bba summer training project report ip university
DESCRIPTION
Based on summer training ReportTRANSCRIPT
SUMMER TRAINING PROJECT REPORT
XYZ. Ltd Logo
ON THE TOPIC
“WORKING ANALYSIS OF AN ORGANISATION”
In Partial Fulfillment for the Degree of Bachelor of Business Administration
Under Supervision of:Mr. xxxxxx xxxxx
Production Manager “XYZ ltd.”,
GURU GOBIND SINGH INDRAPRASTHA UNIVERSITY
Submitted to: Submitted by:
ACKNOWLEDGEMENT
I, ……………… of BBA 5th Semester, am having immense pleasure in bringing out the Project Report on the topic ‘WORKING ANALYSIS OF AN ORGANISATION’. A department………………
Date: (Name)……… ROLL NO………
4
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
INDEX
CHAPTER CONTENTS PAGE NO.
1. INTRODUCTION 6
2. LITERATURE REVIEW 22
3. RESEARCH METHODOLOGY
33
4. WORKING ANALYSIS OF AN ORGANISATION (xyz ltd)
42
5. SUMMARY 63
6. BIBLIOGRAPHY 67
5
CHAPTER-1
INTRODUCTION
6
Automotive industry in India:
Over a period of more than two decades the Indian Automotive Industry has
been driving its own growth through phases. The entry of Suzuki
Corporation in Indian passenger car manufacturing is often pointed as the
first sign of India turning to a market economy. Since then the automotive
sector witnessed rapid growth year after year. By late-90's the industry
reached self reliance in engine and component manufacturing from the status
of large scale importer.
With comparatively higher rate of economic growth rate index against that
of great global powers, India has become a hub of domestic and exports
business.
The automotive sector has been contributing its share to the shining
economic performance of India in the recent years. With the Indian middle
class earning higher per capita income, more people are ready to own private
vehicles including cars and two-wheelers. Product movements and manned
services have boosted in the sales of medium and sized commercial vehicles
for passenger and goods transport.
7
The data obtained from Ministry of Commerce and Industry, shows high
growth obtained since 2001-02 in automobile production continuing in the
…………………………………………………..
…………………..
MORE.
OBJECTIVES OF STUDY
…………………………………………………………….
………………………………………………………
…………………………………………………..
8
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
………………….. MEANS MORE WORDS ARE THERE.
CHAPTER-2Literature Review (XYZ ltd.)
9
The XYZ Group of Industries, a US $40 Million Conglomerate, is a Leading
OEM (Original Equipment Manufacturer) catering to leading
auto……………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
……………………………………….
………………………………………………………………………………
…………………………………………..
………………………………………………………………..and the stress
on the mantra of “Perfection in Quality, Cost and Delivery.”
10
………………….. MEANS MORE WORDS ARE THERE.
Components Manufacturing in XYZ ltd:
Products for Domestic Market:
As an OEM of M/s Hero Honda, TVS, Yamaha and other Auto Majors, the
Group supplies the following major parts:
Chassis parts………..
……………….
…………………..more
Financial Performance:
11
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
………………….. MEANS MORE WORDS ARE THERE.
The Groups Growth curve is snapped below:
Other Interests:
The Group also has interests and association, other than its main line of
Business:
The xyz School:
An International School of repute, cocooned inside the commercial hub of
Gurgaon. It follows the Primary Years Programme of the International
Baccalaureate of Switzerland and the ICSE/ISC programme of the Council
for the Indian School Certificate Examination, New Delhi.
Website.: www.xyz.com
12
Flash xyz devices Pvt. Ltd.:
An association of the xyz Group, which is involved in the design, production
and sales of hi-tech electronic
energy meters. Had been the largest supplier to the Government of State of
Punjab in the Year 2004 –05.
13
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
ABC India Pvt. Ltd.:
ABC India, a market leader in the field of children related products, an
entirely new collection of futuristic models of tricycles, perambulators, and
battery operated cars and cycles etc for new borns to 12 year olds.
14
15
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
CHAPTER-3
RESEARCH METHODOLOGY
16
Research:
Research in common parlance refers to a search of knowledge. Research
comprises defining and redefining problems, formulating hypothesis or
suggested solutions; collecting, organizing and evaluating data; making
deductions and reaching conclusions; and at last carefully testing the
conclusions to determine whether they fit the formulating hypothesis.
One can also define research as scientific and systematic search for pertinent
information on a specific topic.
Objectives of Research:
………………………………………………………………………………
………………………………………………………………………………
……………………
……………..
…………….
17
………………….. MEANS MORE WORDS ARE THERE.
Research Process:
………………………………………………………………………………
……………….
………………………………………………………………………………
……………………………..
…………………………………………………..
18
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
Research Design:
Decisions regarding what, where, when, how much, by what means
concerning an inquiry or a research study constitute a research design.
“ A research design is the arrangement of conditions for collection and
analysis of data in a manner that aims to combine relevance to the research
purpose with economy in procedure.”
More explicitly, the designing decisions happen to be in respect of:
What is the study about?
Why is the study being made?
Where will the study be carried out?
What type of data is required?
Where can the required data be found?
What periods of time will the study include?
What will be the sample design?
What techniques of data collection will be used?
How will the data be analyzed?
In what style will the report be prepared?
19
Research Approach:
………………………………………………………………………………
………………………………………………………………………………
……………………………
Data Collection:
TYPES OF DATA
1) PRIMARY DATA: Are those which are collected afresh and for the first
time and thus happen to be original in character and known as Primary data.
Personal Interview
Close observation
Survey conduction
Group Discussion etc...
2) SECONDARY DATA: Are those which have been collected by someone
else and which have already been passed through the statistical process are
known as Secondary data.
The data for report has taken from
………………………………………………………………………………
………………….
20
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
CHAPTER-4
WORKING ANALYSIS OF AN ORGANISATION(XYZ LTD.)
21
MANUFACTURING DEPARTMENT ANALYSIS:
The manufacturing of the automotive spare parts passes through various sub
manufacturing departments to reach at the final component.
MANUFACTURING PROCESS:
Procuring the order
Arranging the Raw material
Manufacturing dies to make components
……………..
Dispatch
Production Department:
The Production/Manufacturing Department is the back bone of a company.
In this the whole process starting from the getting of the order then on to
22
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
manufacturing Dies then to the Cutting, Parsing, Bending.. Welding then on
to Paint & Powder Coating and then Dispatching of the order is done.
To reach at a Final Component, the manufacturing process passes through
various Sub Departments. These are as follows:
1) Store Department:
The department deals in with the storage of the raw material for the
p………………………………………………………………………
……………….
……………………………………………………………………………
………………………………………………………..
.
2) Tool Room:
23
………………….. MEANS MORE WORDS ARE THERE.
This department is one among the major departments, prepares different
dies (tools) for the machines which are used in production. Number of
machines used for this process. The names and working of some major
machines are given below:
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
…………………………………………..
24
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
………………………………………………………………………………
………………………………………………………………………………
…………………………………………………………………………….
8) Quality Assurance and Dispatch:
Quality assurance, or QA for short, is the set of planned and systematic
actions necessary to provide appropriate confidence that a product or
service will satisfy the requirements for quality.
Quality Assurance is a wide range concept concerning all the matters
collectively or individually, which directly
25
………………….. MEANS MORE WORDS ARE THERE.
affect the quality of product. It controls the quality of a product by doing
in-process quality checks, effectively functioning as the brain of an
organization.
The objective of Quality Assurance is to delight there Customers by
involving state of the art, manufacturing techniques and ontime delivery
with consistent quality.
After the quality assurance if the component quality is as per the quality
standards set by the organization then further it will sent for Dispatch.
The process in Dispatch involves sending the components from
organization to there designated customers.
Main Components which are assembeled are as follows:
Top Bridge(Handle Plate)
Swing Arm
Chain Adjuster
Battery Case
Processes:
For Top Bridge:
Visual Inspection
Reaming
Retapping
26
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
Handle Holder Assembling
Dispatch
For Swing Arm:
Visual Inspection
Reaming
Retapping
Bush Fitting
Brake Arm Fitting
Dispatch
For Chain Adjuster:
Size Checking
Cap Assembly
Dispatch
9) Vendor Development:
27
It is an important department of any industry. The main purpose of this
department is to establish contacts with vendors which are able to fulfill the
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
……………………………technical and business assistance by means of
relevant training, seminars, and workshops.
28
………………….. MEANS MORE WORDS ARE THERE.
CHAPTER-5
SUMMARY
29
Observations:
Various methods adopted to store data in store department…
…………………………………………………………………………
………………………..
…………………………………………………………………………
……………………
…………………………………………………………………………
…………………………………..
…………………………………………………………………………
…………………………
Methods adopted to provide layer coating on components.
30
………………….. MEANS MORE WORDS ARE THERE.
Recommendations:
………………………………………………………………………………
………………………………………………………………………………
………………………………………………………………………………
…..
………………………………………………………………………………
………………………………………………….
Company should adopt new technology to meet modern business
requirements.
31
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
………………….. MEANS MORE WORDS ARE THERE.
Limitations:
Non-cooperative approach and rude behavior of employees
The time available for the completion of the project was limited.
Research work was carried out only in the branch of xyz. Therefore it
may not be possible to know various methods adopted by other
production branches of the company.
32
CHAPTER-5
BIBLIOGRAPHY
33
Bibliography:
company’s annual report
……………………….
…………………………..
………………………….
Research Methodology ( CR KOTHARI)
34
This is a sample of SUMMER TRAINING PROJECT REPORT based upon exactly IP university requirement (BBA).If u need an original and complete report file in MS Word format + Presentation on this file PPT,Then u may contact [email protected]
………………….. MEANS MORE WORDS ARE THERE.