Page 1: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Be Conference 2008

Innovating Substation Design Leveraging 3D Technology

Page 2: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

50,000 Foot View

• Decrease Bill of Material Creation Time

• Decrease O & M Design Time on new assets

• Create easily maintainable standards

• Easily apply standard designs to projects

• Provide Design Estimates prior to construction

• Decrease errors in material procurement

Page 3: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

The Result

• Add a module to an existing tool to generate Bills of Materials and provide Design Estimates

• Integrate directly with MicroStation

• Provide ability to order materials as a direct result of the 3D Model

• Watch Demo

Page 4: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Previous Process: Designer Time Allocation

8%

23%

7%3%

18%3%

10%

6%

22%

Locating Design Resources

Creating Drawings

Itemizing Materials/BOM

As Builts

Checking Drawings

Plan and Profiles

Estimate, 1-Line, LP

Ordering Material

Other

Source: Employee Survey

Page 5: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Investment & Savings for Intelligent Substation Design

ProjectIT

Implementation SPE

Implementation Current Cost Savings

Activity MH $ MH $ MH $ MH $

CAD Interface 1000 60,000 3,120 156,000 24752 1,237,600 7426 371,300

BOM 400 24,000 0 0 3536 176,800 2298 106,100

Total 1,400 84,000 3,120 156,000 28,288 1,414,400 9,724 477,400

Page 6: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Final Projected Savings

• Design Time - Save 30% = 7426 h/yr

• BOM Prep Time - Save 60% = 2122 h/yr

Page 7: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

SE PORT Objective Overview

Improve Substation Project E&C Process• The process: Estimate>design>construct>manage

– Improve cost, quality, speed– Reduce outside service $– Apply technology well established in other industries

• Key process improvements:– Link drawings with material library & cost data – Simplify BOM, procurement process– Improve estimate precision, cost control (link E/D)– Facilitate design optimization– Avoid redundant data entry into multiple tools

Page 8: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Substation Intelligent Design Goals

• CAD Interface – speed physical design work– Complete project drawings using smart cells– Automatically generate Bills of Materials (BOM)– Automatically calculate material counts– Generate “design complete,” pre-construct estimate– Facilitate design optimization for cost reduction– Request material as assemblies v. components – Explore: reduced # drawings, synch object views

Page 9: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Benefits Already Realized

• Complete, accurate cell library already available for both 2D and 3D application

• New Substations built with Intelligence already improving rehab process

• Standards are easier to maintain due to only having to change the 3D model, then update the sheets

Page 10: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology

Next Steps

• Finish 3D CAD Practices to ensure consistent use of Intelligent Design

• Improve CAD interface to better accommodate design process (Dec 08)

• Certify users for 3D Design• Train users on CAD Interface and

Intelligent Design• Look for other opportunities to improve our

process using available technology!

Page 11: Be Conference 2008 Innovating Substation Design Leveraging 3D Technology