BASIC NETWORK
FERDINAND FASSA
LECTURE 3
![Page 2: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/2.jpg)
• REVIEW LECTURE 2
• INTRODUCTION
• FUNCTION NETWORK DIAGRAM
• ACTIVITY ON ARROW (AOA) & ACTIVITY ON NODES (AOD)
OUTLINE LECTURE 3
![Page 3: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/3.jpg)
REVIEW LECTURE 2
A BAR CHART..???
‘‘A GRAPHIC REPRESENTATION OF PROJECT ACTIVITIES,
SHOWN IN A TIME-SCALED BAR LINE WITH NO LINKS SHOWN
BETWEEN ACTIVITIES’’
WHY BAR CHART
1. SIMPLE AND EASY TO UNDERSTAND
2. USED FOR GLOBAL CONTROL AT THE PROJECT MANAGEMENT AND
EXECUTIVE LEVEL
3. VERY USEFUL FOR MILESTONE AND SUMMARY SCHEDULES
![Page 4: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/4.jpg)
REVIEW PROJECT X
SCHEDULE...????
BAR CHART...???
![Page 5: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/5.jpg)
Network Diagrams
• Developed in the 1950’s
• A graphical representation of the tasks necessary to complete a project
• Visualizes the flow of tasks & relationships
INTRODUCTION
![Page 6: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/6.jpg)
6
• Network diagrams show the precedence relationships among activities
• Network diagrams help to understand the flow of work in a project
• Network diagrams are a useful tool for project planning and control, as well as for scheduling
FUNCTION NETWORK DIAGRAM
![Page 7: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/7.jpg)
• Two classic formats
–AOA: Activity on Arrow
–AON: Activity on Node
ACTIVITY ON ARROW & ACTIVITY ON NODES
![Page 8: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/8.jpg)
• AOA consists of • Circles representing Events
–Such as ‘start’ or ‘end’ of a given task
• Lines representing Tasks
–Thing being done
• Arrows represent activities and nodes are events for points in time
• Sometimes requires dummy activities
Continue AOA & AON
![Page 9: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/9.jpg)
• AON • Tasks on Nodes
– Nodes can be circles or rectangles
– Task information written on node
• Arrows are dependencies between tasks
• Nodes represent activities, and arrows show precedence relationships
• No dummy activities
Continue AOA & AON
![Page 10: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/10.jpg)
![Page 11: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/11.jpg)
11
• Activity
– A task or a certain amount of work required in the project
– Requires time to complete
– Represented by an arrow
• Dummy Activity
– Indicates only precedence relationships
– Does not require any time of effort
– an artificial activity with zero time duration that only
shows a precedence relationship among activities
Continue AOA & AON
![Page 12: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/12.jpg)
Arrow & Node Formats Continue AOA & AON
![Page 13: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/13.jpg)
13
Situations in network diagram
A B
C
A must finish before either B or C can start
A
B
C Both A and B must finish before C can start
D
C
B
A Both A and C must finish before either of B or D can start
A
C
B
D
Dummy
A must finish before B can start
both A and C must finish before D can start
![Page 14: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/14.jpg)
14
Concurrent Activities
2 3
Lay foundation
Order material
(a) Incorrect precedence
relationship
(b) Correct precedence
relationship
3
4 2
Dummy Lay
foundation
Order material
1
2 0
![Page 15: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/15.jpg)
Table 1 A Sample Set of Project Activities and Precedences
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 16: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/16.jpg)
Figure 1 Stage 1 of a Sample AON Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
Nodes represent activities, and arrows show precedence relationships Arrows are dependencies between tasks
![Page 17: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/17.jpg)
Figure 2 Stage 2 of a Sample AON Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 18: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/18.jpg)
Figure 3 A Completed Sample AON Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 19: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/19.jpg)
Figure 4 Stage 1 of a Sample AOA Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 20: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/20.jpg)
Figure 5 Stage 2 of a Sample AOA Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 21: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/21.jpg)
Figure 6a A Completed Sample AOA Network
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 22: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/22.jpg)
Figure 6b A Completed Sample AOA Network Showing the Use of a Dummy Task
Task Predecessor
a --
b --
c a
d b
e b
f c, d
g e
![Page 23: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/23.jpg)
Table 2 A Sample Problem for Finding the Critical Path and Critical Time
Activity Predecessor Duration
a -- 5 days
b -- 4
c a 3
d a 4
e a 6
f b, c 4
g d 5
h d, e 6
i f 6
j g, h 4
![Page 24: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/24.jpg)
Figure 7 Stage 1 of a Sample Network
![Page 25: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/25.jpg)
Figure 8 A Complete Network
![Page 26: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/26.jpg)
AOA Project Network for House
3
2 0
1
3
1 1
1 1 2 4 6 7
3
5
Lay foundation
Design house and obtain financing
Order and receive materials
Dummy
Finish work
Select carpet
Select paint
Build house
AON Project Network for House
1 3
2 2
4 3
3 1 5
1
6 1
7 1 Start
Design house and obtain financing
Order and receive materials
Select paint Select carpet
Lay foundations Build house
Finish work
![Page 27: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/27.jpg)
• the example ‘‘Install caissons.’’
1. Accept winning bid and award contract.
2. Schedule municipal inspection.
3. Order and deliver reinforcing steel cages.
4. Lay out the exact location of the hole.
5. Excavate caisson.
6. Install rebar cages.
7. Connect cages to foundation continuous rebar.
8. Place concrete.
9. Strip forms.
10. Clean up site.
EXAMPLE
![Page 28: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/28.jpg)
EXAMPLE
![Page 29: BASIC NETWORK - ocw.upj.ac.id · •AOA consists of •Circles representing Events –Such as ‘start’ or ‘end’ of a given task •Lines representing Tasks –Thing being done](https://reader033.vdocument.in/reader033/viewer/2022042212/5eb468d58f594a118e24596b/html5/thumbnails/29.jpg)
Task Project X