battery sizing 132-11kv
TRANSCRIPT
-
8/10/2019 Battery Sizing 132-11kV
1/10
Doc no-xxxx Battery Sizing calculations
Approv ed by- Umesh Nai r
110V DC Battery Sizing calculation for 132/11kV Primary SubstationFor Tender Purpose Only
Design by-Dundi kumar.B Abhu-Dhabi national Chemical Plant
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
2/10
INDEX
1.0
2.0
3.0
4.0
5.0 RESULT & SUMMARY
6.0 LOAD CYCLE CALCULATIONS:
6.1 CALCULATION OF CONTINOUS LOADS:-
6.2 CALCULATION OF DC EMERGENCY LIGHTING LOADS:-
6.3 CALCULATION OF MOMENTARY LOADS:-
6.4 FINAL LOAD CYCLE:-
6.5 DIAGRAM OF LOAD CYCLE
7.0 DC LOAD CALCULATION TABLE
7.1 TABLE-1: FOR INVERTER LOAD
7.2 TABLE-2: FOR AUX BCU PANEL
7.3 TABLE-3: FOR AC BOARD
7.4 TABLE-4: FOR 110V DC BOARD
7.5 TABLE-6: FOR AVR PANEL
8.0 BATTERY CHARGER RATING CALCULATION
9.0 BATTERY SIZING CALCULATION
CONTENT
PURPOSE
DESIGN INPUT
DESIGN CRITERIA
CALCULATION OF LOAD CYCLE
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
3/10
1.0 PURPOSE:
2.0 DESIGN INPUT:01. Abhu Dhabi Transmission & Despatch Company Technical Specification No. s-TR-AUX-BAT&CH-NiCad-110-
D(Rev.1_item2.3.4doc)
02 Tender Draw ing No. CC01A-2-80881-PW-DSL-1010 of Conceptual Overall Key SINGLE LINE DIAGRAM03 Main Single line diagram for 132kV CC01A-2-80881-PW-DSL-1002
04 Main Single line diagram for 11kV CC01A-2-80881-PW-DSL-1008
3.0 DESIGN CRITERIA:
01 110V DC System is composed of 2X100% Battery Banks w ith 2X100% Boost
Battery Chargers
02 Each Battery Bank is sized for a back-up period of 10 Hrs w ith follow ing duty cycle
a) Continuous load for 10 hours comprising of Relays,IEDs,Station HMIs,Spr ing charging ,
Isolator intelocking load,Lighting loads of Controlrooms,relay rooms,Miscellaneous permanently connected
loads etc
b) Emergency load for 6hour comprising of Substaion emergency lighting loads.
c) Momentary load for 1 min comprising of Breaker c losing,Tripping loads (taking simultaneousoccurrence as per system)
03 Type of Battery is Ni-Cd Battery of normal dischage type.(As per Clause 2.2 of Battery & Charger
Specification of page 5 of 15)
04 As per specification battery is designed with following considerations
a) End of discharge cell voltage -1.05V
b) Design ambient temperature : 20 deg C
05 Expected life of Battery is 20 years.
06 Other factors required for battery sizing are considered as follows:
a) Design margin : 1.1 (as per practice)
b) Aging factor : 1.25 (As per clause 6.2.3 IEEE-1115)
07 a) The charger offered for the project shall be Boost charging the battery w ithout connected load.
b) Design margin of 1.1 is applied on continuous load for sizing of charger.
4.0 CALCULATION OF LOAD CYCLE :
a) Based on the design inputs, the load cycle of battery is calculated and summarized
b) As per the Individual relay panel loads.
c) Inverter load details under Table-1
d) Aux BCU panel, AC Board & AVR panel loads are at Table-2, Table-3 & Table-4
5.0 RESULT & SUMMARY:
01 Battery Sizing
a) Battery sizing is done with HBL software - HBL Ni-Cd Optisize 3.2.1b) Corrected size of battery is obtained as 2202.80AH.
c) Battery shall be selected from the available range 2202.80Ah .
02 Charger Sizing
a) Based on the load cycle, charger sizing is done,refer clause no. 2.3
b) The offered rating of charger based on calculations is 600A.
This document is intended to size the battery requirement 110V DC systems for the 220kV
Abhu-Dhabi National Chemicals
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
4/10
6.0 LOAD CYCLE CALCULATIONS:
1.1
Unit
LoadTo tal L oad D ur at io n
(W) (W) Sec
1 Inv erter Load Cont. 1 4000 4000 36000
2 SCMS F ront end Panel-1 Cont. 1 120 120 36000
3 SCMS F ront end Panel-2 Cont. 1 32 32 36000
6 Communicat ion panel-1 Cont. 1 116 116 36000
7 Communicat ion panel-2 Cont. 1 116 116 36000
12 Incomming Protection Panel Cont. 3 114 342 36000
15 132kV Bus coupler Protection Panel Cont. 1 108 108 36000
17 132/11kVTraf o f edder Protection Panel Cont. 4 173 692 36000
18 Auxiliary BCU panel Cont. 1 76 76 36000
19 Aux load AC Board Cont. 1 71.1 71.1 36000
20 Aux Load 110V DC Board Cont. 1 17.2 17.2 36000
21 FMS Ev aluation panel Cont. 1 88 88 36000
22 Ehernet switches Cont. 20 7.5 150 36000
23 11kV Switch gear panel Cont. 44 40 1760 36000
24 Emergency Lighting f or Relay ,Control room Cont. 7 100 700 36000
25 AVR Panel Cont. 1 71 71 36000
26 132kV LCC Panels Cont. 8 300 2400 36000
TOTAL 10859
6.2
Unit
LoadTotal Load
Duration
(W) (W) Sec
1 DC Lighting for other Buildings 0 -360
Min.10 100 1000 21600
TOTAL 1000
6.3
i)
Unit
LoadTo tal L oad D ur at io n
(W) (W) Sec
1 Tripping Coil of the 132kV Breakers 0-1
Min8 1198 9584.00 1.00
Disconnector Opening load
Unit
LoadTo tal L oad D ur at io n
(W) (W) Sec
1 132kV Disconnector Opening load 0-2
Min1 1620 1620.00 91.00
Disconnector Closing load
Unit
LoadTo tal L oad D ur at io n
(W) (W) Sec
1 132kV Disconnector Closing load 0-4
Min1 2200 2200.00 252.00
Sr No
Sr No Descr ip tionDuty
Cycle
No of
Units
CALCULATION OF MOMENTARY LOADS:
Sr No Descr ip tionDuty
Cycle
No of
Units
DescriptionDuty
Cycle
No of
Units
Consider ing o ne bus bar Zone with sub sequent restorat ion
CALCULATION OF CONTINUOUS LOADS:
No of
Units
Sr No Descr ip tionDuty
Cycle
No of
Units
CALCULATION OF DC EMERGENCY LIGHTING LOADS:
Sr No Descr ip tionDuty
Cycle
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
5/10
7
CONTINUOUS LOAD
EMERGENCY LIGHTING
MOMENTARY LOAD(Trippingload)
MOMENTARY LOAD
(Openingload)
MOMENTARY LOAD
(Closing load)
TIME (IN Hours)
10
113.4 A
113.4 A
118.7 A
118.7 A
9:
460 6 8
DIAGRAM FOR LOAD CYCLE
98.7 A
107.8 A
185.8 A
185.8 A
LOAD
(In
Amps)
107.8 A
98.7 A
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
6/10
7.1 TABLE-1 INVERTER LOAD
TYPE Qty
1 Station HMI (including monitor) 1 375.0 375.0
2 Station HMI - Redundant (including monitor) 1 375.0 375.0
3 HMI View Node (including monitor) 2 375.0 750.0
4 DR Work Station 1 375.0 375.0
5 Gateway 2 375.0 750.0
6 GPS Receiv er with Clock 1 100.0 100.07 Laser Printer (When Activ e) 1 375.0 375.0
8 Dot Matrix Printer 2 80.0 160.0
3260.0
Considering eff iciency of Inv erter to be 85%, load on 220V DC System: 3835.29 W
appoximately 4kW considered
7.2 TABLE-2 AUX BCU PANEL
TYPE Qty
1 BCU, C264 1 20.0 20.0
2 Ruggedcom Ethernet Switch 2 28.0 56.0
76.0
7.3 TABLE-3 AC BOARD
TYPE Qty
1 Aux. Contactor 7 1.5 10.5
2 Single Pole Inst. Underv oltage Relay 1 4.0 4.0
3 Trip Circuit Super Vision Relay 3 4.5 13.5
4 INDICATING LAMPS 12 1.0 12.0
5 Dif f erential Relay f or DG incomer (87) 3 5.7 17.1
6 3 O/C Relay (51 RYB) f or DG Incomer 1 3.0 3.0
7 Single Pole Def inite Time delay relay (51Y) 1 5.0 5.0
8 Timer On delay 2 3.0 6.0
71.1
7.4 TABLE-4 110V DC BOARD
TYPE Qty
1 Under Voltage Relay (27) 2 3.3 6.6
2 Ov er Voltage Relay (59) 2 3.3 6.6
3 Earth Leakage Relay (96) 2 2.0 4.0
17.2
7.5 TABLE-5 AVR PANEL
TYPE Qty
1 AVR RELAY 1 40.0 40.0
2 Annunciator 1 18.0 18.0
3 Aux. Flag Relay 2 4.5 9.0
4 INDICATING LAMPS 4 1.0 4.0
71.0
CONTINUOUS
Total
Sl No
Sl NoDEVICE CONTINUOUS
LOAD (W)
Sl NoDEVICE CONTINUOUS
LOAD (W)CONTINUOUS
Total
Total
DEVICE CONTINUOUS
LOAD (W)
Total
CONTINUOUS
Sl NoDEVICE CONTINUOUS
LOAD (W)CONTINUOUS
Total
Sl NoDEVICE CONTINUOUS
LOAD (W)CONTINUOUS
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
7/10
8.0 BATTERY CHARGER RATING CALCULATION
Required Charger Rating =
Boost Charging current f or the proposed Battery + Total Standing (Continous Load)
Selected Battery cell is Type:2*KBM1150P
Current rating r equired in Boost mode
= 0.2 x Ah Capac it y of Bat te (Max imum Perm issible boos t charging current = 20% of Ah)
= 0.2 x 2203
= 440.56 Amps
Total Standing Load=98.72A
539.28
Considering maximum of Boost ;
Design rating of charger 600.00 Amps
The charger will be operated in boost mode .
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
8/10
1.0 DESIGN DATA
1.1 Type of Battery = Ni-Cd
1.2 Manufacturer = HBL
1.3 Battery nominal Voltage (V) = 110
1.4 Battery minimum Voltage (V) = 991.5 = 115.5
1.6 = 10 Deg C
1.7 = 1.05
1.8 = 1.2
1.9 = 1.6
2 = 300C
2.1 = 50C
2.2 = 96
2.5
Load in
Watts
Current
(Amps)
Durations
(Sec)Start
10859.30 98.72 36000.00 0 Sec
1000.00 9.09 21600.00 14056.00 Sec
9584.00 87.13 1.00 35656.00 Sec
1620.00 14.73 91.00 35657.00 Sec
2200.00 20.00 252.00 35748.00 Sec
2.5
Current
(Amps)
98.72
107.81
185.85113.45
118.72
Note:-
0:00:01A4 0:1:51
Tripping Load considered on the 132kV Side only.
Momentary Load( Tripping Load)
Load ProfileTime
( Hrs :Minutes :sec)
A1
Load Profile
End of Cell Volta e:Float Volta e OCVBoost Voltage (OCV)
Maximum Temp
Minimum Tem
Emergency Load for grid station
buildings
132kV CB Closing Load
132kV DS Opening Load
A2 6:00:00
A5 0:4:25
9:46:18
A3
Load Type
Continuous Load (LC)
Battery Sizing calculations 1 of 1
Battery Maximum Voltage (V)
Minimum Ambient Temperature
Battery Duty Cycle Data
Re uired no.of cells er batter
12/23/2014
-
8/10/2019 Battery Sizing 132-11kV
9/10
Monday, 22 December, 2014
Battery Calculation Report - IEEE 1115 - 2000
(8)
Required Section Size
(3) * (6) / (7)
=Rated Amp hrs
Temperature
Derating
Factor for t
Min(Tt)
(7)
Capacity Rating
Factor
t Min Rate(Kt)
(6)
Time To End
of Section
(minutes)
(5)
Duration of
Period
(minutes)
(4)(3)
Change in
Load
(amperes)
Load
(amperes)
(2)
Period
(1)
Performance Type:Cell End Voltage:Min. Electrolyte Temperature:
Project Ref.
:
KBM1.0520
o
Guestustomer :
VC
1233
0Revision:
echnology :
nquiry Number : 1111
Nickel Cadmium Pocket Plate
1ection Period/s Only - If A2 is greater than A1, Go to Section 2First 1
1
1Section Sub Total
2ection Period/s Only - If A3 is greater than A2, Go to Section 3First 2
1
2
2Section Sub Total
3ection Period/s Only - If A4 is greater than A3, Go to Section 4First 3
1 98.72 98.72 586.30 946.32 15.473 1.000 1,527.49
2 107.81 9.09 360.00 360.02 6.054 1.000 55.03
3 185.85 78.04 0.250 1.000 19.51
1,602.043Section Sub Total
4ection Period/s Only - If A5 is greater than A4, Go to Section 5First 4
1
2
3
4
4Section Sub Total
5ection Period/s Only - If A6 is greater than A5, Go to Section 6First 5
1 98.72 98.72 586.30 952.60 15.573 1.000 1,537.37
2 107.81 9.09 360.00 366.30 6.156 1.000 55.96
3 185.85 78.04 6.30 0.526 1.000 41.05
4 113.45 -72.40 1.87 6.28 0.526 1.000 -38.08
5 118.72 5.27 4.42 4.42 0.480 1.000 2.53
1
This document becomes contractual only after written confirmation
2/23/2014
9
-
8/10/2019 Battery Sizing 132-11kV
10/10
Monday, 22 December, 2014
Battery Calculation Report - IEEE 1115 - 2000
(8)
Required Section Size
(3) * (6) / (7)
=Rated Amp hrs
Temperature
Derating
Factor for t
Min(Tt)
(7)
Capacity Rating
Factor
t Min Rate(Kt)
(6)
Time To End
of Section
(minutes)
(5)
Duration of
Period
(minutes)
(4)(3)
Change in
Load
(amperes)
Load
(amperes)
(2)
Period
(1)
Performance Type:Cell End Voltage:Min. Electrolyte Temperature:
Project Ref.
:
KBM1.0520
o
Guestustomer :
VC
1233
0Revision:
echnology :
nquiry Number : 1111
Nickel Cadmium Pocket Plate
1,598.825Section Sub Total
*
Maximum Section Size
=
Selected Cell
2,202.80 *
1,602.04Corrected Size = (Maximum Section Size * Design Margin * Aging Factor)
1,602.04(
2 * KBM 1150 P
2 * 95 KBM 1150 PBattery Proposed
=
:
:
1.10 1.250)
This document becomes contractual only after written confirmation
2/23/2014
10