Expansion.
Debottlenecking (to boost production by remedying/removing the problems/constraints withpiece of equipment/process that create more efficient or make it workable).
Modification of the existing plan:-
Thermal duty of heat exchangers.
Compressor for new gas composition = by equipment supplier.
Distillation column trays for new gas/liquid traffic = by equipment supplier.
Verification of:
Suitability of equipment + piping for new tem + pressure conditions.
Hydraulic calculations of pipework given the new flow conditions.
Control valves + pressure relief valves to be checked to have adequate capacity to cover the n
operating requirements.
Change of operating conditions for process equipment -> The duty must be checked for new condi
e.g.
New unit is added to the existing facility = will use some existing facility utilities (fuel gas, electrical
power, cooling medium, instrument air ) = need to verify.
-
Note: Do h thng b modified, nn c th spare capacity ca n khc ti liu design ban u.
Additional loads phi c estimate chnh xc = Trnh hin tng: existing facilities fall short sau k
new design c develop.
-
V mt physical: phn addition = "future" trong original design.-
C th c s dng 1 vi pre-investment, e.g. 20% free space on pipe rack dnh cho future.
Above ground:
o
c = measuring types, hoc full 3D survey (money) of an area.Underground = evacuation.
Do , c th phi refer bn v c, develop thm, tuy nhin cc bn v ny c th khng th hi
chnh xc as-built condition, vy nn cn site survey:
Some require existing facilities to be shut in = to work to minimize.
Some can be done while the plant is in operation.
Connections of the new facilities to the existing plants = tie-in's (pipework, electrical power distrib
instrumentation & telecom systems, etc.):
-