belle river simulator: a gse, dte and abb collaboration
DESCRIPTION
Presented at ABB Automation & Power World. For more information, visit www.gses.com.TRANSCRIPT
![Page 2: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/2.jpg)
2
Speakers
George McCullough
Vice President
GSE Systems
Baltimore, MD
Fred Ihimodu
Staff Engineer – Engineering Support Organization
DTE Energy
Detroit, MI
Speaker:
Title:
Company:
Location:
![Page 3: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/3.jpg)
3
Belle River Power Plant:A Brief History
5 Diesel Peakers – 13.75 MW commissioned 1981
2 Coal Units – 1,396 MW commissioned 1984 - 1985
3 Natural Gas Peakers - 256 MW commissioned 1999
![Page 4: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/4.jpg)
4
Project History:Recent Control Systems Upgrades
2002 - Unit 2 conversion to ABB Harmony
2008 - Unit 1 conversion to ABB Harmony
2012 - Unit 2 conversion from VMS OIS to 800xA 5.1
- Unit 2 simulator development
2013 - Unit 1 upgrade from 800xA 5.0 to 5.1
- Environmental solutions
![Page 5: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/5.jpg)
5
Proposed Benefits
Training operators & others
Platform to simulate future environmental solutions control system
for units 1 & 2
Complete graphics review prior to unit 2 start-up in fall 2012
Eliminate typical extensive IO checkout during unit 2 fall 2012
Platform to test control philosophy, software configuration
and graphic changes prior to implementing on unit 1 & 2
![Page 6: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/6.jpg)
6
Partners & Teams
GSE Systems Lead engineer and design team Project management
ABB Lead engineer and design team Project management
DTE Energy Plant operations Plant engineers and I&C specialists Process controls engineering support Major enterprise project management
![Page 7: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/7.jpg)
7
Unit 2 Simulator Team:Preparation
Simulator conference exposure
Same personnel on both simulator and unit DCS upgrades
Critical to have continuity across all projects
Experienced operators familiar with units
Engineers & specialists with vast knowledge of control systems
Travel commitments
![Page 8: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/8.jpg)
8
Model:GSE Concepts
Power Generation Modeling Tools
Thermal hydraulic systems
Flow networks
Electrical systems
Logic & controls
High Fidelity
Fully modeled
Simplified model
Not modeled
![Page 9: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/9.jpg)
9
Model:GSE Concepts
Instructor Station
Initial Conditions
Malfunctions
Remote functions
& overrides
Trainee actions review, backtracking
& replay
![Page 10: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/10.jpg)
10
Data Sources & Connections
Harmony Training Simulator
(HTS)
vICI
• Harmony connectivity
• Composer
• DBDOC
HTS manager
![Page 11: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/11.jpg)
11
Data Sources & Connections
Harmony Training Simulator (HTS) vICI
• Harmony connectivity• Composer• DBDOC
HTS manager
![Page 12: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/12.jpg)
12
Data Sources & Connections
Third Party PLC
OPC: No Modbus emulator required
Matrikon OPC Scada Modbus vs. KEPServerEX
![Page 13: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/13.jpg)
13
Data Sources & Connections
Non DCS Emulated HMI
- Soot Blowing - Precipitator - CEMS - ZoloBOSS
Hard Panel Emulation
- Ethernet IO
- Meters
![Page 14: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/14.jpg)
14
Activities
9 to 12 month commitment
Simulator testing
Factory Acceptance Testing (FAT)
Site Acceptance Testing (SAT)
Train the trainer
![Page 15: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/15.jpg)
15
Activities
Issue Tracking
- ABB Teamtrack
– GSE Mantis
Management of Change
Remote Collaboration
– ABB teamwork
– GSE VPN access
– DTE VPN access
![Page 16: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/16.jpg)
16
Decisions:Not Always Black & White
Immersion vs. feedback
Immersion vs. human performance
Redundancy needs vs. test environment completeness
Access to information vs. role clarification
![Page 17: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/17.jpg)
17
Plant & Simulator
Unit 2
Unit 2 Simulator
![Page 18: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/18.jpg)
18
Lessons Learned
Uncovered and resolved existing configuration, logic & graphics
HTS limitations & compatibilities
– Unsupported function codes
Comprehensive startup procedure
Model – Data sources handshake
![Page 19: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/19.jpg)
19
Lessons Learned
System health checks
VMware vCPU allocation
Event concentrator error
Ensure overall system is truly ready for customer
![Page 20: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/20.jpg)
20
Current/Future Objectives
Establish core training program
Expand training benefits beyond operations to
technicians & engineers on engineering tools
− Composer
− Bulk data manager
− Bulk configuration manager
− Graphics builder
− Alarm analysis
− Import/export tool
− Consistency checker, etc.
![Page 21: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/21.jpg)
21
Current/Future Objectives
Model future environmental solutions
- Validate plant design & procedures prior to start-up
Implement management of change to keep the
simulator & unit in sync
Enhancement request
- vICI and HTS manager services
![Page 22: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/22.jpg)
22
Contact
Fred Ihimodu
DTE Energy
George McCullough
GSE Systems
For more information, please contact:
OR
![Page 23: Belle River Simulator: A GSE, DTE and ABB Collaboration](https://reader033.vdocument.in/reader033/viewer/2022061220/54ba8ddb4a795957178b46d7/html5/thumbnails/23.jpg)
For more information:
Go to: www.GSES.com
Call: +1 800.638.7912
Email: [email protected]
Follow us on:
Twitter @GSESystems
Facebook.com/GSESystems