Bedford 13692C NH Route 101 over Pulpit Brook Red List Bridge Effort Bridge No. 090/065 Public Informational Meeting June 20, 2019

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Bedford 13692C

NH Route 101 over Pulpit BrookRed List Bridge Effort

Bridge No. 090/065

Public Informational MeetingJune 20, 2019

Page 2: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Agenda

• Welcome & Introductions

• Project Location

• Existing Conditions

• Natural & Cultural Resources Update

• Initial Alternatives & Proposed Solution

• Schedule & Construction Cost

• Questions and Comments

Page 3: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Project Location

Pulpit Brook

Bridge Location

Bragdon Farm

LaBelle Winery

Twin Brook Lane

Joppa Hill Road

StowellRoadAmherst

Bedford

N

Page 4: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Site Photos

North Headwall

South Headwall

Looking Southwest on NH 101 (Bridge in Picture)

Page 5: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Exist. Roadway Overview – NH 101

• Constructed in 1951 (68 years old)

• Average Daily Traffic = 20,100 vehicles per day (2019)

• Posted Speed Limit = 50 mph

• Roadway width = 40 feet– 12-foot travel lanes – 8-foot shoulders

• 100’ Right-of-Way width

Page 6: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Existing Bridge

• Twin 5’-0” Concrete Culverts

• Constructed in 1951 with roadway (68 years old)

• #44 on the 2018 New Hampshire DOT Red List

• Northern headwall replaced by Bridge Maintenance in 2011

Page 7: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Existing Bridge Condition

Page 8: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Natural/Cultural Resources Update

• Assessment of Natural and Cultural Resources for NEPA and Section 106 compliance

• Natural Resource Concerns

– Wetlands / Vernal Pools

– Stormwater Treatment (MS4 Compliant)

– NHDES Stream crossing rules

– Threatened and Endangered Species• Blanding’s Turtle

• Northern Long-eared Bat

– Conservation lands (Bragdon Farm)

• No impacts to Cultural Resources (archaeological sites or historic structures) identified

Page 9: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Initial Alternatives Analysis

1. Rehabilitation or No Build Options (Not Feasible)• Hydraulic Deficiencies (Route 101 will overtop in a 50-

year storm)

2. Replacement Options

• Phased Bridge Construction (requires over-widening)

• Accelerated Bridge Construction (ABC) with Roadway Closure

• Conventional Construction with On-Site Traffic Diversion and Temporary Bridge

Preferred inFebruary 2018

Page 10: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Proposed Plan - Final

Left Turn Lane Added (for Twin Brook Lane)

Page 11: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Proposed Plan – Phase 1Temporary Impacts

• Temporary on-site diversion

• Possible aerial utility relocations

• Public Hearing Required– ROW needed for stormwater treatment

Page 12: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Proposed Traffic Phasing

Revised Phased Construction ApproachPhase 1 - On-Site Traffic Diversion and Temporary Bridge

Phase 2 - Traffic shifted to Portion of Newly Constructed Bridge

Page 13: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Proposed Bridge Details

• 48-foot clear span

• Butted precast concrete box beams

• Conventional cast-in-place abutments and wingwalls

Page 14: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Project Schedule and Cost

Schedule

• Public Hearing – Fall 2019

• Final Design – 2020

• Advertising – Early Spring 2021

• Construction starting late summer 2021

Construction Cost Estimated at $3.5 million

Page 15: Bedford 13962C PIM Presentation 6-19-19 final.ppt [Read-Only]...%hgirug & 1+ 5rxwh ryhu 3xoslw %urrn 5hg /lvw %ulgjh (iiruw %ulgjh 1r 3xeolf ,qirupdwlrqdo 0hhwlqj-xqh

Thank You

Presentation Material is Availableon the Department’s website

www.nh.gov/dot/projectsBedford 13692C