basic design drawings are shown in the following pages...

23
2-12 2.2.3 Basic Design Drawings Basic Design Drawings are shown in the following pages. The major components of this project are as shown in Table 2.2.3-1. Table 2.2.3-1 Major Components of the Project Whole Project (Stage-1 to 3) Stage-3 Road Length 55.98km (Sta.0+000~55+980) Road Length 11.2km (Sta.1+900~13+100) (4-Lene: 1.800km、2- Lane: 54.180km) 2-Lane: 11.2km Grade Rise Existing road average grade is only 30cm above the flood in 2000. The flood overflowed at 3 sections totally 1,100m. Almost all sections will be grade raised. Almost all sections will be up-graded. Pavement 6.5m wide carriageway was paved. Pavement was damaged by floods. Pavement on carriageway, sidewalk and shoulder for 55.98 km. Pavement on carriageway, sidewalk and shoulder for 11.2 km Market Area Lack of parking lane along markets is causing traffic jams. 3 nos. 1 nos. Bus Stop / Evacuation Space Bus stop space and evacuation space for livestock during floods. 20 nos. 5 nos. School / Hospital 3 bridges, 240.6m(68.8 +103.0+68.8m) (2 replacement, 1 new) 9 nos. Pipe culvert: 2 nos. Box culvert:7 nos. (Total Length: Pipe culvert= 50.1m, Box culvet= 107.1m) Side Ditch: 2,230m Side Ditch: 220m Criss Pipe: 5,045m Revetment Slope erosins are occuring at inlet/outlet of openings. Riverbed Protection Riverbed scouring is occuring at inlet/outlet of openings. Bridge: 3 nos. Culvet: 9 nos. Greenbelt Slope erosion is occuring where current hits, road bends and bridge exists and wave is strong. Length: 2,800m Wet Masonry Sope around culverts are bein eroded. Length: 1,060m Replecement by Qualifed Soil Embankment for road widening on soft ground will cause unequal settlement. Mekong side:16.52km, Colmatage side:44.96km Mekong side:10.15km, Colmatage side:9.86km Replacement by Sand Underwater soft soil will be replaced by sand Mekong side:0.80km, Colmatage:1.72km Mekong side:1.05km, Colmatage:1.34km 2 locations 1 location Chbar Ampov Intersection and Tiger Beer Intersection Tiger Beer Intersection Retainig Wall Insted of embankment slope, retaining wall will be installed to minimize resettlement. (Sta.0+300~ Sta 1+900) Masonry Wall1,635m、 RCL Retaining Wall: 1 166m Centerline, lane line & edge line and 39 crosswalks Centerline, lane line & edge line and 14 Crosswalks Regulatory sign:20 nos., Warnig sign:112 nos., Guide sign: 21 nos. Warnig sign: 22 nos. Median Strip Median strip will be installed for traffic safety. Total length:1,688m Curb Curb will be installed for traffic sefety. Total length:16,800m Total length:8,304m Major Works Item Outline Guardrail Intersection Improvement Ancillary Facilities Road Marking & Traffic Sign Guide Post Revetment/ Riverbed Protection Guide posts will be installed at curbs, culvets and at embankments are higher than 5m. 190 nos. School:31 nos. Hospital: 9 nos. Mekong side:180m, Colmatage side:180m 1,010 nos. Traffic jams and traffic accidents are occuring frequent at Chbar Ampov Intersection. Traffic jams are occuring at Tiger Beer Intersectin. Road marking and traffic signs will be installed for the tarffic safety. Guardrail will be installed at approach of bridges and culverts. School:5 nos. Hospital:2 nos. Measures for Soft Ground Culvert Existing 4 culverts are clogged with mud. Inadequate opening is casusing flood level high and disturbing water fertilizes farms. Road Drainage Facility Lack of road drainage facility is causing traffic jams and traffic accidents. Measures for Slope Erosion Bridge Construction Bailey bridges are narrow and casusign traffic jams. Road Improvemen t Widening Existing carriageway average width 6.5m is too small against the traffic which is mixed with 4-wheel and 2- wheel vehicls, and cousing traffic accidents. Widening of Road Shoulder Groups of student pedestrians are causing traffic jams.

Upload: duongkhuong

Post on 10-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

2-12

2.2.3 Basic Design Drawings

Basic Design Drawings are shown in the following pages.

The major components of this project are as shown in Table 2.2.3-1.

Table 2.2.3-1 Major Components of the Project

Whole Project(Stage-1 to 3)

Stage-3

Road Length 55.98km(Sta.0+000~55+980)

Road Length 11.2km(Sta.1+900~13+100)

(4-Lene: 1.800km、2-Lane: 54.180km)

2-Lane: 11.2km

Grade RiseExisting road average grade is only 30cm above theflood in 2000. The flood overflowed at 3 sectionstotally 1,100m.

Almost all sections willbe grade raised.

Almost all sectionswill be up-graded.

Pavement6.5m wide carriageway was paved. Pavement was damagedby floods.

Pavement on carriageway,sidewalk and shoulderfor 55.98 km.

Pavement oncarriageway, sidewalkand shoulder for 11.2km

Market AreaLack of parking lane along markets is causing trafficjams.

3 nos. 1 nos.

Bus Stop /EvacuationSpace

Bus stop space and evacuation space for livestockduring floods.

20 nos. 5 nos.

School /

Hospital

3 bridges, 240.6m(68.8+103.0+68.8m)

(2 replacement, 1 new) -

9 nos. -

Pipe culvert: 2 nos. -

Box culvert:7 nos. -

(Total Length: Pipeculvert= 50.1m, Boxculvet= 107.1m)

Side Ditch: 2,230m Side Ditch: 220m

Criss Pipe: 5,045m -

Revetment Slope erosins are occuring at inlet/outlet of openings. -

RiverbedProtection

Riverbed scouring is occuring at inlet/outlet ofopenings.

Bridge: 3 nos. Culvet: 9nos.

GreenbeltSlope erosion is occuring where current hits, roadbends and bridge exists and wave is strong.

Length: 2,800m -

Wet Masonry Sope around culverts are bein eroded. Length: 1,060m -

Replecement byQualifed Soil

Embankment for road widening on soft ground will causeunequal settlement.

Mekong side:16.52km,Colmatage side:44.96km

Mekong side:10.15km,Colmatage side:9.86km

Replacement bySand

Underwater soft soil will be replaced by sandMekong side:0.80km,Colmatage:1.72km

Mekong side:1.05km,Colmatage:1.34km

2 locations 1 location

Chbar Ampov Intersectionand Tiger BeerIntersection

Tiger Beer Intersection

Retainig WallInsted of embankment slope, retaining wall will beinstalled to minimize resettlement. (Sta.0+300~Sta 1+900)

Masonry Wall:1,635m、RCL Retaining Wall:1 166m

Centerline, lane line &edge line and 39crosswalks

Centerline, lane line &edge line and 14Crosswalks

Regulatory sign:20 nos.,Warnig sign:112 nos.,Guide sign: 21 nos.

Warnig sign: 22 nos.

Median Strip Median strip will be installed for traffic safety. Total length:1,688m -

Curb Curb will be installed for traffic sefety. Total length:16,800m Total length:8,304m

Major Works

Item Outline

Guardrail -

Intersection Improvement

AncillaryFacilities

Road Marking &Traffic Sign

Guide Post

Revetment/RiverbedProtection

Guide posts will be installed at curbs, culvets and atembankments are higher than 5m.

190 nos.

School:31 nos.Hospital: 9 nos.

Mekong side:180m,Colmatage side:180m

1,010 nos.

Traffic jams and traffic accidents are occuringfrequent at Chbar Ampov Intersection. Traffic jams areoccuring at Tiger Beer Intersectin.

Road marking and traffic signs will be installed forthe tarffic safety.

Guardrail will be installed at approach of bridges andculverts.

School:5 nos.Hospital:2 nos.

Measuresfor SoftGround

CulvertExisting 4 culverts are clogged with mud. Inadequateopening is casusing flood level high and disturbingwater fertilizes farms.

Road Drainage FacilityLack of road drainage facility is causing traffic jamsand traffic accidents.

Measuresfor SlopeErosion

Bridge Construction Bailey bridges are narrow and casusign traffic jams.

RoadImprovemen

t

WideningExisting carriageway average width 6.5m is too smallagainst the traffic which is mixed with 4-wheel and 2-wheel vehicls, and cousing traffic accidents.

Wideningof RoadShoulder

Groups of student pedestrians are causing traffic jams.

IMP

LEM

EN

TA

TIO

N R

EV

IEW

STU

DY

ON

TH

E P

RO

JEC

T F

OR

IM

PR

OV

EM

EN

T

OF N

ATIO

NA

L R

OA

D N

O.1

(P

HN

OM

PEN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN

TH

E K

ING

DO

M O

F C

AM

BO

DIA

DEC

EM

BER

2007

JA

PA

N IN

TER

NA

TIO

NA

L C

OO

PER

ATIO

N A

GEN

CY

KA

TA

HIR

A &

EN

GIN

EER

S IN

TER

NA

TIO

NA

L

2-13

CO

NTEN

TS O

F D

RA

WIN

GS

1)

L

OC

ATIO

N M

AP

G -

1

TO

TA

L

73

She

ets

G -

22)

K

EY P

LA

N

G -

33)

IP

CO

OR

DIN

ATE

G -

44)

T

YP

ICA

L C

RO

SS

SEC

TIO

NS

PL -

1

~17

5)

P

LA

N &

PR

OFIL

E

CS -

1

~40

6)

C

RO

SS

SEC

TIO

N

DR

- 1

7)

R

OA

D D

RA

INA

GE

M -

18)

R

EP

LA

CEM

EN

T O

F E

XIS

TIN

G G

RO

UN

D

M -

29)

D

ETA

ILS O

F B

US B

AY

M -

310)

W

IDEN

ING

OF S

IDEW

ALK (SH

OU

LD

ER

)

M -

4

(MA

RKET,S

CH

OO

L &

HEA

LTH

CEN

TER

)

M -

5

11)

D

ETA

ILS O

F C

UR

B (

LO

CA

TIO

NA

L)

M -

6

13)

D

ETA

ILS O

F R

UM

BLE S

TR

IPS

M -

7

14)

S

CH

ED

ULE O

F R

OA

D S

IGN

S

M -

8

~9

15)

D

ETA

ILS O

F G

UID

E P

OS

T A

ND

KIL

OM

ETER

PO

ST

16)

D

ETA

ILS O

F C

ON

NEC

TIN

G R

OA

DS

17)

D

ETA

ILS O

F T

RU

CK S

CA

LE

18)

S

TA

ND

AR

D P

AV

EM

EN

T A

ND

PED

ESTR

IAN

CR

OSSIN

G

M -

10

M -

11

2-14

5km

10km

15km

20km

PH

NO

M P

EN

H

Chb

ar A

mpo

vIn

ters

ection

Moni

vong

BR

Tig

er

Beer

Inte

rsec

tion

Koki

r M

arke

t

Cd

Al

BA

SA

K R

IVER

PR

OJEC

T L

AYO

UT

Dra

win

g N

o.S

CA

LE

1/5,

000

She

et N

o.G

-1K

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EAK

LOE

UN

G S

ECTI

ON

)IN

TH

E K

ING

DO

M O

F C

AMBO

DIA

PR

OJEC

T R

OA

D L

=11.

200K

m

LEG

EN

D

・Const

ruction S

ection

・Exi

stin

g R

oad

(R

enova

ted)

・Exi

stin

g R

oad

2-15

PH

NO

M P

ENH

NE

AK

LO

EU

NG

KA

TAH

IRA

& E

NG

INE

ER

S IN

TER

NAT

ION

AL

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EAK

LOE

UN

G S

ECTI

ON

)IN

TH

E K

ING

DO

M O

F C

AMBO

DIA

2-16

LC

ME

KO

NG

RIV

ER S

IDE

(STA

. 1+9

00 ~

13+

100)

Ty

pe 3

2

-LA

NE

S SE

CTI

ON

KA

TAH

IRA

& E

NG

INE

ER

S IN

TER

NAT

ION

AL

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EAK

LOE

UN

G S

ECTI

ON

)IN

TH

E K

ING

DO

M O

F C

AMBO

DIA

2-17

E494300

N12

7480

0

E494400

E494500

E494600

N12

7490

0

E494700

E494800

N12

7490

0

N12

7480

0

E494800

E494700

E494600

N12

7470

0

E494500

E494400

E494300

00

E494200

N

CH

BAR

AM

PEO

UH

I GH

SC

HO

OL

Cus

t om

s an

d E

xcis

eS

ub- b

ranc

h M

eanc

h ey

Dis

tr ict

,Phn

o m P

enh

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-18

PI-6

E495500

N127

5200

N127

5000

900

E494900

E495000

N127

4900

E495100

N127

5000

E495200

E495300

N127

5100

E495400

E495500

E495400

N127

5300

E495300

E495200

N127

5200

E495100

N127

5100

E49480N

BAYO

N RA

DIO

&

TELE

VISI

ON

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-19

PI-7

PI-8

N1275

600

E496000

E495700

N1275

300

E495600

N1275

200

E495500

N1275

200

E495500

N1275

400

E495600

E495700

N1275

500

N1275

500

E496000

E496000

N1275

700

E495900

E495800N1275

600

N1275

400

E495800

E495500

E495400

N1275

300

N

TELA

sta

tion

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-20

N12

7570

0

N12

7570

0

E496000

N12

7550

0

E496100

E496200

E496300

N12

7540

0

E496400

E496500

N12

7530

0

E496600

N12

7530

0E496700

N12

7540

0

E496700

N12

7550

0

E496600

E496500

N12

7560

0

E496400

E496300

E496200

0

N12

7560

0

N

Kde

y T a

Ko y

Sc h

ool

Ph a

n Im

e x c

o;LT

D

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-21

E496700

N12

7540

0

E496800

N12

7540

0

E496900

E497000

N12

7530

0

E497100

E497200

N12

7520

0

E497300

N12

751 E497300

E497200

N12

7510

0

E497100

E497000

E496900

N12

7520

0

E496800

00

E496700

E496700

NJa

te P

un P

AG

OD

A

me x

co;

LTD

Pol

ice

Stat

ion

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-22

N12

7490

0

PI-9

E497600

E497800

E497500

E497700

E497900

E497300

E497400

E497500

E497600

E497800

E498000

E497700

E497900

N12

7520

0

N12

7500

0N

1275

100

N12

7490

0

N12

7490

0N

1275

000

N12

7510

0

N

CO

BRA

2

Jate

Pun

PAG

OD

A

Gue

st H

ouse

Vea

l Sbo

uv P

rimar

y sc

hool

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-23

E498000

E498400

E498200

E498600

E498100

E498300

E498500

E498700

N12

7490

0N

1274

900

E498000

E498400

E498200

E498600

E498100

E498300

E498500

E498700

N12

7490

0

N12

7500

0

NPr

ek E

ngPr

imar

y Sc

hool

Pre

k En

gD

estic

t

Prek

Eng

Hig

h Sc

hool

/ PA

GO

DA

Mot

el 0

9

Prek

Eng

Mar

ket Pr

ek E

ngM

arke

t

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-24

PI-1

0

PI-1

1

E499400

E498800

E499000

E499200

E499400

E498700

E498900

E499100

E499300

N12

7480

0

N12

7490

0

N12

7480

0

N12

7500

0

N12

7500

0

E498800

E499000

E499200

E498700

E498900

E499100

E499300

NC

NS

Inte

rnat

iona

l Sch

ool

LYK A

DO

Or g

aniz

atio

n

L'im

prev

u

She

ll S

tatio

n

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-25

PI-1

2

E499900

E499800

E499600

E499400

E500000

E499800

E499500

E499700

E499600

E499400

E500000

E499500

E499700

E499900

N12

7480

0

N12

7460

0

N12

7470

0N

1274

900

N12

7490

0

N12

7470

0N

1274

600

E499400

N12

7480

0

Nn

Jroy

Am

pel

PAG

OD

A

Shel

l Sta

tion

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-26

E500400

E500200

E500600

E500100

E500300

E500500

E500700

E500400

E500200

E500600

E500100

E500300

E500500

E500700

N12

7460

0

N12

7440

0

N12

7450

0

N12

7430

0

N12

7440

0N

1274

500

N12

7460

0

E500000N

GS

SO

KIM

EX

Mac

hhem

Van

PAG

OD

AAn

d Sc

hool

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-27

E501400

E500800

E501000

E501200

E501300

E501100

E500900

E500700

E500700

E501400

E500800

E501000

E501200

E501300

E501100

E500900

N12

7440

0

N12

7420

0

N12

7430

0

N12

7420

0

N12

7410

0

N12

7410

0N

1274

300

NP

AGO

DA

CH

HA

MPA

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-28

PI-1

3

E502000

N12

7400

0

E501400

E501800

E501600

E502000

E501500

E501700

E501900

E501400

E501800

E501600

E502000

E501500

E501700

E501900

N12

7420

0

N12

7390

0

N12

7390

0

N12

7410

0

E501400

N12

7420

0

N12

7410

0

N

NEW

ZALA

ND

SC

HO

OL

Pre

ash

Cha

n R

eang

Sey

PAG

OD

A

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-29

E502600

E502000

E502000

E502200

E502400

E502600

E502100

E502300

E502500

E502200

E502400

E502600

E502100

E502300

E502500

N127

4000

N127

3800

N127

3900

N127

3800

N127

3600

N127

3700

N127

3500

N127

3500

N127

3700

N127

3600

N127

3900N

HE

ALT

HC

EN

TER

KE

AN

SV

AYK

NP

AGO

DA

PR

IMAR

Y SC

HO

OL

YO

RK

BAT

KBA

L KO

H

PAG

OD

AM

UN

ISAK

OR

OFF

ICE

KBAL

KOH

PUBL

IC

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-30

E502600

E502800

E503000

E503200

E502600

E502700

E502900

E503100

E503200

E502800

E503000

E502700

E502900

E503100

N127

3600

N127

3400

N127

3200

N127

3300

N127

3500

N127

3500

N127

3400

N127

3300

N127

3200

N127

3100

N127

3100

E502600

NP

AGO

DA

VIC

HE

T TAR

A M

OFF

ICE

KBAL

KOH

PUBL

IC

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-31

E503200

E503600

E503400

E503300

E503500

E503700

E503800

E503600

E503400

E503300

E503500

E503700

E503200

N127

3200

N127

3000

N127

2700

N127

2700

N127

2800

N127

2900

N127

2900

N127

3100

N127

3100

N127

3000

E503200

E503800

N127

2800

N

PAG

OD

AV

ICH

ET T

ARA M

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-32

E503800

E503700N127

2800

PI-1

4

E504000

E504200

E504400

E504300

E504100

E503900

E503800

E504000

E504200

E504400

E504300

E504100

E503900

N127

2600

N127

2400

N127

2400

N127

2500

N127

2600

N127

2500

N127

2700

N127

2700

N127

2300

N

HEA

LTH

RORT

ANG

PRI

MAR

Y SC

HOO

L

AND

SECO

NDAR

Y SC

HOO

L

PUO

MTO

PUO

MTO

M

KEAN

SVAY

KRAO

V

PAG

ODA

Kea

n S

vay

Krav

PA

GO

DA

And

Sch

ool

Sam

ky P

um T

om S

choo

l

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-33

E504400

E504500

E504600

E504700

E504800

E504900

E505000

N12

7240

0

E505000

E504900

E504800

E504700

E504600

E504500

E504400

N12

7250

0

N12

7240

0

N

MIN

ISTR

Y O

FP

UB

LIC

WO

RK

S A

ND

TR

ANSP

OR

T(M

PW

T)

IMP

LEM

EN

TATI

ON

RE

VIEW

STU

DY

ON

TH

E PR

OJE

CT

FOR

TH

E IM

PR

OV

EM

EN

T O

F N

ATIO

NAL

RO

AD N

O.1

(PH

NO

M P

EN

H-N

EA

K L

OEU

NG

SEC

TIO

N)

IN T

HE

KIN

GD

OM

OF

CAM

BOD

IAK

ATA

HIR

A &

EN

GIN

EE

RS

INTE

RN

ATIO

NAL

2-34