Presented byR.Baskar, AMIE (Mech)
ASNT NDT Level III RT,UT,PT & MT
CSWIP 3.2
AWS – SCWI
BEL Valve - Cladding & Extra Tungsten Carbide Deposit issue – Case Study
2GE Confidential and Proprietary Information
GE2007 All Rights Reserved
• Bond integrity and volumetric
examination of Weld overlay (cladding)
• Extra material Deposit (Tungsten Carbide)
BEL Valve - Cladding & Extra Tungsten Carbide Deposit issue –Case Study
3GE Confidential and Proprietary Information
GE2007 All Rights Reserved
BEL Valve - Cladding & Extra Tungsten Carbide Deposit issue – Case Study
Technical Justification
follows
4GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Bond integrity and volumetric examination of
Weld overlay (clading)
BEL Valve – Cladding issue – Case Study
5GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Bond integrity and volumetric examination of
Weld overlay (clading)
BEL Valve – Cladding issue – Case Study
Lack of bonding at
weld fusion face
6GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Indication from overlay fusion face
BEL Valve – Cladding issue
7GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic equipment REFERENCE LEVEL
(RL) set through reference block
BEL Valve – Cladding issue
RL Set at 90% FSH
8GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Testing - Reference block
BEL Valve – Cladding issue
Flat bottom Drilled Hole Reference Reflector
Weld Interface
9GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Bond integrity and volumetric examination of weld overlay (cladding) in accordance with API 6A
10GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Testing - Acceptance Criteria
BEL Valve – Cladding issue
Reference : API 6A, Para. 7.4.2.3.15 - b - 2
11GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Testing - Acceptance Criteria
BEL Valve – Cladding issue
• RL Set at 90% FSH• Rejection level for
single indication
Rejection level for multiple indication 45% FSH
12GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Testing - Acceptance Level
BEL Valve – Cladding issue
Rejection level for Multiple indication
Rejection level for Multiple indication
Multiple indication from 11” ball (S.No. 48122)
Multiple indication from 9” ball (S.No. 48140)
No indication
13GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Ultrasonic Testing - Acceptance Criteria
based on area
BEL Valve – Cladding issue
Reference : ASME / ASTM SA 265 Para. 13.3.3 and 13.3.4
Based on area it is only 0.13 – 0.14%, hence it can be ignored
14GE Confidential and Proprietary Information
GE2007 All Rights Reserved
• Extra material Deposit (Tungsten Carbide)
Video Display – Tungsten Carbide deposit
BEL Valve – Extra material Deposit (Tungsten Carbide) issue – Case Study
15GE Confidential and Proprietary Information
GE2007 All Rights Reserved
• Extra material Deposit (Tungsten Carbide)
During Tungsten carbide coating at outer surface, by process error ROBO equipment
deposit some portion with Tungsten Carbide into inner surface area of bore. Deposit uptomax. 3mm.
BEL Valve – Extra material Deposit (Tungsten Carbide) issue – Case Study
Extra material Deposit
(Tungsten Carbide)
16GE Confidential and Proprietary Information
GE2007 All Rights Reserved
This Extra material deposit confirmed following checking:
• Visual inspection, by surface color difference between Tungsten Carbide coating and cladding material deposit area
• During dye penetrant testing noticed red color contrast at Tungsten Carbide area. Which is probably due to porous material observed penetrant and resulting red color contrast at that location.
• Checked with PMI and noticed 80 – 84 % of Tungsten, other location 55 – 60 % Nickel
• Checked hardness test and noticed 50 – 55 HRC, other cladded area 32 – 35 HRC
• Checked with coating thickness gauge, it noticed 1 to 3 mm coating thickness
• Inner diameter measured and noticed reduced dimension, than the nominal bore dimension.
• General information, this extra material deposit is very smooth transition and stress raise free.
Based on the above check, it is clearly shows Tungsten Carbide deposit
BEL Valve – Extra material Deposit (Tungsten Carbide) issue – Case Study
17GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Table shows Tungsten Carbide Details
BEL Valve – Extra material Deposit (Tungsten Carbide) issue – Case Study
18GE Confidential and Proprietary Information
GE2007 All Rights Reserved
Suggested Conclusion for Cladding
Based on the review of Ultrasonic indication evaluations, the
indication in the cladding are well within acceptable limit and it will
not affect the integrity of the valves. The valves are fit for purpose.
Leave indication in the cladding as is.