Page 1: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

Know what's below.before you dig.Call

R

J.U.L.I.EJOINTUTILITYLOCATIONINFORMATION FOREXCAVATIONCALL 811

N

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
%%UPROFESSIONAL DESIGN FIRM LICENSE:
AutoCAD SHX Text
GEWALT HAMILTON ASSOCIATES, INC. DESIGN FIRM - LAND SURVEYOR/PROF ENG LICENSE NUMBER: 184.000922-0010 EXPIRES: 4/30/2021
AutoCAD SHX Text
GUARANTEED RATE FIELD
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
%%uPROPOSED
AutoCAD SHX Text
%%uFEATURE
AutoCAD SHX Text
%%uEXISTING
AutoCAD SHX Text
%%USTANDARD SYMBOLS
AutoCAD SHX Text
C.O.
AutoCAD SHX Text
BUFFALO BOX
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
DITCH/SWALE
AutoCAD SHX Text
ELECTRIC LINE
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
BUSH/SHRUB
AutoCAD SHX Text
ELECTRIC MANHOLE
AutoCAD SHX Text
FLARED END SECTION
AutoCAD SHX Text
GAS LINE
AutoCAD SHX Text
GAS MANHOLE
AutoCAD SHX Text
GAS VALVE
AutoCAD SHX Text
INLET
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
R.O.W MARKER
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
STORM SEWER LINE
AutoCAD SHX Text
STORM SEWER MANHOLE
AutoCAD SHX Text
SANITARY SEWER LINE
AutoCAD SHX Text
SANITARY SEWER MANHOLE
AutoCAD SHX Text
TELEPHONE LINE
AutoCAD SHX Text
TELEPHONE MANHOLE
AutoCAD SHX Text
TELEPHONE BOX/PEDESTAL
AutoCAD SHX Text
TREE-CONIFEROUS (SIZE/TAG#)
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
VALVE VAULT
AutoCAD SHX Text
850.00
AutoCAD SHX Text
+
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
G
AutoCAD SHX Text
W
AutoCAD SHX Text
WATERMAIN LINE
AutoCAD SHX Text
SPOT ELEVATION
AutoCAD SHX Text
X
AutoCAD SHX Text
SANITARY FORCEMAIN LINE
AutoCAD SHX Text
OVERHEAD WIRES
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
708
AutoCAD SHX Text
12"
AutoCAD SHX Text
TREE-DECIDUOUS (SIZE/TAG#)
AutoCAD SHX Text
345
AutoCAD SHX Text
CO
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
VALVE BOX
AutoCAD SHX Text
COMBINE SEWER LINE
AutoCAD SHX Text
R.O.W LINE
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
708
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
A
AutoCAD SHX Text
850.0
AutoCAD SHX Text
x
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
12"
AutoCAD SHX Text
345
AutoCAD SHX Text
T
AutoCAD SHX Text
CULVERT
AutoCAD SHX Text
(Not to Scale)
AutoCAD SHX Text
%%ULOCATION MAP
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
CONSTRUCTION MEANS, METHODS AND JOB SITE SAFETY IS THE SOLE AND EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR
AutoCAD SHX Text
GEWALT HAMILTON ASSOCIATES, INC. 625 FOREST EDGE DRIVE VERNON HILLS, ILLINOIS 60061 TELEPHONE: 847-478-9700
AutoCAD SHX Text
%%UTOPOGRAPHIC SURVEY BY:
AutoCAD SHX Text
CHICAGO, ILLINOIS
AutoCAD SHX Text
PLAYERS PARKING LOT
AutoCAD SHX Text
EXPIRATION DATE: NOVEMBER 30, 2021
AutoCAD SHX Text
ILLINOIS LICENSE NO.: 062-056334
AutoCAD SHX Text
SIGNED:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
P.E.
AutoCAD SHX Text
THOMAS A. RYCHLIK
AutoCAD SHX Text
PLANS PREPARED FOR:
AutoCAD SHX Text
CONTROL POINTS:
AutoCAD SHX Text
BENCHMARK:
AutoCAD SHX Text
%%USHEET INDEX
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
5.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
EXISTING CONDITIONS/DEMOLITION PLAN
AutoCAD SHX Text
GEOMETRIC PLAN
AutoCAD SHX Text
GRADING/UTILITY PLAN
AutoCAD SHX Text
GENERAL NOTES & DETAILS
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
ACTIVE WEDGE BARRIER DETAILS
AutoCAD SHX Text
ISSUED FOR BID 08-24-20
AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-DT1-LOT D.DWG 8/19/2020 3:15 PM 8/19/2020 3:15 PM 8/19/2020 3:15 PM
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARENTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
6
AutoCAD SHX Text
ILLINOIS SPORTS FACILITY AUTHORITY 333 WEST 35TH STREET CHICAGO, ILLINOIS 60616 TELEPHONE: 312-674-5582
AutoCAD SHX Text
Point #
AutoCAD SHX Text
66
AutoCAD SHX Text
71
AutoCAD SHX Text
Northing
AutoCAD SHX Text
1880796.87
AutoCAD SHX Text
1880719.31
AutoCAD SHX Text
Easting
AutoCAD SHX Text
1174598.81
AutoCAD SHX Text
1174916.39
AutoCAD SHX Text
Elevation
AutoCAD SHX Text
15.06
AutoCAD SHX Text
15.74
AutoCAD SHX Text
Description
AutoCAD SHX Text
CP66-MAG
AutoCAD SHX Text
CP71-XSW
AutoCAD SHX Text
SOURCE BENCHMARK: (BM#9) 1/2" COPPER BOLT IN CONCRETE MONUMENT LOCATED 4' EAST OF EAST LINE OF MICHIGAN TO WEST AND 19' SOUTH OF NORTH LINE OF EAST CHICAGO AVENUE. ELEVATION: 12.892 DATUM: CITY OF CHICAGO
Page 2: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CP-3
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
16"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
18"
AutoCAD SHX Text
16"
AutoCAD SHX Text
16"
AutoCAD SHX Text
14"
AutoCAD SHX Text
7"
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
LANDSCAPE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GARBAGE CAN
AutoCAD SHX Text
ELECTRIC PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
RIM:15.26 T/WATER:10.16 BOTTOM:7.56
AutoCAD SHX Text
12" VCP
AutoCAD SHX Text
RIM:15.33 INV:9.98
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.76 INV:10.01
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.65 INV:10.75
AutoCAD SHX Text
RIM:15.67 INV:6.42 S INV:6.32 E
AutoCAD SHX Text
RIM:16.35 T/WATER:5.15 BOTTOM:3.05
AutoCAD SHX Text
12" VCP
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
RIM:16.10 INV:3.75
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.50 T/WATER:10.10 BOTTOM:6.00
AutoCAD SHX Text
RIM:15.27 T/WATER:10.57 BOTTOM:9.47
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.90
AutoCAD SHX Text
15.47
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.15
AutoCAD SHX Text
15.92
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.84
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.06
AutoCAD SHX Text
15.84
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.17
AutoCAD SHX Text
15.76
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.99
AutoCAD SHX Text
15.54
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.56
AutoCAD SHX Text
16.07
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.42
AutoCAD SHX Text
15.95
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.32
AutoCAD SHX Text
15.89
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.44
AutoCAD SHX Text
16.01
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.53
AutoCAD SHX Text
16.01
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.74
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.40
AutoCAD SHX Text
15.90
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.36
AutoCAD SHX Text
15.93
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.26
AutoCAD SHX Text
15.80
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.35
AutoCAD SHX Text
15.96
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.21
AutoCAD SHX Text
15.77
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.35
AutoCAD SHX Text
15.92
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.30
AutoCAD SHX Text
15.90
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.36
AutoCAD SHX Text
15.94
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.49
AutoCAD SHX Text
16.08
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.24
AutoCAD SHX Text
15.81
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.29
AutoCAD SHX Text
15.87
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.79
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.16
AutoCAD SHX Text
15.72
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.13
AutoCAD SHX Text
15.70
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.00
AutoCAD SHX Text
15.49
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.84
AutoCAD SHX Text
15.21
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.77
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.09
AutoCAD SHX Text
15.69
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.96
AutoCAD SHX Text
15.63
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.91
AutoCAD SHX Text
15.46
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.85
AutoCAD SHX Text
15.27
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.76
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.82
AutoCAD SHX Text
15.38
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.12
AutoCAD SHX Text
15.70
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.03
AutoCAD SHX Text
15.54
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.72
AutoCAD SHX Text
15.26
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.90
AutoCAD SHX Text
15.45
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
REMOVE FENCE
AutoCAD SHX Text
REMOVE TREE COMPLETE.
AutoCAD SHX Text
REMOVE FENCE AND GATES
AutoCAD SHX Text
REMOVE SIGNS
AutoCAD SHX Text
REMOVE FENCE AND GATES
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
REMOVE INTAKE AND 16 LF OF PIPE CAP CONNECTION AT MAIN
AutoCAD SHX Text
REMOVE EXISTING ELECTRICAL UTILITY EQUIPMENT
AutoCAD SHX Text
X
AutoCAD SHX Text
%%UREMOVAL LEGEND
AutoCAD SHX Text
X
AutoCAD SHX Text
PAVEMENT REMOVAL
AutoCAD SHX Text
SIGN REMOVAL
AutoCAD SHX Text
X
AutoCAD SHX Text
UTILITY TO BE REMOVED
AutoCAD SHX Text
PAVEMENT SAWCUT
AutoCAD SHX Text
STRUCTURE REMOVAL
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
CURB/COMBINATION CURB AND GUTTER REMOVAL
AutoCAD SHX Text
TREE/SHRUB REMOVAL (INCLUDING STUMP)
AutoCAD SHX Text
N
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-PR1.DWG 8/19/2020 3:23 PM 8/19/2020 3:23 PM 8/19/2020 3:23 PM
AutoCAD SHX Text
EXISTING CONDITIONS/DEMOLITION PLAN
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARANTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
1" = 10'
AutoCAD SHX Text
2
AutoCAD SHX Text
7
AutoCAD SHX Text
EXISTING CONDITION AND DEMOLITION NOTES 1. Prior to starting any construction, provide soil erosion and sediment control devices as shown on the Prior to starting any construction, provide soil erosion and sediment control devices as shown on the plans and as required per IEPA NPDES guidelines. Refer to notes and details throughout the entire plan set. 2. Prior to starting any excavation work, provide tree protection, preservation and root pruning as shown Prior to starting any excavation work, provide tree protection, preservation and root pruning as shown on the plans and notes throughout the entire plan set. 3. The contractor shall be responsible for fencing the active work zone from the public and protecting the The contractor shall be responsible for fencing the active work zone from the public and protecting the public from any construction related hazards. At a minimum, all excavation, demolition areas and other areas potentially hazardous to pedestrians and vehicles must be protected. 4. At all times, main drive, loading docks, and dumpster areas shall remain open and unobstructed. At all times, main drive, loading docks, and dumpster areas shall remain open and unobstructed. Temporary shut down of one traffic lane at a time will be permitted for short term periods and shall be coordinated with appointed Property Owner construction staff. Short term closings shall be completed within the work day and restored to unobstructed access by the close of the work day. 5. Temporary stone or asphalt pathways shall be provided as needed throughout the course of Temporary stone or asphalt pathways shall be provided as needed throughout the course of construction to facilitate safe pedestrian and vehicular movement. The longitudinal slope of such paths shall not exceed 5% and cross slopes shall not exceed 2%. Provide 6" CA-6 base and 2" surface asphalt. 6. The existing facilities will remain open and actively used. Contractor shall refer to mechanical, electrical The existing facilities will remain open and actively used. Contractor shall refer to mechanical, electrical and architectural plans as applicable and coordinate with utility companies to ensure continuous utility services during demolition and transitioning of services. 7. The contractor is responsible for the demolition and disposal of all existing improvements onsite The contractor is responsible for the demolition and disposal of all existing improvements onsite necessary to complete the job. These improvements include, but are not limited to, existing pavements, curbs, sidewalks, utilities, lighting, light bases, manholes, fences, foundations, and other structures within the work area. Excavate and grade to proposed pavement and building subbase grades. These items shall be completely removed and legally disposed of offsite. 8. Remove or abandon existing utilities as shown. Utilities that are removed, unless otherwise noted, shall Remove or abandon existing utilities as shown. Utilities that are removed, unless otherwise noted, shall be backfilled with CA-6 crushed stone in lifts of 8" or less and compacted to 95% Modified Proctor density. Utilities to be abandoned shall be plugged at both ends with a minimum of 2 feet long non-shrink concrete/mortar plugs. Manhole structures to be abandoned shall have the top section removed, sewers bulkheaded with concrete and backfilled with CA-6 crushed stone. 9. Temporarily remove, store and protect sign and posts within affected work zone for reinstallation. Temporarily remove, store and protect sign and posts within affected work zone for reinstallation. Coordinate onsite storage with Property Owner. 10. The Contractor shall include all associated costs with the removal, transport, disposal, testing and The Contractor shall include all associated costs with the removal, transport, disposal, testing and certification of "Uncontaminated Soil" as defined under 415 ILCS 5/3.160 including any fees, taxes, or surcharges charged by or through the operator(s) of Clean Construction or Demolition Debris Fill Operations or Uncontaminated Soil Fill Operations for the acceptance of Uncontaminated Soil.
AutoCAD SHX Text
DISTURBANCE AREA: 6,570 SF
Page 3: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CP-3
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
16"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
18"
AutoCAD SHX Text
16"
AutoCAD SHX Text
16"
AutoCAD SHX Text
14"
AutoCAD SHX Text
7"
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
LANDSCAPE
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GARBAGE CAN
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
FENCE BY OTHERS
AutoCAD SHX Text
FENCE AND GATES BY OTHERS
AutoCAD SHX Text
FENCE BY OTHERS
AutoCAD SHX Text
TRAFFIC LOOP BY OTHERS (TYP)
AutoCAD SHX Text
ACTIVE WEDGE BARRIER BY OTHERS
AutoCAD SHX Text
%%UPROPOSED LEGEND
AutoCAD SHX Text
CURB & GUTTER (REGULAR)
AutoCAD SHX Text
DETECTABLE WARNINGS
AutoCAD SHX Text
CURB & GUTTER (REVERSE PITCH)
AutoCAD SHX Text
HMA PAVEMENT
AutoCAD SHX Text
CURB & GUTTER (DEPRESSED)
AutoCAD SHX Text
N
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-PR1.DWG 8/19/2020 3:24 PM 8/19/2020 3:24 PM 8/19/2020 3:24 PM
AutoCAD SHX Text
GEOMETRIC PLAN
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARANTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
1" = 10'
AutoCAD SHX Text
3
AutoCAD SHX Text
7
AutoCAD SHX Text
GEOMETRIC AND PAVING PLAN 1. All pavement dimensions are to edge of pavement, unless otherwise noted. E=edge of pavement, All pavement dimensions are to edge of pavement, unless otherwise noted. E=edge of pavement, B=back of curb, F=face of curb. Radii dimensions are to back of curb. 2. Install all curb and sidewalk as shown. Note some curbs require reverse pitch gutter. Dowel new Install all curb and sidewalk as shown. Note some curbs require reverse pitch gutter. Dowel new sidewalk and curb to existing and proposed curbs per general notes. When constructing a carriage walk, the proposed sidewalk contraction and expansion joints shall align with existing curb joints. 3. Provide 1.90% cross slope and 4.5% maximum longitudinal slope on all sidewalks and pedestrian path Provide 1.90% cross slope and 4.5% maximum longitudinal slope on all sidewalks and pedestrian path ways unless otherwise indicated. Illinois accessibility code requires a maximum constructed cross slope of 2.00% and longitudinal slope of 5.00%. 4. Install bituminous pavement as shown. Refer to detail sheet for specific pavement sections and general Install bituminous pavement as shown. Refer to detail sheet for specific pavement sections and general note sheet for construction, testing and compaction requirements. 5. Install PCC pavement as shown. Refer to detail sheet for specific pavement section and general notes Install PCC pavement as shown. Refer to detail sheet for specific pavement section and general notes for construction, testing and compaction requirements. 6. All parking lot stall markings shall be 4" Yellow paint and all other parking lot pavement markings shall All parking lot stall markings shall be 4" Yellow paint and all other parking lot pavement markings shall be paint, color as noted, in accordance with Section 780 of the IDOT Standard Specifications. (Two single applications, 16 mils each required). Site pavement marking shall be coordinated with Site engineer. Contractor shall notify site engineer 48 hrs prior to installing pavement marking. 7. For handicapped stall markings, refer to Handicapped Parking Stall and Sign Dimensioning Detail. For handicapped stall markings, refer to Handicapped Parking Stall and Sign Dimensioning Detail. 8. Contractor shall install temporary erosion control seed and blanket as necessary to meet soil erosion Contractor shall install temporary erosion control seed and blanket as necessary to meet soil erosion and sediment control requirements. Refer to notes and details throughout the plan set for specific material requirements.
AutoCAD SHX Text
DISTURBANCE AREA: 6,570 SF
Page 4: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
CP-3
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
14"
AutoCAD SHX Text
16"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
18"
AutoCAD SHX Text
16"
AutoCAD SHX Text
16"
AutoCAD SHX Text
14"
AutoCAD SHX Text
7"
AutoCAD SHX Text
BENCH
AutoCAD SHX Text
LANDSCAPE
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GARBAGE CAN
AutoCAD SHX Text
ELECTRIC PIPE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
RIM:15.26 T/WATER:10.16 BOTTOM:7.56
AutoCAD SHX Text
12" VCP
AutoCAD SHX Text
RIM:15.33 INV:9.98
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.76 INV:10.01
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.65 INV:10.75
AutoCAD SHX Text
RIM:15.67 INV:6.42 S INV:6.32 E
AutoCAD SHX Text
RIM:16.35 T/WATER:5.15 BOTTOM:3.05
AutoCAD SHX Text
12" VCP
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
36" RCP
AutoCAD SHX Text
RIM:16.10 INV:3.75
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
RIM:15.50 T/WATER:10.10 BOTTOM:6.00
AutoCAD SHX Text
RIM:15.27 T/WATER:10.57 BOTTOM:9.47
AutoCAD SHX Text
8" VCP
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.90
AutoCAD SHX Text
15.47
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.15
AutoCAD SHX Text
15.92
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.84
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.06
AutoCAD SHX Text
15.84
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.17
AutoCAD SHX Text
15.76
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.99
AutoCAD SHX Text
15.54
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.56
AutoCAD SHX Text
16.07
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.42
AutoCAD SHX Text
15.95
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.32
AutoCAD SHX Text
15.89
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.44
AutoCAD SHX Text
16.01
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.53
AutoCAD SHX Text
16.01
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.74
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.40
AutoCAD SHX Text
15.90
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.36
AutoCAD SHX Text
15.93
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.26
AutoCAD SHX Text
15.80
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.35
AutoCAD SHX Text
15.96
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.21
AutoCAD SHX Text
15.77
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.35
AutoCAD SHX Text
15.92
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.30
AutoCAD SHX Text
15.90
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.36
AutoCAD SHX Text
15.94
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.49
AutoCAD SHX Text
16.08
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.24
AutoCAD SHX Text
15.81
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.29
AutoCAD SHX Text
15.87
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.79
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.16
AutoCAD SHX Text
15.72
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.13
AutoCAD SHX Text
15.70
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.00
AutoCAD SHX Text
15.49
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.84
AutoCAD SHX Text
15.21
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.77
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.09
AutoCAD SHX Text
15.69
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.96
AutoCAD SHX Text
15.63
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.91
AutoCAD SHX Text
15.46
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.85
AutoCAD SHX Text
15.27
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.20
AutoCAD SHX Text
15.76
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.82
AutoCAD SHX Text
15.38
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.12
AutoCAD SHX Text
15.70
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
16.03
AutoCAD SHX Text
15.54
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.72
AutoCAD SHX Text
15.26
AutoCAD SHX Text
TC
AutoCAD SHX Text
FL
AutoCAD SHX Text
15.90
AutoCAD SHX Text
15.45
AutoCAD SHX Text
16.49
AutoCAD SHX Text
16.08
AutoCAD SHX Text
15.84
AutoCAD SHX Text
15.34
AutoCAD SHX Text
16.25
AutoCAD SHX Text
15.75
AutoCAD SHX Text
16.24
AutoCAD SHX Text
15.74
AutoCAD SHX Text
15.83
AutoCAD SHX Text
15.33
AutoCAD SHX Text
16.38
AutoCAD SHX Text
15.98
AutoCAD SHX Text
16.09
AutoCAD SHX Text
15.69
AutoCAD SHX Text
15.89
AutoCAD SHX Text
15.39
AutoCAD SHX Text
16.01
AutoCAD SHX Text
15.61
AutoCAD SHX Text
16.12
AutoCAD SHX Text
15.62
AutoCAD SHX Text
16.13
AutoCAD SHX Text
15.63
AutoCAD SHX Text
15.92
AutoCAD SHX Text
15.52
AutoCAD SHX Text
16.05
AutoCAD SHX Text
15.65
AutoCAD SHX Text
16.00
AutoCAD SHX Text
15.60
AutoCAD SHX Text
15.67
AutoCAD SHX Text
15.27
AutoCAD SHX Text
15.45
AutoCAD SHX Text
15.05
AutoCAD SHX Text
15.83
AutoCAD SHX Text
15.43
AutoCAD SHX Text
16.02
AutoCAD SHX Text
15.62
AutoCAD SHX Text
15.95
AutoCAD SHX Text
15.55
AutoCAD SHX Text
16.27
AutoCAD SHX Text
15.87
AutoCAD SHX Text
16.22
AutoCAD SHX Text
15.82
AutoCAD SHX Text
16.29
AutoCAD SHX Text
15.89
AutoCAD SHX Text
16.09
AutoCAD SHX Text
15.69
AutoCAD SHX Text
16.12
AutoCAD SHX Text
15.72
AutoCAD SHX Text
16.08
AutoCAD SHX Text
15.68
AutoCAD SHX Text
MH #1, 48" DIA. RIM: 15.57 INV: 9.51 EXISTING INV: 11.90 NW, SW
AutoCAD SHX Text
INL #2, 24" DIA. RIM: 15.05 INV: 12.05
AutoCAD SHX Text
INL #1, 24" DIA. RIM: 15.55 INV: 12.55
AutoCAD SHX Text
26 LF, 8" VCP @ 2.85%
AutoCAD SHX Text
16 LF, 8" PVC @ 1.00%
AutoCAD SHX Text
16.05
AutoCAD SHX Text
15.65
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
MATCH EXISTING
AutoCAD SHX Text
2.00%
AutoCAD SHX Text
2.00%
AutoCAD SHX Text
ADJUST RIM TO GRADE INSTALL CLOSED LID
AutoCAD SHX Text
0.50%
AutoCAD SHX Text
0.50%
AutoCAD SHX Text
INL #3, 24" DIA. RIM: 15.27 INV: 12.13
AutoCAD SHX Text
8 LF, 8" PVC @ 1.00%
AutoCAD SHX Text
15.95
AutoCAD SHX Text
15.55
AutoCAD SHX Text
42 LF, 8" VCP @ 3.20%
AutoCAD SHX Text
CONNECT TO ACTIVE WEDGE BARRIER DRAIN LINE. REFER TO DETAILS ON SHEET 7 INV: 13.90
AutoCAD SHX Text
PROPOSED STORM SEWER
AutoCAD SHX Text
PROPOSED STORM INLET
AutoCAD SHX Text
%%UGRADING LEGEND
AutoCAD SHX Text
SUMMIT
AutoCAD SHX Text
0.50%
AutoCAD SHX Text
GRADE BREAK
AutoCAD SHX Text
SLOPES
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
PROPOSED SPOT ELEVATION
AutoCAD SHX Text
FLOW LINE
AutoCAD SHX Text
CURB & GUTTER (DEPRESSED)
AutoCAD SHX Text
CURB & GUTTER (REGULAR)
AutoCAD SHX Text
CURB & GUTTER (REVERSE PITCH)
AutoCAD SHX Text
670.30
AutoCAD SHX Text
624.70
AutoCAD SHX Text
624.20
AutoCAD SHX Text
N
AutoCAD SHX Text
0
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-PR1.DWG 8/19/2020 3:24 PM 8/19/2020 3:24 PM 8/19/2020 3:24 PM
AutoCAD SHX Text
GRADING/UTILITY PLAN
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARANTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
1" = 10'
AutoCAD SHX Text
4
AutoCAD SHX Text
7
AutoCAD SHX Text
UTILITY PLAN NOTES 1. The contractor shall verify the exact location and elevation of existing utilities prior to initiating work. The contractor shall verify the exact location and elevation of existing utilities prior to initiating work. Any discrepancies found between the information noted on the plans and actual field conditions, or any conflicts with proposed improvements shall be reported to the engineer immediately. The contractor shall not proceed any further until given written clarification on how to proceed. 2. Install storm sewer as shown. Refer to Storm Sewer requirement table on General Notes Sheet for pipe Install storm sewer as shown. Refer to Storm Sewer requirement table on General Notes Sheet for pipe material, joint, frame and grate, stone bedding and testing requirements.
AutoCAD SHX Text
GRADING PLAN NOTES 1. Prior to starting any construction, provide soil erosion and sediment control devices as shown on the Prior to starting any construction, provide soil erosion and sediment control devices as shown on the plans and as required per IEPA NPDES guidelines. Refer to notes and details throughout the entire plan set. 2. Prior to starting any excavation work, provide tree protection, preservation and root pruning as shown Prior to starting any excavation work, provide tree protection, preservation and root pruning as shown on the plans and notes throughout the entire plan set. 3. Refer to General Notes for grading, compaction and proof roll requirements. Refer to General Notes for grading, compaction and proof roll requirements. 4. Handicap accessible parking spaces shall be constructed between 1.0% and 1.90% maximum slopes in Handicap accessible parking spaces shall be constructed between 1.0% and 1.90% maximum slopes in any one direction. Illinois accessibility code permits a maximum constructed slope of 2.00%. 5. Crushed concrete meeting IDOT certifications for the design plan gradations for non-porous pavement Crushed concrete meeting IDOT certifications for the design plan gradations for non-porous pavement and sidewalk stone base, structural fill, and trench backfill will be permitted. 6. The contractor shall import or export soil as necessary to construct the site to specified plan grades. The contractor shall import or export soil as necessary to construct the site to specified plan grades. Such work is considered incidental to the contract and no additional compensation shall be allowed for such work. Minor adjustments to grades can be accommodated with Project Engineer approval. 7. The Contractor shall include all associated costs with the removal, transport, disposal, testing and The Contractor shall include all associated costs with the removal, transport, disposal, testing and certification of "Uncontaminated Soil" as defined under 415 ILCS 5/3.160 including any fees, taxes, or surcharges charged by or through the operator(s) of Clean Construction or Demolition Debris Fill Operations or Uncontaminated Soil Fill Operations for the acceptance of Uncontaminated Soil. 8. All structures shall be adjusted to meet finished turf and pavement grades.All structures shall be adjusted to meet finished turf and pavement grades.
AutoCAD SHX Text
DISTURBANCE AREA: 6,570 SF
Page 5: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-DT1-LOT D.DWG 8/19/2020 3:15 PM 8/19/2020 3:15 PM 8/19/2020 3:15 PM
AutoCAD SHX Text
GENERAL NOTES & DETAILS
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARENTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
5
AutoCAD SHX Text
7
AutoCAD SHX Text
UTILITY NOTES 1. UNDERGROUND WORK SHALL INCLUDE TRENCHING, DISPOSAL OF EXCESS MATERIAL, DEWATERING, UNDERGROUND WORK SHALL INCLUDE TRENCHING, DISPOSAL OF EXCESS MATERIAL, DEWATERING, INSTALLATION OF PIPE, CASTINGS, STRUCTURES, BACKFILLING OF TRENCHES AND COMPACTION, AND TESTING AS SHOWN ON THE CONSTRUCTION PLANS. FITTINGS AND ACCESSORIES NECESSARY TO COMPLETE THE WORK MAY NOT BE SPECIFIED BUT SHALL BE CONSIDERED AS INCLUDED TO THE COST OF THE CONTRACT. ALL SEWER SHALL BE INSTALLED USING A LASER AND BEGIN AT THE DOWNSTREAM END. 2. MACHINE CORE ALL CONNECTIONS TO EXISTING STRUCTURES USING A CORE DRILL. HAMMERING OR MACHINE CORE ALL CONNECTIONS TO EXISTING STRUCTURES USING A CORE DRILL. HAMMERING OR SAWING OF STRUCTURES WILL NOT BE ALLOWED. 3. ALL CONNECTIONS TO EXISTING OR DISSIMILAR STORM/SANITARY LINES SHALL BE DONE WITH ALL CONNECTIONS TO EXISTING OR DISSIMILAR STORM/SANITARY LINES SHALL BE DONE WITH STAINLESS STEEL NON-SHEAR COUPLINGS. 4. STONE BEDDING AND BACKFILL SHALL BE OMITTED FOR A DISTANCE OF 15 FEET UP AND DOWNSTREAM STONE BEDDING AND BACKFILL SHALL BE OMITTED FOR A DISTANCE OF 15 FEET UP AND DOWNSTREAM OF SEWERS DRAINING TO OR FROM PONDS OR STREAMS. THE REPLACED BEDDING SHALL BE SILTY CLAY SOIL MECHANICALLY COMPACTED TO 90% MODIFIED PROCTOR DENSITY. THE USE OF PERMEABLE SOILS WILL NOT BE PERMITTED.
AutoCAD SHX Text
03.15.2016
AutoCAD SHX Text
INLET TYPE A
AutoCAD SHX Text
4" GRANULAR BEDDING
AutoCAD SHX Text
CONCRETE BENCH, 4%
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text
NOTES: 1. SEE STORM TABLE FOR FURTHER SEE STORM TABLE FOR FURTHER REQUIREMENTS. 2. PRECAST REINFORCED CONCRETE PRECAST REINFORCED CONCRETE SECTIONS PER ASTM C-478 AND PREFORMED BITUMINOUS JOINTS WITH INTEGRAL PRECAST BOTTOMS. 3. PIPE OPENINGS SHALL BE PRECAST PIPE OPENINGS SHALL BE PRECAST INTO WALLS. 4. FINAL ADJUSTMENT TO FRAMES TO BE FINAL ADJUSTMENT TO FRAMES TO BE DONE WITH STEEL SHIMS SET IN MORTAR.
AutoCAD SHX Text
AGGREGATE BASE COURSE
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
10.08.2018
AutoCAD SHX Text
STORM TRENCH DETAIL
AutoCAD SHX Text
SELECT EXCAVATED MATERIAL
AutoCAD SHX Text
GRANULAR MATERIAL PIPE BEDDING
AutoCAD SHX Text
FINISHED GRADE (TOP OF PAVEMENT OR TOPSOIL)
AutoCAD SHX Text
SEE PLAN FOR PIPE DIA.
AutoCAD SHX Text
TRENCH BACKFILL REQUIRED UNDER OR WITHIN TWO FEET OF NON-TURFED AREAS.
AutoCAD SHX Text
SPECIAL TRENCH BEDDING 3" COARSE AGGREGATE WHERE BOTTOM OF TRENCH IS UNSTABLE.
AutoCAD SHX Text
4" MIN.
AutoCAD SHX Text
TRENCH WIDTH WIDTH (MAX.) = 9" + OD + 9" WHEN TRENCH 5 FT. 5 FT. 5 FT. WIDTH (MAX.) = 18" + OD + 18" WHEN TRENCH > 5 FT.
AutoCAD SHX Text
TOPSOIL
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
NOTE: SEE STORM TABLE FOR MATERIAL REQUIREMENTS.
AutoCAD SHX Text
SPRING LINE OF PIPE
AutoCAD SHX Text
RIGID PIPE INSTALLATION
AutoCAD SHX Text
03.15.2016
AutoCAD SHX Text
STORM MANHOLE TYPE A
AutoCAD SHX Text
GROUND LINE
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
2'-6" TO 4'-3"
AutoCAD SHX Text
4" GRANULAR BEDDING
AutoCAD SHX Text
CONCRETE BENCH
AutoCAD SHX Text
DIA
AutoCAD SHX Text
48"
AutoCAD SHX Text
60"
AutoCAD SHX Text
72"
AutoCAD SHX Text
MIN. THICKNESS (t)
AutoCAD SHX Text
4"
AutoCAD SHX Text
5"
AutoCAD SHX Text
6"
AutoCAD SHX Text
NOTES: 1. SEE STORM TABLE FOR FURTHER SEE STORM TABLE FOR FURTHER REQUIREMENTS. 2. PRECAST REINFORCED CONCRETE PRECAST REINFORCED CONCRETE SECTIONS PER ASTM C-478 AND PREFORMED BITUMINOUS JOINTS WITH INTEGRAL PRECAST BOTTOMS. 3. PIPE OPENINGS SHALL BE PRECAST INTO PIPE OPENINGS SHALL BE PRECAST INTO WALLS. 4. I.D.O.T #602601 FOR FLAT TOPS. I.D.O.T #602601 FOR FLAT TOPS. 5. PRECAST PCC BENCH SHALL EXTEND TO PRECAST PCC BENCH SHALL EXTEND TO CROWN AND SLOPE TO OUTSIDE WALL, SMOOTH FINISH. 6. STEPS TO BE STEEL REINFORCED PLASTIC. STEPS TO BE STEEL REINFORCED PLASTIC. A. IMBEDDED 3" INTO STRUCTURE WALL. IMBEDDED 3" INTO STRUCTURE WALL. B. SPACED AT 16" CENTER TO CENTER. SPACED AT 16" CENTER TO CENTER. C. FIRST STEP LOCATED 8"-12" BELOW FIRST STEP LOCATED 8"-12" BELOW FRAME. 7. FINAL ADJUSTMENT TO FRAMES TO BE FINAL ADJUSTMENT TO FRAMES TO BE DONE WITH STEEL SHIMS SET IN MORTAR.
AutoCAD SHX Text
GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE ILLINOIS DEPARTMENT OF ALL CONSTRUCTION SHALL BE PERFORMED ACCORDING TO THE ILLINOIS DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" LATEST EDITION, THE "SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS" LATEST EDITION, THE "STANDARD SPECIFICATIONS FOR WATER AND SEWER MAIN CONSTRUCTION IN ILLINOIS" LATEST EDITION, THE ILLINOIS PLUMBING CODE, THE DETAILS IN THESE PLANS, THE CONTRACT DOCUMENTS, ALL APPLICABLE REQUIREMENTS OF THE ILLINOIS DEPARTMENT OF TRANSPORTATION, THE IEPA AND ORDINANCES OF AUTHORITIES HAVING JURISDICTION AND ALL ADDENDA THERETO. 2. EASEMENTS FOR THE EXISTING UTILITIES, BOTH PUBLIC AND PRIVATE AND UTILITIES WITHIN PUBLIC EASEMENTS FOR THE EXISTING UTILITIES, BOTH PUBLIC AND PRIVATE AND UTILITIES WITHIN PUBLIC RIGHTS-OF-WAY ARE SHOWN ON THE PLANS ACCORDING TO AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION IN THE FIELD OF THESE UTILITY LINES AND THEIR PROTECTION FROM DAMAGE DUE TO CONSTRUCTION OPERATIONS. IF EXISTING UTILITY LINES OF ANY NATURE ARE ENCOUNTERED WHICH CONFLICT WITH NEW CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SO THAT THE CONFLICT MAY BE RESOLVED. 3. WHENEVER, DURING CONSTRUCTION OPERATIONS, ANY LOOSE MATERIAL IS DEPOSITED IN THE FLOW WHENEVER, DURING CONSTRUCTION OPERATIONS, ANY LOOSE MATERIAL IS DEPOSITED IN THE FLOW LINE OF GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE NATURAL FLOW LINE OF WATER IS OBSTRUCTED, THE LOOSE MATERIAL WILL BE REMOVED AT THE CLOSE OF EACH WORKING DAY. AT THE CONCLUSION OF CONSTRUCTION OPERATIONS, ALL DRAINAGE STRUCTURES AND FLOW LINES SHALL BE FREE FROM DIRT AND DEBRIS. THIS WORK SHALL BE CONSIDERED INCLUDED IN THE CONTRACT. THE CONTRACTOR'S FAILURE TO PROVIDE THE ABOVE WILL PRECLUDE ANY POSSIBLE THE CONTRACTOR'S FAILURE TO PROVIDE THE ABOVE WILL PRECLUDE ANY POSSIBLE ADDED COMPENSATION REQUESTED DUE TO DELAYS OR UNSUITABLE MATERIALS CREATED AS A RESULT THEREOF. 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AFFECTING THEIR WORK THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AFFECTING THEIR WORK WITH THE ACTUAL CONDITIONS AT THE JOB SITE PRIOR TO ORDERING MATERIALS. IN ADDITION, THE CONTRACTOR MUST VERIFY THE LINE AND GRADES. IF THERE ARE ANY DISCREPANCIES FROM WHAT IS SHOWN ON THE CONSTRUCTION PLANS, STANDARD SPECIFICATIONS AND/OR SPECIAL DETAILS, THE CONTRACTOR SHALL SECURE WRITTEN INSTRUCTION FROM THE ENGINEER PRIOR TO PROCEEDING WITH ANY PART OF THE WORK AFFECTED BY OMISSION OR DISCREPANCIES. FAILING TO SECURE SUCH INSTRUCTION, THE CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT HIS/HER OWN RISK AND EXPENSE AND NO ADDITIONAL COMPENSATION WILL BE PROVIDED FOR ANY COSTS INCURRED.. 5. ALL PAVEMENT DIMENSIONS ARE SHOWN TO EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. ALL PAVEMENT DIMENSIONS ARE SHOWN TO EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 6. WHERE SECTION OR SUBSECTION MONUMENTS ARE ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED WHERE SECTION OR SUBSECTION MONUMENTS ARE ENCOUNTERED, THE ENGINEER SHALL BE NOTIFIED BEFORE THE MONUMENTS ARE REMOVED. THE CONTRACTOR SHALL CAREFULLY PRESERVE ALL PROPERTY MARKS AND MONUMENTS UNTIL THE OWNER, AUTHORIZED SURVEYOR OR AGENT HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION. 7. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 72 HOURS PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 72 HOURS PRIOR TO BEGINNING WORK. 8. IF DURING CONSTRUCTION THE CONTRACTOR ENCOUNTERS OR OTHERWISE BECOMES AWARE OF ANY IF DURING CONSTRUCTION THE CONTRACTOR ENCOUNTERS OR OTHERWISE BECOMES AWARE OF ANY SEWERS OR UNDERDRAINS OTHER THAN THOSE SHOWN ON THE PLANS, HE/SHE SHALL INFORM THE ENGINEER, WHO SHALL DIRECT THE WORK NECESSARY TO MAINTAIN OR REPLACE THE FACILITIES IN SERVICE AND TO PROTECT THEM FROM DAMAGE DURING CONSTRUCTION IF MAINTAINED. EXISTING FACILITIES TO BE MAINTAINED THAT ARE DAMAGED BECAUSE OF NON-COMPLIANCE WITH THIS PROVISION SHALL BE REPLACED AT THE CONTRACTOR'S OWN EXPENSE. 9. THE CONTRACTOR SHALL PROVIDE TEMPORARY TOILET FACILITIES AND HAND SANITIZING STATIONS FOR THE CONTRACTOR SHALL PROVIDE TEMPORARY TOILET FACILITIES AND HAND SANITIZING STATIONS FOR THE USE OF ALL THE CONTRACTORS PERSONNEL EMPLOYED ON THE WORK SITE. THE FACILITIES SHALL BE MAINTAINED IN PROPER SANITARY CONDITION THROUGHOUT THE PROJECT. THE LOCATION OF THE TEMPORARY FACILITIES SHALL BE APPROVED BY THE ENGINEER. 10. THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE NPDES PERMIT AND SWPPP MANUAL. IF THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE NPDES PERMIT AND SWPPP MANUAL. IF NO NPDES PERMIT OR SWPPP MANUAL IS NEEDED FOR THE PROJECT THE CONTRACTOR SHALL PERFORM SOIL EROSION SEDIMENT CONTROL BEST PRACTICES OR AS DIRECTED BY THE OWNER TO PREVENT ILLICIT DISCHARGES FROM THE SITE.
AutoCAD SHX Text
PROJECT SPECIFIC NOTES 1. ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE GUARANTEED BY THE CONTRACTOR AND HIS SURETY ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE GUARANTEED BY THE CONTRACTOR AND HIS SURETY FOR A PERIOD OF 12 MONTHS FROM THE DATE OF INITIAL ACCEPTANCE OF THE WORK BY THE OWNER AGAINST ALL DEFECTS IN MATERIALS AND WORKMANSHIP OF WHATEVER NATURE. 2. CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER (847-478-9700) AT LEAST 72 HOURS PRIOR TO CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER (847-478-9700) AT LEAST 72 HOURS PRIOR TO PROJECT ENGINEER (847-478-9700) AT LEAST 72 HOURS PRIOR TO AT LEAST 72 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. 3. THE CONTRACTOR SHALL INDEMNIFY THE OWNER, ENGINEER, THE MUNICIPALITY AND THEIR AGENTS, FROM ALL THE CONTRACTOR SHALL INDEMNIFY THE OWNER, ENGINEER, THE MUNICIPALITY AND THEIR AGENTS, FROM ALL LIABILITY INVOLVED IN CONSTRUCTION, INSTALLATION AND TESTING OF THE WORK ON THIS PROJECT. 4. ALL ELEVATIONS ARE ON CHICAGO DATUM. ALL ELEVATIONS ARE ON CHICAGO DATUM. CHICAGO DATUM. DATUM. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL TRAFFIC CONTROL THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL TRAFFIC CONTROL TO ADEQUATELY INFORM AND PROTECT THE PUBLIC OF ALL CONSTRUCTION OPERATIONS. 6. PRIOR TO PLACEMENT OF FABRIC AND STONE, THE SUBGRADE SHALL BE PROOF-ROLLED IN THE PRESENCE OF PRIOR TO PLACEMENT OF FABRIC AND STONE, THE SUBGRADE SHALL BE PROOF-ROLLED IN THE PRESENCE OF THE ENGINEER. PROOF-ROLLING SHALL BE DONE USING A THREE AXLE DUMP TRUCK TOGETHER WITH LOAD WEIGHING AT LEAST TWENTY-FIVE (25) TONS. THE LOAD SHALL BE UNIFORMLY PLACED IN THE DUMP BODY. ALL DEFICIENCIES SHALL BE REPAIRED AND RE-PROOF-ROLLED UNTIL FOUND ACCEPTABLE TO THE ENGINEER. 7. CRUSHED CONCRETE IS NOT PERMITTED FOR USE ON THE PROJECT UNLESS PRIOR WRITTEN NOTICE IS GIVEN BY CRUSHED CONCRETE IS NOT PERMITTED FOR USE ON THE PROJECT UNLESS PRIOR WRITTEN NOTICE IS GIVEN BY CONCRETE IS NOT PERMITTED FOR USE ON THE PROJECT UNLESS PRIOR WRITTEN NOTICE IS GIVEN BY THE ENGINEER. . 8. ALL STONE USED ON THE PROJECT SHALL BE CRUSHED UNLESS SPECIFICALLY NOTED OTHERWISE. ALL STONE USED ON THE PROJECT SHALL BE CRUSHED UNLESS SPECIFICALLY NOTED OTHERWISE. STONE USED ON THE PROJECT SHALL BE CRUSHED UNLESS SPECIFICALLY NOTED OTHERWISE. . 9. ALL CONCRETE SHALL HAVE A LIGHT BROOM FINISH APPLIED WITHIN 1 HOUR OF FINAL STRIKING. ALL CONCRETE SHALL HAVE A LIGHT BROOM FINISH APPLIED WITHIN 1 HOUR OF FINAL STRIKING. 10. ALL CONCRETE SHALL CONSIST OF PORTLAND CEMENT CONCRETE MEETING REQUIREMENTS OF SECTION 1020. ALL CONCRETE SHALL CONSIST OF PORTLAND CEMENT CONCRETE MEETING REQUIREMENTS OF SECTION 1020. ALL SIDEWALKS, CURBS AND POST FOUNDATIONS SHALL BE CLASS SI 3,500 PSI @ 14 DAYS. ALL PAVEMENT SHALL BE CLASS PV 3,500 PSI @ 14 DAYS. WHERE NOTED ON THE PLANS HIGH EARLY CONCRETE SHALL BE CLASS PV TYPE III 3,500 PSI CONCRETE @ 3 DAYS. ALL CONCRETE REQUIRING A CURE TIME FASTER THAN 3 DAYS SHALL HAVE A MIX DESIGN SUBMITTED TO THE ENGINEER FOR APPROVAL. WHEN REQUIRED BY THE MUNICIPALITY, FLY ASH SHALL NOT BE USED IN THE MIX DESIGN. SLUMP SHALL BE 2-4" AND AIR CONTENT SHALL BE BETWEEN 5-8% UNLESS MODIFIED BY ARTICLE 1020.04. 11. ALL CONCRETE SHALL HAVE A WHITE, IDOT TYPE 3 CURING COMPOUND APPLIED TO THE SURFACE WITHIN 1 ALL CONCRETE SHALL HAVE A WHITE, IDOT TYPE 3 CURING COMPOUND APPLIED TO THE SURFACE WITHIN 1 HOUR OF FINAL STRIKING AT THE MANUFACTURER RECOMMENDED APPLICATION RATE. 12. 3/4" THICK PRE-MOLDED FIBER EXPANSION JOINTS WITH 2 , 3/4" x 18" PLAIN ROUND, STEEL DOWEL BARS 3/4" THICK PRE-MOLDED FIBER EXPANSION JOINTS WITH 2 , 3/4" x 18" PLAIN ROUND, STEEL DOWEL BARS SHALL BE INSTALLED IN ALL CURBS AT (45') FORTY-FIVE FOOT INTERVALS AND AT ALL P.C.'S, P.T.'S AND CURB RETURNS. ALTERNATE ENDS OF THE DOWEL BARS SHALL BE GREASED AND FITTED WITH METAL EXPANSION TUBES. ALL EXPANSION JOINTS MUST BE FREE OF CONCRETE FOR FULL DEPTH. CONTRACTION JOINTS SHALL BE TOOLED AT 15' INTERVALS. 13. UNLESS OTHERWISE NOTED ON THE PLANS WHENEVER NEW CONCRETE ABUTS EXISTING/ OR NEW CONCRETE SET UNLESS OTHERWISE NOTED ON THE PLANS WHENEVER NEW CONCRETE ABUTS EXISTING/ OR NEW CONCRETE SET A 1/2" THICK PRE-MOLDED FIBER EXPANSION JOINT AND DOWEL WITH SMOOTH 12" #4 BARS @ 24" O.C. THIS INCLUDES CONCRETE POURED ADJACENT TO EXISTING SIDEWALKS, CURBS AND BUILDING. THE DOWEL BARS SHOULD BE 4" INTO EXISTING CONCRETE WITH 8" EXTENDING INTO NEW CONCRETE. 14. ALL DOWEL BARS AND TIE BARS SHALL BE EPOXY COATED UNLESS NOTED OTHERWISE. ALL DOWEL BARS AND TIE BARS SHALL BE EPOXY COATED UNLESS NOTED OTHERWISE. 15. ALL PAVEMENT AND BUILDING SUBGRADE SHALL BE COMPACTED TO 95% MODIFIED PROCTOR DENSITY (ASTM ALL PAVEMENT AND BUILDING SUBGRADE SHALL BE COMPACTED TO 95% MODIFIED PROCTOR DENSITY (ASTM D-1557). ALL SUBGRADE IN LAWN AREAS SHALL BE COMPACTED TO 90% MODIFIED PROCTOR DENSITY (ASTM D-1557). ALL TOPSOIL AND SUBGRADE 6" BELOW TOPSOIL SHALL BE COMPACTED TO 80% STANDARD PROCTOR DENSITY (ASTM D-698) 16. SPREAD SCREENED TOPSOIL ON ALL DISTURBED AREAS AND PROPOSED GREEN AREAS. TOPSOIL SHALL SPREAD SCREENED TOPSOIL ON ALL DISTURBED AREAS AND PROPOSED GREEN AREAS. TOPSOIL SHALL COMPLY WITH REQUIREMENTS OF ARTICLE 1081.05.
AutoCAD SHX Text
EROSION CONTROL NOTES 1. AT A MINIMUM, THE CONTRACTOR SHALL INSTALL AND MAINTAIN SOIL EROSION AND SEDIMENT AT A MINIMUM, THE CONTRACTOR SHALL INSTALL AND MAINTAIN SOIL EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE LATEST EDITION OF THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY'S URBAN MANUAL. 2. DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS. 3. LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFFSITE SEDIMENT TRACKING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ANY ROAD OF MATERIAL THAT IS FROM THE PROJECT. THIS WILL BE DONE AT THE CLOSE OF EACH DAY OF WORK OR MORE FREQUENTLY AS FIELD CONDITIONS WARRANT. 4. ALL STORM WATER STRUCTURES WITH OPEN LIDS SHALL BE PROTECTED WITH INLET FILTER BASKETS. ALL STORM WATER STRUCTURES WITH OPEN LIDS SHALL BE PROTECTED WITH INLET FILTER BASKETS. DURING CONSTRUCTION, SEDIMENT SHALL BE REMOVED AS NEEDED, AND BASKETS SHALL BE REPAIRED OR REPLACED AS NEEDED. 5. AFTER ACHIEVING PERMANENT VEGETATION, ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE AFTER ACHIEVING PERMANENT VEGETATION, ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED, AND THE DRAINAGE STRUCTURES SHALL BE CLEANED. 6. THE CONTRACTOR SHALL KEEP A WATER SOURCE AT THEIR DISPOSAL FOR THE PURPOSE OF THE CONTRACTOR SHALL KEEP A WATER SOURCE AT THEIR DISPOSAL FOR THE PURPOSE OF WATERING DOWN SOIL ON SITE AND ADJACENT ROADWAYS WHICH OTHERWISE MAY BECOME AIRBORNE. 7. THE CONTRACTOR SHALL STABILIZE ALL IDLE, DISTURBED AREAS WITHIN SEVEN DAYS OF CESSATION THE CONTRACTOR SHALL STABILIZE ALL IDLE, DISTURBED AREAS WITHIN SEVEN DAYS OF CESSATION OF THE CONSTRUCTION ACTIVITIES IN THAT AREA. 8. THE CONTRACTOR IS EXPRESSLY ADVISED NOT TO DISTURB AREAS WHICH ARE OUTSIDE THOSE THE CONTRACTOR IS EXPRESSLY ADVISED NOT TO DISTURB AREAS WHICH ARE OUTSIDE THOSE NECESSARY TO PROVIDE THE IMPROVEMENTS AS CALLED FOR IN THE PLANS. 9. ALL EROSION CONTROL MEASURES SHALL BE REPLACED IF DAMAGED OR MAINTAINED THROUGHOUT ALL EROSION CONTROL MEASURES SHALL BE REPLACED IF DAMAGED OR MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT. 10. ALL BYPASS CHANNELS, MUST BE CONSTRUCTED SO THAT CHANNEL FLOWS WILL NOT CAUSE ALL BYPASS CHANNELS, MUST BE CONSTRUCTED SO THAT CHANNEL FLOWS WILL NOT CAUSE EROSION OF EXCAVATED MATERIAL. IN EACH CASE A SEDIMENTATION BASIN MUST BE CONSTRUCTED SO AS TO ALLOW THE SEDIMENT TO SETTLE PRIOR TO THE DOWNSTREAM OUTLET OF THE PROJECT AREA. 11. PUMPS MAY BE USED AS BYPASS DEVICES, BUT IN NO CASE WILL THE WATER BE DIVERTED OUTSIDE PUMPS MAY BE USED AS BYPASS DEVICES, BUT IN NO CASE WILL THE WATER BE DIVERTED OUTSIDE THE PROJECT LIMIT. ALL PUMPED WATER SHALL BE FREE OF SILT. PUMPING MAY REQUIRE THE USE OF A SEDIMENT CONTAINMENT FILTER BAG AND OTHER SUPPLEMENTAL SEDIMENT CONTROL MEASURES. 12. CONCRETE WASHOUT FACILITIES SHALL BE MADE AVAILABLE IF NEEDED, AND PROPERLY MAINTAINED CONCRETE WASHOUT FACILITIES SHALL BE MADE AVAILABLE IF NEEDED, AND PROPERLY MAINTAINED THROUGHOUT THE PROJECT. 13. PROPERLY MANAGE ALL MATERIAL STORAGE AREAS, PORTABLE TOILETS, AND EQUIPMENT FUELING, PROPERLY MANAGE ALL MATERIAL STORAGE AREAS, PORTABLE TOILETS, AND EQUIPMENT FUELING, CLEANING, AND MAINTENANCE AREAS TO ENSURE THESE AREAS ARE FREE OF SPILLS, LEAKS, OR OTHER POTENTIAL POLLUTANTS. 14. WASTE, CONSTRUCTION DEBRIS, AND BUILDING MATERIALS SHALL BE COLLECTED AND PLACED IN WASTE, CONSTRUCTION DEBRIS, AND BUILDING MATERIALS SHALL BE COLLECTED AND PLACED IN APPROVED RECEPTACLES.
Page 6: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
10.12.2018
AutoCAD SHX Text
MEDIUM DUTY
AutoCAD SHX Text
PAVEMENT DETAIL
AutoCAD SHX Text
2" HMA SURFACE COURSE, MIX 'D', N50
AutoCAD SHX Text
3" HMA BINDER COURSE, IL-19.0, N50
AutoCAD SHX Text
6" CA-6 CRUSHED STONE
AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-DT1-LOT D.DWG 8/19/2020 3:15 PM 8/19/2020 3:15 PM 8/19/2020 3:15 PM
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARENTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
12.08.2018
AutoCAD SHX Text
PAVEMENT PATCH FOR NEW
AutoCAD SHX Text
CURB INSTALLATION
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text
2" HMA SURFACE COURSE
AutoCAD SHX Text
CURB AND GUTTER, SEE DETAIL
AutoCAD SHX Text
FULL DEPTH SAWCUT
AutoCAD SHX Text
REMOVE AND REPLACE WITH 4" AGGREGATE BASE COURSE MEETING CA-6 GRADATION
AutoCAD SHX Text
PORTLAND CEMENT CONCRETE BASE COURSE, 8" MINIMUM OR MATCH EXISTING
AutoCAD SHX Text
PRIME EDGES OF PATCH AREA
AutoCAD SHX Text
SEE PCC NOTES ON SHEET C3
AutoCAD SHX Text
10.12.2018
AutoCAD SHX Text
PCC SIDEWALK DETAIL
AutoCAD SHX Text
95% STANDARD PROCTOR COMPACTION
AutoCAD SHX Text
4" OF 1/4"-3/4" CRUSHED STONE CA-6
AutoCAD SHX Text
6" PCC SIDEWALK
AutoCAD SHX Text
#4 DOWEL BARS @ 24" O.C.
AutoCAD SHX Text
CROSS SLOPE AT MAXIMUM 2% OR AS SHOWN ON PLANS
AutoCAD SHX Text
EXISTING SIDEWALK
AutoCAD SHX Text
PCC CURB
AutoCAD SHX Text
6" PCC SIDEWALK
AutoCAD SHX Text
#4 DOWEL BARS @ 24" O.C.
AutoCAD SHX Text
95% STANDARD PROCTOR COMPACTION
AutoCAD SHX Text
4" OF 1/4"-3/4" CRUSHED STONE CA-6
AutoCAD SHX Text
SEE PCC NOTES BELOW
AutoCAD SHX Text
10.12.2018
AutoCAD SHX Text
PCC PAVEMENT DETAIL
AutoCAD SHX Text
PCC CURB
AutoCAD SHX Text
95% STANDARD PROCTOR COMPACTION
AutoCAD SHX Text
6" CA-6 CRUSHED STONE
AutoCAD SHX Text
8" PCC CONCRETE
AutoCAD SHX Text
#6 TIE BARS @ 24" O.C.
AutoCAD SHX Text
1/2" EXPANSION JOINT
AutoCAD SHX Text
SEE PCC NOTES BELOW
AutoCAD SHX Text
%%UPCC NOTES
AutoCAD SHX Text
1. SET 3/4" EXPANSION JOINTS AT POINTS ABUTTING CURB OR PAVEMENT SET 3/4" EXPANSION JOINTS AT POINTS ABUTTING CURB OR PAVEMENT AND AT 60' MAX. INTERVALS. 2. CONTROL JOINTS SHALL BE 1/8" TO 1/4" WIDE AND 1/4 OF THE CONTROL JOINTS SHALL BE 1/8" TO 1/4" WIDE AND 1/4 OF THE SIDEWALK THICKNESS DEEP. THE EDGE OF THE CONTROL JOINTS SHALL BE GIVEN A 1/4" RADIUS. JOINTS TO BE LOCATED AT 5' MAX. INTERVALS. 3. THREE #4 DEFORMED STEEL BARS SHALL BE INSTALLED IN THE THREE #4 DEFORMED STEEL BARS SHALL BE INSTALLED IN THE SIDEWALK CENTERED OVER ALL TRENCH CROSSINGS. THEY SHALL EXTEND 10 FEET BEYOND THE EDGES OF THE TRENCH. 4. SIDEWALK ADJACENT TO NEW OR EXISTING CURB, OR EXISTING SIDEWALK ADJACENT TO NEW OR EXISTING CURB, OR EXISTING SIDEWALK SHALL BE DOWELED TO CURB OR EXISTING SIDEWALK WITH SMOOTH 12" EPOXY COATED #4 BARS AT 24" O.C. 5. SIDEWALK CONTRACTION AND EXPANSION JOINTS SHALL ALIGN WITH SIDEWALK CONTRACTION AND EXPANSION JOINTS SHALL ALIGN WITH WITH NEW CURB JOINTS RESPECTIVELY. 6. ADD 2 POUNDS POLYPROPELENE FIBER REINFORCEMENT PER CUBIC ADD 2 POUNDS POLYPROPELENE FIBER REINFORCEMENT PER CUBIC YARD OF CONCRETE. FIBERS PROVIDED BY W.R. GRACE OR APPROVED EQUAL. 7. SET EXPANSION JOINTS AT ALL PC'S, PT'S, FIVE FEET ON EITHER SIDE SET EXPANSION JOINTS AT ALL PC'S, PT'S, FIVE FEET ON EITHER SIDE OF ANY FRAMES, AND AT 45' MAX. INTERVALS. 8. SAW CUT CONTRACTION JOINTS FULL FACE AND TOP, AT LEAST 2 SAW CUT CONTRACTION JOINTS FULL FACE AND TOP, AT LEAST 2 INCHES IN DEPTH AND AT 15' MAXIMUM INTERVALS WITHIN 24 HOURS OF POURING. 9. TWO COATS CURING COMPOUND REQUIRED.TWO COATS CURING COMPOUND REQUIRED.
Page 7: below. · loading dock & players parking lot security upgrades. city of chicago, illinois 60616. note: construction means, methods and job site safety is the sole and exclusive responsibility

625 Forest Edge Drive Vernon Hills, IL. 60061TEL 847.478.9700 FAX 847.478.9701

AutoCAD SHX Text
specific project and site named herein, and cannot be
AutoCAD SHX Text
reproduced in any manner without the express written
AutoCAD SHX Text
permission from Gewalt-Hamilton Associates, Inc.
AutoCAD SHX Text
This drawing is the property of Gewalt-Hamilton Assoc., Inc.
AutoCAD SHX Text
and is not to be used for any purpose other than the
AutoCAD SHX Text
COPYRIGHT NOTICE
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
BY
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET NUMBER:
AutoCAD SHX Text
GHA PROJECT #
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
FILE:
AutoCAD SHX Text
G:\4700\4710.315 GRF 2020 CIVIL WORK UPDATE\4710.315-DT1-LOT D.DWG 8/19/2020 3:15 PM 8/19/2020 3:15 PM 8/19/2020 3:15 PM
AutoCAD SHX Text
ACTIVE WEDGE BARRIER DETAILS
AutoCAD SHX Text
LOADING DOCK & PLAYERS PARKING LOT SECURITY UPGRADES
AutoCAD SHX Text
GUARENTEED RATE FIELD
AutoCAD SHX Text
CITY OF CHICAGO, ILLINOIS 60616
AutoCAD SHX Text
JEH
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
TAR
AutoCAD SHX Text
08-24-20
AutoCAD SHX Text
4710.315
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
7
AutoCAD SHX Text
7
AutoCAD SHX Text
NOTE: REFER TO PERIMETER SECURITY PARTNERS GUARENTEED RATE FIELD, CHICAGO, IL AVB & PVB INSTALLATION PLANS FOR INSTALLATION LOCATIONS AND DETAILS. GIBRALTAR DETAILS IN THIS PLAN SET SHALL ONLY BE USED FOR REFERENCE TO DRAIN LINE LOCATIONS AND ELEVATIONS. REFER TO UTILITY PLAN ON SHEET 5. ACTIVE WEDGE BARRIER NOT PART OF THIS CONTRACT.
AutoCAD SHX Text
NOTE: REFER TO PERIMETER SECURITY PARTNERS GUARENTEED RATE FIELD, CHICAGO, IL AVB & PVB INSTALLATION PLANS FOR INSTALLATION LOCATIONS AND DETAILS. GIBRALTAR DETAILS IN THIS PLAN SET SHALL ONLY BE USED FOR REFERENCE TO DRAIN LINE LOCATIONS AND ELEVATIONS. REFER TO UTILITY PLAN ON SHEET 5. ACTIVE WEDGE BARRIER NOT PART OF THIS CONTRACT.