basement abatement plan...20. existing bearing wall to remain during demo. 21. remove all acoustic...

11
UNEXCAVATED UNEXCAVATED EXCAVATED UNEXCAVATED 1972 1921 1972 1921 1921 1921 1990 1962 1350 SF STORAGE B105 391 SF BOMB SHELTER B104 1797 SF BOILER ROOM B102 816 SF FAN ROOM B101 232 SF STORAGE B100 109 SF STOR B103 53 SF STORAGE B106 134 SF STAIR 3 ST 3 194 SF STAIR 107C VG 49 SF ELEVATOR 1 EL 1 53 SF STORAGE B 3 DUC BASEMENT ABATEMENT PLAN GENERAL ASBESTOS NOTES APPLICABLE TO AB-101 1. COORDINATE REMOVALS WITH OTHER TRADES. 2. ALL ASBESTOS MATERIALS REMOVED SHALL BE DISPOSED OF AN AS ACM. 3. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES, BEFORE START OF WORK. 4. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH CONTRACT SPECIFICATIONS, NEW YORK STATE DEPARTMENT OF LABOR (NYSDOL) INDUSTRIAL CODE RULE 56, OSHA 1926.1101, NESHAPS 40 CFR PART 61, AHERA 40 CFR PART 763 AND ALL OTHER APPLICABLE CODES. 5. THE CONTRACTOR SHALL COORDINATE ALL ASBESTOS REMOVAL WORK WITH OWNER'S REPRESENTATIVE AND OTHER CONTRACTORS. 6. THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK AREA AT ALL TIMES, FOR THE DURATION OF THE ASBESTOS REMOVAL PROJECT. 7. ASBESTOS TRANSPORT ROUTE TO BE COORDINATED WITH THE OWNER'S REPRESENTATIVE. 8. CONTRACTOR SHALL COORDINATE SHUT DOWN AND LOCK OUT OF ELECTRICAL POWER WITH OWNER'S REPRESENTATIVE. ALL TEMPORARY POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT THE SOURCE OF THE POWER. 9. MOVABLE OBJECTS SHALL BE REMOVED BY THE ABATEMENT CONTRACTOR AND SHALL BE PRE-CLEANED PER CODE RULE 56 AND SHALL BE DISPOSED OF AS A NON-CONTAMINATED WASTE. 10. VARIATIONS (+/- 10%) IN QUANTITIES AND LOCATIONS OF ACM SHALL BE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND/OR SCHEDULE OF THIS CONTRACT. 11. THE OWNER IS RESPONSIBLE TO CONTRACT FOR NYSDOL PROJECT MONITORING / AIR SAMPLING TECHNICIAN SERVICES. OSHA PERSONAL AIR MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR. 12. CONTRACTOR SHALL REQUEST AND RECEIVE PROJECT MONITOR AND OWNER'S REPRESENTATIVE APPROVAL BEFORE ASBESTOS REMOVAL IS UNDERTAKEN. 13. CONTRACTOR TO HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR TO COVERING WITH PROTECTIVE PLASTIC SHEETING. 14. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED WASTEWATER ENTER THE SANITARY SEWER SYSTEM. ALL WASTE WATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5.0 MICRON PARTICLE SIZE COLLECTION CAPABILITY. 15. IF WATER LEAKS THROUGH THE CONTAINMENT AREAS, OR FROM THE DECONTAMINATION AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WATER DAMAGE. CONTRACTOR SHALL DOCUMENT ALL PRE-EXISTING WATER DAMAGE PRIOR TO ESTABLISHING CONTAINMENT AREAS. 16. ASBESTOS REMOVAL SHALL BE CONDUCTED PRIOR TO ANY DEMOLITION OR RENOVATION WORK. IF SUSPECT OR ASBESTOS MATERIAL IS DISCOVERED, NOT PREVIOUSLY IDENTIFIED, CEASE OPERATIONS AND NOTIFY THE OWNER AND/OR OWNER'S REPRESENTATIVE IMMEDIATELY. REFERENCE SK-1 THROUGH SK-5 FOR ADDITIONAL ASBESTOS REMOVAL INFORMATION. 17. CONTRACTOR SHALL IDENTIFY AND INCLUDE IN THEIR BID ALL DEMOLITION REMOVALS SHOWN ON THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND MECHANICAL DEMOLITION PLANS. 18. REFER TO ARCHITECTURAL DEMOLITION DRAWING FOR GENERAL DEMOLITION NOTES. 19. CONTRACTOR SHALL USE UNIT PRICING FOR ABATEMENT OF TEN MINOR-SIZE TENT ENCLOSURES IN THE EVENT UNKNOWN ACMS ARE DISCOVERED OVER THE COURSE OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND DETERMINING THE EXTENT/QUANTITY OF ACM ABATEMENT AS PER THE PROJECT DOCUMENTS. IN THE EVENT ACM IS DISCOVERED IN INACCESSIBLE SPACES, APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF WORK. 20. CONTRACTOR SHALL USE UNIT PRICING FOR AN APPROXIMATE MINIMUM 200 SQUARE FEET SURFACE AREA, AND HAVING A MINIMUM 6.5” DEPTH, (I.E., 4.0 CUBIC FEET) OF CONTAMINATED SOIL ABATEMENT IN ALL CRAWLSPACE AND BASEMENT AREAS IN THE EVENT PIPE INSULATION DEBRIS IS DISCOVERED BELOW THE EXISTING CONCRETE MUD-MAT FLOOR LOCATED AT AND AS REQUIRED FOR THE CONSTRUCTION OF ALL MECHANICAL AND ELECTRICAL COMPONENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION AND EXTENT/QUANTITY OF CONTAMINATED SOIL ABATEMENT AS PER THE PROJECT'S MECHANICAL AND ELECTRICAL DOCUMENTS. APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF WORK. LEAD PAINT NOTE APPLICABLE TO AB-101 SURFACES CONTAINING LEAD PAINT ARE PRESENT IN THE RENOVATION AREA. ALTERATIONS TO PAINTED SURFACES CONTAINING LEAD SHALL BE PERFORMED BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH 40 CFR PART 735 AND 29 CFR 1926.62. MOLD REMEDIATION NOTE APPLICABLE TO AB-101 WOOD FLOOR JOISTS IN THE BASEMENT CRAWLSPACE CONTAIN SELECT AREAS OF MOLD GROWTH. CONTRACTOR SHALL USE UNIT PRICING FOR THE REMEDIATION OF APPROXIMATELY 3,200 SQUARE FEET OF MOLD CONTAMINATED FLOOR JOISTS. WORK SHALL BE PERFORMED IN ACCORDANCE SPECIFICATION 028400 AND ARTICLE 32 OF THE NEW YORK STATE LABOR LAW. ASBESTOS ABATEMENT NOTES APPLICABLE TO AB-101 REMOVE ASBESTOS CONTAINING (AC) TAN FILTER BANK CAULK FULL DEPTH ALL LAYERS INSIDE THE BASEMENT AIR HANDLING UNIT AND DISPOSE OF AS AN ACM. THE TAN FILTER BANK CAULK IS NOT PRESENT ON EVERY SECTION OF THE DUCTWORK. THE PROJECT MONITOR SHALL ASSIST THE ABATEMENT CONTRACTOR SUPERVISOR WITH LOCATING THE TAN FILTER BANK CAULK. LEGEND AC ASBESTOS CONTAINING ACM ASBESTOS CONTAINING MATERIAL SF SQUARE FEET DUC FILTER BANK CAULK APPROXIMATE REMOVAL LOCATIONS APPROXIMATE ASBESTOS REMOVAL QUANTITIES APPLICABLE TO AB-101 (FOR REFERENCE ONLY) DUC 8 SF DUC 1 1 for DWG. COORD.: TECH. COORD.: 4415 Euclid Avenue Suite 100 Cleveland, OH 44103 Phone: (216) 432-0696 Fax: (216) 432-0699 SED No. 26-16-00-01-0-001-022 16307.01 04/19/17 CHILDREN'S SCHOOL OF ROCHESTER - ADDITION/RENOVATION Rochester Joint Schools Construction Board GRB CMS ABATEMENT & DEMOLITION BID SET 85 Hillside Ave, Rochester, NY 14610 BASEMENT FLOOR PLAN - OVERALL # DATE CHANGE DESCRIPTION 2110 SOUTH CLINTON AVENUE, SUITE 1 ROCHESTER, NEW YORK 14618 RAVI ENGINEERING & LAND SURVEYING, P.C. TL: (585) 223-3660 FX: (585) 223-4250 C B D BUILDING KEY PLAN A AB-101 1 5/24/17 REVISED NOTES

Upload: others

Post on 12-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

UNEXCAVATED

UNEXCAVATED

EXCAVATED

UNEXCAVATED

19

72

19

21

19

72

19

21

19

21

1

9

2

1

1

9

9

0

19

62

1350 SF

STORAGEB105

391 SF

BOMB SHELTERB104

1797 SF

BOILER ROOMB102

816 SF

FAN ROOMB101

232 SF

STORAGEB100

109 SF

STORB103

53 SF

STORAGEB106

134 SF

STAIR 3ST 3

194 SF

STAIR 107CVG

49 SF

ELEVATOR 1EL 1

53 SF

STORAGEB 3

DUC

BASEMENT ABATEMENT PLAN

GENERAL ASBESTOS NOTES APPLICABLE TO AB-101

1. COORDINATE REMOVALS WITH OTHER TRADES.

2. ALL ASBESTOS MATERIALS REMOVED SHALL BE DISPOSED OF AN AS ACM.

3. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

QUANTITIES, BEFORE START OF WORK.

4. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE

WITH CONTRACT SPECIFICATIONS, NEW YORK STATE DEPARTMENT OF LABOR

(NYSDOL) INDUSTRIAL CODE RULE 56, OSHA 1926.1101, NESHAPS 40 CFR PART

61, AHERA 40 CFR PART 763 AND ALL OTHER APPLICABLE CODES.

5. THE CONTRACTOR SHALL COORDINATE ALL ASBESTOS REMOVAL WORK WITH

OWNER'S REPRESENTATIVE AND OTHER CONTRACTORS.

6. THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK

AREA AT ALL TIMES, FOR THE DURATION OF THE ASBESTOS REMOVAL

PROJECT.

7. ASBESTOS TRANSPORT ROUTE TO BE COORDINATED WITH THE OWNER'S

REPRESENTATIVE.

8. CONTRACTOR SHALL COORDINATE SHUT DOWN AND LOCK OUT OF

ELECTRICAL POWER WITH OWNER'S REPRESENTATIVE. ALL TEMPORARY

POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK

AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT THE SOURCE OF

THE POWER.

9. MOVABLE OBJECTS SHALL BE REMOVED BY THE ABATEMENT CONTRACTOR

AND SHALL BE PRE-CLEANED PER CODE RULE 56 AND SHALL BE DISPOSED OF

AS A NON-CONTAMINATED WASTE.

10. VARIATIONS (+/- 10%) IN QUANTITIES AND LOCATIONS OF ACM SHALL BE

CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND/OR SCHEDULE

OF THIS CONTRACT.

11. THE OWNER IS RESPONSIBLE TO CONTRACT FOR NYSDOL PROJECT

MONITORING / AIR SAMPLING TECHNICIAN SERVICES. OSHA PERSONAL AIR

MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.

12. CONTRACTOR SHALL REQUEST AND RECEIVE PROJECT MONITOR AND

OWNER'S REPRESENTATIVE APPROVAL BEFORE ASBESTOS REMOVAL IS

UNDERTAKEN.

13. CONTRACTOR TO HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR

TO COVERING WITH PROTECTIVE PLASTIC SHEETING.

14. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED WASTEWATER ENTER

THE SANITARY SEWER SYSTEM. ALL WASTE WATER SHALL BE FILTERED

THROUGH A SYSTEM WITH AT LEAST 5.0 MICRON PARTICLE SIZE COLLECTION

CAPABILITY.

15. IF WATER LEAKS THROUGH THE CONTAINMENT AREAS, OR FROM THE

DECONTAMINATION AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

ALL WATER DAMAGE. CONTRACTOR SHALL DOCUMENT ALL PRE-EXISTING

WATER DAMAGE PRIOR TO ESTABLISHING CONTAINMENT AREAS.

16. ASBESTOS REMOVAL SHALL BE CONDUCTED PRIOR TO ANY DEMOLITION OR

RENOVATION WORK. IF SUSPECT OR ASBESTOS MATERIAL IS DISCOVERED,

NOT PREVIOUSLY IDENTIFIED, CEASE OPERATIONS AND NOTIFY THE OWNER

AND/OR OWNER'S REPRESENTATIVE IMMEDIATELY. REFERENCE SK-1

THROUGH SK-5 FOR ADDITIONAL ASBESTOS REMOVAL INFORMATION.

17. CONTRACTOR SHALL IDENTIFY AND INCLUDE IN THEIR BID ALL DEMOLITION

REMOVALS SHOWN ON THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND

MECHANICAL DEMOLITION PLANS.

18. REFER TO ARCHITECTURAL DEMOLITION DRAWING FOR GENERAL DEMOLITION

NOTES.

19. CONTRACTOR SHALL USE UNIT PRICING FOR ABATEMENT OF TEN MINOR-SIZE

TENT ENCLOSURES IN THE EVENT UNKNOWN ACMS ARE DISCOVERED OVER

THE COURSE OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR VERIFYING THE LOCATION AND DETERMINING THE EXTENT/QUANTITY OF

ACM ABATEMENT AS PER THE PROJECT DOCUMENTS. IN THE EVENT ACM IS

DISCOVERED IN INACCESSIBLE SPACES, APPROVAL OF THE QUANTITY AND

EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER

PRIOR TO THE START OF WORK.

20. CONTRACTOR SHALL USE UNIT PRICING FOR AN APPROXIMATE MINIMUM 200

SQUARE FEET SURFACE AREA, AND HAVING A MINIMUM 6.5” DEPTH, (I.E., 4.0

CUBIC FEET) OF CONTAMINATED SOIL ABATEMENT IN ALL CRAWLSPACE AND

BASEMENT AREAS IN THE EVENT PIPE INSULATION DEBRIS IS DISCOVERED

BELOW THE EXISTING CONCRETE MUD-MAT FLOOR LOCATED AT AND AS

REQUIRED FOR THE CONSTRUCTION OF ALL MECHANICAL AND ELECTRICAL

COMPONENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

THE LOCATION AND EXTENT/QUANTITY OF CONTAMINATED SOIL ABATEMENT

AS PER THE PROJECT'S MECHANICAL AND ELECTRICAL DOCUMENTS.

APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE

APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF WORK.

LEAD PAINT NOTE APPLICABLE TO AB-101

SURFACES CONTAINING LEAD PAINT ARE PRESENT IN THE RENOVATION AREA.

ALTERATIONS TO PAINTED SURFACES CONTAINING LEAD SHALL BE PERFORMED

BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH 40 CFR PART 735 AND 29

CFR 1926.62.

MOLD REMEDIATION NOTE APPLICABLE TO AB-101

WOOD FLOOR JOISTS IN THE BASEMENT CRAWLSPACE CONTAIN SELECT AREAS

OF MOLD GROWTH. CONTRACTOR SHALL USE UNIT PRICING FOR THE

REMEDIATION OF APPROXIMATELY 3,200 SQUARE FEET OF MOLD

CONTAMINATED FLOOR JOISTS. WORK SHALL BE PERFORMED IN ACCORDANCE

SPECIFICATION 028400 AND ARTICLE 32 OF THE NEW YORK STATE LABOR LAW.

ASBESTOS ABATEMENT NOTES APPLICABLE TO AB-101

REMOVE ASBESTOS CONTAINING (AC) TAN FILTER BANK CAULK FULL DEPTH ALL

LAYERS INSIDE THE BASEMENT AIR HANDLING UNIT AND DISPOSE OF AS AN

ACM. THE TAN FILTER BANK CAULK IS NOT PRESENT ON EVERY SECTION OF THE

DUCTWORK. THE PROJECT MONITOR SHALL ASSIST THE ABATEMENT

CONTRACTOR SUPERVISOR WITH LOCATING THE TAN FILTER BANK CAULK.

LEGEND

AC ASBESTOS CONTAINING

ACM ASBESTOS CONTAINING MATERIAL

SF SQUARE FEET

DUC FILTER BANK CAULK

APPROXIMATE REMOVAL LOCATIONS

APPROXIMATE ASBESTOS REMOVAL QUANTITIES

APPLICABLE TO AB-101

(FOR REFERENCE ONLY)

DUC 8 SF

DUC

1

1

for

DWG. COORD.: TECH. COORD.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SE

D N

o.26-16-00-01-0-001-022

16307.01

04/19/17

CHILDREN'S SCHOOL OF

ROCHESTER -

ADDITION/RENOVATION

Rochester Joint Schools

Construction Board

GRBCMS

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

BASEMENT FLOOR PLAN -

OVERALL

# DATE CHANGE DESCRIPTION

2110 SOUTH CLINTON AVENUE, SUITE 1ROCHESTER, NEW YORK 14618

RAVI ENGINEERING

& LAND SURVEYING, P.C.

TL: (585) 223-3660 FX: (585) 223-4250

C

B

D

BUILDING KEY PLAN

A

AB-101

1 5/24/17 REVISED NOTES

AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
AB-101
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: 1/16"=1'-0"
Page 2: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

UP

DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.

EXISTING WALL TO REMAIN

EXISTING DOOR & FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED.

GENERAL DEMOLITION NOTESA.

B.

C.

D.

E.

F.

G.

H.

DEMOLITION DRAWINGS SHOW GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT AREA TO RECIEVE NEW WORK.

PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT REQURIES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS.

CORE DRILLING, CUTTING AND REMOVAL OF WALLS AND SLABS AS NECESSARY TO INSTALL MECHANICAL, ELECTRICAL AND PLUMBING WORK. REFER TO MEP DRAWINGS TO COORDINATE REQUIRED DEMOLITION WORK.MAINTAIN BUILDING IN A WEATHER TIGHT CONDITION AS MUCH AS POSSIBLE.

PROVIDE TEMPORARY BARRIERS TO PROTECT PERSONS FROM DEMOLITION SITE HAZARDS AND INJURY. MAINTAIN GOOD INDUSTRY PRACTICE, AND COMPLY WITH OSHA REGULATIONS.

PROVIDE TEMPORARY BRACING REQUIRED TO SUPPORT BUILDING ELEMENTS TO REMAIN AND REQUIRED TO MAINTAIN THE PROJECT IN A SAFE CONDITION.

STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT FROM DAMAGE.

DIMENSIONS SHOWN ON DEMOLITIONS DRAWINGS ARE FOR GENERAL INFORMATION PURPOSES ONLY. VERIFY ALL DIMENSIONS WITH NEW WORK REQUIREMENTS TO ASSURE DEMOLITION IS CONDUCTED TO THE EXTENT REQUIRED TO ALLOW/SUPPORT NEW CONSTRUCTION SHOWN IN A FUTURE PHASE OF CONTRACT DOCUMENTS.

FIRE ALARM TO REMAIN OPERATIONAL AND ACTIVE DURING CONSTRUCTION. REPLACE SMOKE DETECTORS WITH HEAT DECTECTORS.

1

2

3

4

5

6

7

9

10

11

12

13

14

15 15

B AA.2CE.7 DF.7G.4H.2J.3

1.9

4.7

3.9

6.4

88

9.6

11.311.3

H G

E

JKL

M

M

P

P N

N

12.112.1

10.710.7

9.7

6.3

14.1

5.3

L.1

CRAWL SPACE

BOILER ROOMSTORAGE

FAN ROOM

STORAGE

STAIR

STORAGE

ELEVATOR STORAGE

ARTS

EXISTINGTRENCH

TRENCH

COAL ROOM INFILLED

TRENCH

1AD401

2AD401

1 5

6

8

6

8

6

3

1

1

DEMOLITION KEY NOTES

1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.

2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.

3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.

4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR

SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR

LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES

COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS

REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.

9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.

10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.

11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.

12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR

SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE

BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS

ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.

18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.

19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH

AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)

FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &

BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,

TACKBOARD, AND CHALK BOARDS.

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

54:4

9 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

BASEMENT DEMOLITIONPLAN AD1000 16' 32' 40'

1/16" = 1'-0"OVERALL BASEMENT DEMOLITION PLAN1

1

1

1

1

1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 3: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

UP

1

2

3

4

5

6

7

9

10

11

12

13

14

15

B AA.2CC.6E.7 DF.7G.4H.2J.3

1.9

4.7

3.9

6.4

8

9.6

11.311.3

H G

F

E

JKL

MP N

12.112.1

10.710.7

9.7

6.3

14.1

5.3

L.1

3RD GRADE CLASSROOM

5TH GRADE CLASSROOM

VEST.

3RD GRADE CLASSROOM

5TH GRADE CLASSROOM

3RD GRADE SPEC. ED.

MEN'S RESTROOM

SERVER/DATA CLOSET

BOOK STORAGE

SINK

OFFICESTORAGE

PRINCIPAL

CLERKOFFICE

CORRIDOR

TOILET

VEST.

PHSYCH/TCOSE

TCSOE/ESEL

NURSE

TOILETCOPIER

SINK

WOMEN'STOILET

UP

UP

UP

DN

KINDERGARTENCLASSROOM

1ST GRADE CLASSROOM

1ST GRADE CLASSROOM

2ND GRADE CLASSROOM

2ND GRADE CLASSROOM

VEST.

DN

UP

DNVICE

PRINCIPAL

CLOSET

TEACHER'S LOUNGE

TOILETSPECIALIST

OFFICETOILET

RESOURCE ROOM

KINDERGARTENCLASSROOMALCOVE

SINK ROOM

CORRIDOR

FAN ROOM (BELOW)

PARENT LIASON / BAND OFFICE

BOY'S TOILET

VEST.

SINK

4TH GRADE CLASSROOM

4TH GRADE CLASSROOM

SPEECH

HARD/HEARING OFFICE

HARD/HEARING OFFICE

CAFETERIA

WOMEN'S TOILET

MEN'S TOILET

KITCHEN

OT/PT/BAND OFFICE

CUSTODIAL

VEST.

2ND GRADE SPEC ED. MUSIC ROOM

GROUNDS EQUIP.

TOILET

COMPUTER LAB

GIRL'S TOILET

VEST.

LIBRARY

CUSTODIAL

CUSTODIAL

STAIR

BOILER ROOM(BELOW)

STAGE

PE OFFICE

PE STOR.

PE STOR.

AUDITORIUM / GYMNASIUM

CORRIDORDN

DN

6TH GRADE CLASSROOM

6TH GRADE CLASSROOM

CLASSROOM

PRE-K CLASSROOM

1AD401

2AD401

1

DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.

EXISTING WALL TO REMAIN

EXISTING DOOR & FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED.

GENERAL DEMOLITION NOTESA.

B.

C.

D.

E.

F.

G.

H.

DEMOLITION DRAWINGS SHOW GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT AREA TO RECIEVE NEW WORK.

PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT REQURIES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS.

CORE DRILLING, CUTTING AND REMOVAL OF WALLS AND SLABS AS NECESSARY TO INSTALL MECHANICAL, ELECTRICAL AND PLUMBING WORK. REFER TO MEP DRAWINGS TO COORDINATE REQUIRED DEMOLITION WORK.MAINTAIN BUILDING IN A WEATHER TIGHT CONDITION AS MUCH AS POSSIBLE.

PROVIDE TEMPORARY BARRIERS TO PROTECT PERSONS FROM DEMOLITION SITE HAZARDS AND INJURY. MAINTAIN GOOD INDUSTRY PRACTICE, AND COMPLY WITH OSHA REGULATIONS.

PROVIDE TEMPORARY BRACING REQUIRED TO SUPPORT BUILDING ELEMENTS TO REMAIN AND REQUIRED TO MAINTAIN THE PROJECT IN A SAFE CONDITION.

STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT FROM DAMAGE.

DIMENSIONS SHOWN ON DEMOLITIONS DRAWINGS ARE FOR GENERAL INFORMATION PURPOSES ONLY. VERIFY ALL DIMENSIONS WITH NEW WORK REQUIREMENTS TO ASSURE DEMOLITION IS CONDUCTED TO THE EXTENT REQUIRED TO ALLOW/SUPPORT NEW CONSTRUCTION SHOWN IN A FUTURE PHASE OF CONTRACT DOCUMENTS.

FIRE ALARM TO REMAIN OPERATIONAL AND ACTIVE DURING CONSTRUCTION. REPLACE SMOKE DETECTORS WITH HEAT DECTECTORS.

6

7

9

10

B

B

C

C

C.6

C.6

E.7 D

D

F.7G.4H.2

6.4

8

9.6

H G F

E

EJ

10.7

5.3

AUDITORIUM / GYMNASIUM

BALCONY

PROJECTOR ROOM

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

55:3

0 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

JS BES

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

FIRST FLOOR DEMOLITIONPLAN AD101 1/16" = 1'-0"

OVERALL FIRST FLOOR DEMOLITION PLAN10 16' 32' 40'

1/16" = 1'-0"BALCONY DEMOLITION PLAN2 NO DEMOLITION WORK

BUILDING KEY PLAN

AC

BD

1

1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 4: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

1

2

3

4

5

6

7

9

10

11

B AA.2CC.6E.7 DF.7G.4H.2J.3

1.9

4.7

3.9

6.4

8

9.6

H G F

E

JKL

M

10.710.7

9.7

6.3

5.3

L.1

3RD GRADESPEC. ED.

5TH GRADE CLASSROOM

VEST.

3RD GRADE CLASSROOM

5TH GRADE CLASSROOM

3RD GRADE CLASSROOM

MEN'S RESTROOM

SERVER/DATA CLOSET

BOOK STORAGE

SINK

OFFICESTORAGE PRINCIPAL

CLERKOFFICE

CORRIDOR

TOILET

VEST.

PHSYCH/TCOSE

TCSOE/ESEL

TOILET

UP

UP

UP

DN

UP

DN

FAN ROOM (BELOW)

PARENT LIASON / BAND OFFICE

GROUNDS EQUIP.

TOILET

COMPUTER LAB

GIRL'S TOILET

LIBRARY

CUSTODIAL

CUSTODIAL

STAIR

BOILER ROOM(BELOW)

STAGE

PE OFFICE

PE STOR.

PE STOR.

AUDITORIUM / GYMNASIUM

CORRIDOR

DN

1 2 51 2 5

1 2 5

1 2 5

1 2 5

25

8

6

8

25

25

8

6

6

6 7

6

8

25

6

3

3

1 2 5

1 2 5

1 2 5

33

3

6

3

3

3

1 2 5

4

8

25

8

1 2 5

1 2 5

6

7

3

6

66

10

6

4

4

6

12

12

13

1313

1313

13

13

13

13

1AD401

1818

18

19

18

23

23

12

1212

12

12

24

23

9'-5 5/8"

11

1

1

25

1 1

26 1

26

1

1

1

8

1

26

11

1

26

1

1

1

6 26

1

1

EXISTING CABINETTO REMAIN

4

1

71

1 25 1

1 25

1

1 25

1

181

1 25

1

61

61

8

CIRCULATION DESK

8RECEPTION DESK

1

1

2727

27

CLOSET TO REMAIN

1

CLOSET TO REMAIN

WARDROBES TO REMAIN

3'-2" 4'-10 5/8"

3'-2" 4 5/8"

1 2

1'-9" 3'-2"

3'-2" 2'-7"

6'-2" 5'-7"

3'-1" 6'-2"

51

DEMOLITION KEY NOTES

1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.

2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.

3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.

4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR

SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR

LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES

COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS

REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.

9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.

10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.

11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.

12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR

SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE

BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS

ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.

18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.

19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH

AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)

FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &

BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,

TACKBOARD, AND CHALK BOARDS.

DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.

EXISTING WALL TO REMAIN

EXISTING DOOR & FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED.

GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

55:4

0 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

FIRST FLOOR DEMOLITIONPLAN - AREA A AD101A

1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA A1 0 8' 16' 20'12'

BUILDING KEY PLAN

AC

BD

1

1

1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 5: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

9

10

11

12

13

14

15

B AA.2CC.6D

9.6

11.311.3

H G F

E

JKL

M

12.112.1

10.710.7

9.7

14.1

TCSOE/ESEL

NURSE

TOILET

COPIER

SINK

WOMEN'STOILET

UP

UP

DN

KINDERGARTENCLASSROOM

1ST GRADE CLASSROOM1ST GRADE

CLASSROOM

2ND GRADE CLASSROOM

2ND GRADE CLASSROOM

VEST.

DN

VICE PRINCIPAL

CLOSET

TEACHER'S LOUNGE

TOILET

SPECIALIST OFFICE

TOILET

RESOURCE ROOM

KINDERGARTENCLASSROOMALCOVE

SINK ROOM

CORRIDOR

BOY'S TOILET

SINK

1 2 5

1 2 51 2 5

1 2 5 1 2 5

1 5

1 5

1 2 5

1 5

67

3

8

4

4 4

4

8

3

4 8

67

67

1 5

3

4

11

25

8 8

25

25

25

8

6

1 5

12

12

12

1313

13

1313

13

13 13

13

13

13

13

18

12 12

23

12

4

2323

66

1 5

11

4

6

1

1

3

1

6

8

EXISTING WARDROBES TO REMAIN UP TO NEW PARTITION

6

1

1

1

11

1

124

12

12

7

7

1

1

1

6

1

1

8REMOVE LOWER CABINETS ONLY

6

1

1

26

1

1

626

1

8

25

1

1 1

1

261

1 1

EXISTING CASEWORKTO REMAIN

1

1

221

15

1

15

1

1 51

1 5

1

25

1

23

1

23

1

25

1

CABINETS REMAIN

67

1

16

15

1

1 2 51

1 25

1

27

2727

231

NEW PARTITION, SEE NEW CONSTRUCTION PLANS

3'-2" 13'-11 3/8"

3'-2"

1'-2 7

/8"

3'-2"

9'-4 7

/16"

22

22

2

1

51

5 1

1 2 5

5 1

DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.

EXISTING WALL TO REMAIN

EXISTING DOOR & FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED.

GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.

DEMOLITION KEY NOTES

1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.

2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.

3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.

4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR

SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR

LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES

COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS

REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.

9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.

10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.

11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.

12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR

SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE

BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS

ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.

18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.

19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH

AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)

FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &

BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,

TACKBOARD, AND CHALK BOARDS.

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

55:4

7 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

FIRST FLOOR DEMOLITIONPLAN - AREA B AD101B

1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA B1

BUILDING KEY PLAN

AC

BD

1

1

1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 6: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

UP

3

13

4.7

3.9

8

11.3

MP N

12.1

10.7

6.3

5.3

VEST.

SINK

4TH GRADE CLASSROOM

4TH GRADE CLASSROOM

SPEECH HARD/HEARING OFFICE

HARD/HEARING OFFICE

CAFETERIA

WOMEN'S TOILET

MEN'S TOILET

KITCHEN

OT/PT/BAND OFFICE

CUSTODIAL

VEST.

2ND GRADE SPEC ED. MUSIC ROOM

VEST.

DN

DN

6TH GRADE CLASSROOM

6TH GRADE CLASSROOM

6 7

1 5

12

13

1 5

1 51 5

13

13 13

11'-6 1/8"

8'-4" 5'-10 3/16"

6 8

6'-8"2'-8"

13'-2 1/16" 11'-1 1/4"

8 6

6

8866

25

14

14

14

14

15

16

25

3

3

3

16

16

1 5

1 51 5

1 5

1 175

1 5

1 5

3

3

3

1AD401

2AD401

20

20

20

20

20

20

1'-8 7/8" 1 51 5

1

1

1

1

1

1

1

4

1

4

1

44

1

4

1

4

1

4

1

4

1

41

41

41

4

1

4

1

125

1

26 26

1 1

231

1

1

1

231

231

25

1

2

1 52

1 52

1 52

1 52

3'-4"

6"

271

271

2

1

12'-9 7/16" 8'-6 11/16"

24'-6

1/4"

8'-11

1/2"

1

21 1

9 1

DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.

EXISTING WALL TO REMAIN

EXISTING DOOR & FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED.

GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.

DEMOLITION KEY NOTES

1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.

2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.

3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.

4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR

SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR

LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES

COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS

REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.

9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.

10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.

11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.

12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR

SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE

BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS

ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.

18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.

19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH

AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)

FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &

BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,

TACKBOARD, AND CHALK BOARDS.

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

55:5

2 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

FIRST FLOOR DEMOLITIONPLAN - AREA C & D AD101C

1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA C & D1

BUILDING KEY PLAN

AC

BD

1

1

1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 7: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

MP N

CAFETERIAKITCHEN CORRIDOR

CRAWL SPACE

CRAWL SPACE

EXISTING ROOF AND ROOF STRUCTURE TO REMAIN - PRESERVE AND PROTECT

DURING CONSTRUCTION

EXISTING LOAD BEARING WALL TO REMAIN DURING DEMOLITIION. REMOVAL TO OCCUR

DURING FUTURE PROJECT PHASE

1

1311.3 12.110.7

9.7

SPEECH CORRIDOR4TH GRADE

CLASSROOM

EXISTING ROOF AND ROOF STRUCTURE TO REMAIN - PRESERVE AND PROTECT

DURING CONSTRUCTION

REMOVE WALL TO PROVIDE NEW OPENING (SEE PLANS).

COORDINATE WITH STRUCTURAL DEMOLITION DRAWINGS.

PARTIALLY EXCAVATED

PARTIALLY EXCAVATED

CAFETERIA

1

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

55:5

7 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

DEMOLITION BUILDINGSECTIONS AD401SECTION

1/8" = 1'-0"CAFETERIA DEMOLITION 011

1/8" = 1'-0"CAFATERIA DEMOLITION 022

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 8: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

REAR PLYWOOD PANEL TO REMAIN

REMOVE SIDE PANELS AND SHELVING HARDWARE ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED

REMOVE JAMB AND STOP AT TOP OF OPENING

WOOD CEILING TO REMAIN (NOT VISIBLE)IF ABOVE 6'-8" AFF.

REMOVE SHELVING AND SHELVING HARDWARE ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED. SAVE SHELVES FROM DEMO TO BE ALLOCATED WHERE WARDROBES REMAIN. MAKE SURE SHELVES FIT WHERE THEY ARE ALLOCATED. REMAINING WARDROBES TO HAVE 4 ADJUSTABLE SHELVES INSIDE EACH SET OF DOORS.

REMOVE COATHOOKS AND SUPPORT PANELS ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED.

1

1

1

REMO

V E W

OOD W

ORK

IN T

HIS

ARE A

UP

TO 6'

-8" A

FF

REMOVE DOORS AND DOOR HADWARE

REMOVE STYLES BETWEENDOORS

REMOVE STOPS AND JAMBS

TRIM BOARD TO REMAIN IF ABOVE6'-8" AFF

RAIL AND BRACKETS TO REMAIN IF ABOVE 6'-8" AFF EX

ISTI

NG C

ONST

RUCT

ION

TO

REMA

IN A

BOVE

THI

S LIN

E

1

1

1

NOTE: SAVE AND STORE 3 CLASSROOM SETS WORTH OF WARDROBE DOORS TO BE RE-USED BY MILLWORKER ON CUSTOM CASEWORK.

1

SEE

WAR

DROB

E DE

TAILS

FOR

EXT

ENT

OF D

EMO

EXISTING TRIM TO REMAIN ABOVE SINK ALCOVE

RAIL AND BRACKETS TO REMAIN ABOVE SINK ALCOVE

REMOVE SHELVING AND SHELVING HARDWARE

VERTICAL STRUCTURE AND WOOD TRIM TO REMAIN

REMOVE WALL TILE

REMOVE DISPENSER(S)

VERTICAL STRUCTURE AND WOOD TRIM TO REMAIN

REMOVE SINK, FOUNTAIN, AND ALL APPURTENANCES

REMOVE COUNTERTOP AND BASE CABINET

ALL THREE ALCOVE WALLS TO REMAIN

CEILING

STRUCTURE ABOVE

TACKABLE SURFACE

EXISTING WALL FRAMING

EXISTING FRAMING

EXISTING WOOD TRIM

EXISTING WOOD TRIM AND FRAMING TO BE DEMOLISHED

SAVE

RAI

L AN D

BRA

CKET

S, IF

POS

SIBL

EDE

MO U

P TO

6'-8

" AFF

INSTALL HORIZONTAL FRAMING SO FINISHED SOFFIT IS AT LEAST 6'-8"AFF

IF EXISTING WOOD CEILING IS ABOVE 6'-8" AFF, RETAIN. IF LOWER, DEMOLISH.

INSTALL NEW WOOD FRAMING PRIOR TO DEMO OF WARDROBE BELOW. NEW FRAMING TO TIE INTO STRUCTURE ABOVE TO SUPPORT LOAD.

FASTENERS AS REQUIRED

FASTEN INTO STRUCTURE ABOVE AS REQUIRED

© 2

016

Moo

dy/N

olan

Inc.

PRIN

T D

ATE:

FILE

INFO

:

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid AvenueSuite 100Cleveland, OH 44103

Phone: (216) 432-0696Fax: (216) 432-0699

SED

No.

26-

16-0

0-01

-0-0

01-0

22

5/24

/201

7 2:

56:0

3 P

MC

:\$$L

ocal

Rev

it P

roje

cts\

201 7

Pro

jec t

s\16

307

MB

A E

S1 -

AR

CH

_BSa

eger

.rvt

16307.01

04/19/17

CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION

Rochester Joint SchoolsConstruction Board

Author Checker

ABATEMENT & DEMOLITION BID SET

85 Hillside Ave, Rochester, NY 14610

DEMOLITION DETAILS AD500 1/4" = 1'-0"WARDROBE DETAIL 22 1/4" = 1'-0"

WARDROBE DETAIL 11

1/4" = 1'-0"SINK ALCOVE DETAIL3 1

1 1/2" = 1'-0"WARDROBE HEADER DETAIL4 1

# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Page 9: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

1FIRST FLOOR DEMOLITION PLAN - AREA A 1/8" = 1'-0"

(IN CASEWORK)

RADIATION

1

S

2

120

CLASSROOM

REGISTER

SUPPLY

SHAFT

SUPPLY

DEMOLITION NOTES:

S

2

REGISTER

SUPPLY

14

(IN CASEWORK)

RADIATION

1

119

CLASSROOM

CONVECTOR

4

S

2

118

CLASSROOM

(IN CASEWORK)

RADIATION

1

REGISTER

SUPPLY

3

SHAFT

SUPPLY

S

2

(IN CASEWORK)

RADIATION

1

1

121

CLASSROOM

SHAFT

SUPPLY

3

3

REGISTER

SUPPLYRADIATION

5

REGISTER

SUPPLY

3

(IN CASEWORK)

RADIATION

1

122

CLASSROOM

SHAFT

SUPPLY

3

3

REGISTER

SUPPLY

S

2

S

2

REGISTER

RELIEF

13

REGISTER

SUPPLY

3SHAFT

SUPPLY

3

12x12

13

S

2

RADIATION

5

RADIATION

5

UNIT

A/C

8

S

2

RADIATION

5

UNIT

A/C

8REGISTER

RELIEF

13

SHAFT

SUPPLY

3

CONVECTOR

4

CONVECTOR

4

CONVECTOR

4

S 2

8"

SHAFT

SUPPLY

33

3

SHAFT

RELIEF

9

REGISTER

SUPPLY

10

REGISTER

SUPPLY

10

UNIT

A/C

8

8"

REGISTER

SUPPLY

3

S2

REGISTER

SUPPLY

SHAFT

SUPPLY

3

3

SHAFT

SUPPLY

3

REGISTER

SUPPLY

3

S 2

RADIATION

5

UNIT

A/C

8

123A

OFFICE

CONVECTOR

4

S 2

123C

OFFICE

123

OFFICE

1

EXIT

101B

PSYCH.101A

TCOSE.

109

AUD./GYM

109E

STORAGE

109F

STORAGE

109J

STAGE

109B

PARENT

109A

OFFICE

SHAFT

RELIEF

SHAFT

RELIEF

107B

TOILET

117

STORAGE

116A

SERVER

REGISTER

SUPPLY

S

2

3

SHAFT

SUPPLY

SHAFT

SUPPLY

SHAFT

SUPPLY

REGISTER

SUPPLY

3

3

33

S

2

116

LIBRARY

1

RADIATION

1

RADIATION RADIATION

1 1

RADIATION

5

CONVECTOR

4

S

2

REGISTER

SUPPLY

3

SHAFT

SUPPLY

3

RADIATION

5

115

LABCOMPUTER

112B

TOILET

MD101ADEMOLITION PLAN - HVAC

AREA A FIRST FLOOR

AJM AJM

FAN

EXHAUST

11

CONVECTOR

4

AC

B

D

77

7

7

7

S 2

FAN

EXHAUST

11

7 7

S

2

S

2

FAN

EXHAUST

11

PANEL

CONTROL

12

PANEL

CONTROL

12

1 1 1 1 1

1

1

1 1 1 1

1

1

1

ROOMBOILERUPPER

6

AIR DAMPERS

3 COMBUSTION

GENERAL NOTES:

B.

A.

WEATHER TIGHT CONDITION.

REMOVALS SHALL BE COMPLETED AS TO LEAVE THE BUILDING IN A

MOLD AND ASSOCIATED SYSTEMS.

COMPLETE REMOVAL OF THE ASSOCIATED TUBING, CONDUITS, WIRE

THE REMOVAL OF THE EXISTING CONTROLS SHALL INCLUDE THE

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

(TYP.10)

GRILLES

RETURN

44x12

20x12

44x12

44x12

20x12

44x12

OF DUCTWORK

FOR CONT.

SEE MD100A

BELOW STAGE.

IS ROUTED

DUCTWORK

RETURN

1

14

13

12

11

10

9

8

7

6

5

4

3

2

1

SHAFT

SUPPLY

3

14

1

1

DOOR SHALL BE ABANDONED. CAP AND SEAL AIR TIGHT.

REMOVE SUPPLY REGISTER/GRILLES. DUCTWORK IN THE SOFFIT ABOVE THE

COMPLETE.

REMOVE RELIEF GRILLE AND TRANSFER DUCTWORK TO THE CORRIDOR

REMOVE CONTROL PANEL AND ASSOCIATED WIRING/ TUBING COMPLETE.

SYSTEMS COMPLETE.

REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE DUCTWORK

CRAWLSPACE BELOW.

REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK TO THE

REMOVE TRANSFER GRILLES AND ASSOCIATED DUCTWORK COMPLETE.

EVACUATION.

FOLLOW ALL STATE AND LOCAL CODES FOR PROPER REFRIGERANT

REMOVE THE REFRIGERANT PIPING TO THE ROOF MOUNTED CONDENSING UNIT.

REMOVE DUCTLESS SPLIT SYSTEM AND ASSOCIATED CONTROLS COMPLETE.

REMAIN.

REMOVE RELIEF GRILLE, THE TRANSFER DUCTWORK TO THE CORRIDOR SHALL

TO REMAIN.

REMOVE PNEUMATIC ACTUATORS FROM COMBUSTION AIR DAMPERS. DAMPERS

TO THE CRAWLSPACE BELOW.

REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING

TO THE CRAWLSPACE BELOW.

REMOVE CONVECTOR AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING

THE SUPPLY SHAFT COMPLETE.

REMOVE SUPPLY REGISTER/GRILLES AND ASSOCIATED DUCTWORK BACK TO

REMOVE SENSOR/ THERMOSTAT AND ASSOCIATED WIRING/ TUBING COMPLETE.

CRAWL SPACE BELOW AND PREP FOR CONNECTION TO NEW.

REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE PIPING TO THE

CHILDREN'S SCHOOL OF

ROCHESTER -

ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610

# DATE CHANGE DESCRIPTION

© 2

016 M

oody/N

ola

n Inc.

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid Avenue

Suite 100

Cleveland, OH 44103

Phone: (216) 432-0696

Fax: (216) 432-0699

NEER NGENG

Capital DistrictSyracuseRochester

585.288.5590

Buffalo

www.meengineering.com

Mechanical/Electrical Engineering Consultants

150 N. CHESTNUT ST.

ROCHESTER, NY 14604

M/E Project #: 160270

BUILDING KEY PLAN

SE

D N

o. 26-1

6-0

0-0

1-0-0

01-0

22

Rochester Joint Schools

Construction Board

16307.01

04/19/17

1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Abatement & Demolition Bid Set

AR

EA A

AR

EA C

VEST.

UP

UP

UP

DN

UP

CORRIDOR

FAN ROOM

(BELOW)

VEST.

DN

Page 10: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

1FIRST FLOOR DEMOLITION PLAN - AREA B 1/8" = 1'-0"

DEMOLITION NOTES:

(IN CASEWORK)

RADIATION

1

1

103

CLASSROOM

SHAFT

SUPPLY

3

3

REGISTER

SUPPLY

S 2

RADIATION

5

LOUVER

EXHAUST

9"9"

FAN

EXHAUST11

11

11

9

REGISTER

SUPPLY

3

SHAFT

SUPPLY

3

(IN CASEWORK)

RADIATION

1

104

CLASSROOM

SHAFT

SUPPLY

3

3

REGISTER

SUPPLY

S 2

REGISTER

SUPPLY

SHAFT

SUPPLY

S

2

(IN CASEWORK)

RADIATION1

1

105

CLASSROOM

CONVECTOR

4

REGISTER

SUPPLY

15

SHAFT

SUPPLY

S

2

(IN CASEWORK)

RADIATION

1

106

CLASSROOM

1

(IN CASEWORK)

RADIATION

1

107

CLASSROOM

REGISTER

SUPPLY

3

S

2

S

2

RADIATION

5

RADIATION

5

REGISTER

SUPPLY

10

S

2

S

2

UNIT

A/C

8

CONVECTOR

4

8x6

SHAFT

SUPPLY

3

3

RADIATION

5

6x66x6

10x6

M

LOUVER

EXHAUST

FAN

EXHAUST

11

11

FAN

EXHAUST

11

11

S

2

REGISTER

SUPPLY

3

107A

TOILET

CONVECTOR

4CASEWORK)

(IN

RADIATION

1

1

S

2

S

RADIATION

5 2

REGISTER

SUPPLY

3

SHAFT

SUPPLY

3

CASEWORK)

(IN

RADIATION

CASEWORK)

(IN

RADIATION

CASEWORK)

(IN

RADIATION

55

5

S

2

107D

OFFICE

108

LOUNGE

110B

RESOURCE

110F

OFFICE

110

CLASSROOM

110D

ROOMSINK

REGISTER

SUPPLY

10

10

CASEWORK)

(IN

RADIATION

1

1

1

110C

ALCOVE

HOOD

RANGE

12

S

2

SHAFT

SUPPLY

3

3

110A

TOILET

RADIATION

5

12FAN

EXHAUST

13

FAN

EXHAUST

13

CONVECTOR

4

DEMOLITION PLAN - HVAC

AREA B FIRST FLOOR MD101B

AJM AJM

AC

B

D

7

S2

7

7

7

7

RADIATION

5

RADIATION

5PANEL

CONTROL

14

S

2

S2

DOWN

DUCT

SUPPLY

GENERAL NOTES:

B.

A.

WEATHER TIGHT CONDITION.

REMOVALS SHALL BE COMPLETED AS TO LEAVE THE BUILDING IN A

MOLD AND ASSOCIATED SYSTEMS.

COMPLETE REMOVAL OF THE ASSOCIATED TUBING, CONDUITS, WIRE

THE REMOVAL OF THE EXISTING CONTROLS SHALL INCLUDE THE

111

1

1

1

5

1

1

GRILLE

RELIEF

GRILLE

RELIEF

7

GRILLE

RELIEF

GRILLE

RELIEF

GRILLE

RELIEF

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

15 15

15

15

1

1

DOOR SHALL BE ABANDONED. CAP AND SEAL AIR TIGHT.

REMOVE SUPPLY REGISTER/GRILLES. DUCTWORK IN THE SOFFIT ABOVE THE

REMOVE CONTROL PANEL AND ASSOCIATED WIRING/ TUBING COMPLETE.

DUCTWORK COMPLETE.

REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE ALL ASSOCIATED

REMOVE RANGE HOOD AND ASSOCIATED DUCTWORK COMPLETE.

INSIDE FACE OF THE LOUVER.

DUCTWORK. THE LOUVER SHALL REMAIN. PROVIDE A SHEETMETAL CAP ON THE

REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE ALL ASSOCIATED

CRAWLSPACE BELOW.

REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK TO THE

REMOVE TRANSFER GRILLES AND ASSOCIATED DUCTWORK COMPLETE.

EVACUATION.

FOLLOW ALL STATE AND LOCAL CODES FOR PROPER REFRIGERANT

REMOVE THE REFRIGERANT PIPING TO THE ROOF MOUNTED CONDENSING UNIT.

REMOVE DUCTLESS SPLIT SYSTEM AND ASSOCIATED CONTROLS COMPLETE.

REMAIN.

REMOVE RELIEF GRILLE, THE TRANSFER DUCTWORK TO THE CORRIDOR SHALL

NOT USED

TO THE CRAWLSPACE BELOW.

REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING

TO THE CRAWLSPACE BELOW.

REMOVE CONVECTOR AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING

SUPPLY SHAFT COMPLETE.

REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK BACK TO THE

REMOVE SENSOR/ THERMOSTAT AND ASSOCIATED WIRING/ TUBING COMPLETE.

CRAWL SPACE BELOW AND PREP FOR CONNECTION TO NEW.

REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE PIPING TO THE

CHILDREN'S SCHOOL OF

ROCHESTER -

ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610

# DATE CHANGE DESCRIPTION

© 2

016 M

oody/N

ola

n Inc.

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid Avenue

Suite 100

Cleveland, OH 44103

Phone: (216) 432-0696

Fax: (216) 432-0699

NEER NGENG

Capital DistrictSyracuseRochester

585.288.5590

Buffalo

www.meengineering.com

Mechanical/Electrical Engineering Consultants

150 N. CHESTNUT ST.

ROCHESTER, NY 14604

M/E Project #: 160270

BUILDING KEY PLAN

SE

D N

o. 26-1

6-0

0-0

1-0-0

01-0

22

Rochester Joint Schools

Construction Board

16307.01

04/19/17

1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Abatement & Demolition Bid Set

Page 11: BASEMENT ABATEMENT PLAN...20. existing bearing wall to remain during demo. 21. remove all acoustic pads and panels from walls in this room. 22. existing wood bench to remain. slate

1/16" = 1'-0"1

OVERALL ROOF DEMOLITION PLAN

RELIEF

GOOSENECK

B.

A.

GENERAL NOTES:

OF REFRIGERANT PIPING FROM AIR CONDITIONING UNITS.

FOLLOW ALL STATE AND LOCAL CODES FOR PROPER EVACUATION AND CONTAINMENT

ALL ROOF WORK SHALL BE DONE AS TO MAINTAIN THE EXISTING ROOFING WARRANTY.

DEMOLITION NOTES:

1

UNIT

CONDENSING

2

RELIEF

3

RELIEF

GOOSENECK

1

UNIT

CONDENSING

2

PENTHOUSE

RELIEF

PENTHOUSE

RELIEF

UNIT

CONDENSING

5

UNIT

CONDENSING

2

5

4

3

2

1

UNIT

CONDENSING

2

RELIEF

GOOSENECK

1

UNIT

CONDENSING

2

AC

B

D

PLAN

ROOF DEMOLITION MD102

AJM AJM

AND CONTROLS SYSTEMS COMPLETE.

REMOVE CONDENSING UNIT. EQUIPMENT RAILS TO REMAIN. REMOVE REFRIGERANT PIPING

NOT USED.

REMOVE RELIEF SYSTEM TO 6" ABOVE THE ROOF LEVEL AND CAP WEATHER TIGHT.

PIPING AND CONTROLS SYSTEMS COMPLETE.

REMOVE CONDENSING UNIT AND ASSOCIATED PAD SYSTEM. REMOVE REFRIGERANT

REMOVE RELIEF GOOSENECK TO 6" ABOVE THE ROOF LEVEL AND CAP WEATHER TIGHT.

1

1

1

CHILDREN'S SCHOOL OF

ROCHESTER -

ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610

# DATE CHANGE DESCRIPTION

© 2

016 M

oody/N

ola

n Inc.

for

Dwg. Coord.: Tech. Coord.:

4415 Euclid Avenue

Suite 100

Cleveland, OH 44103

Phone: (216) 432-0696

Fax: (216) 432-0699

NEER NGENG

Capital DistrictSyracuseRochester

585.288.5590

Buffalo

www.meengineering.com

Mechanical/Electrical Engineering Consultants

150 N. CHESTNUT ST.

ROCHESTER, NY 14604

M/E Project #: 160270

BUILDING KEY PLAN

SE

D N

o. 26-1

6-0

0-0

1-0-0

01-0

22

Rochester Joint Schools

Construction Board

16307.01

04/19/17

1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3

Abatement & Demolition Bid Set