bcal r&d gluex collaboration meeting newport news, virginia september 9-11, 2004 george lolos,...

28
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

Upload: jane-king

Post on 16-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

BCAL R&DBCAL R&D

GlueX Collaboration MeetingNewport News, VirginiaSeptember 9-11, 2004

George Lolos, Zisis Papandreou

Page 2: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 2

Work Report...Work Report...Module-1 construction completed

Length is 400 cm after machining and polishing

Height is 23.3 cm of Pb/SciFi/Epoxy matrix

Used almost 80 km of SciFi’s

Took 5-6 persons a month to complete

Used five gallons of BICRON 600 epoxy

All construction and machining was done at CSR

Cosmic ray tests will be done at the UofR

SiPM readout progress and in-beam tests

Page 3: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

Some Pictures Now

Some Pictures Now

Details will be shown in the training video

Page 4: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 4

In the Beginning....In the Beginning....

Page 5: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 5

A Critical OperationA Critical Operation

Page 6: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 6

Let the Lead RollLet the Lead Roll

Page 7: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 7

Placing the SciFi’s, 96 at a time

Placing the SciFi’s, 96 at a time

Page 8: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 8

Module 1 Fully Grown @23.3 cm

Module 1 Fully Grown @23.3 cm

Page 9: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 9

Module 1 (a.k.a. Moly) leaves its incubator

Module 1 (a.k.a. Moly) leaves its incubator

Page 10: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 10

Moly’s first haircut before machining and polishing

Moly’s first haircut before machining and polishing

Page 11: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 11

Face Machined (first pass) and Oops!

Face Machined (first pass) and Oops!

Page 12: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 12

Moly is coming home in a box

Moly is coming home in a box

Page 13: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 13

Performance Objectives

Energy resolution ΔΕ∕E ≈ (0.05+ 0.05/√E) with E in GeV

Depends on SciFi/Pb sampling ratio

Depends on Radiation Length

Depends on #P.E.’s and intrinsic PMT resolution

Timing Resolution σ≈200 ps

Depends on #P.E.’s (number of SciFi’s read out per PMT that have recorded “hits”)

Depends on intrinsic PMT resolution

BCALBCAL

Page 14: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 14

Read-Out R&DRead-Out R&D60 SiPM’s have been obtained from CPTA

All results so far have been very promising

Significant R&D is required to determine the optimum SiPM-to-SciFi coupling to obtain the required timing and energy resolutions with the minimum number of SiPM’s

Pulse rise time and energy resolution are excellent and gain is almost as good as vacuum PMT’s

Page 15: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

SiPM vs. Burle 8575SiPM vs. Burle 8575Green trace is for SiPM flashed with Optitron NR-1A

Black trace is for BURLE 8575 under identical conditions and at 2,000 V

50 mV/unit and 20 ns/unit

Page 16: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 16

SiPM and SciFi with sourceSiPM and SciFi with source

Page 17: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 17

SiPM’s and dark ratesSiPM’s and dark rates

SiPM’s are more noisy than vacuum PMT’s

“Effective” noise levels depend on noise amplitude. Most vacuum PMT’s have very high dark rates at the 1-5 mV levels, also known as electronic noise (well below 1 P.E. levels)

Some brands of SiPM’s have much higher noise rates and currents than others

Page 18: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 18

CPTA with SciFi and LEDCPTA with SciFi and LED

QuickTime™ and a decompressor

are needed to see this picture.

QuickTime™ and a decompressor

are needed to see this picture.

Page 19: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 19

The “noise” rate is shown to be less than 100 kHz, since the LED was triggered at that rate

The noise amplitude is below the one P.E. level

Each SiPM - in a matrix of 10-20 coupled devices viewing the same BCAL area - will be discriminated at that level to prevent noise triggering the TDC’s and causing amplitude resolution effects

What does it all mean?What does it all mean?

Page 20: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 20

“Standard” SiPM’s have higher Q.E. in the λ≈500-600 nm range (Y-G)

“Standard’’ (blue) SciFi’s have peak emission in the λ≈410-450 nm. However, for lengths longer than 50 cm, the light surviving is in the Y-G region

We need to model and test with beam and/or cosmic rays the optimum way to collect the light onto the SiPM’s

Matching SiPM’s to SciFi’sMatching SiPM’s to SciFi’s

Page 21: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

Scintillating light wave shifting in SciFi

Scintillating light wave shifting in SciFi

Source: Ocean Optics 280 nm LED

SciFi: PoliHiTech double-clad 1 mm ∅

Transmission spectra have been obtained as a function of fiber length

Blue ➽ Yellow-Green

Page 22: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 22

Cost Projections (Materials) per Module (I)

Cost Projections (Materials) per Module (I)

SciFi (80 km @ $0.65/m): $52,000

BICRON 600 epoxy (5 gallons @ $600/gal) $3,000

Lead: $2,000

Consumables (industrial epoxy, gloves, brushes, paper and cloth wipes, alcohol, etc., etc.): $1,500

Al plate and steel support channel: $2,500 (includes labour)

Page 23: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 23

Cost Projections (Materials) per Module (II)

Cost Projections (Materials) per Module (II)

11 sets of 15 coupled (matrices) of SiPM’s ($80 per SiPM): $13,200

Electronics (bases + discriminator chips) for above: $12,000 (includes labour)

11 sets of SciFi-to-SiPM (matrix) light guides and Winston cones + 15 light collection fibers per set: $6,000 (includes labour)

Shipping crate: $1,000 (includes labour)

Page 24: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 24

Cost Projections (Equipment)

Cost Projections (Equipment)

New swaging machine: $20,000 (includes labour)

Second press-frame: $15,000 (includes labour)

Fiber handling and sorting table with Cu (grounded) table top cover: $1,500

“Clean room” to house two presses and one main SciFi table with A/C (filtered) and temperature and humidity controls. Estimated cost: $20,000 (includes labour)

Page 25: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 25

Cost Projections for BCAL (Materials + Equipment)☛All these numbers are

preliminary☚

Cost Projections for BCAL (Materials + Equipment)☛All these numbers are

preliminary☚ Total Materials Cost: $4,473,600

Total Equipment Cost: $56,500

Sub-Total Materials+Equipment (includes some labour, as indicated): $4,530,100

Page 26: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 26

Labour Cost EstimatesLabour Cost EstimatesEach module requires 5 man-months to complete - assuming eight hours per day (unskilled labour, e.g. students)

Cutting and swaging ≈200 sheets require approximately 20 man-hours per module (unskilled labour, e.g. students)

Labour and milling machine charges for machining each module to final dimensions are approximately $2,800 (machinist rates)

More specific estimates will be provided for the detector review and the CDR.

Page 27: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

It’s not cheap !It’s not cheap !

Page 28: BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou

GlueX Collaboration Meeting, September 2004GlueX Collaboration Meeting, September 2004 28

And UV tests of fibers...And UV tests of fibers...

Controlled exposure to fluorescent lighting; LED 480nm, transmission spectrum