2-12
2.2.3 Basic Design Drawings
Basic Design Drawings are shown in the following pages.
The major components of this project are as shown in Table 2.2.3-1.
Table 2.2.3-1 Major Components of the Project
Whole Project(Stage-1 to 3)
Stage-3
Road Length 55.98km(Sta.0+000~55+980)
Road Length 11.2km(Sta.1+900~13+100)
(4-Lene: 1.800km、2-Lane: 54.180km)
2-Lane: 11.2km
Grade RiseExisting road average grade is only 30cm above theflood in 2000. The flood overflowed at 3 sectionstotally 1,100m.
Almost all sections willbe grade raised.
Almost all sectionswill be up-graded.
Pavement6.5m wide carriageway was paved. Pavement was damagedby floods.
Pavement on carriageway,sidewalk and shoulderfor 55.98 km.
Pavement oncarriageway, sidewalkand shoulder for 11.2km
Market AreaLack of parking lane along markets is causing trafficjams.
3 nos. 1 nos.
Bus Stop /EvacuationSpace
Bus stop space and evacuation space for livestockduring floods.
20 nos. 5 nos.
School /
Hospital
3 bridges, 240.6m(68.8+103.0+68.8m)
-
(2 replacement, 1 new) -
9 nos. -
Pipe culvert: 2 nos. -
Box culvert:7 nos. -
-
(Total Length: Pipeculvert= 50.1m, Boxculvet= 107.1m)
-
Side Ditch: 2,230m Side Ditch: 220m
Criss Pipe: 5,045m -
Revetment Slope erosins are occuring at inlet/outlet of openings. -
RiverbedProtection
Riverbed scouring is occuring at inlet/outlet ofopenings.
Bridge: 3 nos. Culvet: 9nos.
-
GreenbeltSlope erosion is occuring where current hits, roadbends and bridge exists and wave is strong.
Length: 2,800m -
Wet Masonry Sope around culverts are bein eroded. Length: 1,060m -
Replecement byQualifed Soil
Embankment for road widening on soft ground will causeunequal settlement.
Mekong side:16.52km,Colmatage side:44.96km
Mekong side:10.15km,Colmatage side:9.86km
Replacement bySand
Underwater soft soil will be replaced by sandMekong side:0.80km,Colmatage:1.72km
Mekong side:1.05km,Colmatage:1.34km
2 locations 1 location
Chbar Ampov Intersectionand Tiger BeerIntersection
Tiger Beer Intersection
Retainig WallInsted of embankment slope, retaining wall will beinstalled to minimize resettlement. (Sta.0+300~Sta 1+900)
Masonry Wall:1,635m、RCL Retaining Wall:1 166m
-
Centerline, lane line &edge line and 39crosswalks
Centerline, lane line &edge line and 14Crosswalks
Regulatory sign:20 nos.,Warnig sign:112 nos.,Guide sign: 21 nos.
Warnig sign: 22 nos.
Median Strip Median strip will be installed for traffic safety. Total length:1,688m -
Curb Curb will be installed for traffic sefety. Total length:16,800m Total length:8,304m
Major Works
Item Outline
Guardrail -
Intersection Improvement
AncillaryFacilities
Road Marking &Traffic Sign
Guide Post
Revetment/RiverbedProtection
Guide posts will be installed at curbs, culvets and atembankments are higher than 5m.
190 nos.
School:31 nos.Hospital: 9 nos.
Mekong side:180m,Colmatage side:180m
1,010 nos.
Traffic jams and traffic accidents are occuringfrequent at Chbar Ampov Intersection. Traffic jams areoccuring at Tiger Beer Intersectin.
Road marking and traffic signs will be installed forthe tarffic safety.
Guardrail will be installed at approach of bridges andculverts.
School:5 nos.Hospital:2 nos.
Measuresfor SoftGround
CulvertExisting 4 culverts are clogged with mud. Inadequateopening is casusing flood level high and disturbingwater fertilizes farms.
Road Drainage FacilityLack of road drainage facility is causing traffic jamsand traffic accidents.
Measuresfor SlopeErosion
Bridge Construction Bailey bridges are narrow and casusign traffic jams.
RoadImprovemen
t
WideningExisting carriageway average width 6.5m is too smallagainst the traffic which is mixed with 4-wheel and 2-wheel vehicls, and cousing traffic accidents.
Wideningof RoadShoulder
Groups of student pedestrians are causing traffic jams.
IMP
LEM
EN
TA
TIO
N R
EV
IEW
STU
DY
ON
TH
E P
RO
JEC
T F
OR
IM
PR
OV
EM
EN
T
OF N
ATIO
NA
L R
OA
D N
O.1
(P
HN
OM
PEN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN
TH
E K
ING
DO
M O
F C
AM
BO
DIA
DEC
EM
BER
2007
JA
PA
N IN
TER
NA
TIO
NA
L C
OO
PER
ATIO
N A
GEN
CY
KA
TA
HIR
A &
EN
GIN
EER
S IN
TER
NA
TIO
NA
L
2-13
CO
NTEN
TS O
F D
RA
WIN
GS
1)
L
OC
ATIO
N M
AP
G -
1
TO
TA
L
73
She
ets
G -
22)
K
EY P
LA
N
G -
33)
IP
CO
OR
DIN
ATE
G -
44)
T
YP
ICA
L C
RO
SS
SEC
TIO
NS
PL -
1
~17
5)
P
LA
N &
PR
OFIL
E
CS -
1
~40
6)
C
RO
SS
SEC
TIO
N
DR
- 1
7)
R
OA
D D
RA
INA
GE
M -
18)
R
EP
LA
CEM
EN
T O
F E
XIS
TIN
G G
RO
UN
D
M -
29)
D
ETA
ILS O
F B
US B
AY
M -
310)
W
IDEN
ING
OF S
IDEW
ALK (SH
OU
LD
ER
)
M -
4
(MA
RKET,S
CH
OO
L &
HEA
LTH
CEN
TER
)
M -
5
11)
D
ETA
ILS O
F C
UR
B (
LO
CA
TIO
NA
L)
M -
6
13)
D
ETA
ILS O
F R
UM
BLE S
TR
IPS
M -
7
14)
S
CH
ED
ULE O
F R
OA
D S
IGN
S
M -
8
~9
15)
D
ETA
ILS O
F G
UID
E P
OS
T A
ND
KIL
OM
ETER
PO
ST
16)
D
ETA
ILS O
F C
ON
NEC
TIN
G R
OA
DS
17)
D
ETA
ILS O
F T
RU
CK S
CA
LE
18)
S
TA
ND
AR
D P
AV
EM
EN
T A
ND
PED
ESTR
IAN
CR
OSSIN
G
M -
10
M -
11
2-14
5km
10km
15km
20km
PH
NO
M P
EN
H
Chb
ar A
mpo
vIn
ters
ection
Moni
vong
BR
Tig
er
Beer
Inte
rsec
tion
Koki
r M
arke
t
Cd
Al
BA
SA
K R
IVER
PR
OJEC
T L
AYO
UT
Dra
win
g N
o.S
CA
LE
1/5,
000
She
et N
o.G
-1K
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EAK
LOE
UN
G S
ECTI
ON
)IN
TH
E K
ING
DO
M O
F C
AMBO
DIA
PR
OJEC
T R
OA
D L
=11.
200K
m
LEG
EN
D
・Const
ruction S
ection
・Exi
stin
g R
oad
(R
enova
ted)
・Exi
stin
g R
oad
2-15
PH
NO
M P
ENH
NE
AK
LO
EU
NG
KA
TAH
IRA
& E
NG
INE
ER
S IN
TER
NAT
ION
AL
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EAK
LOE
UN
G S
ECTI
ON
)IN
TH
E K
ING
DO
M O
F C
AMBO
DIA
2-16
LC
ME
KO
NG
RIV
ER S
IDE
(STA
. 1+9
00 ~
13+
100)
Ty
pe 3
2
-LA
NE
S SE
CTI
ON
KA
TAH
IRA
& E
NG
INE
ER
S IN
TER
NAT
ION
AL
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EAK
LOE
UN
G S
ECTI
ON
)IN
TH
E K
ING
DO
M O
F C
AMBO
DIA
2-17
E494300
N12
7480
0
E494400
E494500
E494600
N12
7490
0
E494700
E494800
N12
7490
0
N12
7480
0
E494800
E494700
E494600
N12
7470
0
E494500
E494400
E494300
00
E494200
N
CH
BAR
AM
PEO
UH
I GH
SC
HO
OL
Cus
t om
s an
d E
xcis
eS
ub- b
ranc
h M
eanc
h ey
Dis
tr ict
,Phn
o m P
enh
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-18
PI-6
E495500
N127
5200
N127
5000
900
E494900
E495000
N127
4900
E495100
N127
5000
E495200
E495300
N127
5100
E495400
E495500
E495400
N127
5300
E495300
E495200
N127
5200
E495100
N127
5100
E49480N
BAYO
N RA
DIO
&
TELE
VISI
ON
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-19
PI-7
PI-8
N1275
600
E496000
E495700
N1275
300
E495600
N1275
200
E495500
N1275
200
E495500
N1275
400
E495600
E495700
N1275
500
N1275
500
E496000
E496000
N1275
700
E495900
E495800N1275
600
N1275
400
E495800
E495500
E495400
N1275
300
N
TELA
sta
tion
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-20
N12
7570
0
N12
7570
0
E496000
N12
7550
0
E496100
E496200
E496300
N12
7540
0
E496400
E496500
N12
7530
0
E496600
N12
7530
0E496700
N12
7540
0
E496700
N12
7550
0
E496600
E496500
N12
7560
0
E496400
E496300
E496200
0
N12
7560
0
N
Kde
y T a
Ko y
Sc h
ool
Ph a
n Im
e x c
o;LT
D
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-21
E496700
N12
7540
0
E496800
N12
7540
0
E496900
E497000
N12
7530
0
E497100
E497200
N12
7520
0
E497300
N12
751 E497300
E497200
N12
7510
0
E497100
E497000
E496900
N12
7520
0
E496800
00
E496700
E496700
NJa
te P
un P
AG
OD
A
me x
co;
LTD
Pol
ice
Stat
ion
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-22
N12
7490
0
PI-9
E497600
E497800
E497500
E497700
E497900
E497300
E497400
E497500
E497600
E497800
E498000
E497700
E497900
N12
7520
0
N12
7500
0N
1275
100
N12
7490
0
N12
7490
0N
1275
000
N12
7510
0
N
CO
BRA
2
Jate
Pun
PAG
OD
A
Gue
st H
ouse
Vea
l Sbo
uv P
rimar
y sc
hool
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-23
E498000
E498400
E498200
E498600
E498100
E498300
E498500
E498700
N12
7490
0N
1274
900
E498000
E498400
E498200
E498600
E498100
E498300
E498500
E498700
N12
7490
0
N12
7500
0
NPr
ek E
ngPr
imar
y Sc
hool
Pre
k En
gD
estic
t
Prek
Eng
Hig
h Sc
hool
/ PA
GO
DA
Mot
el 0
9
Prek
Eng
Mar
ket Pr
ek E
ngM
arke
t
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-24
PI-1
0
PI-1
1
E499400
E498800
E499000
E499200
E499400
E498700
E498900
E499100
E499300
N12
7480
0
N12
7490
0
N12
7480
0
N12
7500
0
N12
7500
0
E498800
E499000
E499200
E498700
E498900
E499100
E499300
NC
NS
Inte
rnat
iona
l Sch
ool
LYK A
DO
Or g
aniz
atio
n
L'im
prev
u
She
ll S
tatio
n
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-25
PI-1
2
E499900
E499800
E499600
E499400
E500000
E499800
E499500
E499700
E499600
E499400
E500000
E499500
E499700
E499900
N12
7480
0
N12
7460
0
N12
7470
0N
1274
900
N12
7490
0
N12
7470
0N
1274
600
E499400
N12
7480
0
Nn
Jroy
Am
pel
PAG
OD
A
Shel
l Sta
tion
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-26
E500400
E500200
E500600
E500100
E500300
E500500
E500700
E500400
E500200
E500600
E500100
E500300
E500500
E500700
N12
7460
0
N12
7440
0
N12
7450
0
N12
7430
0
N12
7440
0N
1274
500
N12
7460
0
E500000N
GS
SO
KIM
EX
Mac
hhem
Van
PAG
OD
AAn
d Sc
hool
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-27
E501400
E500800
E501000
E501200
E501300
E501100
E500900
E500700
E500700
E501400
E500800
E501000
E501200
E501300
E501100
E500900
N12
7440
0
N12
7420
0
N12
7430
0
N12
7420
0
N12
7410
0
N12
7410
0N
1274
300
NP
AGO
DA
CH
HA
MPA
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-28
PI-1
3
E502000
N12
7400
0
E501400
E501800
E501600
E502000
E501500
E501700
E501900
E501400
E501800
E501600
E502000
E501500
E501700
E501900
N12
7420
0
N12
7390
0
N12
7390
0
N12
7410
0
E501400
N12
7420
0
N12
7410
0
N
NEW
ZALA
ND
SC
HO
OL
Pre
ash
Cha
n R
eang
Sey
PAG
OD
A
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-29
E502600
E502000
E502000
E502200
E502400
E502600
E502100
E502300
E502500
E502200
E502400
E502600
E502100
E502300
E502500
N127
4000
N127
3800
N127
3900
N127
3800
N127
3600
N127
3700
N127
3500
N127
3500
N127
3700
N127
3600
N127
3900N
HE
ALT
HC
EN
TER
KE
AN
SV
AYK
NP
AGO
DA
PR
IMAR
Y SC
HO
OL
YO
RK
BAT
KBA
L KO
H
PAG
OD
AM
UN
ISAK
OR
OFF
ICE
KBAL
KOH
PUBL
IC
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-30
E502600
E502800
E503000
E503200
E502600
E502700
E502900
E503100
E503200
E502800
E503000
E502700
E502900
E503100
N127
3600
N127
3400
N127
3200
N127
3300
N127
3500
N127
3500
N127
3400
N127
3300
N127
3200
N127
3100
N127
3100
E502600
NP
AGO
DA
VIC
HE
T TAR
A M
OFF
ICE
KBAL
KOH
PUBL
IC
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-31
E503200
E503600
E503400
E503300
E503500
E503700
E503800
E503600
E503400
E503300
E503500
E503700
E503200
N127
3200
N127
3000
N127
2700
N127
2700
N127
2800
N127
2900
N127
2900
N127
3100
N127
3100
N127
3000
E503200
E503800
N127
2800
N
PAG
OD
AV
ICH
ET T
ARA M
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-32
E503800
E503700N127
2800
PI-1
4
E504000
E504200
E504400
E504300
E504100
E503900
E503800
E504000
E504200
E504400
E504300
E504100
E503900
N127
2600
N127
2400
N127
2400
N127
2500
N127
2600
N127
2500
N127
2700
N127
2700
N127
2300
N
HEA
LTH
RORT
ANG
PRI
MAR
Y SC
HOO
L
AND
SECO
NDAR
Y SC
HOO
L
PUO
MTO
PUO
MTO
M
KEAN
SVAY
KRAO
V
PAG
ODA
Kea
n S
vay
Krav
PA
GO
DA
And
Sch
ool
Sam
ky P
um T
om S
choo
l
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-33
E504400
E504500
E504600
E504700
E504800
E504900
E505000
N12
7240
0
E505000
E504900
E504800
E504700
E504600
E504500
E504400
N12
7250
0
N12
7240
0
N
MIN
ISTR
Y O
FP
UB
LIC
WO
RK
S A
ND
TR
ANSP
OR
T(M
PW
T)
IMP
LEM
EN
TATI
ON
RE
VIEW
STU
DY
ON
TH
E PR
OJE
CT
FOR
TH
E IM
PR
OV
EM
EN
T O
F N
ATIO
NAL
RO
AD N
O.1
(PH
NO
M P
EN
H-N
EA
K L
OEU
NG
SEC
TIO
N)
IN T
HE
KIN
GD
OM
OF
CAM
BOD
IAK
ATA
HIR
A &
EN
GIN
EE
RS
INTE
RN
ATIO
NAL
2-34