ASHRAE stands for American Society of Heating, Refrigerating and Air-Conditioning Engineers. It is an HVAC society that aims to advance the arts and sciences of heating, ventilating, air conditioning and refrigerating. This presentation discusses the new energy standards based on ASHRAE 90.1 2010, which gives 30% energy savings compared to ASHRAE 90.1-2004, to provide minimum requirements for the energy-efficient design of buildings except low-rise residential buildings. The 6 Key Topics that will be discussed are: 1. ASHRAE 90.1 Overview 2. Compliance Paths 3. Implementation Cost 4. Envelope 5. HVAC

TRANSCRIPT

Page 1: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

ASHRAE 90.1-2010 Overview

January 14th, 2013

FUSION PROJECTS

Page 2: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

YOUR CONTACTS

• Henry Leung, P.Eng., MBA, LEED AP Senior Design Engineer

• Amir Tehrani, P.Eng., LEED AP

Contract Manager, Partner

Page 3: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

BC COMFORTDESIGN BUILD MECHANICAL

CONTRACTORS

HVAC

Plumbing

Controls

Engineering

Service

Page 4: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

AGENDA1. ASHRAE 90.1 Overview

2. Compliance Paths

3. Implementation Cost

4. Envelope

5. HVAC

Page 5: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

To provide minimum requirements for the energy-efficient design of buildings except low-rise residential buildings

30% Energy savings compared to ASHRAE 90.1-2004

OVERVIEW

Page 6: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 7: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 8: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

National Energy Code for Canada

i.e. Canadian ASHRAE 90.1

Page 9: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 10: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 11: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 12: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 13: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Buildings that are specifically designated as historic

by the adopting authority or on the National Register of Historic Places or eligible for listing by the U.S. Secretary of Interior

If the building’s annual energy consumption is the same as a building that meets the requirements of Sections 5-10

verified by a design professional using methods acceptable to the authority having jurisdiction

SECTION 4EXCEPTIONS FOR ALTERATIONS

Page 14: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Mandatory Provisions(required for

most compliance options)

Building System Compliance Options

Energy Code Compliance

Prescriptive Option

Energy Cost Budget

Trade Off Option

Simplified

Envelope

HVAC

Lighting

SWH

Power

Other

Compliance Approaches

Page 15: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 16: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation
Page 17: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

LEED

• LEED Canada CI-V1.0 - Valid until at least 2015

1. ASHRAE 90.1-20042. MNECB 1997

• LEED v4 – No more Canadian LEED, now ACP

1. ASHRAE 90.1-20102. maybe NECB 2011

Page 18: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

COST

Page 19: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Allowed if they don’t increase energy usage of building

Installation of storm windows

Replacement of glazing in existing sash and frame

Alterations to envelope cavities provided they are insulated to full depth with a nominal R-3.0 per in.

Roof and floor alterations where no new cavities are created

Fenestration replacement less than 25% of total

Replacement of roof membranes

Replacement of existing doors

Replacement of existing fenestration, provided area of replacement is no more than 25% of total fenestration area

Section 5Envelope Alteration Exceptions

Page 20: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

ENVELOPE

Page 21: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

ENVELOPE

Page 22: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Equipment– New equipment shall meet the minimum efficiency

requirements Cooling systems

– New cooling systems installed to serve previously uncooled spaces shall comply with this section

– Alterations to existing cooling systems shall not decrease economizer capacity (unless economizer tradeoff is used)

Ductwork– New and replacement ductwork shall comply with applicable

requirements Piping

– New and replacement piping shall comply with applicable requirements

SECTION 6 – 6.1.1.3HVAC ALTERATIONS SCOPE

Page 23: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Alterations to the building HVAC system shall comply with the requirements of Section 6

Exceptions that are allowed:– Equipment being modified or repaired (not replaced)

• provided such modifications will not result in an increase in the annual energy consumption

– Equipment being replaced or altered which requires extensive revisions to other systems and such replaced or altered equipment is a like-for-like replacement

– Refrigerant change of existing equipment– Relocation of existing equipment– Ducts and pipes where there is insufficient space or access

to meet these requirements

SECTION 6 – 6.1.1.3HVAC ALTERATIONS

Page 24: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

SWH equipment installed as a direct replacement shall meet these requirements

EXCEPTION: Not sufficient space or access to meet requirements

SECTION 7 – 7.1.1.3SWH ALTERATIONS

Page 25: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

HVAC COMPLIANCE

Mandatory Provisions(required for

most compliance options)

Building System Compliance Options

Energy Code

Compliance

Prescriptive Option

Energy Cost Budget

Trade Off Option

Simplified

Envelope

HVAC

Lighting

SWH

Power

Other

Page 26: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

You have to follow Sections – 6.1 General, – 6.7 Submittals, and – 6.8 Minimum Equipment Efficiency

And then you can follow either – Section 6.3 Simplified Approach OR– Sections 6.4 Mandatory Provisions and 6.5 Prescriptive Path

Alternatively, you can follow Section 11 (ECB), in which case Section 6.4 is mandatory

SECTION 6 – 6.2 HVAC COMPLIANCE PATHS

Page 27: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

HVAC1. Economizers required for > 4 ton RTU

2. Energy Recovery > 5000 CFM units

Page 28: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

HVAC Equipment Covered Air conditioners and condensing units Heat pumps (air, water, and ground source) Water-chilling packages (chillers) Packaged terminal and room air conditioners and heat pumps Furnaces, duct furnaces and unit heaters Boilers Heat rejection equipment (cooling towers) Heat transfer equipment (heat exchangers) Variable refrigerant flow (VRF) air conditioners VRF air-to-air and applied heat pumps Air conditioners serving computer rooms

SECTION 6 – 6.4.1.1 MINIMUM EQUIPMENT EFFICIENCY

Page 29: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

DCV must be provided for each zone with a area > 500 ft² and the design occupancy > 40 people/1000 ft² where the HVAC system has:

An air-side economizer, Automatic modulating control of the OSA dampers, or A design outdoor airflow > 3,000 cfm

SECTION 6 – 6.4.3.9 (6.3.2Q)DEMAND CONTROL VENTILATION

Demand control ventilation (DCV): a ventilation system capability that provides for the automatic reduction of outdoor air intake below design rates when the actual occupancy of spaces served by the system is less

than design occupancy.

Page 30: BC Comfort Fusion ASHRAE 90.1 2010 January 2013 Presentation

Henry Leung, P.Eng., MBA, LEED AP

[email protected]

604-412-0206

THANK YOU