basildon town centre highway and regeneration improvements€¦ · highway improvements represent...

7
C.L. C.L. I.L. I.L. 4155 155 31.03 NK 30.91 29.47 30.9 29.46 C.L. C.L. I.L I.L. 6211 32.05 30.05 C.L. C.L. I.L. I.L. 6203 30.25 25 28.82 2 C.L. C.L. .L. I.L. 29.35 6464 6464 C.L. C.L. I.L. I.L. 6456 28.59 C.L. C.L. I.L. I.L. I.L. 4451 C.L. L. C.L. I.L. I I.L. I.L 4469 9 29.07 07 27.88 7.88 FIRST GROUP BUS DEPOT 2.78m 3.25m PROPOSED CYCLE PARK DOUBLE HEIGHT CYCLE RACKS LEFT TURNS BANNED EXCEPT FOR BUS AND TAXI. CONTROLLED VIA DOUBLE HEAD TRAFFIC SIGNAL . -ONE RIGHT GREEN ARROW SIGNAL. -ONE GREEN BUS GATE SIGNAL SHARED CYCLE WAY AND FOOTPATH BUS LANE/TAXI ONLY ACQUISITION OF EXISTING HIGHWAYS BOUNDARY JUNCTION AND ADJA 3.0m WIDE SHARED CYCLE WAY AND FOOTPATH BUS DEPOT ENTRANCE ONLY BUS DEPOT EXIT ONLY HIGHWAY BOUNDARY EXTENTS AYOUT CONVERTED LAYOUT AXI ONLY NLY ED FOR ALL VEHICLES. CANTILEVER TRAFFIC E: TURN ONLY (ALL TRAFFIC). HT BANNED FOR ALL VEHICLES. LLED VIA CANTILEVER TRAFFIC SIGNAL. BUS LANE, TAXI AND GOODS VEHICLES FOR MARKET PAVEMENT. SIGNAGE TO BE PROVIDED INSTEAD OF LANE EXISTING SUBWAY TO BE DECOMMISSIONED BY COLLEGE CONTRACTOR OR OUR CONTRACTOR (RECHARGED BACK TO COLLEGE) DEPENDING ON SITE START DATES. SHARED CYCLE WAY AND FOOTPATH PROPOSED TAXI/REPLACEMENT RAIL PARKING AND SHELTERS. (4 of 6 SPACES) 3.5m (MAX) WIDE SHARED CYCLE WAY AND FOOTPATH BUS GATE SIGNAGE BLACK PAVING AND CHAINAGE DRAINAGE TO EXISTING BUS CANOPY TO BE RETAINED. GLASS PANELS TO BE CLEARED. ALL FACADES TO BE REPAINTED WITH NEW COLOUR (TO BE AGREED). ALL EXISTING COLUMNS TO BE REPAINTED AS ABOVE. DAMAGED SECTIONS/AREAS TO BE REPAIRED/REPLACED. PROPOSED TAXI/REPLACEMENT RAIL PARKING AND SHELTERS. (2 of 6 SPACES) EXISTING BOLLARDS TO BE EXISTING PEDESTRIAN TO BE RETAINED (PAVING MADE GOOD) EXISTING CEILING FACADE OF BUS STATION CANOPY TO BE REPLACED WITH LIGHT WOOD/ BAMBOO STYLE FINISH. EXISTING BUS STATION ELECTRICS TO BE TIDIED/ MADE GOOD. (LED LIGHTING TO BE INSTALLED) EXISTING BUS STATION PEDESTRIAN PAVING TO BE RETAINED AND DAMAGED SECTIONS MADE GOOD EXISTING BUS STATION GUARD RAILS (UNDER CANOPY) TO BE REMOVED IN TOTAL AND PAVING MADE GOOD EXISTING PEDESTRIAN GUARD RAIL TO BE REMOVED ENTIRELY NEW PINCH POINT TO PEDESTRIAN CROSSING 3m MINIMUM WIDTH SHARED CYCLE WAY AND FOOTPATH NEW FOOTPATH PAVING TO MATCH EXISTING AS INSTALLED FOOTPATH PAVING AT ENTRANCE TO EAST GATE SHOPPING EXISTING STREET LIGHTING TO BE RETAINED AND REFRESHED. UNCONTROLLED PEDESTRIAN CROSSING TO BE INSTALLED UNCONTROLLED PEDESTRIAN CROSSING TO BE INSTALLED Fl Fl Sp p S GrL F: F: 57.77 30.51 30.42 30.39 37.99 30.39 28.11 28.20 8.20 28.2 8.2 28 39.85 29.18 9.1 29.1 CVR C'box C'box ox Construction works in progress at time of survey at time of s Basildon Town Centre Highway and Regeneration Improvements Consultation leaflet

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

C.L.C.L.C.L.I.L.

I.L.I.L.

41554155

31.03NK

30.9129.47

30.929.46

C.L.C.L.C.L.I.L.

I.L.I.L.

621132.0530.05 C.L.

C.L.C.L.I.L.

I.L.I.L.

6203 30.2530.2528.82

28.82

C.L.C.L.C.L.I.L.

I.L.I.L.

29.35

64646464

C.L.C.L.C.L.I.L.

I.L.I.L.

645628.59

C.L.C.L.C.L.I.L.

I.L.I.L.

4451

C.L.C.L.C.L.C.L.I.L.

I.L.I.L.I.L.

44694469

29.0729.0727.88

27.88

FIRST GROUP

BUS DEPOT

BUS DEPOT

2.78m2.78m

3.25m3.25m

PROPOSED CYCLE PARK

PROPOSED CYCLE PARK

DOUBLE HEIGHT CYCLE RACKS

DOUBLE HEIGHT CYCLE RACKS

LEFT TURNS BANNED EXCEPT FOR BUS AND TAXI.

LEFT TURNS BANNED EXCEPT FOR BUS AND TAXI.

CONTROLLED VIA DOUBLE HEAD TRAFFIC SIGNAL .

CONTROLLED VIA DOUBLE HEAD TRAFFIC SIGNAL .

-ONE RIGHT GREEN ARROW SIGNAL.

-ONE RIGHT GREEN ARROW SIGNAL.

-ONE GREEN BUS GATE SIGNAL

-ONE GREEN BUS GATE SIGNAL

SHARED CYCLE WAY AND FOOTPATH

SHARED CYCLE WAY AND FOOTPATH

BUS LANE/TAXI ONLY

BUS LANE/TAXI ONLY

ACQUISITION OF EXISTING GREEN AREA OUTSIDE

HIGHWAYS BOUNDARY TO FACILITATE UPGRADE OF

JUNCTION AND ADJACENT ESTATE ACCESS ROAD.

JUNCTION AND ADJACENT ESTATE ACCESS ROAD.

3.0m WIDE SHARED

CYCLE WAY AND

CYCLE WAY AND

FOOTPATH

FOOTPATH

BUS DEPOT ENTRANCE ONLY

BUS DEPOT ENTRANCE ONLY

BUS DEPOT EXIT ONLY

BUS DEPOT EXIT ONLY

HIGHWAY BOUNDARY

HIGHWAY BOUNDARY

EXTENTS

EXTENTS

ONE WAY LAYOUT CONVERTED

ONE WAY LAYOUT CONVERTED

TO TWO WAY LAYOUT

BUS LANE /TAXI ONLY

RIGHT TURN ONLY

STRAIGHT BANNED FOR ALL VEHICLES.

CONTROLLED VIA CANTILEVER TRAFFIC

LANE ONE:LEFT TURN ONLY (ALL TRAFFIC).

LEFT TURN ONLY (ALL TRAFFIC).

STRAIGHT BANNED FOR ALL VEHICLES.

STRAIGHT BANNED FOR ALL VEHICLES.

CONTROLLED VIA CANTILEVER TRAFFIC SIGNAL.BUS LANE, TAXI AND GOODS

BUS LANE, TAXI AND GOODS

VEHICLES FOR MARKET

VEHICLES FOR MARKET

PAVEMENT. SIGNAGE TO BE

PAVEMENT. SIGNAGE TO BE

PROVIDED INSTEAD OF LANE

PROVIDED INSTEAD OF LANE

EXISTING SUBWAY TO BE DECOMMISSIONED BY

EXISTING SUBWAY TO BE DECOMMISSIONED BY

COLLEGE CONTRACTOR OR OUR CONTRACTOR

COLLEGE CONTRACTOR OR OUR CONTRACTOR

(RECHARGED BACK TO COLLEGE) DEPENDING ON

(RECHARGED BACK TO COLLEGE) DEPENDING ON

SITE START DATES.

SITE START DATES.

SHARED CYCLE WAY

SHARED CYCLE WAY

AND FOOTPATH

AND FOOTPATH

PROPOSED TAXI/REPLACEMENT

PROPOSED TAXI/REPLACEMENT

RAIL PARKING AND SHELTERS. (4 of

RAIL PARKING AND SHELTERS. (4 of

6 SPACES)

6 SPACES)

3.5m (MAX) WIDE

3.5m (MAX) WIDE

SHARED CYCLE WAY

SHARED CYCLE WAY

AND FOOTPATH

AND FOOTPATH

BUS GATE

BUS GATE

SIGNAGE

SIGNAGE

BLACK PAVING AND

BLACK PAVING AND

CHAINAGE DRAINAGE TO

CHAINAGE DRAINAGE TO

EXISTING BUS CANOPY TO BE RETAINED.

EXISTING BUS CANOPY TO BE RETAINED.

GLASS PANELS TO BE CLEARED. ALL

GLASS PANELS TO BE CLEARED. ALL

FACADES TO BE REPAINTED WITH NEW

FACADES TO BE REPAINTED WITH NEW

COLOUR (TO BE AGREED). ALL EXISTING

COLOUR (TO BE AGREED). ALL EXISTING

COLUMNS TO BE REPAINTED AS ABOVE.

COLUMNS TO BE REPAINTED AS ABOVE.

DAMAGED SECTIONS/AREAS TO BE

DAMAGED SECTIONS/AREAS TO BE

REPAIRED/REPLACED.

REPAIRED/REPLACED.

PROPOSED TAXI/REPLACEMENT

PROPOSED TAXI/REPLACEMENT

RAIL PARKING AND SHELTERS. (2 of 6 SPACES)

RAIL PARKING AND SHELTERS. (2 of 6 SPACES)

EXISTING BOLLARDS TO BE

EXISTING BOLLARDS TO BE

EXISTING PEDESTRIAN TO BE RETAINED

EXISTING PEDESTRIAN TO BE RETAINED

(PAVING MADE GOOD)

(PAVING MADE GOOD)

EXISTING CEILING FACADE OF BUS STATION

EXISTING CEILING FACADE OF BUS STATION

CANOPY TO BE REPLACED WITH LIGHT

CANOPY TO BE REPLACED WITH LIGHT

WOOD/ BAMBOO STYLE FINISH.

WOOD/ BAMBOO STYLE FINISH.

EXISTING BUS STATION

EXISTING BUS STATION

ELECTRICS TO BE TIDIED/

ELECTRICS TO BE TIDIED/

MADE GOOD.

MADE GOOD.

(LED LIGHTING TO BE

(LED LIGHTING TO BE

INSTALLED)

INSTALLED)

EXISTING BUS STATION

EXISTING BUS STATION

PEDESTRIAN PAVING TO

PEDESTRIAN PAVING TO

BE RETAINED AND

BE RETAINED AND

DAMAGED SECTIONS

DAMAGED SECTIONS

MADE GOOD

MADE GOOD

EXISTING BUS STATION

EXISTING BUS STATION

GUARD RAILS (UNDER

GUARD RAILS (UNDER

CANOPY) TO BE

CANOPY) TO BE

REMOVED IN TOTAL AND

REMOVED IN TOTAL AND

PAVING MADE GOOD

PAVING MADE GOOD

EXISTING PEDESTRIAN

EXISTING PEDESTRIAN

GUARD RAIL TO BE

GUARD RAIL TO BE

REMOVED ENTIRELY

REMOVED ENTIRELY

NEW PINCH POINT

NEW PINCH POINT

TO PEDESTRIAN CROSSING

TO PEDESTRIAN CROSSING

3m MINIMUM WIDTH SHARED

3m MINIMUM WIDTH SHARED

CYCLE WAY AND FOOTPATH

CYCLE WAY AND FOOTPATH

NEW FOOTPATH PAVING TO MATCH

NEW FOOTPATH PAVING TO MATCH

EXISTING AS INSTALLED FOOTPATH PAVING

EXISTING AS INSTALLED FOOTPATH PAVING

AT ENTRANCE TO EAST GATE SHOPPING

AT ENTRANCE TO EAST GATE SHOPPING

EXISTING STREET LIGHTING TO BE

EXISTING STREET LIGHTING TO BE

RETAINED AND REFRESHED.

RETAINED AND REFRESHED.

UNCONTROLLED PEDESTRIAN

UNCONTROLLED PEDESTRIAN

CROSSING TO BE INSTALLED

CROSSING TO BE INSTALLED

UNCONTROLLED PEDESTRIAN

UNCONTROLLED PEDESTRIAN

CROSSING TO BE INSTALLED

CROSSING TO BE INSTALLED

Fl

Fl

SpSpSp

GrLF:

F:

57.77

30.5130.42

30.39

37.99

30.39

28.11

28.2028.2028.2028.2028.2028.20

39.85

29.1829.1829.18

CVR

C'boxC'boxC'box

Construction works

in progress

at time of survey

at time of survey

TARMAC

TARMAC

TARMAC

TARMAC

TARMAC

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

SERVICE ROAD

Basildon Town CentreHighway and Regeneration Improvements

Consultation leafl et

Page 2: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

Introduction Essex County Council is pleased to announce a range of proposals to improve the highway and public realm within the Basildon Town Centre. Basildon Borough Council and Basildon Town Centre Management Company are already making a number of improvements to the Town Centre environment, which currently includes new paving and enhanced market within the area. Essex County Council was successful in acquiring Local Growth Funding from the South East Local Enterprise Partnership (SELEP) for highway related improvements, which will complement the works already being undertaken.

In 2012 Basildon Borough Council adopted a Masterplan for the Town Centre, which sets out the Council’s vision for the area, and the highway improvement proposals are a key part of delivering this vision. The highway improvements represent £6.2m of investment into the Town Centre.

Basildon Borough Council has secured £9.7 million from the Housing Infrastructure Fund (HIF) to enable and support housing development within the town centre. This further complements the Basildon Town Centre Masterplan and the highway improvements to make a positive impact to the town centre environment. Key projects identified include the redevelopment of the former Post Office Block for mixed use development, increases in car park capacity and public realm improvements. Central to this is the re-landscaping of the routes connecting East Square to Great Oaks multi-storey car park. This in addition to the exciting changes already going on will help to make Basildon Town Centre a more vibrant and modern 21st Century town centre that will accommodate existing and future needs of residents and local businesses.

Basildon is a key area in South Essex and the largest employment area. I am pleased that the County Council is working in partnership with Basildon Borough Council to deliver this exciting project. This will support the regeneration of the Town Centre and provide a focal point for sustainable transport. The project will improve access within and around the Town Centre area, including the Bus Interchange and Rail Station. This scheme will also improve the current taxi rank area, and forecourt of the Bus Interchange, as well as an exciting partnership with the rail operator c2c, to make improvements to the area outside the Rail Station. A cleaner, safer and more accessible environment is key and I am sure that you will find these proposals are more than worthy of helping the goal of enhancing the Town Centre, and delivering the vision in the Masterplan.

Foreword by Councillor Kevin BentleyDeputy Leader and Cabinet Member for Infrastructure

Page 3: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

Overview of the Improvements These changes will enable the formation of a new sustainable transport hub to make the area more attractive and accessible, and deter unnecessary traffic from the town centre. These proposals have been through a traffic modelling process to consider the impact on the Town Centre and wider highway network. This has identified some measures on the highway network that need to be implemented to aid the distribution of traffic.

 Changes to the road layout outside the Bus and Rail Stations to enable the formation of a sustainable transport hub. This includes removal of the subway outside the Rail Station, replaced with improved surface crossings and connections between the Rail station and the Town Centre, creating an attractive gateway to the Town Centre.

 Restrictions on Southernhay between Station Way and Clay Hill Road to allow access for buses / cycles / taxis and pedestrians only to create a ‘transit-mall’ and dedicated sustainable transport hub. This will be enforced with the installation of a bus gate on the approach to the Bus Interchange next to Market Pavement and at Clay Hill Road.

 Change of traffic flow on Cherrydown East, Station Way and Clay Hill Road from one-way traffic flow to two-way traffic flow for all vehicles. This will allow vehicles to travel west to east and east to west without conflicting with the transport hub.

 Improvements to the street scene around the taxi rank outside the Bus Interchange.

 New taxi rank and rail replacement bus/coach stops on the southern side of Southernhay to serve the Rail Station.

 Improvements to the Bus Interchange waiting area, including Real Time Passenger Information Displays.

 Improvements to the Rail Station forecourt including new paving, new and increased secure cycle storage, and new signing.

 New potential Cycle Hub / one stop shop for cyclists to the rear of the Rail Station (part of another series of works linked to this project).

 Upgrade of existing ‘puffin’ crossing on Cherrydown East to a ‘toucan’ crossing, to provide a crossing point for cyclists and pedestrians and to operate with two-way traffic to facilitate future cycle way improvements around the Town Centre including north south links to the Enterprise Corridor.

 Improvements to the taxi and bus laybys outside Asda on Southernhay. It is proposed to relocate the bus stop onto the nearside lane and move the taxi rank into the current bus layby. This will improve safety for taxi users and enable buses to merge into the traffic flow more efficiently.

 Trimming and removal of some trees to provide open space and improved access between the Rail Station and Bus Interchange, and the Town Centre. This will include the removal of bushes to help deter anti-social behaviour.

Scheme consultation early

2019

Construction Start – Spring

2019Appointment of Contractor and finalising

of construction designs – early

2019

Construction complete – summer

2020 (subject to change)

Get Involved! ÂTo keep up-to-date on scheme progress and to submit your comments on line please go to

www.essex.gov.uk/basildontc

We would value your views and comments on the scheme proposals. At the back of this leaflet, there is a questionnaire where you can give us your views on the proposals. This can either be submitted by post or online.

Page 4: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

N* *

*

Improvements around rail station area including subway removal

Key

New cycle storage

New taxi rank

Interchange Hub - improvements to bus station area and taxi rank

New taxi rank and rail replacement

New taxi rank

New bus stop

Public realm improvement areas

New bus gate

Improvements to shared pedestrian/cycle route

Bus/taxi/private hire only routes

Conversion to two-way traffic flow

Pedestrian/cyclist crossing

Signal Junction with pedestrian/cycle crossing

Parking restrictions to 24/7 to accommodate two-way traffic and improve access to bus depot

2

1

3

4

5

6

Bus Lane7

Potential cycle hub

Subway Removed

Southernhay

Market Square

Southernhay

Taxi rank

Southernhay

Not to scale

Cherrydown East

Clay H

ill RoadSt

atio

n W

ay

Basildon Rail Station

1

2

34

5

7

6

Supermarket

Shopping Centreand Car Park

Bus Station

Taxi Rank

Through Traffic

Subway Removed

Subway Removed

Through Traffic

Key to numbers 1 Improvements around rail station area

including subway removal

2 Interchange Hub – improvements to bus station area and taxi rank

3 New taxi rank

4 New taxi rank and rail replacement

5 New taxi rank

6 New on-carriageway bus stop

7 Bus lane

Public realm improvement

New bus gate (access for buses, cycles and taxis to be maintained)

Improvements to shared pedestrian/cycle route

Bus/taxi/private hire only routes

Conversion to two-way traffi c fl ow

Pedestrian/cyclist crossing

Signal Junction with pedestrian/cycle crossing

New cycle storage

Potential cycle hub

Subway removed

Key to symbols

Basildon Town CentreProposed improvements

Not to scale

N

Visualisation of Transit Mall / Bus Station Visualisation of the Rail Station

Page 5: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

DS

18_6

244

This information is issued by:Essex County Council Highways and Transportation

Contact us:[email protected] www.essex.gov.uk/basildontc 0845 603 7631

Transportation and Infrastructure Planning Essex County Council County Hall, Chelmsford Essex, CM1 1QH

Sign up to Keep Me Posted email updates:essex.gov.uk/keepmeposted

facebook.com/essexcountycouncil

The information contained in this document can be translated, and/or made available in alternative formats, on request.

Published February 2019.

Page 6: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

DS

18_6

244

Questionnaire How to give us your viewsOnline: www.essex.gov.uk/basildontc

Email: [email protected]

Post: Transportation and Infrastructure Planning Highways and Transportation (Basildon Town Centre) E3, ZONE 4 Essex County Council County Hall, Chelmsford Essex CM1 1QH

The deadline for questionnaires to be received is 29 March 2019. Responses received after this date will not be accepted. If completing this questionnaire by hand please either place it in the box provided, send a completed copy to the above postal address, or complete the questionnaire online via our website.

When responding, please state whether you are responding as an individual or representing the views of an organisation. If responding on behalf of an organisation, please make it clear whom the organisation represents and, where applicable, how the views of members were assembled.

Confidentiality and data protection If you would like full details on how ECC uses personal data, please go to www.essex.gov.uk/privacy or call 03457 430430

Comments and questionnaire

1. Please tell us your postcode – this will help us to build a picture of where respondents are from.

2. Do you think improvements to access and public realm are needed at the Basildon Town Centre?

Yes No Undecided (please tick ONE box only)

3. Would you be inclined to use the new cycle storage once it is available?

Yes No Undecided (please tick ONE box only)

4. How often do you visit the Basildon Town Centre?

Once a week Twice a week

Many times in the week Once a fortnight

Twice a fortnight Many times in the fortnight

Random visits when necessary

Page 7: Basildon Town Centre Highway and Regeneration Improvements€¦ · highway improvements represent £6.2m of investment into the Town Centre. Basildon Borough Council has secured £9.7

5. What mode of transport do you use most regularly when travelling to and from the Basildon Town Centre?

Car (or similar private vehicle) – driver Car (or similar private vehicle) – passenger

Car share scheme Taxi

Powered two-wheeler (eg. motorbike or scooter)

Bus

Cycle Walking

LGV / HGV / Lorry

Other, please state

6. Do you support to formation of a sustainable transport hub?

Yes No Undecided (please tick ONE box only)

7.

Are you completing this questionnaire on behalf of: (Please select one box ONLY)

Yourself (as an individual) A Business

A friend or relative (Please answer using their details)

A District/Town/Parish Council

A Voluntary or Community Sector Organisation (VCS)

If you are responding on behalf of an organisation, please tell us:

The name of the organisation:

Who the organisation represents:

Where applicable, how the views of members were assembled:

8. Additional comments: Please use the space below to tell us your views including if there are any other highway improvements that you would like to be considered for the Basildon Town Centre