basement abatement plan...20. existing bearing wall to remain during demo. 21. remove all acoustic...
TRANSCRIPT
UNEXCAVATED
UNEXCAVATED
EXCAVATED
UNEXCAVATED
19
72
19
21
19
72
19
21
19
21
1
9
2
1
1
9
9
0
19
62
1350 SF
STORAGEB105
391 SF
BOMB SHELTERB104
1797 SF
BOILER ROOMB102
816 SF
FAN ROOMB101
232 SF
STORAGEB100
109 SF
STORB103
53 SF
STORAGEB106
134 SF
STAIR 3ST 3
194 SF
STAIR 107CVG
49 SF
ELEVATOR 1EL 1
53 SF
STORAGEB 3
DUC
BASEMENT ABATEMENT PLAN
GENERAL ASBESTOS NOTES APPLICABLE TO AB-101
1. COORDINATE REMOVALS WITH OTHER TRADES.
2. ALL ASBESTOS MATERIALS REMOVED SHALL BE DISPOSED OF AN AS ACM.
3. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
QUANTITIES, BEFORE START OF WORK.
4. THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE
WITH CONTRACT SPECIFICATIONS, NEW YORK STATE DEPARTMENT OF LABOR
(NYSDOL) INDUSTRIAL CODE RULE 56, OSHA 1926.1101, NESHAPS 40 CFR PART
61, AHERA 40 CFR PART 763 AND ALL OTHER APPLICABLE CODES.
5. THE CONTRACTOR SHALL COORDINATE ALL ASBESTOS REMOVAL WORK WITH
OWNER'S REPRESENTATIVE AND OTHER CONTRACTORS.
6. THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK
AREA AT ALL TIMES, FOR THE DURATION OF THE ASBESTOS REMOVAL
PROJECT.
7. ASBESTOS TRANSPORT ROUTE TO BE COORDINATED WITH THE OWNER'S
REPRESENTATIVE.
8. CONTRACTOR SHALL COORDINATE SHUT DOWN AND LOCK OUT OF
ELECTRICAL POWER WITH OWNER'S REPRESENTATIVE. ALL TEMPORARY
POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK
AREA THROUGH A GROUND-FAULT CIRCUIT INTERRUPTER AT THE SOURCE OF
THE POWER.
9. MOVABLE OBJECTS SHALL BE REMOVED BY THE ABATEMENT CONTRACTOR
AND SHALL BE PRE-CLEANED PER CODE RULE 56 AND SHALL BE DISPOSED OF
AS A NON-CONTAMINATED WASTE.
10. VARIATIONS (+/- 10%) IN QUANTITIES AND LOCATIONS OF ACM SHALL BE
CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND/OR SCHEDULE
OF THIS CONTRACT.
11. THE OWNER IS RESPONSIBLE TO CONTRACT FOR NYSDOL PROJECT
MONITORING / AIR SAMPLING TECHNICIAN SERVICES. OSHA PERSONAL AIR
MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.
12. CONTRACTOR SHALL REQUEST AND RECEIVE PROJECT MONITOR AND
OWNER'S REPRESENTATIVE APPROVAL BEFORE ASBESTOS REMOVAL IS
UNDERTAKEN.
13. CONTRACTOR TO HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR
TO COVERING WITH PROTECTIVE PLASTIC SHEETING.
14. UNDER NO CIRCUMSTANCES SHALL CONTAMINATED WASTEWATER ENTER
THE SANITARY SEWER SYSTEM. ALL WASTE WATER SHALL BE FILTERED
THROUGH A SYSTEM WITH AT LEAST 5.0 MICRON PARTICLE SIZE COLLECTION
CAPABILITY.
15. IF WATER LEAKS THROUGH THE CONTAINMENT AREAS, OR FROM THE
DECONTAMINATION AREA, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL WATER DAMAGE. CONTRACTOR SHALL DOCUMENT ALL PRE-EXISTING
WATER DAMAGE PRIOR TO ESTABLISHING CONTAINMENT AREAS.
16. ASBESTOS REMOVAL SHALL BE CONDUCTED PRIOR TO ANY DEMOLITION OR
RENOVATION WORK. IF SUSPECT OR ASBESTOS MATERIAL IS DISCOVERED,
NOT PREVIOUSLY IDENTIFIED, CEASE OPERATIONS AND NOTIFY THE OWNER
AND/OR OWNER'S REPRESENTATIVE IMMEDIATELY. REFERENCE SK-1
THROUGH SK-5 FOR ADDITIONAL ASBESTOS REMOVAL INFORMATION.
17. CONTRACTOR SHALL IDENTIFY AND INCLUDE IN THEIR BID ALL DEMOLITION
REMOVALS SHOWN ON THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND
MECHANICAL DEMOLITION PLANS.
18. REFER TO ARCHITECTURAL DEMOLITION DRAWING FOR GENERAL DEMOLITION
NOTES.
19. CONTRACTOR SHALL USE UNIT PRICING FOR ABATEMENT OF TEN MINOR-SIZE
TENT ENCLOSURES IN THE EVENT UNKNOWN ACMS ARE DISCOVERED OVER
THE COURSE OF THE PROJECT. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR VERIFYING THE LOCATION AND DETERMINING THE EXTENT/QUANTITY OF
ACM ABATEMENT AS PER THE PROJECT DOCUMENTS. IN THE EVENT ACM IS
DISCOVERED IN INACCESSIBLE SPACES, APPROVAL OF THE QUANTITY AND
EXTENT OF THIS WORK MUST BE APPROVED BY CONSULTANT AND OWNER
PRIOR TO THE START OF WORK.
20. CONTRACTOR SHALL USE UNIT PRICING FOR AN APPROXIMATE MINIMUM 200
SQUARE FEET SURFACE AREA, AND HAVING A MINIMUM 6.5” DEPTH, (I.E., 4.0
CUBIC FEET) OF CONTAMINATED SOIL ABATEMENT IN ALL CRAWLSPACE AND
BASEMENT AREAS IN THE EVENT PIPE INSULATION DEBRIS IS DISCOVERED
BELOW THE EXISTING CONCRETE MUD-MAT FLOOR LOCATED AT AND AS
REQUIRED FOR THE CONSTRUCTION OF ALL MECHANICAL AND ELECTRICAL
COMPONENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
THE LOCATION AND EXTENT/QUANTITY OF CONTAMINATED SOIL ABATEMENT
AS PER THE PROJECT'S MECHANICAL AND ELECTRICAL DOCUMENTS.
APPROVAL OF THE QUANTITY AND EXTENT OF THIS WORK MUST BE
APPROVED BY CONSULTANT AND OWNER PRIOR TO THE START OF WORK.
LEAD PAINT NOTE APPLICABLE TO AB-101
SURFACES CONTAINING LEAD PAINT ARE PRESENT IN THE RENOVATION AREA.
ALTERATIONS TO PAINTED SURFACES CONTAINING LEAD SHALL BE PERFORMED
BY THE GENERAL CONTRACTOR IN ACCORDANCE WITH 40 CFR PART 735 AND 29
CFR 1926.62.
MOLD REMEDIATION NOTE APPLICABLE TO AB-101
WOOD FLOOR JOISTS IN THE BASEMENT CRAWLSPACE CONTAIN SELECT AREAS
OF MOLD GROWTH. CONTRACTOR SHALL USE UNIT PRICING FOR THE
REMEDIATION OF APPROXIMATELY 3,200 SQUARE FEET OF MOLD
CONTAMINATED FLOOR JOISTS. WORK SHALL BE PERFORMED IN ACCORDANCE
SPECIFICATION 028400 AND ARTICLE 32 OF THE NEW YORK STATE LABOR LAW.
ASBESTOS ABATEMENT NOTES APPLICABLE TO AB-101
REMOVE ASBESTOS CONTAINING (AC) TAN FILTER BANK CAULK FULL DEPTH ALL
LAYERS INSIDE THE BASEMENT AIR HANDLING UNIT AND DISPOSE OF AS AN
ACM. THE TAN FILTER BANK CAULK IS NOT PRESENT ON EVERY SECTION OF THE
DUCTWORK. THE PROJECT MONITOR SHALL ASSIST THE ABATEMENT
CONTRACTOR SUPERVISOR WITH LOCATING THE TAN FILTER BANK CAULK.
LEGEND
AC ASBESTOS CONTAINING
ACM ASBESTOS CONTAINING MATERIAL
SF SQUARE FEET
DUC FILTER BANK CAULK
APPROXIMATE REMOVAL LOCATIONS
APPROXIMATE ASBESTOS REMOVAL QUANTITIES
APPLICABLE TO AB-101
(FOR REFERENCE ONLY)
DUC 8 SF
DUC
1
1
for
DWG. COORD.: TECH. COORD.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SE
D N
o.26-16-00-01-0-001-022
16307.01
04/19/17
CHILDREN'S SCHOOL OF
ROCHESTER -
ADDITION/RENOVATION
Rochester Joint Schools
Construction Board
GRBCMS
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
BASEMENT FLOOR PLAN -
OVERALL
# DATE CHANGE DESCRIPTION
2110 SOUTH CLINTON AVENUE, SUITE 1ROCHESTER, NEW YORK 14618
RAVI ENGINEERING
& LAND SURVEYING, P.C.
TL: (585) 223-3660 FX: (585) 223-4250
C
B
D
BUILDING KEY PLAN
A
AB-101
1 5/24/17 REVISED NOTES
UP
DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.
EXISTING WALL TO REMAIN
EXISTING DOOR & FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED.
GENERAL DEMOLITION NOTESA.
B.
C.
D.
E.
F.
G.
H.
DEMOLITION DRAWINGS SHOW GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT AREA TO RECIEVE NEW WORK.
PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT REQURIES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS.
CORE DRILLING, CUTTING AND REMOVAL OF WALLS AND SLABS AS NECESSARY TO INSTALL MECHANICAL, ELECTRICAL AND PLUMBING WORK. REFER TO MEP DRAWINGS TO COORDINATE REQUIRED DEMOLITION WORK.MAINTAIN BUILDING IN A WEATHER TIGHT CONDITION AS MUCH AS POSSIBLE.
PROVIDE TEMPORARY BARRIERS TO PROTECT PERSONS FROM DEMOLITION SITE HAZARDS AND INJURY. MAINTAIN GOOD INDUSTRY PRACTICE, AND COMPLY WITH OSHA REGULATIONS.
PROVIDE TEMPORARY BRACING REQUIRED TO SUPPORT BUILDING ELEMENTS TO REMAIN AND REQUIRED TO MAINTAIN THE PROJECT IN A SAFE CONDITION.
STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT FROM DAMAGE.
DIMENSIONS SHOWN ON DEMOLITIONS DRAWINGS ARE FOR GENERAL INFORMATION PURPOSES ONLY. VERIFY ALL DIMENSIONS WITH NEW WORK REQUIREMENTS TO ASSURE DEMOLITION IS CONDUCTED TO THE EXTENT REQUIRED TO ALLOW/SUPPORT NEW CONSTRUCTION SHOWN IN A FUTURE PHASE OF CONTRACT DOCUMENTS.
FIRE ALARM TO REMAIN OPERATIONAL AND ACTIVE DURING CONSTRUCTION. REPLACE SMOKE DETECTORS WITH HEAT DECTECTORS.
1
2
3
4
5
6
7
9
10
11
12
13
14
15 15
B AA.2CE.7 DF.7G.4H.2J.3
1.9
4.7
3.9
6.4
88
9.6
11.311.3
H G
E
JKL
M
M
P
P N
N
12.112.1
10.710.7
9.7
6.3
14.1
5.3
L.1
CRAWL SPACE
BOILER ROOMSTORAGE
FAN ROOM
STORAGE
STAIR
STORAGE
ELEVATOR STORAGE
ARTS
EXISTINGTRENCH
TRENCH
COAL ROOM INFILLED
TRENCH
1AD401
2AD401
1 5
6
8
6
8
6
3
1
1
DEMOLITION KEY NOTES
1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.
2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.
3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.
4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR
SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR
LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES
COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS
REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.
9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.
10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.
11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.
12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR
SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE
BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS
ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.
18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.
19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH
AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)
FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &
BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,
TACKBOARD, AND CHALK BOARDS.
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
54:4
9 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
BASEMENT DEMOLITIONPLAN AD1000 16' 32' 40'
1/16" = 1'-0"OVERALL BASEMENT DEMOLITION PLAN1
1
1
1
1
1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
UP
1
2
3
4
5
6
7
9
10
11
12
13
14
15
B AA.2CC.6E.7 DF.7G.4H.2J.3
1.9
4.7
3.9
6.4
8
9.6
11.311.3
H G
F
E
JKL
MP N
12.112.1
10.710.7
9.7
6.3
14.1
5.3
L.1
3RD GRADE CLASSROOM
5TH GRADE CLASSROOM
VEST.
3RD GRADE CLASSROOM
5TH GRADE CLASSROOM
3RD GRADE SPEC. ED.
MEN'S RESTROOM
SERVER/DATA CLOSET
BOOK STORAGE
SINK
OFFICESTORAGE
PRINCIPAL
CLERKOFFICE
CORRIDOR
TOILET
VEST.
PHSYCH/TCOSE
TCSOE/ESEL
NURSE
TOILETCOPIER
SINK
WOMEN'STOILET
UP
UP
UP
DN
KINDERGARTENCLASSROOM
1ST GRADE CLASSROOM
1ST GRADE CLASSROOM
2ND GRADE CLASSROOM
2ND GRADE CLASSROOM
VEST.
DN
UP
DNVICE
PRINCIPAL
CLOSET
TEACHER'S LOUNGE
TOILETSPECIALIST
OFFICETOILET
RESOURCE ROOM
KINDERGARTENCLASSROOMALCOVE
SINK ROOM
CORRIDOR
FAN ROOM (BELOW)
PARENT LIASON / BAND OFFICE
BOY'S TOILET
VEST.
SINK
4TH GRADE CLASSROOM
4TH GRADE CLASSROOM
SPEECH
HARD/HEARING OFFICE
HARD/HEARING OFFICE
CAFETERIA
WOMEN'S TOILET
MEN'S TOILET
KITCHEN
OT/PT/BAND OFFICE
CUSTODIAL
VEST.
2ND GRADE SPEC ED. MUSIC ROOM
GROUNDS EQUIP.
TOILET
COMPUTER LAB
GIRL'S TOILET
VEST.
LIBRARY
CUSTODIAL
CUSTODIAL
STAIR
BOILER ROOM(BELOW)
STAGE
PE OFFICE
PE STOR.
PE STOR.
AUDITORIUM / GYMNASIUM
CORRIDORDN
DN
6TH GRADE CLASSROOM
6TH GRADE CLASSROOM
CLASSROOM
PRE-K CLASSROOM
1AD401
2AD401
1
DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.
EXISTING WALL TO REMAIN
EXISTING DOOR & FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED.
GENERAL DEMOLITION NOTESA.
B.
C.
D.
E.
F.
G.
H.
DEMOLITION DRAWINGS SHOW GENERAL EXTENT OF REQUIRED WORK. REMOVE FIXTURES FITTINGS, DEVICES, ETC. REQUIRED TO PREPARE THE PROJECT AREA TO RECIEVE NEW WORK.
PERFORM SELECTIVE DEMOLITION FOR WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS THAT REQURIES DEMOLITION NOT SHOWN ON DEMOLITION DRAWINGS.
CORE DRILLING, CUTTING AND REMOVAL OF WALLS AND SLABS AS NECESSARY TO INSTALL MECHANICAL, ELECTRICAL AND PLUMBING WORK. REFER TO MEP DRAWINGS TO COORDINATE REQUIRED DEMOLITION WORK.MAINTAIN BUILDING IN A WEATHER TIGHT CONDITION AS MUCH AS POSSIBLE.
PROVIDE TEMPORARY BARRIERS TO PROTECT PERSONS FROM DEMOLITION SITE HAZARDS AND INJURY. MAINTAIN GOOD INDUSTRY PRACTICE, AND COMPLY WITH OSHA REGULATIONS.
PROVIDE TEMPORARY BRACING REQUIRED TO SUPPORT BUILDING ELEMENTS TO REMAIN AND REQUIRED TO MAINTAIN THE PROJECT IN A SAFE CONDITION.
STORE SALVAGED MATERIALS INTENDED FOR REUSE IN PROJECT AREA AND PROTECT FROM DAMAGE.
DIMENSIONS SHOWN ON DEMOLITIONS DRAWINGS ARE FOR GENERAL INFORMATION PURPOSES ONLY. VERIFY ALL DIMENSIONS WITH NEW WORK REQUIREMENTS TO ASSURE DEMOLITION IS CONDUCTED TO THE EXTENT REQUIRED TO ALLOW/SUPPORT NEW CONSTRUCTION SHOWN IN A FUTURE PHASE OF CONTRACT DOCUMENTS.
FIRE ALARM TO REMAIN OPERATIONAL AND ACTIVE DURING CONSTRUCTION. REPLACE SMOKE DETECTORS WITH HEAT DECTECTORS.
6
7
9
10
B
B
C
C
C.6
C.6
E.7 D
D
F.7G.4H.2
6.4
8
9.6
H G F
E
EJ
10.7
5.3
AUDITORIUM / GYMNASIUM
BALCONY
PROJECTOR ROOM
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
55:3
0 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
JS BES
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
FIRST FLOOR DEMOLITIONPLAN AD101 1/16" = 1'-0"
OVERALL FIRST FLOOR DEMOLITION PLAN10 16' 32' 40'
1/16" = 1'-0"BALCONY DEMOLITION PLAN2 NO DEMOLITION WORK
BUILDING KEY PLAN
AC
BD
1
1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
1
2
3
4
5
6
7
9
10
11
B AA.2CC.6E.7 DF.7G.4H.2J.3
1.9
4.7
3.9
6.4
8
9.6
H G F
E
JKL
M
10.710.7
9.7
6.3
5.3
L.1
3RD GRADESPEC. ED.
5TH GRADE CLASSROOM
VEST.
3RD GRADE CLASSROOM
5TH GRADE CLASSROOM
3RD GRADE CLASSROOM
MEN'S RESTROOM
SERVER/DATA CLOSET
BOOK STORAGE
SINK
OFFICESTORAGE PRINCIPAL
CLERKOFFICE
CORRIDOR
TOILET
VEST.
PHSYCH/TCOSE
TCSOE/ESEL
TOILET
UP
UP
UP
DN
UP
DN
FAN ROOM (BELOW)
PARENT LIASON / BAND OFFICE
GROUNDS EQUIP.
TOILET
COMPUTER LAB
GIRL'S TOILET
LIBRARY
CUSTODIAL
CUSTODIAL
STAIR
BOILER ROOM(BELOW)
STAGE
PE OFFICE
PE STOR.
PE STOR.
AUDITORIUM / GYMNASIUM
CORRIDOR
DN
1 2 51 2 5
1 2 5
1 2 5
1 2 5
25
8
6
8
25
25
8
6
6
6 7
6
8
25
6
3
3
1 2 5
1 2 5
1 2 5
33
3
6
3
3
3
1 2 5
4
8
25
8
1 2 5
1 2 5
6
7
3
6
66
10
6
4
4
6
12
12
13
1313
1313
13
13
13
13
1AD401
1818
18
19
18
23
23
12
1212
12
12
24
23
9'-5 5/8"
11
1
1
25
1 1
26 1
26
1
1
1
8
1
26
11
1
26
1
1
1
6 26
1
1
EXISTING CABINETTO REMAIN
4
1
71
1 25 1
1 25
1
1 25
1
181
1 25
1
61
61
8
CIRCULATION DESK
8RECEPTION DESK
1
1
2727
27
CLOSET TO REMAIN
1
CLOSET TO REMAIN
WARDROBES TO REMAIN
3'-2" 4'-10 5/8"
3'-2" 4 5/8"
1 2
1'-9" 3'-2"
3'-2" 2'-7"
6'-2" 5'-7"
3'-1" 6'-2"
51
DEMOLITION KEY NOTES
1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.
2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.
3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.
4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR
SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR
LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES
COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS
REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.
9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.
10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.
11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.
12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR
SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE
BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS
ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.
18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.
19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH
AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)
FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &
BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,
TACKBOARD, AND CHALK BOARDS.
DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.
EXISTING WALL TO REMAIN
EXISTING DOOR & FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED.
GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
55:4
0 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
FIRST FLOOR DEMOLITIONPLAN - AREA A AD101A
1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA A1 0 8' 16' 20'12'
BUILDING KEY PLAN
AC
BD
1
1
1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
9
10
11
12
13
14
15
B AA.2CC.6D
9.6
11.311.3
H G F
E
JKL
M
12.112.1
10.710.7
9.7
14.1
TCSOE/ESEL
NURSE
TOILET
COPIER
SINK
WOMEN'STOILET
UP
UP
DN
KINDERGARTENCLASSROOM
1ST GRADE CLASSROOM1ST GRADE
CLASSROOM
2ND GRADE CLASSROOM
2ND GRADE CLASSROOM
VEST.
DN
VICE PRINCIPAL
CLOSET
TEACHER'S LOUNGE
TOILET
SPECIALIST OFFICE
TOILET
RESOURCE ROOM
KINDERGARTENCLASSROOMALCOVE
SINK ROOM
CORRIDOR
BOY'S TOILET
SINK
1 2 5
1 2 51 2 5
1 2 5 1 2 5
1 5
1 5
1 2 5
1 5
67
3
8
4
4 4
4
8
3
4 8
67
67
1 5
3
4
11
25
8 8
25
25
25
8
6
1 5
12
12
12
1313
13
1313
13
13 13
13
13
13
13
18
12 12
23
12
4
2323
66
1 5
11
4
6
1
1
3
1
6
8
EXISTING WARDROBES TO REMAIN UP TO NEW PARTITION
6
1
1
1
11
1
124
12
12
7
7
1
1
1
6
1
1
8REMOVE LOWER CABINETS ONLY
6
1
1
26
1
1
626
1
8
25
1
1 1
1
261
1 1
EXISTING CASEWORKTO REMAIN
1
1
221
15
1
15
1
1 51
1 5
1
25
1
23
1
23
1
25
1
CABINETS REMAIN
67
1
16
15
1
1 2 51
1 25
1
27
2727
231
NEW PARTITION, SEE NEW CONSTRUCTION PLANS
3'-2" 13'-11 3/8"
3'-2"
1'-2 7
/8"
3'-2"
9'-4 7
/16"
22
22
2
1
51
5 1
1 2 5
5 1
DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.
EXISTING WALL TO REMAIN
EXISTING DOOR & FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED.
GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.
DEMOLITION KEY NOTES
1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.
2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.
3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.
4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR
SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR
LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES
COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS
REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.
9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.
10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.
11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.
12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR
SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE
BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS
ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.
18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.
19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH
AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)
FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &
BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,
TACKBOARD, AND CHALK BOARDS.
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
55:4
7 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
FIRST FLOOR DEMOLITIONPLAN - AREA B AD101B
1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA B1
BUILDING KEY PLAN
AC
BD
1
1
1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
UP
3
13
4.7
3.9
8
11.3
MP N
12.1
10.7
6.3
5.3
VEST.
SINK
4TH GRADE CLASSROOM
4TH GRADE CLASSROOM
SPEECH HARD/HEARING OFFICE
HARD/HEARING OFFICE
CAFETERIA
WOMEN'S TOILET
MEN'S TOILET
KITCHEN
OT/PT/BAND OFFICE
CUSTODIAL
VEST.
2ND GRADE SPEC ED. MUSIC ROOM
VEST.
DN
DN
6TH GRADE CLASSROOM
6TH GRADE CLASSROOM
6 7
1 5
12
13
1 5
1 51 5
13
13 13
11'-6 1/8"
8'-4" 5'-10 3/16"
6 8
6'-8"2'-8"
13'-2 1/16" 11'-1 1/4"
8 6
6
8866
25
14
14
14
14
15
16
25
3
3
3
16
16
1 5
1 51 5
1 5
1 175
1 5
1 5
3
3
3
1AD401
2AD401
20
20
20
20
20
20
1'-8 7/8" 1 51 5
1
1
1
1
1
1
1
4
1
4
1
44
1
4
1
4
1
4
1
4
1
41
41
41
4
1
4
1
125
1
26 26
1 1
231
1
1
1
231
231
25
1
2
1 52
1 52
1 52
1 52
3'-4"
6"
271
271
2
1
12'-9 7/16" 8'-6 11/16"
24'-6
1/4"
8'-11
1/2"
1
21 1
9 1
DEMOLITION PLAN LEGENDEXISTING WALL TO BE REMOVED.
EXISTING WALL TO REMAIN
EXISTING DOOR & FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED.
GENERAL DEMOLITION NOTESSEE OVERALL FIRST FLOOR DEMOLITION PLAN AD101 FOR GENERAL DEMOLITION NOTES.
DEMOLITION KEY NOTES
1. REMOVE EXISTING CEILINGS, SUSPENSION GRIDS, LIGHTING AND ANY CEILING MOUNTED EQUIPMENT. REFERENCE MEP SHEETS. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM.
2. EXISTING STAMPED TIN CEILING (IF PRESENT) AND PLASTER LATH BACKING TO BE REMOVED. REFERENCE ABATEMENT PLAN (SK-1) FOR REMOVAL OF ACM. SALVAGE 1,000 S.F. OF STAMPED TIN CEILING (WHOLE PIECES) TO BE STORED FOR FUTURE REINSTALLATION AND ATTIC STOCK. SALVAGE 500 LINEAR FEET OF WHOLE PIECES OF TIN PERIMETER CEILING TRIM AND TIN CEILING COVE FOR FUTURE REINSTALLATION.
3. REMOVE PARTITION TO EXTENT INDICATED; PATCH AND REPAIR FLOORS AND ADJACENT WALLS AS REQUIRED.
4. REMOVE EXISTING DOORS AND FRAMES.5. REMOVE EXISTING FLOOR FINISH DOWN TO SLEEPERS & SUBSTRATE OR
SLAB AND PREPARE SURFACE TO RECEIVE NEW FLOOR FINISH MATERIALS. 6. REMOVE EXISTING WATER CLOSET, URINAL, DRINKING FOUNTAIN, OR
LAVATORY. PATCH AND REPAIR WALLS AND FLOORS AS REQUIRED.7. REMOVE EXISTING TOILET PARTITIONS AND TOILET ACCESSORIES
COMPLETE; PATCH AND REPAIR WALLS AND FLOORING AS REQUIRED. 8. REMOVE EXISTING CASEWORK / BOOKCASE; PATCH AND REPAIR WALLS AS
REQUIRED. SEE EXISTING WARDROBE DETAILS 1/AD500 2/AD500 & 4/AD500 FOR ADDITIONAL INFORMATION.
9. REMOVE EXISTING SLAB AND PREPARE FOR INSTALLATION OF NEW RECESSED SLAB.
10. REMOVE STEPS AND FLOOR OF RAISED AREA DOWN TO FRAMING AND SUBSTRATE BELOW.
11. EXISTING INFILLED HISTORIC OPENING. REMOVE EXISTING INFILL AND PREPARE OPENING FOR NEW DOOR AND SIDELIGHT INSTALLATION.
12. REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING.13. EXISTING WINDOWS AND FRAMES TO REMAIN. REMOVE ANY INTERIOR
SHADES OR BLINDS.14. PORTABLE CLASSROOMS TO REMAIN DURING DEMOLITION.15. EXISTING ELECTRICAL PANEL TO REMAIN DURING CONSTRUCTION FOR USE
BY GENERAL CONTRACTOR.16. REMOVE EXISTING LOADING PLATFORM, RAMP, STEPS AND/OR WALK.17. EXISTING MECHANICAL EQUIPMENT LOCATED IN A MEZZANINE ABOVE THIS
ROOM. SEE MECHANICAL DEMOLITION PLAN 2/MD101C FOR MORE INFORMATION.
18. EXISTING FLOOR TO REMAIN. PROTECT EXISTING FLOOR DURING DEMO AND CONSTRUCTION.
19. REMOVE EXISTING STAGE CURTAIN.20. EXISTING BEARING WALL TO REMAIN DURING DEMO.21. REMOVE ALL ACOUSTIC PADS AND PANELS FROM WALLS IN THIS ROOM.22. EXISTING WOOD BENCH TO REMAIN. SLATE SILL BETWEEN BACK OF BENCH
AND WINDOW TO BE REMOVED.23. REMOVE EXISTING CHALKBOARD(S) / MARKERBOARD(S) / TACKBOARD(S)
FROM WALL INDICATED.24. EXISTING DOORS AND WALL TO REMAIN DURING DEMOLITION.25. REMOVE EXISTING BOOKCASES AND FIN TUBE ENCLOSURE. 26. REMOVE EXISTING BASE CABINET, COUNTERTOP, WALL SHELVING &
BRACKETS, AND WALL TILES. SEE DETAIL 3/AD500. 27. EXISTING WOOD TRIM TO REMAIN. REMOVE METAL WALL BRACKETS,
TACKBOARD, AND CHALK BOARDS.
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
55:5
2 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
FIRST FLOOR DEMOLITIONPLAN - AREA C & D AD101C
1/8" = 1'-0"FIRST FLOOR DEMOLITION PLAN - AREA C & D1
BUILDING KEY PLAN
AC
BD
1
1
1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
MP N
CAFETERIAKITCHEN CORRIDOR
CRAWL SPACE
CRAWL SPACE
EXISTING ROOF AND ROOF STRUCTURE TO REMAIN - PRESERVE AND PROTECT
DURING CONSTRUCTION
EXISTING LOAD BEARING WALL TO REMAIN DURING DEMOLITIION. REMOVAL TO OCCUR
DURING FUTURE PROJECT PHASE
1
1311.3 12.110.7
9.7
SPEECH CORRIDOR4TH GRADE
CLASSROOM
EXISTING ROOF AND ROOF STRUCTURE TO REMAIN - PRESERVE AND PROTECT
DURING CONSTRUCTION
REMOVE WALL TO PROVIDE NEW OPENING (SEE PLANS).
COORDINATE WITH STRUCTURAL DEMOLITION DRAWINGS.
PARTIALLY EXCAVATED
PARTIALLY EXCAVATED
CAFETERIA
1
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
55:5
7 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
DEMOLITION BUILDINGSECTIONS AD401SECTION
1/8" = 1'-0"CAFETERIA DEMOLITION 011
1/8" = 1'-0"CAFATERIA DEMOLITION 022
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
REAR PLYWOOD PANEL TO REMAIN
REMOVE SIDE PANELS AND SHELVING HARDWARE ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED
REMOVE JAMB AND STOP AT TOP OF OPENING
WOOD CEILING TO REMAIN (NOT VISIBLE)IF ABOVE 6'-8" AFF.
REMOVE SHELVING AND SHELVING HARDWARE ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED. SAVE SHELVES FROM DEMO TO BE ALLOCATED WHERE WARDROBES REMAIN. MAKE SURE SHELVES FIT WHERE THEY ARE ALLOCATED. REMAINING WARDROBES TO HAVE 4 ADJUSTABLE SHELVES INSIDE EACH SET OF DOORS.
REMOVE COATHOOKS AND SUPPORT PANELS ONLY AT LOCATIONS WHERE WARDROBES ARE DEMOLISHED.
1
1
1
REMO
V E W
OOD W
ORK
IN T
HIS
ARE A
UP
TO 6'
-8" A
FF
REMOVE DOORS AND DOOR HADWARE
REMOVE STYLES BETWEENDOORS
REMOVE STOPS AND JAMBS
TRIM BOARD TO REMAIN IF ABOVE6'-8" AFF
RAIL AND BRACKETS TO REMAIN IF ABOVE 6'-8" AFF EX
ISTI
NG C
ONST
RUCT
ION
TO
REMA
IN A
BOVE
THI
S LIN
E
1
1
1
NOTE: SAVE AND STORE 3 CLASSROOM SETS WORTH OF WARDROBE DOORS TO BE RE-USED BY MILLWORKER ON CUSTOM CASEWORK.
1
SEE
WAR
DROB
E DE
TAILS
FOR
EXT
ENT
OF D
EMO
EXISTING TRIM TO REMAIN ABOVE SINK ALCOVE
RAIL AND BRACKETS TO REMAIN ABOVE SINK ALCOVE
REMOVE SHELVING AND SHELVING HARDWARE
VERTICAL STRUCTURE AND WOOD TRIM TO REMAIN
REMOVE WALL TILE
REMOVE DISPENSER(S)
VERTICAL STRUCTURE AND WOOD TRIM TO REMAIN
REMOVE SINK, FOUNTAIN, AND ALL APPURTENANCES
REMOVE COUNTERTOP AND BASE CABINET
ALL THREE ALCOVE WALLS TO REMAIN
CEILING
STRUCTURE ABOVE
TACKABLE SURFACE
EXISTING WALL FRAMING
EXISTING FRAMING
EXISTING WOOD TRIM
EXISTING WOOD TRIM AND FRAMING TO BE DEMOLISHED
SAVE
RAI
L AN D
BRA
CKET
S, IF
POS
SIBL
EDE
MO U
P TO
6'-8
" AFF
INSTALL HORIZONTAL FRAMING SO FINISHED SOFFIT IS AT LEAST 6'-8"AFF
IF EXISTING WOOD CEILING IS ABOVE 6'-8" AFF, RETAIN. IF LOWER, DEMOLISH.
INSTALL NEW WOOD FRAMING PRIOR TO DEMO OF WARDROBE BELOW. NEW FRAMING TO TIE INTO STRUCTURE ABOVE TO SUPPORT LOAD.
FASTENERS AS REQUIRED
FASTEN INTO STRUCTURE ABOVE AS REQUIRED
© 2
016
Moo
dy/N
olan
Inc.
PRIN
T D
ATE:
FILE
INFO
:
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid AvenueSuite 100Cleveland, OH 44103
Phone: (216) 432-0696Fax: (216) 432-0699
SED
No.
26-
16-0
0-01
-0-0
01-0
22
5/24
/201
7 2:
56:0
3 P
MC
:\$$L
ocal
Rev
it P
roje
cts\
201 7
Pro
jec t
s\16
307
MB
A E
S1 -
AR
CH
_BSa
eger
.rvt
16307.01
04/19/17
CHILDREN'S SCHOOL OFROCHESTER -ADDITION/RENOVATION
Rochester Joint SchoolsConstruction Board
Author Checker
ABATEMENT & DEMOLITION BID SET
85 Hillside Ave, Rochester, NY 14610
DEMOLITION DETAILS AD500 1/4" = 1'-0"WARDROBE DETAIL 22 1/4" = 1'-0"
WARDROBE DETAIL 11
1/4" = 1'-0"SINK ALCOVE DETAIL3 1
1 1/2" = 1'-0"WARDROBE HEADER DETAIL4 1
# DATE CHANGE DESCRIPTION1 05/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
1FIRST FLOOR DEMOLITION PLAN - AREA A 1/8" = 1'-0"
(IN CASEWORK)
RADIATION
1
S
2
120
CLASSROOM
REGISTER
SUPPLY
SHAFT
SUPPLY
DEMOLITION NOTES:
S
2
REGISTER
SUPPLY
14
(IN CASEWORK)
RADIATION
1
119
CLASSROOM
CONVECTOR
4
S
2
118
CLASSROOM
(IN CASEWORK)
RADIATION
1
REGISTER
SUPPLY
3
SHAFT
SUPPLY
S
2
(IN CASEWORK)
RADIATION
1
1
121
CLASSROOM
SHAFT
SUPPLY
3
3
REGISTER
SUPPLYRADIATION
5
REGISTER
SUPPLY
3
(IN CASEWORK)
RADIATION
1
122
CLASSROOM
SHAFT
SUPPLY
3
3
REGISTER
SUPPLY
S
2
S
2
REGISTER
RELIEF
13
REGISTER
SUPPLY
3SHAFT
SUPPLY
3
12x12
13
S
2
RADIATION
5
RADIATION
5
UNIT
A/C
8
S
2
RADIATION
5
UNIT
A/C
8REGISTER
RELIEF
13
SHAFT
SUPPLY
3
CONVECTOR
4
CONVECTOR
4
CONVECTOR
4
S 2
8"
SHAFT
SUPPLY
33
3
SHAFT
RELIEF
9
REGISTER
SUPPLY
10
REGISTER
SUPPLY
10
UNIT
A/C
8
8"
REGISTER
SUPPLY
3
S2
REGISTER
SUPPLY
SHAFT
SUPPLY
3
3
SHAFT
SUPPLY
3
REGISTER
SUPPLY
3
S 2
RADIATION
5
UNIT
A/C
8
123A
OFFICE
CONVECTOR
4
S 2
123C
OFFICE
123
OFFICE
1
EXIT
101B
PSYCH.101A
TCOSE.
109
AUD./GYM
109E
STORAGE
109F
STORAGE
109J
STAGE
109B
PARENT
109A
OFFICE
SHAFT
RELIEF
SHAFT
RELIEF
107B
TOILET
117
STORAGE
116A
SERVER
REGISTER
SUPPLY
S
2
3
SHAFT
SUPPLY
SHAFT
SUPPLY
SHAFT
SUPPLY
REGISTER
SUPPLY
3
3
33
S
2
116
LIBRARY
1
RADIATION
1
RADIATION RADIATION
1 1
RADIATION
5
CONVECTOR
4
S
2
REGISTER
SUPPLY
3
SHAFT
SUPPLY
3
RADIATION
5
115
LABCOMPUTER
112B
TOILET
MD101ADEMOLITION PLAN - HVAC
AREA A FIRST FLOOR
AJM AJM
FAN
EXHAUST
11
CONVECTOR
4
AC
B
D
77
7
7
7
S 2
FAN
EXHAUST
11
7 7
S
2
S
2
FAN
EXHAUST
11
PANEL
CONTROL
12
PANEL
CONTROL
12
1 1 1 1 1
1
1
1 1 1 1
1
1
1
ROOMBOILERUPPER
6
AIR DAMPERS
3 COMBUSTION
GENERAL NOTES:
B.
A.
WEATHER TIGHT CONDITION.
REMOVALS SHALL BE COMPLETED AS TO LEAVE THE BUILDING IN A
MOLD AND ASSOCIATED SYSTEMS.
COMPLETE REMOVAL OF THE ASSOCIATED TUBING, CONDUITS, WIRE
THE REMOVAL OF THE EXISTING CONTROLS SHALL INCLUDE THE
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
(TYP.10)
GRILLES
RETURN
44x12
20x12
44x12
44x12
20x12
44x12
OF DUCTWORK
FOR CONT.
SEE MD100A
BELOW STAGE.
IS ROUTED
DUCTWORK
RETURN
1
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SHAFT
SUPPLY
3
14
1
1
DOOR SHALL BE ABANDONED. CAP AND SEAL AIR TIGHT.
REMOVE SUPPLY REGISTER/GRILLES. DUCTWORK IN THE SOFFIT ABOVE THE
COMPLETE.
REMOVE RELIEF GRILLE AND TRANSFER DUCTWORK TO THE CORRIDOR
REMOVE CONTROL PANEL AND ASSOCIATED WIRING/ TUBING COMPLETE.
SYSTEMS COMPLETE.
REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE DUCTWORK
CRAWLSPACE BELOW.
REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK TO THE
REMOVE TRANSFER GRILLES AND ASSOCIATED DUCTWORK COMPLETE.
EVACUATION.
FOLLOW ALL STATE AND LOCAL CODES FOR PROPER REFRIGERANT
REMOVE THE REFRIGERANT PIPING TO THE ROOF MOUNTED CONDENSING UNIT.
REMOVE DUCTLESS SPLIT SYSTEM AND ASSOCIATED CONTROLS COMPLETE.
REMAIN.
REMOVE RELIEF GRILLE, THE TRANSFER DUCTWORK TO THE CORRIDOR SHALL
TO REMAIN.
REMOVE PNEUMATIC ACTUATORS FROM COMBUSTION AIR DAMPERS. DAMPERS
TO THE CRAWLSPACE BELOW.
REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING
TO THE CRAWLSPACE BELOW.
REMOVE CONVECTOR AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING
THE SUPPLY SHAFT COMPLETE.
REMOVE SUPPLY REGISTER/GRILLES AND ASSOCIATED DUCTWORK BACK TO
REMOVE SENSOR/ THERMOSTAT AND ASSOCIATED WIRING/ TUBING COMPLETE.
CRAWL SPACE BELOW AND PREP FOR CONNECTION TO NEW.
REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE PIPING TO THE
CHILDREN'S SCHOOL OF
ROCHESTER -
ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610
# DATE CHANGE DESCRIPTION
© 2
016 M
oody/N
ola
n Inc.
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid Avenue
Suite 100
Cleveland, OH 44103
Phone: (216) 432-0696
Fax: (216) 432-0699
NEER NGENG
Capital DistrictSyracuseRochester
585.288.5590
Buffalo
www.meengineering.com
Mechanical/Electrical Engineering Consultants
150 N. CHESTNUT ST.
ROCHESTER, NY 14604
M/E Project #: 160270
BUILDING KEY PLAN
SE
D N
o. 26-1
6-0
0-0
1-0-0
01-0
22
Rochester Joint Schools
Construction Board
16307.01
04/19/17
1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
Abatement & Demolition Bid Set
AR
EA A
AR
EA C
VEST.
UP
UP
UP
DN
UP
CORRIDOR
FAN ROOM
(BELOW)
VEST.
DN
1FIRST FLOOR DEMOLITION PLAN - AREA B 1/8" = 1'-0"
DEMOLITION NOTES:
(IN CASEWORK)
RADIATION
1
1
103
CLASSROOM
SHAFT
SUPPLY
3
3
REGISTER
SUPPLY
S 2
RADIATION
5
LOUVER
EXHAUST
9"9"
FAN
EXHAUST11
11
11
9
REGISTER
SUPPLY
3
SHAFT
SUPPLY
3
(IN CASEWORK)
RADIATION
1
104
CLASSROOM
SHAFT
SUPPLY
3
3
REGISTER
SUPPLY
S 2
REGISTER
SUPPLY
SHAFT
SUPPLY
S
2
(IN CASEWORK)
RADIATION1
1
105
CLASSROOM
CONVECTOR
4
REGISTER
SUPPLY
15
SHAFT
SUPPLY
S
2
(IN CASEWORK)
RADIATION
1
106
CLASSROOM
1
(IN CASEWORK)
RADIATION
1
107
CLASSROOM
REGISTER
SUPPLY
3
S
2
S
2
RADIATION
5
RADIATION
5
REGISTER
SUPPLY
10
S
2
S
2
UNIT
A/C
8
CONVECTOR
4
8x6
SHAFT
SUPPLY
3
3
RADIATION
5
6x66x6
10x6
M
LOUVER
EXHAUST
FAN
EXHAUST
11
11
FAN
EXHAUST
11
11
S
2
REGISTER
SUPPLY
3
107A
TOILET
CONVECTOR
4CASEWORK)
(IN
RADIATION
1
1
S
2
S
RADIATION
5 2
REGISTER
SUPPLY
3
SHAFT
SUPPLY
3
CASEWORK)
(IN
RADIATION
CASEWORK)
(IN
RADIATION
CASEWORK)
(IN
RADIATION
55
5
S
2
107D
OFFICE
108
LOUNGE
110B
RESOURCE
110F
OFFICE
110
CLASSROOM
110D
ROOMSINK
REGISTER
SUPPLY
10
10
CASEWORK)
(IN
RADIATION
1
1
1
110C
ALCOVE
HOOD
RANGE
12
S
2
SHAFT
SUPPLY
3
3
110A
TOILET
RADIATION
5
12FAN
EXHAUST
13
FAN
EXHAUST
13
CONVECTOR
4
DEMOLITION PLAN - HVAC
AREA B FIRST FLOOR MD101B
AJM AJM
AC
B
D
7
S2
7
7
7
7
RADIATION
5
RADIATION
5PANEL
CONTROL
14
S
2
S2
DOWN
DUCT
SUPPLY
GENERAL NOTES:
B.
A.
WEATHER TIGHT CONDITION.
REMOVALS SHALL BE COMPLETED AS TO LEAVE THE BUILDING IN A
MOLD AND ASSOCIATED SYSTEMS.
COMPLETE REMOVAL OF THE ASSOCIATED TUBING, CONDUITS, WIRE
THE REMOVAL OF THE EXISTING CONTROLS SHALL INCLUDE THE
111
1
1
1
5
1
1
GRILLE
RELIEF
GRILLE
RELIEF
7
GRILLE
RELIEF
GRILLE
RELIEF
GRILLE
RELIEF
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
15 15
15
15
1
1
DOOR SHALL BE ABANDONED. CAP AND SEAL AIR TIGHT.
REMOVE SUPPLY REGISTER/GRILLES. DUCTWORK IN THE SOFFIT ABOVE THE
REMOVE CONTROL PANEL AND ASSOCIATED WIRING/ TUBING COMPLETE.
DUCTWORK COMPLETE.
REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE ALL ASSOCIATED
REMOVE RANGE HOOD AND ASSOCIATED DUCTWORK COMPLETE.
INSIDE FACE OF THE LOUVER.
DUCTWORK. THE LOUVER SHALL REMAIN. PROVIDE A SHEETMETAL CAP ON THE
REMOVE EXHAUST FAN AND ASSOCIATED CONTROLS. REMOVE ALL ASSOCIATED
CRAWLSPACE BELOW.
REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK TO THE
REMOVE TRANSFER GRILLES AND ASSOCIATED DUCTWORK COMPLETE.
EVACUATION.
FOLLOW ALL STATE AND LOCAL CODES FOR PROPER REFRIGERANT
REMOVE THE REFRIGERANT PIPING TO THE ROOF MOUNTED CONDENSING UNIT.
REMOVE DUCTLESS SPLIT SYSTEM AND ASSOCIATED CONTROLS COMPLETE.
REMAIN.
REMOVE RELIEF GRILLE, THE TRANSFER DUCTWORK TO THE CORRIDOR SHALL
NOT USED
TO THE CRAWLSPACE BELOW.
REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING
TO THE CRAWLSPACE BELOW.
REMOVE CONVECTOR AND ASSOCIATED CONTROLS. REMOVE HEATING PIPING
SUPPLY SHAFT COMPLETE.
REMOVE SUPPLY REGISTER AND ASSOCIATED DUCTWORK BACK TO THE
REMOVE SENSOR/ THERMOSTAT AND ASSOCIATED WIRING/ TUBING COMPLETE.
CRAWL SPACE BELOW AND PREP FOR CONNECTION TO NEW.
REMOVE RADIATION AND ASSOCIATED CONTROLS. REMOVE PIPING TO THE
CHILDREN'S SCHOOL OF
ROCHESTER -
ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610
# DATE CHANGE DESCRIPTION
© 2
016 M
oody/N
ola
n Inc.
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid Avenue
Suite 100
Cleveland, OH 44103
Phone: (216) 432-0696
Fax: (216) 432-0699
NEER NGENG
Capital DistrictSyracuseRochester
585.288.5590
Buffalo
www.meengineering.com
Mechanical/Electrical Engineering Consultants
150 N. CHESTNUT ST.
ROCHESTER, NY 14604
M/E Project #: 160270
BUILDING KEY PLAN
SE
D N
o. 26-1
6-0
0-0
1-0-0
01-0
22
Rochester Joint Schools
Construction Board
16307.01
04/19/17
1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
Abatement & Demolition Bid Set
1/16" = 1'-0"1
OVERALL ROOF DEMOLITION PLAN
RELIEF
GOOSENECK
B.
A.
GENERAL NOTES:
OF REFRIGERANT PIPING FROM AIR CONDITIONING UNITS.
FOLLOW ALL STATE AND LOCAL CODES FOR PROPER EVACUATION AND CONTAINMENT
ALL ROOF WORK SHALL BE DONE AS TO MAINTAIN THE EXISTING ROOFING WARRANTY.
DEMOLITION NOTES:
1
UNIT
CONDENSING
2
RELIEF
3
RELIEF
GOOSENECK
1
UNIT
CONDENSING
2
PENTHOUSE
RELIEF
PENTHOUSE
RELIEF
UNIT
CONDENSING
5
UNIT
CONDENSING
2
5
4
3
2
1
UNIT
CONDENSING
2
RELIEF
GOOSENECK
1
UNIT
CONDENSING
2
AC
B
D
PLAN
ROOF DEMOLITION MD102
AJM AJM
AND CONTROLS SYSTEMS COMPLETE.
REMOVE CONDENSING UNIT. EQUIPMENT RAILS TO REMAIN. REMOVE REFRIGERANT PIPING
NOT USED.
REMOVE RELIEF SYSTEM TO 6" ABOVE THE ROOF LEVEL AND CAP WEATHER TIGHT.
PIPING AND CONTROLS SYSTEMS COMPLETE.
REMOVE CONDENSING UNIT AND ASSOCIATED PAD SYSTEM. REMOVE REFRIGERANT
REMOVE RELIEF GOOSENECK TO 6" ABOVE THE ROOF LEVEL AND CAP WEATHER TIGHT.
1
1
1
CHILDREN'S SCHOOL OF
ROCHESTER -
ADDITION/RENOVATION85 Hillside Ave, Rochester, NY 14610
# DATE CHANGE DESCRIPTION
© 2
016 M
oody/N
ola
n Inc.
for
Dwg. Coord.: Tech. Coord.:
4415 Euclid Avenue
Suite 100
Cleveland, OH 44103
Phone: (216) 432-0696
Fax: (216) 432-0699
NEER NGENG
Capital DistrictSyracuseRochester
585.288.5590
Buffalo
www.meengineering.com
Mechanical/Electrical Engineering Consultants
150 N. CHESTNUT ST.
ROCHESTER, NY 14604
M/E Project #: 160270
BUILDING KEY PLAN
SE
D N
o. 26-1
6-0
0-0
1-0-0
01-0
22
Rochester Joint Schools
Construction Board
16307.01
04/19/17
1 5/24/17 ABATEMENT & DEMO ADDENDUM NO. 3
Abatement & Demolition Bid Set