bellwork 29

6
Bellwork 29 4/30 – 5/4

Upload: abbot-maddox

Post on 01-Jan-2016

16 views

Category:

Documents


0 download

DESCRIPTION

Bellwork 29. 4/30 – 5/4. Monday, April 30. What is a cirque?. Tuesday, May 1. What is an erratic?. Wednesday, May 2. What are the different types of moraines?. Thursday, May 3. State the difference between terminal and lateral moraines. Friday, May 4. How is a hanging valley formed?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bellwork 29

Bellwork 29

4/30 – 5/4

Page 2: Bellwork 29

Monday, April 30

• What is a cirque?

Page 3: Bellwork 29

Tuesday, May 1

• What is an erratic?

Page 4: Bellwork 29

Wednesday, May 2

• What are the different types of moraines?

Page 5: Bellwork 29

Thursday, May 3

• State the difference between terminal and lateral moraines.

Page 6: Bellwork 29

Friday, May 4

•How is a hanging valley formed?