be conference 2008 innovating substation design leveraging 3d technology
TRANSCRIPT
![Page 1: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/1.jpg)
Be Conference 2008
Innovating Substation Design Leveraging 3D Technology
![Page 2: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/2.jpg)
50,000 Foot View
• Decrease Bill of Material Creation Time
• Decrease O & M Design Time on new assets
• Create easily maintainable standards
• Easily apply standard designs to projects
• Provide Design Estimates prior to construction
• Decrease errors in material procurement
![Page 3: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/3.jpg)
The Result
• Add a module to an existing tool to generate Bills of Materials and provide Design Estimates
• Integrate directly with MicroStation
• Provide ability to order materials as a direct result of the 3D Model
• Watch Demo
![Page 4: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/4.jpg)
Previous Process: Designer Time Allocation
8%
23%
7%3%
18%3%
10%
6%
22%
Locating Design Resources
Creating Drawings
Itemizing Materials/BOM
As Builts
Checking Drawings
Plan and Profiles
Estimate, 1-Line, LP
Ordering Material
Other
Source: Employee Survey
![Page 5: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/5.jpg)
Investment & Savings for Intelligent Substation Design
ProjectIT
Implementation SPE
Implementation Current Cost Savings
Activity MH $ MH $ MH $ MH $
CAD Interface 1000 60,000 3,120 156,000 24752 1,237,600 7426 371,300
BOM 400 24,000 0 0 3536 176,800 2298 106,100
Total 1,400 84,000 3,120 156,000 28,288 1,414,400 9,724 477,400
![Page 6: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/6.jpg)
Final Projected Savings
• Design Time - Save 30% = 7426 h/yr
• BOM Prep Time - Save 60% = 2122 h/yr
![Page 7: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/7.jpg)
SE PORT Objective Overview
Improve Substation Project E&C Process• The process: Estimate>design>construct>manage
– Improve cost, quality, speed– Reduce outside service $– Apply technology well established in other industries
• Key process improvements:– Link drawings with material library & cost data – Simplify BOM, procurement process– Improve estimate precision, cost control (link E/D)– Facilitate design optimization– Avoid redundant data entry into multiple tools
![Page 8: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/8.jpg)
Substation Intelligent Design Goals
• CAD Interface – speed physical design work– Complete project drawings using smart cells– Automatically generate Bills of Materials (BOM)– Automatically calculate material counts– Generate “design complete,” pre-construct estimate– Facilitate design optimization for cost reduction– Request material as assemblies v. components – Explore: reduced # drawings, synch object views
![Page 9: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/9.jpg)
Benefits Already Realized
• Complete, accurate cell library already available for both 2D and 3D application
• New Substations built with Intelligence already improving rehab process
• Standards are easier to maintain due to only having to change the 3D model, then update the sheets
![Page 10: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/10.jpg)
Next Steps
• Finish 3D CAD Practices to ensure consistent use of Intelligent Design
• Improve CAD interface to better accommodate design process (Dec 08)
• Certify users for 3D Design• Train users on CAD Interface and
Intelligent Design• Look for other opportunities to improve our
process using available technology!
![Page 11: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology](https://reader036.vdocument.in/reader036/viewer/2022082817/56649e175503460f94b02480/html5/thumbnails/11.jpg)