bbsrc national centre of virology the pirbright institute and cl4 facilities dr mike johnson head of...

Download BBSRC National Centre of Virology The Pirbright Institute and CL4 Facilities Dr Mike Johnson Head of Estates SRO Development Programme

If you can't read please download the document

Upload: kimberly-keyes

Post on 14-Dec-2015

217 views

Category:

Documents


3 download

TRANSCRIPT

  • Slide 1

BBSRC National Centre of Virology The Pirbright Institute and CL4 Facilities Dr Mike Johnson Head of Estates SRO Development Programme Slide 2 A Brief, Terrifying History of Viruses Escaping From Labs: How well-intentioned research with dangerous pathogens could put people at risk. The Ebola Strain Links African Outbreak To A Lab Escape CDC Closes Labs After Anthrax, Bird Flu, Smallpox, and Who Knows What Else Escaped New lab incidents fuel fear, safety concerns in Congress Bio-Unsafety Level 3: Could the Next Lab Accident Result in a Pandemic? Threatened pandemics and laboratory escapes: Self-fulfilling prophecies Pirbright lab told to improve safety over foot and mouth UNWANTED HEADLINES! Slide 3 Reviews Series of Reports and recommendations re the future of the Pirbright facilities - HSE (2007) - Spratt (2007) - Callaghan (2007) - Anderson (2008) - House of Common Review (2008) - Beringer (2008) - H&S Biosecurity (2014) Rebuild the Pirbright facility.fit for purpose Slide 4 In 2001 there was a major FMD outbreak event in the UK .. Cost 8B+ Formative idea of a National Centre for Virology including relocation of science from VLA Weybridge.2005 Pirbright Site Redevelopment Plan 2007 another FMD outbreak: 200M focus on the infrastructure of the Institute. Requirement. Slide 5 NEW OLD Transition projects building assurance Drainage Slide 6 OLD NEW Transition projects Interim Laboratory Slide 7 OLDNEW Transition projects Effluent Treatment Slide 8 Science strategy: work on viruses only : extend to interface between animals and humans and work on zoonotic agents. Design of Plowright building CL4 containment facility All the features: HVAC/pressure cascades, Effluent treatment, sealability, generic labs flexibility CL3 labs on GF East- ACDP3 agents Science Strategy - Design Slide 9 The Big Change project: Plowright Building August 2010 construction started 2009 Slide 10 The Big Change project: Plowright Building Slide 11 Slide 12 Slide 13 Slide 14 The BBSRC National Virology Centre The Plowright Building Jan 2014 Slide 15 Acknowledgements