BEMCO Commitment to QualityBEMCO was formed in 1965 as a Mechanical

El i l C i C Th fBEMCO Commitment to Quality

Quality is an obsession in BEMCO’S culture.Strict Quality Control Procedures related toManagement, Engineering, Procurement,Selection of Vendors/Subcontractors and atthe construction site are designed to ensure

& Electrical Contracting Company. Thereafter,BEMCO expanded its experience to become aworld-class Contractor in Industrial and PowerProjects. Under this expansion, BEMCO hasundertaken the largest and most challengingturnkey projects in Saudi Arabia and the Regionusing various state of the art technologies.the construction site are designed to ensure

the highest grade of excellence. Suchmeticulous procedures for quality produceclient satisfaction, repeated business, andavoidance of risk.

BEMCO scrutinizes down to the minor details

Today BEMCO is a leading EPC TurnkeyContractor, comprising full-scale and integratedcapabilities in Engineering, Procurement,Construction, Fabrication, and Start-up &Commissioning.

BEMCO’ s Entrepreneurial Leadership restructuredBEMCO scrutinizes down to the minor details

its work to enhance not only the performance

of the complete system it installs, but also to

ensure that its finished work is aesthetically

pleasant.

BEMCO is a pioneer in obtaining and

p pthe company into three highly organized BusinessUnits (Power, Industrial, Electromechanical andLarge Civil Projects) enabling efficientmanagement, providing sufficient flexibility toexpand regionally by focusing on clientsatisfaction, quality and timely completion ofprojectsBEMCO is a pioneer in obtaining and

implementing the ISO 9001 Certification for

Engineering. Design, Management,

Procurement and Construction since 1994.

The continuous implementation of such

quality work contributes to BEMCO’s

projects.

BEMCO is also diversifying its operation in projectdevelopment and project financing under IPP &IWPP scheme to benefit from the Governmentsprivatization initiatives.

BEMCO is expanding regionally in the Middle East,G lf and No th Af ica to become the leade inquality work contributes to BEMCO s

reputation and credentials with all its clients

and partners.

Gulf and North Africa to become the leader inPower and Water projects as Developer andContractor, working in conjunction withrenowned international Engineering, Constructionand Manufacturing Firms.

BEMCO continues to enhance its capabilities tomeet the challenges of the 21st century.meet the challenges of the 21 century.

Henry M. Sarkissian

CEO

Page 3: Bemco Brochure

Arabian BEMCO has

three distinct business

units operating as

profit centers. A

d di t d E ti

1- Power Projects Page 6-11

Power Generation

Transmission & Distribution

dedicated Executive

Director is responsible

for running the day to

day activities of each of

the units and managing

2- Industrial Projects Page 12-17

Oil & Gas

Refrigerationits engineering,

procurement and

construction activities.

These business units

coordinate and

Refrigeration

Water

3- Civil & Electromechanical Projects Page 18-21

cooperate with each

other in the execution

of projects providing

scope of their

specialties giving

Commercial Projects

Industrial Projects

specialties, giving

Arabian BEMCO a

wealth of professional

and specialized

resources to integrate

large projects and

ensure their success.

Page 4: Bemco Brochure

Power Generation ProjectsPower Generation ProjectsPP9 Combined Cycle 4,500 MW Power Plant - Riyadh

jj

BEMCO’s experience and know-how in the power sector isunrivaled for its efficient and timely delivery of Projects.

BEMCO has participated in the implementation ofnumerous large and prestigious Power Projects ranging

> 16,000 MWCombined Cycle Power Plantsnumerous, large and prestigious Power Projects, ranging

from Simple Cycle to Combined Cycle Technology. BEMCOhas undertaken on an EPC basis more than 16,000 MW ofPower Generation Projects in the Kingdom of Saudi Arabiaand in the Gulf Region.

The Riyadh (KSA) Power Plant No.9 Combined Cycle (PP9)j t i t i l l f B i th

Combined Cycle Power Plants

Simple Cycle CombustionTurbine Power Plants

project is a typical example of Bemco prowess in thePower Generation sector; the project with a generationcapacity of 4,500MW, was built on an area of 3.2 squarekilometers.

Conventional Steam Power Plants

Page 5: Bemco Brochure

An Achievement to the RecordAn Achievement to the Record480 MW PP9 Extension – Fast Track

480 MW Power plant120 MW Delivered in 5-1/2 monthsTotal Capacity delivered in 7-1/2 months

Letter of Appreciation

Attn. Arabian Bemco Contracting Co.

I received your letter dated 2/6/1425H

Reference to the completion of thesecond extension of phase I of theRi dh Po e Pl nt No 9 R h

In early 2004, Saudi Electricity Company (SEC) awardedArabian Bemco Contracting Company a super rush project for480MW extension to Power Plant No.9 in Riyadh with anunimaginable and unprecedented schedule of 7-1/2 months.The contract was signed on 1st February 2004 with first powerdelivered (120MW) by July 15th to meet the high power

Riyadh Power Plant No. 9 – RushProject as well as its handing over inrecord time.

I thank you and all those whocontributed to this accomplishment andI appreciate your efforts which resultedin such distinguished achievement.( ) y y g p

demand during the summer season. All other power deliverymilestones were met culminating with the delivery of fullpower (480 MW) by mid September 2004.

Minister of Power & WaterAbdullah Bin Abdullrahman Al-Hussain

Page 6: Bemco Brochure

Transmission & DistributionTransmission & Distribution380 kV Gas Insulated Bus Duct (GIB)380 kV GIS

Transmission & DistributionTransmission & DistributionBemco has executed over 30 High voltage substations on EPC

Basis up to 400 KV with 10,000 MVA Transformer capacity using

Gas insulated switchgear (GIS) and Air insulated switchgear

(AIS) technologies. The scope of such projects has covered

>10,000MVAGIS & AIS High Voltage

turnkey Engineering, Procurement, Erection, Testing and

Commissioning including civil works.

Among its many projects, Bemco has executed the 400 KV

Substation in Aqaba, Jordan, which forms the first part of the

Substations

High Tension Transmission station link interconnecting Egypt, Jordan, Syria, Iraq and

Turkey. In addition, Bemco successfully completed two 380 KV

substations in Hail & Taif, Saudi Arabia.

High Tension Transmission

Lines

Page 7: Bemco Brochure

Oil & GasOil & Gas2,000,000 BPD Crude Oil Metering Station Riyadh

Oil & GasOil & GasBEMCO executed on EPC basis a large number of Oil & Gas

projects related to pumping, transferring, metering and

storage of hydrocarbon products totaling

BEMCO is a General Contractor for

construction works in Hydrocarbon

Process Plants undertaking

responsibility for civil, electrical,

mechanical, erection, instrumentation,

controls, piping, insulation and

Oil & Gas

• Bulk Oil Storage Facilities

• Refinery & Petrochemicalstorage of hydrocarbon products totaling

>100 Million Gallons

Of Hydrocarbon

painting.

Among the Oil & Gas projects

executed for ARAMCO is the 519,000

Barrels Medinah bulk storage facility,

the PP9 2,000,000 BPDD crude oil

i li th t ti i t th t t

• Pipelines

• Compressor Stations

• Off site Works> Storage Facilitiespipeline that ties into the east-west

Saudi ARAMCO 48 inch pipeline and a

Flare Tank Project for Luberef.

• Utilities

Page 8: Bemco Brochure

RefrigerationRefrigerationCooling Water Pumps

RefrigerationRefrigerationBEMCO executed on EPC basis a large number of central refrigeration and district

cooling plants using technologies from centrifugal reciprocating and screw

compression technologies to absorption technologies for applications in HVAC,

district cooling and Gas Turbines Inlet air Cooling (TIAC) facilities for Power

Plants.Plants.

Among the refrigeration technology projects executed by Bemco is Makkah and

Madinah Haram (Over 35,000 TR), the Qatar District Cooling Plant #1 &2 (Over

65,000 TR) and Gas Turbines Inlet air Cooling (TIAC) Plants in Jouba Hail Power

Plants (Over 10,000 TR) and PP9 (over 50,000 TR)

>400 000 Tones of Central Refrigeration>400,000 Tones of

Refrigeration• Large Chiller Plants

• District Cooling

• Turbine Inlet Air Cooling Central Reciprocating Chiller Plant

Page 9: Bemco Brochure

WaterWaterBoweib Water Treatment Plant 60,000 m3/daySewage Water Treatment – KKIA Riyadh 10,000 m3/day

WaterWaterBEMCO executed on EPC basis numerous water treatment plants using

Reverse Osmosis technologies for seawater and brackish water desalination

as well as industrial and domestic waste water treatment plants. In addition,

BEMCO has undertaken large water pumping and transfer stationsBEMCO has undertaken large water pumping and transfer stations.

Among BEMCO’s list of projects are ARAMCO’s Waste Water & Spent Caustic

Systems & Juaymah Gas Plant (6,000 m3/day), New Doha Int’l Airport

Domestic Waste Water Treatment Plant (17,000 m3/day), Boweib Water

Treatment Plant (60,000 m3/day), Salboukh Water Treatment Plant (60,000

• Water & Sewage Treatment

• Industrial / Domestic Water Treatment

• Desalination – Sea Water / Brackish (R.O)

P i St tim3/day), Royal Commission sea water intake pumping stations (180,000

m3/day), King Khaled International Airport Waste Water Sewage Treatment

Plant (9,600 m3day)

• Pumping Stations

• Pipelines

Page 10: Bemco Brochure

ElectromechanicalElectromechanical

Refrigeration CompressorsCooling Water Pumps

ElectromechanicalElectromechanicalBEMCO has more than 30 years of experience in the Design, Supply, Installation, Testing

and Commissioning of Mechanical, Electrical, and low current systems. BEMCO has

undertaken a large number of complex projects on “design and build” basis and

executed on a rush schedule to the full satisfaction of the Clients.

Among these projects executed are Makkah and Madinah Holly Haram the Four SeasonsAmong these projects executed are Makkah and Madinah Holly Haram, the Four Seasons

Hotel in Amman-Jordan, the Conference Center Palace in Riyadh and 300 villas in Hafr

Al-Baten.

Building Services Works• Large Commercial & Residential Complexes

• Royal Palaces, Luxury Hotels and High Rise Buildings

• Holly Haram of Makkah and Madinah• Holly Haram of Makkah and Madinah

Industrial Electromechanical Works• Power Plants

• Industrial Plants

Medium Voltage Switchgear

Page 11: Bemco Brochure

Civil Projects Civil Projects Community Housing Projects

BEMCO’s Civil Business Unit executes Civil Works for BEMCO’s turnkey

projects in the Power & Industrial Sector related to large Power

Plants, Oil & Gas Facilities, Refrigeration and Water Projects.

BEMCO also Executes the construction of large complexes as a general

contractor for projects such as Housing and Commercial Buildings incontractor for projects such as Housing and Commercial Buildings in

PP9 and Shoaiba Power Plants.

Commercial / Residential • High rise Buildings

Industrial

• Power Plants

• Industrial Buildings • Industrial Plants

Page 12: Bemco Brochure

Typical BOT Project Development Structure

Project Developer

ConcessionaireConcessionaire

Equity-25-30%

Pension FundsPrivate Investors

Debt-70-75%

Financial Institutions

Multilateral,

Financial & Technical

Advisors

pBEMCO

PROJECTPrivate InvestorsOff-taker

(Fuel or Feedstock Agreement)

O&MContract

,

Bilateral AgenciesPROJECT COMPANY

Project Structured Financing Project Structured Financing

Off-taker Agreement

EPC Contract

Partial List of Project Development Studies and Proposals• 1,200 MW Shoaiba CC Power Plant – 1991 Study and

presentation conducted by GE, BECHTEL and BEMCO for SCECO –West

and Projects Developmentand Projects DevelopmentBEMCO has offered and implemented in some of its projects long-

term Project Structured Financing as well as deferred payment

options with tenures between 5-10 years. As the power sector

West.

• 1,750 MW Shoaiba Steam Power Plant – 1997, Official tender forBOO concept for SCECO – West, Joint Venture BEMCO-ENRON.

• 1,050 MW Shoaiba Steam Power Plant – 1998, Official Tender forStructured Project Financing for SCECO – West, Joint VentureBEMCO-ENRON.

• 25,000m3/day STP -2000/2001, Official tender for BOT Conceptevolves, BEMCO continues to pioneer this concept at the forefront

of the movement.

BEMCO has initiated several concepts for the implementation of

Independent Power Projects (IPP) in the Kingdom of Saudi Arabia.

for Jeddah Industrial City (JIC), Upgrading and Expansion ofexisting STP.

• 150MW CC Power Plant – 2001, Tender for BOO Concept forHadeed Iron and Steel Company.

• 480MW PP-9 Power Plant -2004, Implementation of DeferredPayment Project Financing.

• 350MW Marib 2 Power Plant 2005 Proposal for Long termIn this process, BEMCO has worked with International Developers

in the Integration of the project development.

• 350MW Marib-2 Power Plant 2005, Proposal for Long-termfinancing for the Ministry of Electricity in Yemen.

36,000 m3/day Desalination Plant – 2006, Official tender for BOTconcept for the General Authority of Civil Aviation (GACA) – JointVenture BEMCO - GE

Page 13: Bemco Brochure

BEMCO has evolved to

become a world class

Power Industrial and

BEMCO utilizes a modern and systematic approachin the implementation of projects from its pre-award phase of development, conceptual design,pricing, proposal preparation, bid submittal andnegotiation; through the engineering,procurement and construction phase BEMCO’s

• Large resources with over 4000 direct employees,extensive fleet of construction equipment, vehiclesand facilities, quick and swift mobilization.

• Over 400 Engineers in all disciplines includingCivil, Electrical, mechanical, Instrumentation andControlPower, Industrial and

Civil Contractor with

capabilities to Develop,

Engineer, Procure,

Construct, Test, Start-

up and Commission

procurement and construction phase. BEMCO svast resources of Manpower, Plant & Equipment,and Fabrication facilities in construction, coupledwith its single point responsibility ProjectManagement approach ensures customersatisfaction and success in the execution of itsprojects.

Control.

• Highly qualified Engineering and Design groupcomprising over 150 Engineers, Designers and CADOperators.

• Highly qualified technicians for specialized work;such as welding, high voltage cabling, others.

• Global procurement capabilitiesup and Commission

Projects on a turnkey

basis.

BEMCO’s vast

resources permit the

p j

BEMCO’s IT infrastructure is a key ingredient tomanage and track the progress of our projects.BEMCO has a centralized database withinformation being shared between its head office,branches and sites. We take pride in using state

• Global procurement capabilities

• Large fabrication workshop with state of the artEquipments.

• Competitive pricing with international biddingstandards

• Testing & Commissioning Services and O&Mresources permit the

implementation of

large and complex

projects in record time.

of the art ERP software such as J.D. Edwards andPrimavera. Project

ManagementPlanning and Scheduling

Quality ControlCost Control

ReportingProcurement

Sourcing P h i

Start-up & Commissioning

Operation & MaintenancePower plants &

Purchasing& Logistics

EngineeringFabrication

pSubstation, Protection& Control, Firefighting

systems, HVAC

Project Evolution

Basic & DetailedEngineering

Erection

Mechanical Erection, Electrical &

Instrumentation

FabricationSteel Structure

Pipe pre-fabricationSkids Ducting

Award

Evolution

Instrumentation Works

Page 14: Bemco Brochure

Project Management Project Management BEMCO’s Project Management objective is to identify, monitor and correct any deviations from the original

Management PhilosophyManagement PhilosophyBEMCO s Project Management objective is to identify, monitor and correct any deviations from the originalproject scope of work quality, cost and schedule. To achieve the above objective, the following functionsare monitored during project execution:

Planning and Scheduling:Planning is performed to address as a minimum the following: Scope of work, assumptions and risks,execution strategy, specific contract requirements, engineering design, procurement, tasks and work breakdown, resources, construction requirements, inspection and test requirements, tooling and equipmentssupplies.

Quality & Safety Control:

Each business line is led by a senior vice-president who is

responsible for the projects in a vertical structure and Quality & Safety Control:Designed to ensure that all quality and safety requirements are implemented through all the stages of aproject.

Cash Flow Control:Designed to know the status of Billing and Collection during any stage of a project execution.

Budget/Cost Control:Designed to check expenses on a project as they are incurred. It is intended to keep track of each costelement or cost center to identify reasons for cost variance against budget of the item throughout the

responsible for business development, proposals

preparation, project execution and hand over.

element or cost center, to identify reasons for cost variance against budget of the item throughout thevarious stages of project.

Contract Administration:Designed to secure legal and contractual rights for the company in an efficient and timely manner. Thisfunction is to be carried out jointly by the Project Manager and Contract Administration Section .

Page 15: Bemco Brochure

EngineeringEngineering ProcurementProcurementGas Turbine Elevation Design 500 MVA Transformer, weight 400 tons including trailer, transported to site via special trailer equipped with 320 wheels

EngineeringEngineeringEngineering and Procurement Groups work closely with each other to ensure early sourcing of major and long-lead equipment and to ensure compliance with the technical requirements and customer specifications.

Q lit E i i i T k EPC I d t i l d P j t i

Procurement for all projects is carried out in compliance with strictcompany policies and ISO certified procedures.

The Procurement Business Process is stream-lined into the followingbasic phases, to ensure quality and timely delivery of materials to site.

Vendor selectionQuality Engineering in Turnkey EPC Industrial and Power projects is

the essence of success. BEMCO’s Professional group of engineers,

designers and draftsmen provide conceptual designs from the

proposal stage of a project all the way to detailed construction

drawings and as-built drawings at the construction stage. The group

utilizes computer aided design (CAD) systems for all its two and

Ensuring specification compliance

Expediting material production and delivery

Achieving quality requirement, by arranging the quality tests

Tracking shipments and site delivery

To achieve a successful procurement performance, BEMCO utilizes J.D. three dimensional designs, as well as state of the art engineering

software for piping, electrical and structural designs and

calculations. The Group is supported by its offices in Lebanon,

Egypt, India, and USA.

Edwards and ERP system, to map and to allow recording of procurement data at all phases of the Business Process yielding detailed reports on each phase and for greater procurement control.

Page 16: Bemco Brochure

FabricationFabrication BEMCO owns a large, Partial list of Fabrication:

CNC Plasma and Gas Cutting Machine CNC Beam Drilling and Saw Cutting Machine

FabricationFabricationToday’s demanding construction

market requires from qualified

and successful contractors

modern and automated

fabrication workshop to

deliver and erect high

quality products on an

expedited and continuous

basis. This workshop facility

Partial list of Fabrication:

Pressure tanks and vessels

Pipe and electrical steel supports

Pipe fabrication and welding 2”

diameter and aboveand successful contractors

extensive in house fabrication of

various mechanical, structural

and electrical components for its

consists of 80,000 sq.m. of

fabrication floor space with

resources, equipment and

over 2,200 highly qualified

technicians, engineers and

management personnel. It

Platforms, Ladders and Stairs

Pumps and compressor skids

complete with piping, tubing and

electricaland electrical components for its

turnkey projects.

management personnel. It

has basic and detailed

engineering capabilities and

is ASME certified for

pressure vessels.

Steel Structures

Pipe Spool

Page 17: Bemco Brochure

BEMCO has its own Start-up & Commissioning, Operation & Maintenance

service group (BEMCO Services Co.) This Group is a formidable team of Highest Quality Erection & Construction

Steam Turbine – Shoaiba Stage 2, Phase I

professional engineers and technicians specialized in Maintaining,

Operating, Testing and Commissioning of Electrical and Mechanical systems

for Industrial, Power and Commercial Projects. To support this well trained

team, BMECO has assembled a large inventory of precision instruments and

tools for the testing, commissioning and start-up of the projects.

constitutes an essential part of a successful turnkey project.

BEMCO’s competences are demonstrated by

the successful completion of major

industrial, power, electromechanical & civil

projects.

Partial list of System Testing Capabilities: Partial list of System Testing Capabilities:

• Hi-pot Testing of Cables • MV Circuit Breakers

• LV, MV and HV Switchgears • Chilled Water Plants

• Protection and Intertip Relays • AHU’s and FCU’s

projects.

The significant resources and years of

experience in Engineering, Procurement,

Construction, Mechanical Erection, Electrical

and Instrumentation activities, along with a

fully owned large modern and highly

• Pilots Differential Protection • CCMS

• Distance Relays • Variable Frequencies Drivers

• Power Transformers • PLC & DDC Controlled Systems

efficient fabrication workshop and

construction equipment enables BEMCO to

erect and construct the highest quality

projects.

Page 18: Bemco Brochure

ARABIAN BEMCOPROJECT & CONSTRUCTION

MANAGEMENT

BEMCO INTERNATIONALPROJECT & CONSTRUCTION

MANAGEMENT (Lebanon)

Partial list of international companies with whom BEMCO has worked in the past and present:MANAGEMENT MANAGEMENT (Lebanon)

Projects

BEMCO STEEL TRUBA ARABIA CO. TECHMASTER INC.

past and present:Siemens – GermanyGeneral Electric – USAABB – SwitzerlandAlstom – FranceAREVA - FranceMitsui – JapanBEMCO STEEL

FABRICATIONSTRUBA ARABIA CO.

ERECTION TEAMTECHMASTER INC.

ILLINOIS, USA

BEMCO SERVICESSTART-UP & COMMI.

OPERATION & MAINTENANCE

TECHMASTER ENG’G EGYPT & INDIA

GEDAC ELECTRICMANUFACTURING OF POWER,

LIGHT. & ELEC. SYSTEMS

Marubeni - JapanMitsubishi Heavy Industries– JapanDoosan Heavy Industries – KoreaHitachi – JapanToshiba – JapanNuovo Pignone – ItalyYIT – FinlandS ll

REGIONAL OFFICES

Bemco has formed strategic affiliated companies working as Profit Centers providing highly competitive and quality services.

BEMCO International (Offshore) in Lebanon takes responsibility onassigned projects, proposals, engineering, procurement and projectmanagement

Spie-Batignolles – FranceBechtel – USALurgi – GermanyPB Power - UKBelleli – ItalyFoster Wheeler - ItalyShaw Group Inc. – USACBI USAmanagement.

TRUBA ARABIA is specialized in heavy Mechanical Erection works forUtility Boilers, large Steam & Gas Turbines, Petrochemical, Cementand Refinery Complexes.

GEDAC has been at the forefront in the Middle East since 1978manufacturing and assembling electrical switchgears and control

CBI – USAMot MacDonald - UKBlack & Veatch – USATermoMeccanica – ItalyKorea Power Engineering Company (KOPEC) – KoreaHyundai Heavy Industries– KoreaIshikawajima-Harima Heavy Industries Co. (IHI) – JapanHitachi Zosen Japanpanels in the medium and low voltage range.

BEMCO Steel Industries (BSI) is specialized in manufacturing ofstructural and sheet steel, pre-fab pipes, skids ducts, vessels andtanks.

BEMCO Services is specialized in Operation, Maintenance, Testing &Commissioning systems for Power, Industrial and Building Services.

Hitachi Zosen – JapanInternational Power – UKWATERLEAU – BelgiumAPINA – SpainCADAGUA – SpainIBERINCO – SpainWeir – UKEnpropie – FranceCommissioning systems for Power, Industrial and Building Services.

Impregilo Arabia is specialized in Engineering and Construction ofinfrastructure, high rise buildings, and marine works.

Enpropie FranceEFACEC – PortugalDURO Felgueraca - Spain

Page 19: Bemco Brochure

Partial List of Power ProjectsPOWER GENERATION PROJECTSRiyadh Power Plant No. 10 – PP10 3,000MWConstruction of Qurayyah Open Cycle Power Plant 2,565MWPP9 A&B, Grass Root Combined Cycle Power Plant 1,800MWPP9, Blocks C&D 1,700MWPP9, Block F 1,000MWPP9, Grass Root Block E 680MWAl F j i h IWPP C bi d C l U A E 255MW

REFRIGERATION PROJECTSWest Bay District Cooling Plant II 30,000 Tons - QatarNew Doha International Airport (NDIA) Chiller Plant 12,000 tons - QatarTurbine Inlet Air Cooling System for Block C at PP9 (for 10 GTG Units)Turbine Inlet Air Cooling System for Block D at PP9 (for 10 GTG Units)Turbine Inlet Air Cooling System for Block E at PP9 (for 8 GTG Units)Turbine Inlet Air Cooling System for Block F at PP9 (for 12 GTG Units)Al Fujairah IWPP – Combined Cycle, U.A.E 255MW

Aweer Power Plant, Dubai, U.A.E. 490MWMaarib power Plant, Yemen 490MWSadaf Al-Jubail Co-Generation 250MWTabouk Power Plant 170MWPP7 Extension Power Plant 500MWAsir Extension Power Plant 225MWJizan extension Power Plant 225MWNajran Power Plant 350MWTihama Power Plant 170MW

Turbine Inlet Air Cooling System for Block F at PP9 (for 12 GTG Units)Juba Turbine Inlet Air-cooling Project (for 9 GTG Units)Hail Turbine Inlet Air-cooling Project (for 5 GTG Units)KAAU Chiller, Two Chiller Units with two Ice Storage TanksWest Bay District Cooling – Qatar, Refrigeration Capacity of 30,000 tonsKing Abdul Aziz University Piping, Installation of main chilled water pipes which links two chillers With other University facilitiesKing Khalid National Guard Hospital A/C Plant, 4 Centrifugal Chillers

Tihama Power Plant 170MWDuba Power Plant 80MWMadina Extension Power Plant 170MWHail Power Plant Extension 85MWNew Doha International Airport (NDIA) - Qatar 40MW

TRANSMISSION & DISTRIBUTION PROJETSAqaba Substation – Jordan 400/132 KV GIS 480MVATaif Substation 380/110 KV GIS 1,000 MVAHail Substation 380/132 KV AIS/GIS 800MVA

King Fahd International Airport (I&II) Capacity of 15,000 tonsKing Abdul Aziz International Airport Jeddah, Replacement of evaporator and condenser VesselsTwo chiller plants, and two ice TanksAjyad Central Chiller Plant,Capacity 60,000 tons centralARAMCO’s Rastanura Refinery Upgrade, Laboratory & Refinery Operations BuildingAmino Plant, Capacity 3,000 tons/yearProphet Mosque Extension Chiller Plant, Capacity 21,000 tons

WATER PROJECTSHail Substation 380/132 KV AIS/GIS 800MVAAbha North Substation 132/33/13.8 KV AIS 386MVASakaka & Al Jouf Reinforcement 132/13.8 KV GIS 240 MVAIdwa & Kilabiyah Substations 115 KV AIS 80MVATufaih Substation 115 KV AIS 80MVASaudia City Substation 110 KV GIS 120 MVAHaram III Substation 110 KV GIS 120 MVAAl Aous Substation 110 KV GIS 120 MVANuzha Substation 115KV 13.8 KV GIS 120 MVASafa Substation 110 KV GIS 120 MVA

ARAMCO’s Waste Water & Spent Caustic Systems at Juaymah Gas Plant 6,000 m3/dayKing Khalid International Airport Wastewater Treatment Capacity 10,000 m3/dayBoweib Water Treatment Plants Capacity 60,000 m3/daySalboukh Water Treatment Plants Capacity 60,000 m3/daySeawater Pump House Upgrade Phase I, Capacity 60,000 m3/hrSeawater Pump House Upgrade Phase II, Capacity 60,000 m3/hrQatar (NDIA) Waste Water Treatment Plant 17,000 m3/day

Partial List of Civil ProjectsSawamlah & Al Leith Substations 110/33/13.8 KV AIS 160 MVAKhayber Substation 110/33/13.8 KV AIS 160 MVAPP9 Gas Insulated Bus Duct 30 Km, 380 KVMakkah Haram II Substation 110 KV GIS 160MVAMadinah Haram II Substation 110 KV GIS 120MVAJeddah Ind. City II Substation 110 KV GIS 120MVANuzlah Yamaniyah Substation 110 KV GIS 120MVAJeddah Rawdah Substation 110 KV GIS 120MVAJeddah Nahda Substation 110 KV GIS 120MVA

Partial List of Civil ProjectsMaarib Power Plant Housing Complex - YemenShoaiba Power Plant Housing Complex – JeddahPower Plant 9 & Family Housing Complex – RiyadhSchool Complex for Royal Commission - YanbuLab Bldg. – ARAMCO, Ras TanuraNew Doha International Airport (NDIA) – Qatar

Partial List of Electromechanical ProjectsNagah, Marwah, Bayah Substation 110 KV GIS 120KVADubah & Joubah Substation 110/13.8 KV 120MVABayouniah & Al Khobar Al Sahiliah Substations 69/13.8 KV GIS 160MVAFive (5) Substations at New Doha InternationalAirport (NDIA) – Qatar 66/11kV GIS 560 MVA

Partial List of Industrial ProjectsOIL & GAS PROJECTSARAMCO’s Utility Upgrade at Juaymah Gas Plant ARAMCO’ N th W t B lk Pl t (T if Al J f T b k d D b )

New Doha International Airport (NDIA) Utility Systems - Qatar

Al Habtour Grand Hotel – Beirut

Makkah Intercontinental Hotel

Madinah Hotels Plot 131, 136, 141

Four Seasons Hotel – Jordan

Residential and Commercial Center - Makkah

Ras Tanura Laboratory – Saudi ARAMCOARAMCO’s North West Bulk Plants (Traif, Al Jouf, Tabouk and Duba)ARAMCO’s South West Bulk Plants (Najran, Abha and Jizan)ARAMCO’s Madinah Bulk Plant Project 510,000 Barrels of product storageARAMCO’s Two Grade Gasoline Hydrocarbon Storage FacilitiesLuberef Flare & Tank Project

y

300 Villas – Hafr Al Batin

Beirut Government Hospital (500 Bed) – Beirut

Conference Center Palace – Riyadh

King Fahad International Airport - Air Cargo Terminal - Dammam