4
BELT CONVEYOR LENGTHS LOCATION GRADE TOP BOTTOM PLY 1 BC-1 500 M 24 3mm 1.5MM 3 20 17 33.5 2 BC-2 500 M 24 3mm 1.5MM 3 20 0 10 3 BC-3 500 M 24 3mm 1.5MM 3 25 15 38.5 4 BC-4 500 M 24 3mm 1.5MM 3 prepered 25 18 33.5 5 BC-5 500 M 24 3mm 1.5MM 3 25 18 35.5 6 BC-6 500 M 24 3mm 1.5MM 3 25 0 10 7 BC-7 500 M 24 3mm 1.5MM 3 40 0 16 8 BC-8 500 M 24 3mm 1.5MM 3 10 8 45 9 BC-9 Tr house to Day Bin 500 M 24 3mm 1.5MM 3 10 8 45 10 BC-10 500 M 24 3mm 1.5MM 3 30 13 45.6 11 BC-11 500 M 24 3mm 1.5MM 3 pellets 30 15 35 SL. No. EQT. No. BELT WIDTH mm MATERIAL HANDLED CAPACITY TPH INCLINATION DEG. HORIZENTAL DISTANCE(mtrs) From Ground Hopper to Surge Bin Iron Ore fines From Surge bin to dryer feed Iron Ore fines From Emergency GH to Storege bin Iron Ore fines From Storege Bins to Mixer From Mixer to Day Bin mixing materials Day Bin Top (reversible) mixing materials Disc dischrge conveyor to roller screen green pellet From Roller Screen to Tr house spillege materials from screen spillege materials from screen Disc dischrge to Tg Building green pellet Cooler Discharge to Tr house (200°C)

Upload: ram-gupta

Post on 21-Nov-2015

212 views

Category:

Documents


0 download

DESCRIPTION

SHRIRAM BELTINGS

TRANSCRIPT

CONVEYORSPALLET PLANTBELT CONVEYOR LENGTHSSL.No.EQT. No.LOCATIONBELT WIDTH mmGRADETOPBOTTOMPLYMATERIAL HANDLEDCAPACITY TPHINCLINATION DEG.HORIZENTAL DISTANCE(mtrs)LENGTH BETWEEN PULLEY CENTRAL (mtrs)HIGHT AT TAIL END(mtrs)HIGHT AT HEAD END(mtrs)1BC-1From Ground Hopper to Surge Bin500M 243mm1.5MM3Iron Ore fines201733.538.5192BC-2From Surge bin to dryer feed500M 243mm1.5MM3Iron Ore fines2001010003BC-3From Emergency GH to Storege bin500M 243mm1.5MM3Iron Ore fines251538.548.71104BC-4From Storege Bins to Mixer500M 243mm1.5MM3prepered251833.53619.45BC-5From Mixer to Day Bin500M 243mm1.5MM3mixing materials251835.537.8110.46BC-6Day Bin Top (reversible)500M 243mm1.5MM3mixing materials2501010117BC-7Disc dischrge conveyor to roller screen500M 243mm1.5MM3green pellet40016161.51.58BC-8From Roller Screen to Tr house500M 243mm1.5MM3spillege materials from screen10845514.559BC-9Tr house to Day Bin500M 243mm1.5MM3spillege materials from screen10845514.59.410BC-10Disc dischrge to Tg Building500M 243mm1.5MM3green pellet301345.651.6110.611BC-11Cooler Discharge to Tr house (200C)500M 243mm1.5MM3pellets301535514.5612BC-12Tr house to Storege500M 243mm1.5MM3pellets301345.651.6110