat

ive

Are

a W

all F

ace

(SF)

x 1

000

Weekly Actual Cumulative Planned Cumulative Actual

Actual 60,507 of 68,466 sf* of Wall face = 88.4% ComplPlanned 68,466 of 68,466 sf* of Wall face = 100.0 % Compl*sf required to complete all stages

Stage 1

Stage 2

Stage 3

Stage 4

Note: sf total revised to reflect projected final quantity (11/05/03)

Page 11: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 073

Outer Loop & National Harbor Interchange (MA -2 & 3)Project Number: PG-3475173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: G.A. & F.C. Wagman, Inc.PCC Resident Engineer: Craig Lease Contractor Project Manager: Scott Miller

Estimate Ending Date: April 12, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 45,352,639$ Notice to Proceed Date: 23-Dec-02Approved Change Orders: (Total Chgs:2) 126,022$ Original Contract Completion Date: 15-May-06Additional Work Items: (Total Items:8) 376,614$ Number of Contract Days: 1240Overruns to Date: 521,972$ Current Contract Amount: 46,377,246$ Contract Days Expended: 40.3% or 500 DaysRemaining Work Item Budget 1,369,046$ Total MSHA Contract Budget 47,746,293$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #17) 18,677,159$ Current Baseline Schedule % Complete: 48.2%Stored Material Balance: 2,577,603$ Total Paid to Contractor 21,254,763$

Contract Amount Remaining*: 27,700,087$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 40.3% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 38 Average Daily Supervisory: 11

MSHA WWB Progress Report

Y:\MA-2&3\Weekly Reports\[MA2&3 2004-05-05.xls]Report

May 5, 2004April 29, 2004

A) Current Progress:Bridge 8- Form/pour Abut. A wingwalls.Bridge 9- Tie steel for concrete endposts.- Prepare parapet steel for slip forming.- Early start for slipforming 5-10-04.Bridge 15- Form/pour Pier 5 cap.Existing Bridge 14- No work this period. New Bridge 14- Form/pour Pier 3 stem/cap.- Form/pour Pier 4 stem/cap.Bridge 18:- Driving pile at Abut. A.Bridge 19:- No work this period.Bridge 22- forming overhangs, haunches.Bridge 23- forming overhangs, haunches.Bridge 24- forming overhangs, haunches.Bridge 25- forming overhangs, haunches. Bridge 26- No work this period.Common Borrow- Placing material for Ramps G,H,K,L,P,T,V,X,OLL.- Prepairing for subgrade at Ramp A, OLL.MSE Wall 25- No work this period.Retaining Wall 26- No work this period.Ornamental Fence- Completed work on brick pilasters.Retaining Wall 11- Early start 05/03/04.

B) Planned Activities For The Next 30 Days:Bridge 15- Form/pour cap for pier 8, 9 - Form/pour shaft for pier 10.- Set structural steel Unit 2.

B) Planned Activities For The Next 30 Days: (cont.)Bridge 8- Form / pour Abut B stemwall.Bridge 22/23/24/25- Shooting shear studs.- Tie deck steel.- Pour deck.Existing Bridge 14:- Demolition of piers.New Bridge 14:- Form / pour column and cap at pier #4.- Form/ pour Abut B footer.- Drive pile Abut. A.New Bridge 18:- Drive piles abutment.BPAR- Tie in new BPAR with new National Harbor south haul road.National Harbor South Haul Road- Switch from existing haul road to new haul road 4-16-04.MOT Paving- Paving at Ramp B for Stage 2.Access to Adjoining Projects :- Relocated thru National Harbor.Electrical:- 30-day notice for clearing on Ramp M.C) Issues/Concerns

E) Key Date Plan Forecast Open Ramp A (Bridge 9) 21-May-2004 Mid-July-2004

F) Piling Data- Bridge 8 = 100% Abut. A/B- Bridge 9 = 100% Pier 1/2, Abut. A/B- Bridge 14 = 100% Pier 3/4/Abut. B - Bridge 15 = 100% Pier 1/2/3/4/5/6/7/8/9/10 100% Abut. A/B- Bridge 18 = 100% Abut. A- Bridge 19 = 100% Abut. A- Bridge 22 = 100% Abut. B/Abut.A/Pier 1- Bridge 23 = 100% Abut. A/Pier 1/Abut. B- Bridge 24 = 100% Abut. A/Pier/Abut. B- Bridge 25 = 100% Abut. A/Abut. B/Pier 1/Pier 2

Page 12: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT
Page 13: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

MA 2/3

Pile DrivingThrough 05-May-04

Bridge 15

Bridge 24Bridge 18

Bridge 22

Bridge 9

Bridges 23 & 14

Bridges 8 & 19

Bridge 25

0

10

20

30

40

50

60

70

80

90

100

13-Ja

n-03

24-Feb

-03

7-Apr-

03

19-M

ay-03

30-Ju

n-03

11-A

ug-03

22-S

ep-03

3-Nov

-03

15-D

ec-03

26-Ja

n-04

8-Mar-

04

19-A

pr-04

31-M

ay-04

12-Ju

l-04

23-A

ug-04

4-Oct-

04

15-N

ov-04

27-D

ec-04

7-Feb

-05

21-M

ar-05

2-May

-05

Hun

dred

sW

eekl

y Pi

les

(LF)

0

10

20

30

40

50

60

70

80

90

100

Thou

sand

sC

umul

ativ

e Pi

les

(LF)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 64,464 of 74,923 LF = 86.0 % ComplPlanned 53,832 of 74,923 LF = 71.8 % Compl

Bridge 26

Bridge 9

Bridge 22

Bridge 15

Bridge 23

Bridge 18

Bridge 24

Bridge 8 & 19

Bridge 14

Bridge 25

0

2

4

6

8

10

12

28-Ja

n-03

25-M

ar-03

20-M

ay-03

15-Ju

l-03

9-Sep

-03

4-Nov

-03

30-D

ec-03

24-Feb

-04

20-A

pr-04

15-Ju

n-04

10-A

ug-04

5-Oct-

04

30-N

ov-04

25-Ja

n-05

22-M

ar-05

17-M

ay-05

12-Ju

l-05

6-Sep

-05

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

20

40

60

80

100

120

Hun

dred

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 7,243 of 10,071 cy = 71.9 % ComplPlanned6,958 of 10,071 cy = 69.1 % Compl

Substructure Concrete PlacedThrough 05-May-2004

Page 14: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

MA 2/3

Bridge 14

Bridge 9

Bridge 22

Bridge 24

Bridge 15 Unit 2 & 3

Bridge 25

Bridge 23

Bridge 15 Unit 1

0

10

20

30

40

50

60

9-Jun

-03

21-Ju

l-03

1-Sep

-03

13-O

ct-03

24-N

ov-03

5-Jan

-04

16-Feb

-04

29-M

ar-04

10-M

ay-04

21-Ju

n-04

2-Aug

-04

13-S

ep-04

25-O

ct-04

6-Dec

-04

17-Ja

n-05

28-Feb

-05

11-A

pr-05

23-M

ay-05

Wee

kly

Stee

l (#

of G

irder

s)

0

30

60

90

120

150

180

Cum

ulat

ive

Stee

l (#

of G

irder

s)

Weekly Actual Cumulative Actual Cum Plan Early Cum Plan Late

Actual 84 of 170 Girders = 49.4 % ComplPlanned 133 of 170 Girders = 78.2 % Compl

Steel ErectionThrough 05-May-2004

Bridge 25Bridge 19 & 14Bridge 8Bridge 24Bridge 18

Bridge 15 & 23

Bridge 22Bridge 9

0

1

2

3

4

5

6

7

8

22-A

pr-03

17-Ju

n-03

12-A

ug-03

7-Oct-

03

2-Dec

-03

27-Ja

n-04

23-M

ar-04

18-M

ay-04

13-Ju

l-04

7-Sep

-04

2-Nov

-04

28-D

ec-04

22-Feb

-05

19-A

pr-05

14-Ju

n-05

9-Aug

-05

4-Oct-

05

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

1

2

3

4

5

6

7

8

Thou

sand

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 728 of 6,928 cy = 10.5 % ComplPlanned2,971 of 6,928 cy = 42.9 % Compl

Superstructure Concrete PlacedThrough 05-May-2004

Page 15: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 013

MD 210 Noise Walls, Ramps G & F-1, Bald Eagle Road (MB 1&2)Project Number: PG-3605173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: G.A. & F.C. Wagman, Inc.PCC Resident Engineer: Ed Keiter Contractor Project Manager: Mike Navecky

Estimate Ending Date: April 13, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 18,732,719$ Notice to Proceed Date: 4-Feb-04Approved Change Orders: (Total Chgs:0) -$ Original Contract Completion Date: 30-Apr-06Additional Work Items: (Total Items:0) -$ Number of Contract Days: 816Overruns to Date: 30,908$ Current Contract Amount: 18,763,627$ Contract Days Expended: 11.3% or 92 DaysRemaining Work Item Budget 905,728$ Total MSHA Contract Budget 19,669,355$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #3) 1,658,893$ Current Baseline Schedule % Complete: 8.8%Stored Material Balance: 346,323$ Total Paid to Contractor 2,005,216$

Contract Amount Remaining*: 17,104,734$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 8.8% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 13 Average Daily Supervisory: 3

May 5, 2004April 29, 2004

A) CURRENT PROGRESS - ROADWAY - Completed clearing for sound walls - Installed temporary concrete barrier at Ramp F - Fine grading and placing GAB at Ramp F-1 - STRUCTURE WORK - Continue tying re-bar cages for caissons at sound wall S-13 - Begin augering and pouring caissons for sound wall S-13

- EROSION AND SEDIMENT CONTROL - Installing E & S controls in areas where clearing is completed

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS - Begin ITS & signal work C) ISSUES/CONCERNS - Verizon work at Bald Eagle Road D) POTENTIAL COMMUNITY CONCERNS - None

E) KEY INTERFACE DATES

Page 16: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 031

Rock Creek Pierce Mill Dam Stream Mitigation (MM-3)Project Number: AT1345173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: Compass EnvironmentalPCC Resident Engineer: Robert Sebkarshad Contractor Project Manager: Todd King

Estimate Ending Date: April 13, 2004 Schedule Status Date: May 6, 2004Base Contract Amount: 2,432,425$ Notice to Proceed Date: 27-Oct-03Approved Change Orders: (Total Chgs:3) 37,257$ Contract Type: Working Days ContractAdditional Work Items: (Total Items:0) -$ Number of Contract Work Days: 320Overruns to Date: -$ Current Contract Amount: 2,469,682$ Contract Work Days Expended: 26.6% or 85 DaysRemaining Work Item Budget -$ Total MSHA Contract Budget 2,469,682$

Installed Work Paid to Date: (Est. #5) 409,149$ Stored Material Balance: -$ Total Paid to Contractor 409,149$

Contract Amount Remaining*: 2,060,533$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 16.6% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 4 Average Daily Supervisory: 1

May 6, 2004April 29, 2004

CURRENT PROGRESS: - Installation of wooden stockade fence and snow fence around new staging area at Picnic Grove #7 is complete. - Signage ("Parking Lot Closed") has been installed on fencing at RC3 and new staging area at Picninc Grove #7, and on Type III barricades at RC8. - Ford removal is complete at RC2, landscaping, punchlist, and cleanup items ongoing. - Removal of sanitary sewer, repair of historic wall structures and in-stream work at RC4 complete. - Mobilization to RC2, RC4, RC7 and RC8 ongoing. - Tree removal in progress at RC 7. PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: - Common fill, granular filter and Class II slope protection at RC4. - Clean-up, stabilization, and replacing guard rail at RC2. - Set up perimeter controls, staging and access to RC8. - Set up stream diversion at RC8. - Grading and construction of flow constrictor step-pool structures on right side at RC8. - Mobilization and set-up of SCE at RC7, possibly starting clearing and grubbing of site. - Sample Wall for RC3 Denil Fishway and Retaining Wall to be constructed at RC3 by Espina Stone Co. Another Sample wall to be costructed based on comments addressed at meeting with NPS, SHPO, KCI and PCC on April 9, 2004. ISSUES/CONCERNS:

- Approval for new source of supply for in-stream stone materials from Aggregate Industries Quarry in Rockville, MD.

Page 17: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 035

Bladensburg Waterfront Park Pedestrain Bridge & Tidal Wetland Mitigation (MM-5)Project Number: PG3585173

MDOT Ass't District Engr.: Paul Gudelski General Contractor: Peak IncorporatedPCC Resident Engineer: John Fox Contractor Project Manager: Daniel J. Deschenes

Estimate Ending Date: April 30, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 655,493$ Notice to Proceed Date: 8-Sep-03Approved Change Orders: (Total Chgs:0) -$ Original Contract Completion Date: 20-May-04Additional Work Items: (Total Items:0) -$ Number of Contract Work Days: 180Overruns to Date: 13,347$ Current Contract Amount: 668,840$ Contract Work Days Expended: 61.1% or 110 DaysRemaining Work Item Budget (13,347)$ Total MSHA Contract Budget 655,493$ Revised Contract Completion Date: N/A

Installed Work Paid to Date: (Est. #8) 419,230$ Stored Material Balance: -$ Total Paid to Contractor 419,230$

Contract Amount Remaining*: 249,610$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 62.7% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 7 Average Daily Supervisory: 1

May 5, 2004April 29, 2004

CURRENT PROGRESS: - Continued construction stakeout for wetland mitigation grades, and pier components. - Wetland mitigation grade work continuing by Peak personnel. - Class 1 excavation on-going with approx. 3386 cy's removed and hauled to approved off-site location. - De-watering procedures on-going by peak personnel. - Storm drain manhole for 36 inch storm drain pipe removed. - 147 linear feet of 36 inch diameter storm drain pipe removed. - Pre-cast Concrete Drainage Structure arrive on site. - Footer for Pre-cast Concrete Drainage Structure poured. - Partnering meeting held on 05-03-04. PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: - Continue construction stakeout for wetland mitigation grades and pedestrian bridge. - Continue excavation and removal of spoils for wetland mitigation. - Installation of sump pit 1. - Continue structure concrete work for piers and abutments. - Remove temp. steel sheets from north end of site, and from Pier 2. - Prepare for bridge work on West side of Anacostia River. - Installation of concrete drainage structure and class 2 riprap

ISSUES/CONCERNS:

- Construction activities on West side of Anacostia pending approval by P.G. County E.& S. personnel. - Approx. 60 linear feet of 36 inch diameter storm drain pipe will have to be removed to achieve final grades, this additional 60 or so feet was not shown on drawings.

Page 18: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 062

US Route 1 Interchange Tie-In Project (VA-4)Project Number: (FO)0095-100-104, C511, (FO)0095-96A-106, C504,B648,B649,B650,B668,L802

VDOT Construction Mgr: Jalal Masumi General Contractor: Corman Construction Inc.PCC Construction Engineer: Chris Sherard Contractor Project Manager: Ryan Gorman

Estimate Ending Date: May 4, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 54,634,209$ Notice to Proceed Date: 14-Feb-03Approved Change Orders: (Total Chgs:10) 1,035,557$ Original Contract Completion Date: 01-Nov-07Overruns to Date: 201,535$ Number of Contract Days: 1722Finalized Underruns to Date (218,155)$ Current Contract Amount: 55,653,146$ Installed Work Paid to Date: (Est. #15) 18,578,719$ Contract Days Expended: 26.0% or 447 DaysMaterial On Hand Balance: 1,789,027$ Total Paid to Contractor 20,367,746$ Revised Contract Completion Date: N.A.Contract Amount Remaining*: 37,074,427$

Percent Work Complete**: 33.4% Current Baseline Schedule % Complete: 38.3% * - Current contract amount less installed work paid to date. ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 65 Average Daily Supervisory: 13

May 5, 2004April 29, 2004

A. CURRENT PROGRESS:Southeast Quadrant of the Urban DeckB648:-Making preparations for the traffic switch. B649:-Placed concrete for the deck at spans 1 & 2.South Washington Street-Placed base and intermediate asphalt for roadway section between the Connector Rd. and the approach slab at Abutment A, and between the "jump slab" and the existing Washington St. Bridge. -Placed concrete for the last section Retaining Wall No. 2.-Installing foundations for permanent lighting and signal poles.-Placed asphalt pavement for the temporary slip ramp to be used in the traffic switch.SE Trail Retaining Walls-Continued installation of side forms and reinforcing steel for portions of the Southeast Trail deck.SW Trail Retaining Walls-Continued installation of wood lagging and soil anchors for the shoring system. -Continued excavation of material for the Southwest Trail retaining wall .-Parking Lots-No work this week.Outer Loop-Nearing completion of grading for installation of LDCF behind the Virginia Abutment.Miscellaneous-Virginia Power's contractor continued installation and splicing of conductors for electrical duct banks.-Installed foundations for Soundwall No. 3.

B. ISSUES/CONCERNS: -Received direction and pile lengths for prestressed piles for the Southwest Trail.C. PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Switching traffic to the east side of South Washington St. and to the southeast quadrant of the Urban Deck. -Completion of Parking Lot No. 1. -Placement of LDCF.-Complete concrete placement for S.E. Trail wall sections.-Installation of shoring on the west side of S. Washington St. in preparation for the Southwest Quadrant of the urban deck and Southwest Trail.-Removal of the surcharge.-Preboring and setting of prestressed piles for the Southwest Trail.D. POTENTIAL COMMUNITY IMPACTS:-Saturday work.-Traffic switch on South Washington St. planned for May 8, 2004.-Relocation of the slip ramp on South Washington St. that will have minimal effect on access to Hunting Point, Porto Vecchio and the bus layover.E. KEY INTERFACE DATES: Planned Forecast - Shift Wash. St. traffic to stage 3 14-May-04 24-May-04- MS1 Complete OL VA Abutment 23-Mar-04 23-Mar-04 -BR-3B ARD 17-May-04 - MS2 Compl utilities OL VA Abut. 02-Aug-04 19-Oct-04 -Va. Dom. Pwr. pull power cables -BR-3A AR1 - 15-Apr-05

Page 19: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-4SE Trail Wall

Concrete PlacedThrough 05-May-04

0

2

4

6

8

10

21-M

ay-03

18-Ju

n-03

16-Ju

l-03

13-A

ug-03

10-S

ep-03

8-Oct-

03

5-Nov

-03

3-Dec

-03

31-D

ec-03

28-Ja

n-04

25-F

eb-04

24-M

ar-04

21-A

pr-04

19-M

ay-04

16-Ju

n-04

14-Ju

l-04

11-A

ug-04

8-Sep

-04

6-Oct-

04

3-Nov

-04

Wee

kly

Con

cret

e (C

Y) x

100

0

1

2

3

4

5

Cum

ulat

ive

Con

cret

e (C

Y) x

100

0

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 3,164 of 4,045 cy = 78.2 % ComplPlanned3,784 of 4,045 cy = 93.5 % Compl

Page 20: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-4SE Urban Deck

Superstructure Concrete PlacedThrough 05-May-04

0

150

300

450

600

750

4-Feb

-04

11-Feb

-04

18-Feb

-04

25-Feb

-04

3-Mar-

04

10-M

ar-04

17-M

ar-04

24-M

ar-04

31-M

ar-04

7-Apr-

04

14-A

pr-04

21-A

pr-04

28-A

pr-04

5-May

-04

12-M

ay-04

19-M

ay-04

Wee

kly

Con

cret

e (C

Y)

0

200

400

600

800

1000

Cum

ulat

ive

Con

cret

e (C

Y)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 532 of 824 cy = 64.6 % ComplPlanned 615 of 824 cy = 74.6 % Compl

Page 21: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 047

US Rte. 1 Interchange, Advanced Bridges (VA-5)Project Number: 0095-96A-106-C520

VDOT Construction Mgr: Jalal Masumi General Contractor: R.R. Dawson LLCPCC Construction Engineer: Dan Lord Contractor Project Manager: Gerry Hargis

Estimate Ending Date: May 4, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 38,395,394$ Notice to Proceed Date: 15-Jun-03Approved Wk Odrs/F.A.: (Total:2) 9,836$ Original Contract Completion Date: 13-Jun-05Overruns to Date: 212,660$ Number of Contract Days: 728Finalized Underruns to Date -$ Current Contract Amount: 38,617,889$ Contract Days Expended: 44.8% or 326 DaysPending Work Orders: (Total PWO:0) -$ Revised Contract Completion Date: 15-Jun-05Pending Contract Amount: 38,617,889$ Installed Work Paid to Date: (Est. #11) 12,239,108$ Material On Hand Balance: 4,355,274$ Current Baseline Schedule % Complete: 45.5%Total Paid to Contractor 16,594,382$ Contract Amount Remaining*: 26,378,781$ * - Current contract amount less installed work paid to date.Percent Work Complete**: 31.7% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 44 Average Daily Supervisory: 9

May 5, 2004April 29, 2004

A) CURRENT PROGRESS:a) General:- Surveyors laid out bent, pier, pile and trestle locations, as needed, throughout the project. - Received shipments of concrete piles, reinforcing steel, SIP deck forms, diaphragms and steel girders.

b) Bridge Work:B626- Completed all form work & reinforcing for Unit # 6 and conducted dry runtest and accepted after the final inspection. - Poured class A4 concrete bridge deck for Unit # 6 and began the 7 days wet curing process.- Completed installation of expansion dam at Bent # 24.- Completed installation of galvanized decking forms (SIP) between Bent # 32 to Bent # 35. - Continued to construct diaphragms & overhang for Unit # 7, & 8.- Drove a test pile for the 60.0" steel pipe piles at Bent # 49. Aver Technologies have performed PDA.- Continued to install deck epoxy reinforcing steel for Unit # 7 & 8.- Conducted noise and pressure wave monitoring during driving 60" pipe pile at Bent # 49.B627, B628, B629- Completed the formwork & reinforcing for pilecap at B627 Bent # 7 and poured class A3 concrete pilecap for Bent # 7.- Completed setting up forms and rebar cage for the pilecap at B627 Bent # 6.- Removing forms from pilecap at B628 Bent # 3.B631- Erected the structural steel girders, integral steel cap and cross frames at B631 span "D" beams # G2 & G3. Continue to assembly the beams # G1 & G4.B632, B633, B634-Began to drive production piles at B634 for Bent # 3 pile # 1- Set up template and started driving production piles at B632 Bent # 12 pile # 3 & 4. B640, B641, B642- Completed cofferdam & structural excavation and prepared area to begin driving production piles at B640 for Pier # 2.- Completed formwork, installed rebar cage and poured class A3 concrete at B641 for the Pier # 2 Columns.

A) CURRENT PROGRESS: (cont.)c) Civil Work:- Continued the excavation and placement of class II rip rap in area 2.- Continued constructing temp. bridge cross the ASA channel.- Continued to install and maintain the E & S devices, turbidity curtains and safety fences at various locations as needed.- Installed & maintained fish fencing at work trestles during pile driving.- Continued to conduct dust control, sweeping, & house keeping as needed throughout the project.B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:a) Bridge Work- Drive production piles for B626, B627, B628, B640, B641 and B642.- Continue erecting prestressed beams at the East spans of Bridge B626. - Install steel diaphragms, SIP forms, and deck reinforcing steel at B626.- Continue setting Structural Steel girders at B631.- Drive production piles for B632 & B634.- Driving 60.0" production steel pipe piles at B626.- Placing concrete bridge deck at B626 Unit # 7, & 8.- Install sheetpiling/cofferdam and excavate footings for the Piers at B640, B641, B642.- Form, tie re-steel and pour concrete primarily for bent caps, columns, and footings for B626, B627, B628, B640, B641, B642.b) Civil Work- Continue to place rip rap in Area #2 in front of the existing MSE wall.- Continue to construct access roads, causeways and trestles, as needed throughout the site.- Install and/or maintain E&S controls and traffic control devices.C) ISSUES/CONCERNS:- Developments regarding safety concerns in the Terrace Apartments have potential to impact the VA-5 project schedule. Pile driving on Ramp E was contrary to the direction of VDOT/PCC letter (adjacent to the Terrace Apartments).- Dawson took corrective action in the field and following the meeting with VDOT on Monday morning the Project stand down was lifted at 12:00 NoonMay 3rd and The Contractor resumed his daily productive activities.D) POTENTIAL COMMUNITY IMPACTS:- Noise generated by driving the 60" pipe piles at B626 may have some impacts to the community.E) KEY INTERFACE DATES: - None at this time.

Page 22: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT
Page 23: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Bridge B626

Pile DrivingThrough 05-May-04

0

6

12

18

24

30

8-Sep

-03

6-Oct-

03

3-Nov

-03

1-Dec

-03

29-D

ec-03

26-Ja

n-04

23-F

eb-04

22-M

ar-04

19-A

pr-04

17-M

ay-04

14-Ju

n-04

12-Ju

l-04

9-Aug

-04

6-Sep

-04

4-Oct-

04

Wee

kly

Pile

s (L

F)

Hun

dred

s

0

4

8

12

16

20

Cum

ulat

iveP

iles

(LF)

T

hous

ands

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 11,909 of 18,502 LF = 64.4 % ComplPlanned17,230 of 18,502 LF = 93.1 % Compl

Substructure Concrete PlacedThrough 05-May-04

0

1

2

3

4

5

6

6-Aug

-03

3-Sep

-03

1-Oct-

03

29-O

ct-03

26-N

ov-03

24-D

ec-03

21-Ja

n-04

18-F

eb-04

17-M

ar-04

14-A

pr-04

12-M

ay-04

9-Jun

-04

7-Jul-

04

4-Aug

-04

1-Sep

-04

29-S

ep-04

27-O

ct-04

Wee

kly

Con

cret

e (C

Y)

Hun

dred

s

0

5

10

15

20

25

30

Cum

ulat

ive

Con

cret

e (C

Y)

Hun

dred

s

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 996 of 2,719 cy = 36.6 % ComplPlanned1,658 of 2,719 cy = 61.0 % Compl

Page 24: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Bridge B626

Concrete Beams ErectedThrough 05-May-04

0

10

20

30

40

50

60

70

80

1-Oct-

03

29-O

ct-03

26-N

ov-03

24-D

ec-03

21-Ja

n-04

18-F

eb-04

17-M

ar-04

14-A

pr-04

12-M

ay-04

9-Jun

-04

7-Jul-

04

4-Aug

-04

1-Sep

-04

29-S

ep-04

27-O

ct-04

Wee

kly

Bea

ms

(EA

)

0

50

100

150

200

250

300

350

400

Cum

ulat

ive

Bea

ms

(EA

)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 203 of 359 = 56.5 % ComplPlanned263 of 359 = 73.3 % Compl

Superstructure Concrete PlacedThrough 05-May-04

0

2

4

6

8

12-N

ov-20

03

10-D

ec-20

03

7-Jan

-2004

4-Feb

-2004

3-Mar-

2004

31-M

ar-20

04

28-A

pr-20

04

26-M

ay-20

04

23-Ju

n-200

4

21-Ju

l-200

4

18-A

ug-20

04

15-S

ep-20

04

13-O

ct-20

04

10-N

ov-20

04

8-Dec

-2004

Wee

kly

Con

cret

e (C

Y)

Hun

dred

s

0

2

4

6

8

Cum

ulat

ive

Con

cret

e (C

Y)

Tho

usan

ds

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 2,012 of 7,013 cy = 28.7 % ComplPlanned2,470 of 7,013 cy = 35.3 % Compl

Page 25: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Bridge B628,629,627

Pile DrivingThrough 05-May-04

B627

B628

B629

0

6

12

18

24

27-O

ct-03

10-N

ov-03

24-N

ov-03

8-Dec

-03

22-D

ec-03

5-Jan

-04

19-Ja

n-04

2-Feb

-04

16-Feb

-04

1-Mar-

04

15-M

ar-04

29-M

ar-04

12-A

pr-04

26-A

pr-04

10-M

ay-04

24-M

ay-04

Wee

kly

Pile

s (L

F)

Hun

dred

s

0

2

4

6

8

Cum

ulat

ive

Pile

s (L

F)

Tho

usan

ds

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 6,460 of 7,599 LF = 85.0% ComplPlanned7,599 of 7,599 LF = 100 % Compl

Substructure Concrete PlacedThrough 05-May-04

B627

B629

B628

0

100

200

300

400

500

22-O

ct-03

19-N

ov-03

17-D

ec-03

14-Ja

n-04

11-Feb

-04

10-M

ar-04

7-Apr-

04

5-May

-04

2-Jun

-04

30-Ju

n-04

28-Ju

l-04

25-A

ug-04

22-S

ep-04

20-O

ct-04

Wee

kly

Con

cret

e (C

Y)

0

100

200

300

400

500

Cum

ulat

ive

Con

cret

e (C

Y)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 219 of 482 cy = 45.4 % ComplPlanned482 of 482 cy = 100 % Compl

Page 26: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Bridge B631,B640,B641,B642

Substructure Concrete Placed Through 05-May-04

B642B640

B641

B631

0

1

2

3

4

5

6

7

6-Aug

-03

3-Sep

-03

1-Oct-

03

29-O

ct-03

26-N

ov-03

24-D

ec-03

21-Ja

n-04

18-Feb

-04

17-M

ar-04

14-A

pr-04

12-M

ay-04

9-Jun

-04

7-Jul-

04

4-Aug

-04

1-Sep

-04

29-S

ep-04

27-O

ct-04

24-N

ov-04

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

1

2

3

4

5

6

7

Thou

sand

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 2,971 of 5,860 cy = 76.4 % ComplPlanned4,331 of 5,860 cy = 73.9 % Compl

Pile DrivingThrough 05-May-04

B642

B631

B640

B641

0

2

4

6

8

10

2-Jun

-03

30-Ju

n-03

28-Ju

l-03

25-A

ug-03

22-S

ep-03

20-O

ct-03

17-N

ov-03

15-D

ec-03

12-Ja

n-04

9-Feb

-04

8-Mar-

04

5-Apr-

04

3-May

-04

31-M

ay-04

28-Ju

n-04

26-Ju

l-04

23-A

ug-04

20-S

ep-04

18-O

ct-04

15-N

ov-04

Hun

dred

sW

eekl

y Pi

les

(LF)

0

2

4

6

8

10

Thou

sand

sC

umul

ativ

e Pi

les

(LF)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 4,392 LF of 8,932 LF = 49.2 % ComplPlanned 6,825 LF of 8,932 LF = 76.4 % Compl

Page 27: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Bridge B631,B640,B641,B642

Steel Beams Erected Through 05-May-04

0

4

8

12

16

20

10-M

ar-04

7-Apr-

04

5-May

-04

2-Jun

-04

30-Ju

n-04

28-Ju

l-04

25-A

ug-04

22-S

ep-04

20-O

ct-04

17-N

ov-04

15-D

ec-04

12-Ja

n-05

9-Feb

-05

Wee

kly

Bea

ms

(EA

)

0

30

60

90

120

150

Cum

ulat

ive

Bea

ms

(EA

)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 2 of 113 = 1.8 % ComplPlanned 25 of 113 = 22.1 % Compl

Superstructure Concrete Placed Through 05-May-04

0

200

400

600

800

1,000

1,200

2-Jun

-2004

30-Ju

n-200

4

28-Ju

l-200

4

25-A

ug-20

04

22-S

ep-20

04

20-O

ct-20

04

17-N

ov-20

04

15-D

ec-20

04

12-Ja

n-200

5

9-Feb

-2005

9-Mar-

2005

6-Apr-

2005

4-May

-2005

1-Jun

-2005

Wee

kly

Con

cret

e (C

Y)

0

500

1,000

1,500

2,000

2,500

3,000

Cum

ulat

ive

Con

cret

e (C

Y)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 0 of 2,980 cy = 0.0 % ComplPlanned0 of 2,980 cy = 0.0% Compl

Page 28: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

VA-5Ramp E Bridge B633,B632,B634

Substructure Concrete Placed Through 05-May-04

B633

B632

B634

0

1

2

3

4

5

6-Aug

-03

3-Sep

-03

1-Oct-

03

29-O

ct-03

26-N

ov-03

24-D

ec-03

21-Ja

n-04

18-F

eb-04

17-M

ar-04

14-A

pr-04

12-M

ay-04

9-Jun

-04

7-Jul-

04

4-Aug

-04

1-Sep

-04

29-S

ep-04

27-O

ct-04

24-N

ov-04

22-D

ec-04

19-Ja

n-05

16-F

eb-05

16-M

ar-05

Hun

dred

sW

eekl

y C

oncr

ete

(CY)

0

2

4

6

8

10

Hun

dred

sC

umul

ativ

e C

oncr

ete

(CY)

Weekly Actual Cum Plan Late Cum Plan Early Cumulative Actual

Actual 44 of 934 cy = 4.7 % ComplPlanned331 of 934 cy = 35.4 % Compl

Pile DrivingThrough 05-May-04

B634

B632

B633

0.0

0.5

1.0

1.5

2.0

2.5

25-A

ug-03

22-S

ep-03

20-O

ct-03

17-N

ov-03

15-D

ec-03

12-Ja

n-04

9-Feb

-04

8-Mar-

04

5-Apr-

04

3-May

-04

31-M

ay-04

28-Ju

n-04

26-Ju

l-04

23-A

ug-04

20-S

ep-04

18-O

ct-04

15-N

ov-04

13-D

ec-04

10-Ja

n-05

7-Feb

-05

7-Mar-

05

Thou

sand

sW

eekl

y Pi

les

(LF)

0

3

6

9

12

15

Thou

sand

sC

umul

ativ

e Pi

les

(LF)

Weekly Actual Cumulative Actual Cum Plan Late Cum Plan Early

Actual 579 LF of 12,014 LF = 4.8 % ComplPlanned 9,457 LF of 12,014 LF = 78.7% Compl

Page 29: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 018

US Rte. 1 Interchange Construction (VA-6/7)Project Number: 0095-96A-106-C501

VDOT Construction Mgr: Jalal Masumi General Contractor: Tidewater Skanska, Inc.PCC Construction Engineer: Chip Fiore Contractor Project Manager: James Brookshire, III

Estimate Ending Date: April 20, 2004 Schedule Status Date: May 6, 2004Base Contract Amount: 146,577,166$ Notice to Proceed Date: 23-Dec-03Approved Wk Odrs/F.A.: (Total:0) -$ Original Contract Completion Date: 30-Jun-09Overruns to Date: -$ Number of Contract Days: 2015Finalized Underruns to Date (184,366)$ Current Contract Amount: 146,392,800$ Contract Days Expended: 6.7% or 136 DaysPending Work Orders: (Total PWO:1) 5,400$ Revised Contract Completion Date: N/APending Contract Amount: 146,398,200$ Installed Work Paid to Date: (Est. #5) 5,014,253$ Material On Hand Balance: 46,917$ Current Baseline Schedule % Complete: TBDTotal Paid to Contractor 5,061,170$ Contract Amount Remaining*: 141,378,547$ * - Current contract amount less installed work paid to date.

Percent Work Complete**: 3.4% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 18 Average Daily Supervisory: 6

May 6, 2004April 29, 2004

A) CURRENT PROGRESS:

General:

- Survey

Roadway / Utilities:

- MasTec on project installing Electrical Duct Bank for new Service Road A. Prepping for Jack/Bore pit across Route 1.

- Fourth River removed 9 of 11 USTs from existing gas stations southRoute 1. Results on way to VDEQ.

Structures:

-TS driving test piles for B656 and B672, south Route 1.

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:

Month of May:- Continue general mobilization.- Removal of Underground Storage Tanks- Electrical Duct Bank Construction (Service Road A)- - - Begin Jack Bore across South Rte. 1.- Water line Construction (S. Rte. 1)- Crane driving test piles. Begin Production piles at Ramp I.- Clearing and Grubbing. Sitework at ROWs-Ramps H (detours C1, D1)and at existing Ramp H(NE). Progress Meetings: - First and Third Thursday of each month (VDOT)

Field Coordination Meeting: - All other Thursdays besides Prog. Mtgs. (at Tidewater) C) ISSUES / CONCERNS:

- Detailed CPM Schedule partially submitted, not approved. - Tidewater pile hammer down for second time.- L&L behind on submittals for water line at south Rte.1.- Need to maintain roadway lighting until high masts installed.

D) POTENTIAL COMMUNITY IMPACTS:

- Service Road A impacted by recent utility operations.- Proposed June closure of Fort Hunt Road.

E) KEY INTERFACE DATES:

Page 30: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT
Page 31: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 076

Advanced Intelligent Transportation Systems Installation (VA-9/VB-1)Project Number: (FO)0095-96A-105, C502, (FO)0095-96A-106, C505

VDOT Construction Mgr: Jalal Masumi General Contractor: MasTec North America, Inc.PCC Construction Engineer: Dan Lord Contractor Project Manager: Ray Maikkula

Estimate Ending Date: April 18, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 1,534,174$ Notice to Proceed Date: 7-Nov-02Approved Wk Odrs/F.A.: (Total:1) (21,341)$ Original Contract Completion Date: 30-Sep-03Overruns to Date: 27,803$ Number of Contract Days: 328Finalized Underruns to Date -$ Current Contract Amount: 1,540,636$ Contract Days Expended: 166.5% 546 DaysPending Work Orders: (Total PWO:1) 12,024$ Revised Contract Completion Date: N/APending Contract Amount: 1,552,660$ Installed Work Paid to Date: (Est. #18) 1,330,216$ Material On Hand Balance: 6,010$ Current Baseline Schedule % Complete: 100.0%Total Paid to Contractor 1,336,225$ Contract Amount Remaining*: 210,421$ * - Current contract amount less installed work paid to date.

Percent Work Complete**: 86.3% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 0 Average Daily Supervisory: 0

May 5, 2004April 29, 2004

A) CURRENT PROGRESS:- The Contractor performed testing of equipment installed in the Bald Eagle Hut as well as spare equipment to be turned over to the Project. All equipment passed the accepted test procedures.- The Contractor furnished and installed a pole, removed and relocated a microwave transceiver and performed incidental cabling to restore video feed from the Construction CCTV cameras to the field office.- Project records are being prepared for project closeout.

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:- Complete documentation necessary to closeout the project.

C) ISSUES/CONCERNS:

D) POTENTIAL COMMUNITY IMPACTS:

E) KEY DATES Planned Forecast - Final Acceptance Planned 30-Sep-03 15-May-04

Page 32: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 005

Telegraph Road Ground Improvement (VB-4)Project Number: 0095-96A-105,C504

VDOT Construction Mgr: Jalal Masumi General Contractor: Shirley Contracting Co., LLCPCC Construction Engineer: Paul Knighton Contractor Project Manager: Jason Edsall

Estimate Ending Date: April 20, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 2,978,454$ Notice to Proceed Date: 9-Apr-04Approved Wk Odrs/F.A.: (Total:0) -$ Original Contract Completion Date: 1-Mar-06Overruns to Date: -$ Number of Contract Days: 690Finalized Underruns to Date -$ Current Contract Amount: 2,978,454$ Contract Days Expended: 3.9% or 27 DaysPending Work Orders: (Total PWO:0) -$ Revised Contract Completion Date: N/APending Contract Amount: 2,978,454$ Installed Work Paid to Date: (Est. #1) 90,036$ Material On Hand Balance: -$ Current Baseline Schedule % Complete: 7.5%Total Paid to Contractor 90,036$ Contract Amount Remaining*: 2,888,418$ * - Current contract amount less installed work paid to date.

Percent Work Complete**: 3.0% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 1 Average Daily Supervisory: 1

May 5, 2004April 29, 2004

A) CURRENT PROGRESS:Clearing and grubbing is approximately 80% complete.

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:Installation of erosion and sediment controls, clearing and grubbing for both inner and outer loop.C) ISSUES/CONCERNS:Currently waiting for Contractor's microtunnelling submittal package. By the Contractor's CPM schedule, this was expected in late April. D) POTENTIAL COMMUNITY IMPACTS:

E) KEY INTERFACE DATES:Interim Milestone #1- September 15, 2004. Completion and DVP acceptance of electrical ductbanks #1 and #2.

Page 33: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 039

Aquia Harbor & Silver Property Wetland Mitigation (VM-3)Project Number: 0095-100-104, L801 RW-203

VDOT Construction Mgr: Jalal Masumi General Contractor: Shirley Contracting CompanyPCC Construction Engineer: Miriam Kronisch Contractor Project Manager: Mike Andrilinius

Estimate Ending Date: April 20, 2004 Schedule Status Date: May 5, 2004Base Contract Amount: 1,588,384$ Notice to Proceed Date: 8-Aug-03Approved Wk Odrs/F.A.: (Total WO:0) -$ Original Contract Completion Date: 15-Sep-04Overruns to Date: -$ Number of Contract Days: 405Finalized Underruns to Date (21,850)$ Current Contract Amount: 1,566,534$ Contract Days Expended: 67.2% or 272 DaysPending Work Orders: (Total PWO:0) -$ Revised Contract Completion Date: N/APending Contract Amount: 1,566,534$ Installed Work Paid to Date: (Est. #9) 826,683$ Material On Hand Balance: 0$ Total Paid to Contractor 826,684$ Contract Amount Remaining*: 739,851$ * - Current contract amount less installed work paid to date.

Percent Work Complete**: 52.8% ** - Installed work to date divided by current contract amount.

Construction Activities Summary Status thruAverage Daily Labor: 5 Average Daily Supervisory: 1

May 5, 2004April 29, 2004

A) CURRENT PROGRESS: - Aquia Harbour - Woody species planting complete. - A meeting was held last Tuesday with Dewberry and Davis to discuss the final grades at this site. See issues/concerns for additional information - Silver Property - Contractor continues to maintain necessary E&S controls along access road. - Mass hauling operations from the wetlands to the approved waste areas is ongoing and should be completed this week. - The woody species planting for this site is complete. - As-built survey for this site will be complete this week. - Shirley is working on excavating and placing stone for the additional boat turn-around. B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: - Aquia Harbour - Review initial as-built survey submitted by contractor. - Excavate additional material as directed by Dewberry and Davis to obtain proper final elevations to allow for aquatic planting. - Conduct a second tidal monitoring period once additional excavation is complete.

B) PLANNED ACTIVITIES FOR THE NEXT 30 DAYS: (cont.)- Silver Property - Review as-built survey when submitted by Shirley. - Complete excavation of the wetlands site and haul material to the approved disposal sites. - Continue maintaining access road to allow for hauling operations. - Seed, lime and fertilize site - Upon agency approval, plant aquatic plants.

C) ISSUES/CONCERNS:

The grading of the Aquia site is now complete. PCC has been monitoring the tidal flows into the site and is concerned that not enough water is entering and flushing the site. A meeting was held on Tuesday with Dewberry and Davis. Dewberry and Davis agreed that currently there is not enough water flushing the site on a daily basis. They are currently reviewing their design calculations as well as contacting their sub-consultant who performed the gauge monioting to obtain the tidal data prior to design. It is expected that the site will need to be excavated an additional 10" - 1' from the 3.0' contour line and below. Once Dewberry has a revised design and correction plan for this site, will will notify Shirley to begin additional work.

D) POTENTIAL COMMUNITY CONCERNS

Page 34: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

Construction Activities Summary Status thru

Verizon

Washington Gas

Comcast

Cox Communications

Virginia American Water Company

Fairfax County Department of Public Works

Fairfax County Water Authority

Alexandria Sanitation Authority

City of Alexandria

VA Out-of-Plan Utility RelocationsPCC Utility Coordination: Paul Martin

Dominion Virginia Power - Distribution

Dominion Virginia Power - Transmission

May 5, 2004April 29, 2004

CURRENT PROGRESS: -Pike Electric replaced conductor cables along Church Street in preparation for the switchover from overhead power into the new duct bank system.-DA Foster performed work to tie in existing facilities to new ductbank system for Washington Street and Church Street.-WA Chester pulled conductors into new power pole sweeps.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Continue work to tie in facilities to new ductbanks for VA4 project.-Relocate guy wires on Southern US Rte 1 area VA6/7.ISSUES / CONCERNS:-Coordination of power outages for transfer of power to ductbanks needs to be done between Dominion and PCC Community Affairs office so that residents of Hunting Terrace, Hunting Towers, and Porto Vecchio are made aware of power outages to come.

CURRENT PROGRESS: -JA Walder drilled tower foundation 241-42 near PSC.-CW Wright removing conductors from old 204/241 circuit towers.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Continue transmission tower & line replacement work along I-95.-Additional foundation work scheduled to continue.ISSUES / CONCERNS:-None

CURRENT PROGRESS: -Performed cleanup work on US Rte 1at Old Richmond Highway.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Wreck out of replaced facilities along Route 1, south of I-95.ISSUES / CONCERNS:-Pedestal at Hunting Towers needs relocated.

CURRENT PROGRESS: -None

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-None.ISSUES / CONCERNS:-None.

CURRENT PROGRESS: -None

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Complete connections to new Franklin St. DVP pole. ISSUES / CONCERNS:-None

CURRENT PROGRESS: -None.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-NoneISSUES / CONCERNS:-None

CURRENT PROGRESS: -None.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Repair asphalt patch on Rte 1 north of beltway.ISSUES / CONCERNS:-None

CURRENT PROGRESS: -None.

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-None ISSUES / CONCERNS:-FC DPW is determining if wireless connection proposed by PCC is acceptable for new metering station.

CURRENT PROGRESS: -None

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-None ISSUES / CONCERNS:-None

CURRENT PROGRESS: -None

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-Inspection of VA4 in-plan sewer line.ISSUES / CONCERNS:-None

CURRENT PROGRESS: -None

PLANNED ACTIVITIES FOR THE NEXT 30 DAYS:-NoneISSUES / CONCERNS:-None

Page 35: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

WEEKLY STATUS REPORT NO. 043

Significant Traffic Impact Outlook Listed Chronologically As of 7-May-04

Traffic Impact Projected Date (subject to change)

S. Washington Street Switch (VA-4) 8-May-04 Switch S. Washington Street traffic from west to east side

Work will begin at 7AM and continue into the evening Sidewalk on west side will remain open for several weeks until sidewalk on east

side can be opened Limits of reversible lanes remain unchanged

US 1 Service Road “A” Closure (VA-6/7) 17-May-04 Close service road that runs parallel to US 1 on the east side, north of Ft. Hunt

Road for utility work. This service road currently serves the Hampton Inn Hotel and Alexandria Diner.

The service road closure will be setup after AM rush hour and remain in place (continuously) for up to four weeks.

Shift southbound US 1 ramp traffic (VA-6/7) 24-May-04 Gore area for southbound US 1 ramp traffic bound for I-95/I-495 will be shifted

approximately 100 ft south of its current location onto Detour C1 Southbound US 1 ramp traffic bound for southbound I-95/I-495 will be shifted slightly

onto Detour D1 near the midpoint of the ramp

Ramp F Opening (MA-1) Early Jun-04 Open new Ramp F (Bridge 13) from northbound MD 210 to northbound I-295 Ft. Hunt Rd Closure (VA-6/7) (TENTATIVE) Late Jun-04 Contractor may submit formal request to close Ft. Hunt Rd from US 1 to Huntington

Avenue from June 18th to July 2nd for extensive utility work Proposed detour route would utilize Huntington Avenue and US 1 Substantial signing, pavement marking and signal phasing changes would be required Sidewalk and crosswalk along east side of US 1 near Ft. Hunt Rd will remain open

Temporary Ramps A and B Opening (MA-2/3) Jul-04 Adjust ramp gore from northbound I-495/I-95 (Outer Loop) to I-295 / MD 210

Direct traffic onto Temporary Ramp A (off of left side of Ramp B) shortly after Beltway exit and onto permanent Ramp A (Bridge 9)

Ramp E-1 Opening (MA-1) Jul-04 Open Ramp E-1 from Ramp E to Oxon Hill Road with new signals All dates are subject to change due to weather or other construction activity delays. PCC Senior Project Engineer: Scott C. Crumley

Page 36: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

1

Woodrow Wilson Bridge Project Construction and Right-of-Way Critical Short Term Activity List

As of 7-May-04 (‘A’ following date indicates Actual Completion)

Foundation Contract (BR-2) Contract Substantially Complete 1-Jul-03A Gudelski Bascule Contract (BR-3A)

NTP 21-Feb-03A Healy MS-1 Incentive Date – OL V1 Flanking Girders 29-Dec-04 Amer Bridge Virginia Approach Contract (BR-3B)

NTP 22-Apr-03A Healy Noise Wall Red Line Plan 14-Nov-03A Healy MS1 - VA Approach High Voltage Conduit Complete 15-Apr-05 Granite/

Corman (VAC)

Maryland Approach Contract (BR-3C)

NTP 13-Jun-03A Healy MS1 - Complete MD OL Abutment/Embankment for MA-2/3 1-Jan-05 Potomac Const I-295 Soil Pre-Consolidation at Rosalie Island (Contract MA-1A) NTP 15-Aug-01A Cleveland Complete Section 1 Stage 3 Construction (Elev 45) 16-Jan-04A Driggs I-295 Ramps E&F (Contract MA-1) NTP 26-Nov-01A Cleveland Contract Completion 14-Jun-04 Wagman

Page 37: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

2

I-295 Outer Loop/Ramp/Nat. Harbor (Contract MA-2&3) Advertise 6-Aug-02A Cleveland Bid Opening 31-Oct-02A Gudelski Notice To Proceed 23-Dec-02A Gudelski MS2 – Complete National Harbor access 15-Oct-05 Wagman I-295 Inner Loop Express/Local (Contract MA-4) MA-4 Semi-Final Plans 31-Mar-03A Wallace Rosalie Island Progress Plans (Distribution) 8-Oct-03A Wallace Combined Final Plans Available 31-Mar-04A Wallace PS&E Documents late Jun-04 Wallace ROD and Permit Tracking Database TBD Baker Advertise 31-Aug-04 Cleveland Bid Opening 9-Nov-04 Cleveland NTP 17-Jan-05 MSHA I-295 Ramps C & D (Contract MA-5) Advertise TBD Cleveland Bid Opening TBD Cleveland Notice To Proceed TBD Cleveland MD 210 Noise Walls/Bald Eagle Road (Contract MB-1&2) Establish DBE Goals for MB-1&2 (22%) 8-Mar-02A MSHA Advertise 4-Nov-03A Cleveland Bid Opening 18-Dec-03A Cleveland NTP 4-Feb-04A Cleveland

Page 38: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

3

MD 210 Mainline (Contract MB-3) Final Review Submittal 28-May-04 Wallace Advertise 7-Dec-04 Cleveland Bid Opening 10-Feb-05 Cleveland Notice To Proceed 18-Apr-05 Cleveland MD 210 Beltway Mainline (Contract MB-4) PS&E Documents 2-Jun-05 Wallace Advertise 2-Aug-05 Cleveland Bid Opening TBD Cleveland Notice To Proceed Dec-05 Cleveland Virginia Ground Improvement (VA-2) NTP 17-Dec-01A Nicholson Milestone 5-A West 14-Jan-04A Shirley Milestone 4-B 28-Jan-04A Shirley Milestone 5-A Central / Contract Completion 30-Apr-04A Shirley Virginia Route 1 Tie-In (VA-4) NTP 14-Feb-03A Masumi MS1 – Complete Outer Loop Abutment 16-Mar-04A Corman MS2 – Complete Utilities OL Abutment 20-Jul-04 Corman Virginia Route 1 Advanced Bridge (VA-5) NTP 15-Jun-03A Masumi MS1 – Ramps I and E work for VA-6/7 1-Dec-03A Dawson Contract Completion 15-Jun-05 Dawson

Page 39: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

4

Virginia Route 1 Interchange (VA-6&7) Establish DBE Goals (14%) 4-Jun-03A VDOT Advertisement 22-Jul-03A Nicholson Bid Opening 12-Nov-03A Nicholson NTP 23-Dec-03A Masumi MS1 – Route 1 Utility Work Complete 15-Sep-04 Tidewater Virginia Advanced ITS (VA-9/VB-1) Establish DBE Goals (11%) 14-Jun-02A Nicholson NTP 7-Nov-02A Masumi Forecast Completion Date 15-May-04 Masumi Virginia Telegraph Road Tie-In to US Route 1 (VB-4) Advertise 13-Jan-04A Masumi Bid Opening 25-Feb-04A Nicholson NTP 9-Apr-04A VDOT Pre-Construction Conference 15-Apr-04A Masumi MS1 – Complete Electrical Ductbanks 1 and 2 15-Sep-04 Shirley Rehab Anacostia Freeway (DC Contract) Begin Construction 12-Aug-02A DDOT Contract Complete 1-Aug-04 DDOT

Page 40: Bascule Spans (BR-3A) Project Number: PG …wwblessonslearned.com/pdf/PD10C_Sample_Project_wide...WEEKLY STATUS REPORT NO. 063 Bascule Spans (BR-3A) Project Number: PG-34555173R MDOT

1

Woodrow Wilson Bridge Project Environmental Mitigation Critical Short Term Activity List

As of 7-May-04

(‘A’ following date indicates Actual Completion)

Maryland – IC/LPB Fish Passage - Contract (MM1) Report suspended until June 2004 Maryland – Northwest Branch/ Sligo - Contract (MM2) Report suspended until June 2004 Maryland – Rock Creek - Contract (MM3) (See Weekly Status Report for Construction updates) Maryland – Cabin Branch/Tuxedo Road - Contract (MM4) Construction Contract Substantially Complete 08-Oct-03A Kerr Maryland – Bladensburg Marina - Contract (MM5) (See Weekly Status Report for Construction updates) Maryland – SAV - (MM7) Report suspended until next planting season – May 2004 Maryland – Reforestation WSSC Sites - Contract (MM8) Construction Contract Substantially Complete 15-Dec-02A Cubbage Maryland – Off-Site Reforestation - Contract (MM9) Construction Contract Substantially Complete 21-Jan-04A Martin

Virginia – HP01/HP03 Shoreline Stabilization – Contract (VM1) Construction Contract Substantially Complete 31-Oct-02A Warraich Virginia – Four Mile Run Park/Hart Property – Contract (VM2)

Construction Contract Substantially Complete 5-Feb-04A Kronisch Virginia – Silver Property/Aquia Harbor – Contract (VM3) (See Weekly Status Report for Construction updates) Virginia – SAV – Contract (VM4) Report suspended until next planting season - October 2004