![Page 1: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/1.jpg)
1
BC Hydro Net Metering Program
November 2014
Alevtina Akbulatova
As presented at webinar on November 20, 2014
![Page 2: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/2.jpg)
Agenda
• Net Metering Program: in brief and numbers
• Billing: how it works
• Recent changes
• What’s next
2
![Page 3: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/3.jpg)
3
Net Metering (NM) at BC Hydro
• Started in 2004
• Tariff Rate Schedule 1289
• Eligibility: • Residential and small commercial customers
• Up to 100 kW
• Clean and renewable energy source
• Open application window – come when you are ready
• Simple process, no cost to interconnect to the grid*
• Requires full load displacement before payment (annual basis)
• Annual excess electricity is paid at a rate of 9.99 cents/kWh
• Technical requirements = DGTR/100
• Electricity flow is measured by Smart Meter
![Page 4: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/4.jpg)
BC Hydro Net Metering in numbers
As of November 2014:
371 NM customers – 2 MW installed capacity: • 345 solar PV • 12 Hydro • 9 Wind • 4 Wind & PV • 1 Biogas
4
PV 80%
Hydro 16%
Wind 2%
Wind & PV 1% Biogas
1%
By Installed Capacity
![Page 5: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/5.jpg)
Solar PV Growth in BC
5
0
400
800
1200
1600
2000
0
50
100
150
200
250
300
350
400
2004 2006 2008 2010 2012 2014
# cust kW
Year # of customers capacity, kW
![Page 6: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/6.jpg)
What is Net Metering?
inverter
point of metering
6
![Page 7: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/7.jpg)
Smart Meters
7
http://www.bchydro.com/energy-in-bc/projects/smart_metering_infrastructure_program.html#how meters work
![Page 8: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/8.jpg)
NM Billing
• Inflow (net consumption) • Outflow (net generation) • Billed on net of inflow and outflow:
• If inflow > outflow -> charged for inflow – outflow • If outflow > inflow -> bill $0, outflow – inflow ->
credit to Customer Generation account
8
![Page 9: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/9.jpg)
NM Billing – Net Inflow
9
![Page 10: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/10.jpg)
NM Billing – Net Outflow
10
![Page 11: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/11.jpg)
NM on MyHydro
https://www.bchydro.com/accounts-billing/customer-service-residential/understand-electricity-
consumption-residential/understand-your-net-consumption.html
11
![Page 12: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/12.jpg)
12 Invermere, David Thompson Secondary School
Richmond, Matthew McNair Secondary School
Vancouver Island, T'Sou-ke First Nation
Surrey, BC Housing
Pictures of Existing Projects
Residential installation
Ladysmith, Residential 5 kW project
Quinsam Hatchery 45 kW Micro-Hydro project
![Page 13: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/13.jpg)
Recent Changes to NM
Increased maximum size of generators eligible under NM to 100 kW • Requires professional
design and installation • P.Eng seal requirement • Incremental costs
13
![Page 14: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/14.jpg)
Larger Projects: Things to Consider
• Qualified and experienced contractor • Complex application form & drawings • Service size is large enough • Disconnection devices • Proper labelling • Field Verification Test • Incremental costs
14
![Page 15: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/15.jpg)
Marketing & Communication
Net Metering website Bill insert – highlighted NM program on paper and
electronic bills to all customers Stakeholder meetings and webinar – intervenors,
customers, contractors Featured customers on the website Presented at UBCM, FCM, CanSIA, First Nations Energy
Forum, CSA group, Chartwell webinar, training workshop for solar installers
Promotional materials distributed through BC Hydro Outreach – Net Metering postcards
15
![Page 16: BC Hydro Net Metering Program...3 Net Metering (NM) at BC Hydro • Started in 2004 • Tariff Rate Schedule 1289 • Eligibility: • Residential and small commercial customers •](https://reader033.vdocument.in/reader033/viewer/2022042806/5f6b1bd127a8df48de061927/html5/thumbnails/16.jpg)
16 16
Next Steps for Net Metering
Regulatory Compliance: • Remove interconnection-related terms from RS1289
• Formulate BCH DG Interconnection Policy (and submit to the BCUC)
Amend NM tariff to accept “leased” solar PV systems Continue with communication efforts – more regular
webinars