basic assessment report...basic assessment report 71 appendix e1: public participation – issues...
TRANSCRIPT
BASIC ASSESSMENT REPORT
67
Appendix E: Public Participation
Figure 57: Public Participation Notice placed on site. Notices were placed at four locations
BASIC ASSESSMENT REPORT
68
Figure 58: Letter issued to all I&APs on the Eskom stakeholder database and adjacent landowners
BASIC ASSESSMENT REPORT
69
Figure 59: The advert placed in the Kosmos news during the initial call to register (14 September 2012).
BASIC ASSESSMENT REPORT
70
Figure 60: The advert placed in the Kosmos news during the initial call to register (14 September 2012).
BASIC ASSESSMENT REPORT
71
Appendix E1: Public Participation – Issues and Response Report No I&AP correspondence was received during the PPP period. The DBAR comment period was from 6th December 2013 until 22nd of January 2014. No comment was received during this period.
BASIC ASSESSMENT REPORT
72
Appendix E2: Public Participation – Copy of correspondence sent to I&APs
BASIC ASSESSMENT REPORT
73
Appendix E3: Public Participation – Copy of correspondence received by I&APs